Plans, Project #24-01-32-01.pdf
PDF 2 MB Posted
- Attached to
- Garbage Service for Lake Manawa State Park
- Solicitation number
- 25CRDPFPETHACK-0004.
- Issued by
- Dickinson County, Iowa
About this file
This is an engineering plans document from the Iowa Department of Natural Resources for a water control structure replacement project located in Emmet County, Iowa. The project, identified as #24-01-32-01, involves the replacement of an existing corrugated metal pipe (CMP) structure at the Four Mile Watershed Protection Area (WPA) with a new 4'x4' precast Portland cement concrete (PCC) vertical box. The scope of work includes removing the existing CMP structure completely and installing 10 linear feet of new 9-inch dual wall tile on each side of the new structure, with an existing 15-inch tile connection point noted. The project documents include a cover sheet, location map, typical cross sections and details, site plan, and quantities and general information sheets. The site plan identifies an existing 15-inch tile connection, designated staging area for construction equipment, and site access points for contractor mobilization.
The engineering services are provided by Engineering Services, located at 6200 Park Avenue, Suite 200, Des Moines, Iowa 50312, serving as the consultant on the project. The document provides detailed technical specifications and construction sequencing through multiple plan sheets, enabling contractors to understand the complete scope of the water control structure replacement. The project appears to be in the planning and bidding phase, with the engineering plans prepared and ready for contractor estimation and proposal development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1290672-event.pdf | ||
| Federal Forms.pdf | ||
| 1291610-event.pdf | ||
| Contract, Project #24-01-32-01.pdf | ||
| RFQ 25CRDPFPETHACK-0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER:
DATE:
NO. DATE
BY REVISION
DRAWN BY:
CHK'D BY:
SHEET No:
IO
W
A D
EP
A
RT
M
EN
T O
F N
A
TU
RA
L
RE
SO
UR
C
ES
24-01-32-01
W
AT
ER
C
O
NT
O L S
TR
UC
TU
RE
R
EP
LA
C
EM
EN
T F O
R:
EM
M
ET
C
O
UN
TY
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
P
AR
K
AV
E, ST
E
0, DE
S M O
IN
ES
, IA
C O
NS
UL
TA
NT
FO
UR
M
IL
E
LA
KE
W
PA
PR
O
JE
C
T L O
C A
TIO
N
M A
P
PROJECT LOCATION
A.02
PROJECT NUMBER:
DATE:
NO.
DATE
BY REVISION
DRAWN BY:
CHK'D BY:
SHEET No:
IO
W
A D
EP
A
RT
M
EN
T
O F
N A
TU
RA
L
RE
SO
UR
C
ES
24-01-32-01
W
AT
ER
C
O
NT
O L S
TR
UC
TU
RE
R
EP
LA
C
EM
EN
T F O
R:
EM
M
ET
C
O
UN
TY
EN
G
IN
EE
RI
NG
SE
RV
IC
ES
P
AR
K
AV
E, ST
E
0, DE
S M O
IN
ES
, IA
C O
NS
UL
TA
NT
FO
UR
M
IL
E
LA
KE
W
PA
D.01
SI
TE
P
LA
N
FOUR MILE WPA
INSTALL 10 LF OF NEW ?" DUAL WALL TILE
ON EACH SIDE OF THE NEW STRUCTURE
REMOVE EXISTING CMP STRUCTURE (COMPLETE)
INSTALL 4'X4' PRECAST PCC VERTICAL BOX (SEE SHEET B.01)
EXISTING 15" TILE
SITE ACCESS
STAGING AREA
| 4 Mile WPA - WCS Replacement A.01 Cover Sheet (1) |
| 4 Mile WPA - WCS Replacement-A.02 LOCATION MAP (2) |
| A.02 LOCATION MAP (2) |
| 4 Mile WPA - WCS Replacement B.01 TYPICAL CROSS SECTIONS AND DETAILS (1) |
| 4 Mile WPA - WCS Replacement C.01 Quantities and General Information (1) |
| 4 Mile WPA - WCS Replacement-D.01 Site Plan |
| D.01 Site Plan |
File details come from the government source that posted it. Updated .