plans_id-ef1728101.pdf
PDF 22 MB Posted
- Solicitation number
- 69056720B000023
About this file
This document provides details for a federal contract opportunity for repairs on Idaho's Nez Perce-Clearwater Forest. The solicitation number is 69056720B000023 and seeks contractors to perform ID FS ERFO 2017(2)-81(1), Nez Perce-Clearwater Repairs 2017. The Department of Transportation Federal Highway Administration is the agency issuing this opportunity to provide contract documents for repairs on the Nez Perce-Clearwater National Forest in Idaho. Contractors should respond by the specified date to be considered for this award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary_Nez Perce.pdf | ||
| Amendment A001.pdf | ||
| IFB Nez Perce-Clearwater Repairs.pdf | ||
| Physical Data Hyperlink.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2020.06.15 07:26:41 -07'00'
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
FS ERFO 2017(2)-81(1)
A.2
:2
A
M
J u n e id e f a b
.d g n c p w w o r k
\d
\i d e f a b
.d g
INDEX TO SHEETS
BH
CP GPS
JH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
N
Fiber Roll or Wattle
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014 W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
:0
M a rc h
U
S C m y fi le s \p w p ro d u c ti o n \d
\D e t.
W
-1 .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3
FS ERFO 2018(1)-81(1)
FS ERFO 2017(2)-81(1)
ID
ID
DI
T
North Fork
Clearwater
River
5 PIONEER AREA
MALLARD LARKINS
FOREST
NATIONAL
CLEARWATER
FOREST
NATIONAL
CLEARWATER
Industrial Camp
Moscow Bar
0 11
SCALE IN MILES
FOREST
NATIONAL
CLEARWATER
FOREST
NATIONAL
CLEARWATER
MP 55.5
FSR 250
MP 59
FSR 250
MP 19.45
FSR 255
N o rt h
Fo rk
C le a rw a te r
River
MP 8.0
FSR 700
MP 1.8-1.9
FSR 710
Deadwood
R idge
M o o s e o u n ta in s
0 11
SCALE IN MILES
MP 14.6
FSR 246
MP 2.15
FSR 660
MP 2.4
FSR 660
N o r th
F o rk
C le a rw a te r
Riv er
FOREST
NATIONAL
CLEARWATER
FOREST
NATIONAL
CLEARWATER
0 1
SCALE IN MILES
Middle Fork
C learw ater
Wild And
Scenic River
MP 1.6
FSR 319
MP 2.0
FSR 319
MP 28.83
FSR 443
MP 28.76
FSR 443
0 11
SCALE IN MILES
FOREST
NATIONAL
CLEARWATER
N o rt h
Fo rk
Clearwater
Riv er
F O R E S T
N A T I O N A L
N E Z P E R C E
N E Z P E R C E N A T I O N A L F O R E S T
MP 4.0
FSR 5503
MP 0.5
FSR 426
MP 0.8
FSR 470
N
MP 30.6
FSR 443
FSR 319 MP 3.5
SCALE IN MILES
T o O ro fin a
T o P ie rc e
T o P ie rc e
T o M is s o u la
T o P ie r c e
To Low ell
Ranger Station
To Fenn
T o K o o s k ia
Lowell
Ranger Station
To Fenn
R
E
R
E
R
E
R
E
T 40 N
T 41 N
R
E
R
E
T 40 N
T 41 N
T 39 N
T 40 N
T 38 N
T 39 N
T 37 N
T 38 N
R
E
R
E
W e it a s
C r e e k
R
E
R
E
T 31 N
T 32 N
R
E
R
E
R
E
R
E
T 32 N
T 33 N
R
E
R
E
MP 2.7
FSR 426
OPTION Y
OPTION Y
OPTION Y
OPTION Y
OPTION X
OPTION X
OPTION X OPTION X
BASE ALL SITES BASE ALL SITES
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
A.4
:4 a y id e f a c .d p w w o r k
\d
\i d e f a d
.d g
VICINITY MAP
Sheet and Description
SECTION C SECTION D SECTION F SECTION G SECTION H SECTION I -
TYPICAL
SECTIONS
PLAN -
PROFILE
EROSION
CONTROL
RETAINING
WALL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LNFT 210 10 220
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 3,292 168 3,460
A0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 38 2 40
A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL) EACH 17 1 18
A0200 15801-0000 WATERING FOR DUST CONTROL MGAL 4,300
A0220 20101-0000 CLEARING AND GRUBBING ACRE 2.8 0.1 2.9
A0240 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0260 20401-0000 ROADWAY EXCAVATION CUYD 4,260 210 4,470
A0280 20411-0000 SELECT BORROW TON 533 27 560
A0300 20802-0000 FOUNDATION FILL CUYD 60 3 63
A0320 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (HEADWALL) CUYD 12 1 13
A0340 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 (PROTECTIVE APRON) CUYD 134 6 140
A0360 25201-1000 SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED CUYD 2,629 131 2,760
A0380 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (VEGETATED) SQFT 749 24 773
A0400 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (WITH GABION
ROCK) SQFT 1,921 96 2,017
A0420 26101-1000 REINFORCED SOIL SLOPE, WELDED WIRE FACE (WITH GABION ROCK) SQFT 4,320 220 4,540
A0440 26110-0000 SELECT GRANULAR BACKFILL CUYD 2,730 140 2,870
A0460 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,323 117 2,440
A0480 60201-0800 24-INCH PIPE CULVERT LNFT 114 6 120
A0500 60201-1000 36-INCH PIPE CULVERT LNFT 35 2 37
A0520 60201-1200 48-INCH PIPE CULVERT LNFT 43 2 45
A0540 60201-1600 72-INCH PIPE CULVERT LNFT 50 3 53
A0560 60202-1600 96-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT LNFT 52 3 55
A0580 60704-0000 CLEANING CULVERT IN PLACE EACH 1 1 2
A0600 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 90
A0620 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY HOUR 90
A0640 62201-2050 ROLLER HOUR 90
A0660 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 90
A0680 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 90
A0700 62201-3750 CHAIN SAW HOUR 20
A0720 62301-0000 GENERAL LABOR HOUR 90
A0740 62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH ACRE 1.4 0.1 1.5
A0760 62501-0000 TURF ESTABLISHMENT ACRE 1.4 0.1 1.5
MileStone: 100% Date Completed: 07/09/20 Report Date: 07/09/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 9-
Ju l-
2:
P
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 id
-e f1
_b a.
xl sm ]S he et
STATE PROJECT
B.1FS ERFO 2017(2)-81(1)
FS ERFO 2018(1)-81(1)
ID
ID
SHEET
TYPICAL
SECTIONS
PLAN -
PROFILE
EROSION
CONTROL
RETAINING
WALL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
A0780 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 610 30 640
A0800 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 12 1 13
A0820 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 250 10 260
A0840 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 478 22 500
A0860 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1,920
A0880 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 120 120
9- Ju l-
2:
P M
MileStone: 100% Date Completed: 07/09/20 Report Date: 07/09/20 c:
\p w -w or k\ d0 id
-e f1
_b a.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.2FS ERFO 2017(2)-81(1)
FS ERFO 2018(1)-81(1)
ID
ID
TYPICAL
SECTIONS
PLAN -
PROFILE
EROSION
CONTROL
RETAINING
WALL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
X0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
X0080 15401-0000 CONTRACTOR TESTING LPSM ALL
X0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0120 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LNFT 150 10 160
X0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,804 96 1,900
X0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 26 2 28
X0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL) EACH 3 1 4
X0200 15801-0000 WATERING FOR DUST CONTROL MGAL 2,700
X0220 20101-0000 CLEARING AND GRUBBING ACRE 1.8 0.1 1.9
X0240 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
X0260 20401-0000 ROADWAY EXCAVATION CUYD 1,167 63 1,230
X0280 20404-0000 UNCLASSIFIED BORROW TON 12,082 618 12,700
X0300 20802-0000 FOUNDATION FILL CUYD 66 4 70
X0320 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (HEADWALL) CUYD 18 1 19
X0340 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 (PROTECTIVE APRON) CUYD 98 5 103
X0360 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (WITH GABION
ROCK) SQFT 3,008 150 3,158
X0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,276 114 2,390
X0400 60201-0800 24-INCH PIPE CULVERT LNFT 130 7 137
X0420 60201-1000 36-INCH PIPE CULVERT LNFT 34 2 36
X0440 60201-2300 120-INCH PIPE CULVERT LNFT 124 6 130
X0460 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 50
X0480 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY HOUR 50
X0500 62201-2050 ROLLER HOUR 50
X0520 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 50
X0540 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 50
X0560 62201-3750 CHAIN SAW HOUR 10
X0580 62301-0000 GENERAL LABOR HOUR 50
X0600 62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH ACRE 0.9 0.1 1.0
X0620 62501-0000 TURF ESTABLISHMENT ACRE 0.9 0.1 1.0
X0640 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 100 5 105
X0660 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 1 9
X0680 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 240
X0700 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 15 15
9- Ju l-
2:
P M
MileStone: 100% Date Completed: 07/09/20 Report Date: 07/09/20 c:
\p w -w or k\ d0 id
-e f1
_b a.
xl sm ]S he et
3)
SUMMARY OF QUANTITIES - Option X
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.3FS ERFO 2017(2)-81(1)
FS ERFO 2018(1)-81(1)
ID
ID
TYPICAL
SECTIONS
PLAN -
PROFILE
EROSION
CONTROL
RETAINING
WALL DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
ALLOWANCE Bid Schedule
Y0020 15101-0000 MOBILIZATION LPSM ALL
Y0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
Y0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE LPSM ALL
Y0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 200 10 210
Y0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,240 60 1,300
Y0160 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL) EACH 8 1 9
Y0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FILTER ROCK) EACH 12 1 13
Y0200 15801-0000 WATERING FOR DUST CONTROL MGAL 2,000
Y0220 20101-0000 CLEARING AND GRUBBING ACRE 0.8 0.1 0.9
Y0240 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
Y0260 20401-0000 ROADWAY EXCAVATION CUYD 682 38 720
Y0280 20802-0000 FOUNDATION FILL CUYD 89 5 94
Y0300 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (HEADWALL) CUYD 28 1 29
Y0320 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 (PROTECTIVE APRON) CUYD 10 1 11
Y0340 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (VEGETATED, CONTRACTOR-DESIGNED) SQFT 1,409 71 1,480
Y0360 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (WITH GABION
ROCK) SQFT 2,282 118 2,400
Y0380 25501-1000 MECHANICALLY STABILIZED EARTH WALL, WELDED WIRE FACE (WITH GABION
ROCK, CONTRACTOR-DESIGNED) SQFT 816 44 860
Y0400 25701-0200 CONTRACTOR FURNISHED MECHANICALLY STABILIZED EARTH WALL DESIGN LPSM All ALL
Y0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,268 72 1,340
Y0440 60201-0800 24-INCH PIPE CULVERT LNFT 20 1 21
Y0460 60201-1000 36-INCH PIPE CULVERT LNFT 166 8 174
Y0480 62201-0300 DUMP TRUCK, 12 CUBIC YARD MINIMUM CAPACITY HOUR 30
Y0500 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY HOUR 30
Y0520 62201-2050 ROLLER HOUR 30
Y0540 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 30
Y0560 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT HOUR 30
Y0580 62201-3750 CHAIN SAW HOUR 10
Y0600 62301-0000 GENERAL LABOR HOUR 30
Y0620 62402-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH ACRE 0.6 0.1 0.7
Y0640 62501-0000 TURF ESTABLISHMENT ACRE 0.6 0.1 0.7
Y0660 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 250 15 265
Y0680 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 1 9
Y0700 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 240
Y0720 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 15 15
9- Ju l-
2:
P M
MileStone: 100% Date Completed: 07/09/20 Report Date: 07/09/20 c:
\p w -w or k\ d0 id
-e f1
_b a.
xl sm ]S he et
4)
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B.4FS ERFO 2017(2)-81(1)
FS ERFO 2018(1)-81(1)
ID
ID
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
C.1
:3
J u n e id e f c a .d p w w o r k
\d
\i d e f c a .d g n
SECTION QUANTITIES
TABULATION OF
NO SCALE
FOOTNOTE:
NOTE:
ROUNDING DETAIL
CUT SLOPE
.2
D
1.
Profile grade
LC
S lo p e s ta k e l im it
D
ROUNDING DETAIL
FILL SLOPE
S lo p e s ta k e l im it
[6]
[3]
[1] 3% [1] 3%
[2]
1:3
[2
V a rie s 1 :1 to
:1
[2] [8]
Varies 1:1.5 to 1:3
C o n s tr ic ti o n l im it of trees, minimize wetland impact, as directed by the CO.
Reduce or eliminate slope rounding width to avoid removal
TYPICAL SECTION NO. 1
surface model.
Widening varies as shown in the Land XML proposed finished[7]
See Fill Slope Rounding Detail.[6]
See Cut Slope Rounding Detail.[5]
Additional widening required for turnout at FSR 5503 MP 4.0.[4] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height[3] surface model.
Construct slopes as shown in the Land XML proposed finished[2] curve data of the Plan and Profile Sheets.
Superelevate curves at maximum rate "e" as indicated in the[1] method 2, 4" compacted depth
Roadway aggregate
Embankment construction
BASE: FSR 5503, MP 4.0
BASE: FSR 319, MP 3.5
BASE: FSR 319, MP 2.0
BASE: FSR 319, MP 1.6
80+00 to 84+18.60
30+75 to 34+09.84
20+00 to 21+98.07
10+00 to 11+27.84
[7] W2
[7] W2
Traveled way
[4]
[5]
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it applicable.
Construct MSE Wall as shown on Sheet G.2, where[8]
SHEET 1 of 3
5'
B=5'
D
.2
Turf establishment topsoil, 4" depth
Furnishing and placing
W topsoil, 4" depth
Furnishing and placing
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
C.2
J u n e id e f c b
.d p w w o r k \d
\i d e f c b .d g
TYPICAL SECTION
NOTE:
ROUNDING DETAIL
CUT SLOPE
.2
D
1.
Profile grade
LC
S lo p e s ta k e l im it
D
ROUNDING DETAIL
FILL SLOPE
S lo p e s ta k e l im it
[6]
[3]
[1] 3% [1] 3%
[2
V a rie s 1 :1 .5 to
[2] [9]
Varies 1:1.5 to 1:3
C o n s tr u c ti o n l im it easement at FSR 470 MP 0.8 as directed by the CO.
of trees, minimize wetland impact and to remain within
TYPICAL SECTION NO. 2
Widening varies as shown in the Land XML proposed finished[7]
See Fill Slope Rounding Detail.[6]
See Cut Slope Rounding Detail.[5]
FSR 443 MP 30.6, and FSR 660 MP 2.15.
Additional widening required for turnouts at FSR 246 MP 14.6,[4] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height[3] surface model.
Construct slopes as shown in the Land XML proposed finished[2] curve data of the Plan and Profile Sheets.
Superelevate curves at maximum rate "e" as indicated in the[1]
12" compacted depth
Roadway aggregate, method 2, Traveled way
W
Embankment construction
FSR 710, MP 1.8-1.9
FSR 700, MP 8.0
FSR 250, MP 59.9
OPTION Y: FSR 250, MP 55.5
FSR 660, MP 2.4
FSR 660, MP 2.15
FSR 255, MP 19.45
OPTION X: FSR 246, MP 14.6
FSR 443, MP 30.6
FSR 426, MP 2.7
BASE: FSR 426, MP 0.5
90+00 to 97+75.29
No stationing
No stationing
No stationing
100+00 to 104+94.13
111+44.29 to 113+41.08
120+00 to 124+97.58
140+00 to 145+57.31
40+00 to 47+09.20
No stationing
No stationing
[7]W 2 1 [7]W 2
[4] [4]
[5]
C o n s tr u c ti o n l im it
[8]
[8]
[8]
[8]
[8]
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
See D-Sheets for approximate measurements.[8]
Construct MSE Wall as shown on Sheet G.2, where applicable.[9]
SHEET 2 of 3
.2
D
Turf establishment topsoil 4" depth
Furnishing and placing
Turf establishment topsoil 4" depth
Furnishing and placing
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
C.3
J u n e id e f c c .d p w w o r k \d
\i d e f c c .d g
Profile grade
LC
[5]
[4]
3%
[1]
[1
V a rie s 1 :1 to
[1]
Varies 1:1.5 to 1:3
C o n s tr u c ti o n l im it
TYPICAL SECTION NO. 3
method 2, 4" compacted depth
Roadway aggregate
Embankment construction
BASE: FSR 443, MP 28.76 - 28.83 51+94.73 to 57+56.00
[6] W2
[6] W2
Traveled way lo p e s ta k e l im it
D
ROUNDING DETAIL
FILL SLOPE
S lo p e s ta k e l im it
[2]
.2
D
ROUNDING DETAIL
CUT SLOPE
1.
of trees, minimize wetland impact, as directed by the CO.
Widening varies as shown in the Land XML proposed finished[6]
See Fill Slope Rounding Detail.[5]
See Cut Slope Rounding Detail.[4]
Additional widening required for turnout.[3] proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height[2] surface model.
Construct slopes as shown in the Land XML proposed finished[1]
FOOTNOTE:
NOTE:
NO SCALE
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
3%
SHEET 3 of 3
Furnishing and placing
Furnishing and placing
W
.2
D
[3]
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
C.4
:0
J u n e id e f c d
.d p w w o r k \d
\i d e f c d .d g
XX XX XX
XX XX XX
XX XXXX
XX XXXX
FOOTNOTE:
WELDED WIRE REINFORCEMENT
PLAN VIEW
for Typical Sections
See Sheet C.3 and C.4
LC
V :1
H
Select borrow, 12" depth
Allow 12-inch setback of reinforcement from finished face.[3] by the CO.
If disturbed ground is encountered depth to be determined
Embed rock embankment below existing ground surface. [2]
Assumed slope ratio for informational quantities calculations.[1] class 1, type B (non-woven)
Geotextile filter, 1:2 mechanically-placed
Special rock embankment, 12"x12" - W9.4xW9.4 acceptable in concave curves
Backside separation
Finished face of SRE or gap of 6" with a maximum overlap
Butt adjacent wire panels structure excavation
Limit of acceptable in convex curves
Backside overlap at 4' vertical spacing
Welded wire reinforcement
SPECIAL ROCK EMBANKMENT SECTION
XX XX XX
XX XX XX
XX XXX
XX XXX
NO SCALE
BASE: FSR 443, MP 28.76-28.83
BASE: FSR 426, MP 2.7
BASE: FSR 426, MP 0.5
53+80 to 55+14 LT and 55+60 to 56+40 LT
No Stationing
No Stationing
Common embankment
[4]
[4]
See D-Sheets for approximate measurements.[4]
[1]
[3]
(min.)
8'-0" m a x
(min.)
4'
12" m in
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
C.5
P
J u n e id e f c f .d p w w o r k \d
\i d e f c e .d g n
WIRE DETAILS
WITH REINFORCED WELDED
SPECIAL ROCK EMBANKMENT
NOTE:
shrink/swell.
Excavation and embankment have not been adjusted for
FSR 443 MP 28.76 - 28.83.
FSR 443 MP 30.6 can be used to construct embankment at
Excess suitable material from roadway excavation at
2.
1.
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.1
J u n e id e f f a .d p w w o r k \d
\i d e f f a .d g n
QUANTITIES
TABULATION OF PLAN
Line to be constructed
Slope stake limits
Slope stake limits
Proposed edge of road
Existing edge of road
See Sheet D.20 for Connection Detail
N88°23'09"E N78°23'55"E e = 0.048
'34.86L =
'17.48T =
'200.00R =
(LT)09°59'14"Δ =
145+03.73PI
.2
.1
.3
.3
P
O
'79.99Ls = 29°00'14"Δs =
Line to be constructed
Slope stake limits
Slope stake limits edge of road Proposed edge of road Existing
Reconstruct turnout. See Sheet E.1
Connection detail applies to roadway, and turnout See Sheet D.20 for Connection Detail
Scarp
Scarp
Profile grade
Existing ground
In ta ll p ip e c u lv e rt w it h p la c e d r ip ra p M e th o d B
C la s
(p ro te c ti v e a p ro n a t in le t a n d o u tl e t.
S e e c u lv e rt p la n -p ro fi le o n
S h e e t H
.1
R e m o v e e x is ti n g p ip e c u lv e rt
In ta ll p ip e c u lv e rt w c e d r ip ra p M e th o d B
C la s
(r ip ra p h e a d w a ll a t in le t a n d o u tl e t.
S e e h e a d w a ll d e ta il s e e t H
.1
N
END WORK
145+57.31
FSR 246 MP 14.6
EL=3639.26
E=2661611.6554
N=1838947.9252
BEGIN WORK
140+00.00
FSR 246 MP 14.6
EL=3641.78
E=2661278.0182
N=1838826.0189
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)ID FS ERFO 2017(2)-81(1)
140+00 141+00 142+00 143+00 144+00 145+00
3630 3630
3640 3640
3650 3650
-0.255%
-0.783%
+1.044%
.4
.6
0' VC60
113.70K =
'1289.40SSD =
' VC100
55K =
'3808.37HLSD = 3
,6
.7
,6
.2
146+00
OPTION XOPTION X
221 77
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.2
J u n e
P la n
S h e t] p w
-w o rk
\d \i d -e f1 fb
.d g n
18015
CP
18013
CP
N
N 16°12'28"E
N43° 51'4
3"W e = 0.060 '102.36L = '59.79T = '79.00R =
(RT)74°14'06"Δ =
143+23.79PI
e = 0.060 '99.60L = '54.93T = '95.00R =
(LT)60°04'11"Δ =
140+67.50PI
0+
.5
PC
.0
143+66.36 CS143+66.36 CS
144+46.35
ST
0+
.0
PO
B
'80.00Ls = 29°00'31"Δs =
'79.99Ls = 29°00'14"Δs =
18004
CP
18003
CP
18002
CP
Existing edge of road
Proposed edge of road
Line to be constructed
Slope stake limits
Slope stake limits
Connection Detail
See Sheet D.20 for for Connection Detail
See Sheet D.20
Scarp
Profile grade
Existing ground
I n s ta ll p ip e c u lv e r t w c e d r ip r a p
M e th o d
A
C la s s r ip r a p h e a d w a ll a t in le t a n d o u tl e t.
S e e h e a d w a ll d e ta il s e e t
H .1 stabilized earth wall (wall #1)
122+17 to 123+00, LT
See Section-G for Details
END WORK
124+97.58
FSR 255 MP 19.45 OPTION X
EL=4367.15
E=2784119.5840
N=1874466.0580
BEGIN WORK
120+00.00
FSR 255 MP 19.45 OPTION X
EL=4400.31
E=2783913.0831
N=1870422.7573
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2018(1)-81(1)
ID FS ERFO 2018(1)-81(1)
120+00 121+00 122+00 123+00 124+00
4370 4370
4380 4380
4390 4390
4400 4400
-7.464%
-6.285%
-7.155%
.5
.9
' VC50
57.51K =
'789.43SSD =
' VC100
85K =
'INFHLSD =
,4
.3
,3
.1
125+00
Construct mechanically
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.3
J u n e
P la n
S h e p w w o r k \d
\i d e f f c .d g n
N29°18'20"E
N38°14'12"E
N08° 12'
33" E
N12°0 2'16
"E e = 0.042
'20.05L =
'10.03T =
'300.00R =
(RT)03°49'42"Δ =
124+51.59PI
e = 0.042 '157.22L = '80.46T = '300.00R =
(LT)30°01'39"Δ =
123+11.78PI
.7
.6
.0
P
B
.5
P
18123
CP
CP
18124
CP
18125 stake limits
Slope
Slope stake limits
Line to be constructed
Existing edge of road for Connection Detail
See Sheet D.20
See Sheet D.20 for Connection Detail
Scarp
Scarp unpaved shoulder
Edge of existing
Proposed edge of road
Profile grade
Existing ground
Construct mechanically stabilized earth wall, (wall #7)
10+16 to 11+14
See Section-G for details
BEGIN WORK
10+00.00
FSR 319 MP 1.6
EL=1993.21
E=1915.1981
N=4024.8085
END WORK
11+27.84
FSR 319 MP 1.6
EL=2005.80
E=2042.7082
N=4024.8085
N
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1) ID FS ERFO 2017(2)-81(1)
10+00 11+00
1990 1990
2000 2000
2010 2010
+7.6
.1
.7
' VC60
9K =
'83.72HLSD =
,9
.2
,0
.8
12+00
BASE
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.4
J u n e
P la n
S h e p w w o r k \d
\i d e f f d .d g n
S75°27'2 5"E S65°47'27"E e = 0.024
'50.61L =
'25.37T =
'300.00R =
(RT)09°39'58"Δ =
10+61.33PI
.9
.0
P
.8
P
Proposed edge of road
CP
18120
CP
18121P for Connection Detail
See Sheet D.20
Existing standpipe inlet
Edge of unpaved shoulder unpaved shoulder
Edge of
Slope stake limits stake limits
Slope
Existing stream
Profile grade
Existing ground
I s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d B c la s s r ip r a p h e a d w a ll a t in le t.
R e m o v e e x is ti n g p ip e c u lv e r t a n d s ta n d p ip e i n le t.
s ta ll p la c e d r ip r a p m e th o d B c la s s p r o te c ti o n a p r o n a t o u tl e a p r o n d e ta il s o n S h e e t
H .1
Construct reinforced soil slope (RSS #1)
20+12 to 21+66 RT
See Section-G for details
N
BEGIN WORK
20+00.00
FSR 319 MP 2.0
EL=3991.12
E=4925.2080
N=10073.8381
END WORK
21+98.07
FSR 319 MP 2.0
EL=4006.84
E=4974.6230
N=9909.9555
CUYD
EXC.
CUYD
EMB.
FOOTNOTE:
See Sheet G.16 for Culvert Through RSS detail.[1]
ID FS ERFO 2017(2)-81(1) ID FS ERFO 2017(2)-81(1)
for Connection Details
See Sheet D.20
20+00
3990 3990
4000 4000
4010 4010
21+00 22+00
+9.
8%
+1.474%
+8.8
.9
.3
' VC20
2.64K =
'152.69SSD =
' VC20
3K =
'48.71HLSD =
,9
.1
,0
.8
BASEBASE
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.5
J u n e
P la n
S h e p w w o r k \d
\i d e f f e .d g n
D I
S '1 "E S12°48'22"W e = 0.039
'40.00L =
'21.14T =
'50.00R =
(RT)45°50'12"Δ =
20+50.83PI
e = 0.031 '74.58L = '38.54T = '120.00R =
(RT)35°36'26"Δ =
21+08.23PI
C
.0
PO
B
.5
P
18117
CP
18118
P
Line to be constructed Slope stake limits
Slope stake limits
CP
18119
Proposed edge of road
Existing edge of road
See Sheet D.20 for Connection Detail
See Sheet D.20 for Connection Detail
Slope stake limits
Scarp
Scarp
Edge of unpaved shoulder
Edge of unpaved shoulder
Profile grade
Existing ground
Construct reinforced soil slope (RSS #2)
31+12 to 34+10 LT
See Section-G for details
Profile grade
Existing ground
N
BEGIN WORK
30+75.00
FSR 319 MP 3.5
EL=4985.52
E=9893.3379
N=19940.9498
END WORK
34+09.84
FSR 319 MP 3.5
EL=5024.68
E=10131.6899
N=20141.5686
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
ID FS ERFO 2017(2)-81(1)
30+00 31+00 32+00 33+00
.0
.5
+10 .0
.7
.0
' VC121
39.85K =
'281.08SSD =
' VC81
53K =
'INFHLSD =
,9
.5
34+00 35+00
+11 .1
.7
' VC50
45K =
'INFHLSD =
,0
.1
BASE
BASE
3 4
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.6
J u n e
P la n
S h e p w w o r k \d
\i d e f f g .d g n
N12 °5
4'
"E
N55°56'02"E
N71°33'12"E
N38°14' 29"E
N '5
"W
N °4
7'
"E e = 0.052
'56.33L =
'29.57T =
'75.00R =
(RT)43°01'48"Δ =
30+44.88PI
e = 0.032 '81.78L = '41.15T = '300.00R =
(RT)15°37'10"Δ =
31+46.95PI
e = 0.040 '64.42L = '32.58T = '175.00R =
(RT)21°05'33"Δ =
34+50.83PI
e = 0.038 '116.28L = '59.84T = '200.00R =
(LT)33°18'43"Δ =
32+72.33PI
e = 0.056 '53.97L = '28.97T = '60.00R =
(LT)51°32'25"Δ =
33+78.07PI
+03
PT
T 3
.8
+18
.0
P
.4
PO
Existing edge of road
See Sheet D.20 for Connection Detail edge of road
Proposed
Scarp
Scarp
Scarp
Scarp s h o u ld e r
E d g e o f u n p a v e d
Edge of unpaved shoulder
Slope stake limits
Slope stake limits
Profile grade
Existing ground
Construct special rock embankment, mechanically-placed
53+80 to 55+14, LT
See Sheet C.5 for detail
Construct special rock embankment, mechanically-placed
55+60 to 56+40, LT
See Sheet C.5 for detail s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d
B c la s s
P r o te c ti o n
A p r o n a t in le t a n d o u tl e c u lv e r t p la n p r o f il e o n S h e e t
H .5 a n d a p r o n d e ta il s o n S h e e t
H .5
50+00 51+00 52+00 53+00 54+00 55+00 56+00
3000 3000
3010 3010
3020 3020
3030 3030
-4.882%
-3.869% +1.698%
.8
.8
' VC100
17.96K =
'169.38SSD =
' VC160
24K =
'149.99HLSD =
,0
'1
"W
S70°33'29"W S60°44'20"W
S '5
"E
'54.00L =
'28.23T =
'75.00R =
(RT)41°15'11"Δ =
50+40.94PI
'65.58L = '33.32T = '150.00R =
(RT)25°03'00"Δ =
51+00.03PI
'25.71L = '12.88T = '150.00R =
(LT)09°49'09"Δ =
51+60.86PI
e = NC '103.34L = '83.91T = '50.00R =
(LT)118°25'17"Δ =
53+33.80PI
53+53.23
+12
C
+00
.0
POB
Line to be constructed
Slope stake limits
Proposed edge of road
Slope stake limits
Existing edge of road
Sheet E.2 turnout. See Reconstruct shoulder unpaved Edge of shoulder Edge of unpaved
N
N
18113
CP
18112
CP
18111
CP
18110
CP
P
BEGIN WORK
ID FS ERFO 2017(2)-81(1)
EL=3016.50
E=4733.2975
N=10168.46
CUYD
EXC.
CUYD
EMB.
FSR 443 MP 28.76-28.85 BASE
451076
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.7
J u n e
P la n
S h e p w
-w o rk
\d \i d -e f1 fh
.d g n
S57°40'58"E S72
°22' 29"E
S13°37'07"E e = NC '66.66L = '36.59T = '65.00R =
(RT)58°45'22"Δ =
55+40.84PI
e = NC '33.34L = '16.76T = '130.00R =
(LT)14°41'32"Δ =
54+53.85PI
.4 edge of road
Proposed
Scarp
Scarp
Edge of unpaved shoulder
Slope stake limits
Slope stake limits
Profile grade
Existing ground s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d
B c la s s
P r o te c ti v e A p r o n a t in le t a n d o u tl e t.
R e m o v e e x is ti n g p ip e c u lv e r t.
S e e c u lv e r t p la n p r o f il e o n
S h e e t
H .6 a n d a p r o n d e ta il s o n
S h e e t
H .1
Construct special rock embankment, mechanically-placed
55+60 to 56+40, LT
See Sheet C.5 for detail
N
CP
18109
CP
18108
END WORK
57+56.00
FSR 443 MP 28.76-28.83
EL=3006.45
E=4955.0985
N=9929.5419
See Sheet D.20 for Connection Detail
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
56+00 57+00 58+00 59+00
3000 3000
3010 3010
3020 3020
-3.869%
-8.537%
.9
' VC130
27.85K =
'207.51SSD =
,0
.3
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.8
J u n e
P la n
S h e p w w o r k
\d
\i d e f f h
.d g n
S '0 "E
N12 °4
4'
"E N59°26'24"E e = NC
'80.00L =
'41.31T =
'130.00R =
(RT)35°15'32"Δ =
57+82.17PI
e = NC '51.93L = '26.05T = '260.00R =
(RT)11°26'38"Δ =
58+46.91PI
e = NC '75.08L = '119.59T = '28.00R =
(LT)153°38'39"Δ =
57+55.28PI
56+35.70
55+70.91
C
.3
P
N '3
"E
N26°21'47"W N36°05'56"
W
N34°01'12"W e = NC
'43.54L =
'21.77T =
'1,200.00R =
(RT)02°04'44"Δ =
44+65.83PI
e = 0.044 '84.00L = '43.80T = '120.00R =
(LT)40°06'25"Δ =
40+55.87PI
e = 0.044 '55.28L = '27.76T = '240.00R =
(LT)13°11'52"Δ =
41+23.83PI
e = 0.036 '101.95L = '51.10T = '600.00R =
(LT)09°44'09"Δ =
43+18.02PI
+12
C
+00
.0
POB
3 4 4 4
5 4
18104
CPP
18103
CP 18102
CP
P
P
Line to be constructed Proposed edge of road
Slope stake limits
Slope stake limits
Existing edge of road
Reconstruct turnout.
See Sheet E.3
Existing debris
Existing boulder, (typ.)
Existing debris
Edge of unpaved shoulder
Profile grade
Existing ground
In s ta ll w it h p la c e d ri p ra p
M e th o d
B c la s s
P ro te c ti v e
A p ro n a t in le t a n d o u tl e t.
R e m o v e e x is ti n g p ip e c u lv e rt
S e e c u lv e rt p la n
-p ro fi le o n
S h e e t H
.7 a n d a p ro d ta il s o n S h e e t H
.1
N
BEGIN WORK
40+00.00
FSR 443 MP 30.6
EL=1775.97
E=2740195.9846
N=1594825.8115
CUYD
EXC.
CUYD
EMB.
Connection Detail See Sheet D.20 for
ID FS ERFO 2017(2)-81(1)
40+00 41+00 42+00 43+00 44+00 45+00 46+00
1750 1750
1760 1760
1770 1770
1780 1780
-1.160%
-1.886%
-2.250%
-10.147%
-1.886%
.1
.5
.4
' VC70
7.79K =
'109.01SSD =
' VC70
192.16K =
'1859.33SSD =
' VC70
8K =
'75.21HLSD =
,7
.9
BASE
16907
2 4
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.9
:4
J u n e
P la n
S h e p w
-w o rk \d
\i d
-e f1 fi .d
N26°10'20"W e = 0.022
'82.18L =
'41.16T =
'600.00R =
(RT)07°50'52"Δ =
46+38.86PI
.7
P
CP
18101
Line to be constructed
Proposed edge of road
Existing edge of road
Connection Detail
See Sheet D.20 for
Edge of unpaved shoulder
Slope stake limits grade Profile
Existing ground
N
END WORK
47+09.20
FSR 443 MP 30.6
EL=1756.61
E=2739903.5388
N=1595445.8087
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
46+00 47+00
1740 1740
1750 1750
1760 1760
1770 1770
-2.250% +1.387%
.6
' VC70
19K =
'173.49HLSD =
,7
.6
BASE
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.10
:5
J u n e
P la n
S h e p w
-w o rk \d
\i d
-e f1 fi .d
N84°37'35"E
S77°06'50"E N69° 37'
25" E e = 0.028
'127.48L =
'64.28T =
'400.00R =
(RT)18°15'35"Δ =
72+26.55PI
e = 0.048 '58.05L = '29.87T = '100.00R =
(LT)33°15'45"Δ =
73+71.44PI
.0
P
.7
P
0 7 1 7
T
Line to be constructed
Slope stake limits
Existing edge of road
Slope stake limitsfor Connection Detail See Sheet D.20
N for Connection Detail See Sheet D.20
Edge of unpaved shoulder
Scarp pull box line and telephone Existing in place culvert Clean edge of road Proposed
Construct mechanically stabilized earth wall (wall #2)
71+62 to 72+71, LT See Section-G for details
C le a n c u lv e rt i n p la c e
Existing ground
Proposed grade
BEGIN WORK
70+00.00
FSR 470 MP 0.8
EL=1845.40
E=2667813.6169
N=1622485.3286
END WORK
73+10.00
FSR 470 MP 0.8
EL=1815.930
E=2668121.5822
N=1622487.6916
CUYD
EXC.
CUYD
EMB.
before performing work at this site.
Contact telephone company per Subsection 107.02
UTILITIES:
Century Link
Email: Cody.Hollenbeck@centurylink.com Cell: (509) 780-2558 Office: (208) 798-8380 Cody Hollenbeck, Network Engineer II
ID FS ERFO 2017(2)-81(1) ID FS ERFO 2017(2)-81(1)
70+00 71+00 72+00 73+00
1,820 1,820
1,830 1,830
1,840 1,840
' VC100
35.33K =
'431.45SSD =
' VC50
67K =
'INFHLSD =
,8
.4
,8
.9
.8
.7
-8.951%
-11.031%
-8.200%
' VC100
35.33K =
'431.45SSD =
,8
.9
BASE BASE
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.11
J u n e
P la n
S h e p w
-w o rk \d
\i d
-e f1 fj .d
Slope stake limits
Slope stake limits
See Sheet E.4
Reconstruct turnout.
CP
18103
CP
18102
CP
18101
Connection Detail
See Sheet D.20 for
Connection Detail
See Sheet D.20 for
Existing edge of road
Edge of unpaved shoulder
Scarp
Scarp
Profile grade Existing ground
Construct mechanically stabilized earth wall (wall #3)
81+34 to 82+18, RT
See Section-G for details
I n s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d B c la s s r ip r a p h e a d w a ll a t in le t.
R e m o v e e x is ti n g p ip e c u lv e r t.
S e e h e a d w a ll d e ta ls o n S h e e t
H .1
N
BEGIN WORK
80+00.00
FSR 5503 MP 4.0
EL=1983.14
E=4807.1276
N=9921.8951
END WORK
84+18.60
FSR 5503 MP 4.0
EL=2009.73
E=5081.4148
N=10143.6774
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
ID FS ERFO 2017(2)-81(1)
80+00 81+00 82+00 83+00 84+00
1980 1980
1990 1990
2000 2000
2010 2010
+10 .1
+7.7
+5.06 9%
+4.73 7%
.2
.0
.5
' VC50
20.31K =
'294.99SSD =
' VC100
37.91K =
'302.04SSD =
' VC100
301.18K =
'2051.62SSD =
,9
.1
,0
.7
85+00
BASE
BASE
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.12
J u n e
P la n
S h e p w w o r k \d
\i d e f f k .d g n
N41° 25'
53" E
N66°59'36"E
N87°51'39"E
N '1
W e = 0.044
'55.77L =
'28.36T =
'125.00R =
(RT)25°33'42"Δ =
80+40.21PI
e = 0.042 '54.63L = '27.62T = '150.00R =
(RT)20°52'04"Δ =
81+78.74PI
e = 0.052 '133.59L = '94.88T = '73.00R =
(LT)104°50'58"Δ =
83+37.61PI
83+ 76.3
PT
.0
P
84+ 18.6
POE 8
18019
CP
18020
CP
18018 turnout, and approach apron
Connection detail applies to roadway, See Sheet D.20 for Connection Detail.
Slope stake limits
Line to be constructed
Proposed edge of road
Existing edge of road
Scarp
Reconstruct portion of turnout. See Sheet E.5
Slope stake limits
Profile grade
Existing ground
Construct mechanically stabilized earth wall (wall #4)
111+46 to 112+37, RT
See Section-G for details
R m o v a l o f p ip e c u lv e r t
I n s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d
B c la s s r ip r a p h e a d w a ll a t in le t.
S e e h e a d w a ll d e ta il s o n S h e e t
H .1
N
BEGIN WORK
111+44.29
FSR 660 MP 2.15
EL=3548.74
E=2683680.5659
N=1790790.4376
END WORK
113+41.08
FSR 660 MP 2.15
EL=3567.67
E=2983825.2188
N=1790669.7517
Connection Detail
See Sheet D.19 for
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
ID FS ERFO 2017(2)-81(1)
110+00 111+00 112+00 113+00 114+00
3540 3540
3550 3550
3560 3560
+10 .5
+6.9
+4.05 8%
+8.4
.9
.8
.8
' VC100
15.42K =
'152.59SSD =
' VC80
28K =
'287.49HLSD =
' VC100
63K =
'INFHLSD =
,5
.4
,5
.6
OPTION X
OPTION X
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.13
J u n e
P la n
S h e p w w o r k \d
\i d e f f l.
d g n
J H
J H
S 07°04'34"E
S7 3°
'0 6"
E
S30°17'44"E
S54° 43'39
"E e = 0.042
'112.50L =
'59.05T =
'150.00R =
(RT)42°58'22"Δ =
112+38.21PI
e = 0.048 '60.00L = '30.93T = '100.00R =
(LT)34°22'39"Δ =
110+60.03PI
e = 0.060 '27.76L = '14.25T = '50.00R =
(LT)31°48'53"Δ =
111+03.34PI
e = 0.042 '63.96L = '32.48T = '150.00R =
(LT)24°25'55"Δ =
113+73.56PI
C
.0
PO
.7
P
Slope stake limits
Slope stake limits
Sheet D.20 for Connection Detail
CP
18021
CP
18022 18024
CP
18023
CP
Connection Detail
Sheet D.20 for
Edge of unpaved shoulder
Scarp
Profile grade
Existing ground
Construct mechanically stabilized earth wall (wall #5)
102+02 to 103+13, RT
See Section-G for details s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p M e th o d A c la s s r ip r a p h e a d w a ll a t in le t.
R e m o v e e x is ti n g p ip e c u lv e r t.
S e e h e a d w a ll d e ta il s o n
S h e e t
H .1
N
BEGIN WORK
100+00.00
FSR 660 MP 2.4
EL=3629.25
E=2684863.6008
N=1790137.6267
END WORK
104+94.13
FSR 660 MP 2.4
EL=3652.64
E=2685339.3078
N=1790044.7791
CUYD
EXC.
CUYD
EMB.
ID FS ERFO 2017(2)-81(1)
ID FS ERFO 2017(2)-81(1)
100+00 101+00 102+00 103+00 104+00
3630 3630
3640 3640
3650 3650
5.20 93%
.6
.3
.2
4.49 16%
3.002 5%
K=50
36' VC
K=40
60' VC
OPTION X
OPTION X
1 1
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.14
J u n e
P la n
S h e p w w o r k
\d
\i d e f f m
.d g n
N89°0 3'15"
E
S79°40'52"E S82°29'34"E
S °1
'1 "E e = 0.022
'117.96L =
'59.17T =
'600.00R =
(RT)11°15'53"Δ =
100+92.36PI
e = 0.050 '81.06L = '42.47T = '110.00R =
(RT)42°13'21"Δ =
104+46.25PI
e = NC '88.34L = '44.18T = '1,800.00R =
(LT)02°48'42"Δ =
102+69.24PI
.4
4+
.0
P
4+
.1
PO
E
0 1
18005
18006
CP
18008
CP
CP
18009
Line to be constructed
Proposed edge of road
Slope stake limits
Slope stake limits
Existing edge of road for Connection Detail
See Sheet D.20
Profile grade
Existing ground
Construct mechanically stabilized earth wall
(wall #6A)
91+07 to 91+55, LT
See Section-G for details
91+92 to 92+96, LT
See Section-G for details 95+16 to 95+77, LT
See Section-G for details
I n s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d
A c la s s r ip r a p h e a d w a ll a t in le t a n d o u tl e t.
S e e a p r o n d e ta il s e e t
H .1 stabilized earth wall
(wall #6C)
R e m o v e p ip e c u lv e r t stabilized earth wall (wall #6B)
I n s ta ll p ip e c u lv e r t w it h p la c e d r ip r a p
M e th o d
A c la s s r ip r a p h e a d w a ll a t in le t a n d o u tl e t.
R e m o v e p ip e c u lv e r t
N
WORK
BEGIN
FSR 710 MP 1.8-1.9, 90+00.00
EL=2778.53
E=2695961.8405
N=1882340.9365
CUYD
EXC.
CUYD
EMB.
OPTION Y
ID FS ERFO 2017(2)-81(1)
90+00 91+00 92+00 93+00 94+00 95+00 96+00
2750 2750
2760 2760
2770 2770
2780 2780
-8.940%
-4.414%
.7
.8
' VC200
41.18K =
'237.09SSD =
' VC100
22K =
'153.74HLSD =
,7
.5
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.15
J u n e
P la n
S h e p w w o r k
\d
\i d e f f n
.d g n
N06°26'44"W
N00°59'44"W N17°05
'41"W e = 0.030
'57.07L =
'28.56T =
'600.00R =
(RT)05°27'00"Δ =
90+83.42PI
e = 0.042 '80.42L = '41.20T = '150.00R =
(RT)30°43'02"Δ =
95+87.47PI
e = 0.032 '84.30L = '42.43T = '300.00R =
(LT)16°05'58"Δ =
93+16.43PI
C 9
C 9
.0
P
3 9
5 9
18010 edge of road
Proposed constructed
Line to be
Slope stake limits Existing edge of road
Profile grade
Existing ground
N pw:\\UMATILLA.hfl17do1.wfl.fld.fhwa.dot.gov:PW_Oracle\Documents\76\Teams\Drafting\Timesheet\Cindy
EL=2731.18
E=2695891.5689
N=1883102.8204
97+75.29
FSR 710 MP 1.8-1.9
END WORK
for Connection Detail
See Sheet D.20
CUYD
EXC.
CUYD
EMB.
OPTION Y
ID FS ERFO 2017(2)-81(1)
96+00 97+00
2730 2730
2740 2740
2750 2750
-9.270%
,7
.1
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.16
J u n e
P la n
S h e p w w o r k
\d
\i d e f f n
.d g n
N13°37'20"E N06°2 0'29
"W e = 0.042
'80.42L =
'41.20T =
'150.00R =
(RT)30°43'02"Δ =
95+87.47PI
e = 0.042 '52.26L = '26.40T = '150.00R =
(LT)19°57'49"Δ =
97+12.67PI
.2
P
See headwall details on Sheet H.15.
(riprap headwall) at inlet.
method A, class 3 placed riprap, Install 24" pipe culvert with contractor-designed). See Sheet G.3 for details wall, (Wall #8, welded wire face, vegetated, Construct mechanically stabilized earth
Scarp
100'
See headwall details on Sheet H.15.
class 3 (riprap headwall) at inlet.
with palced riprap, Method A, Install 24" pipe culvert
Existing turnout
Scarp
LC
LC
Proposed edge of road
Proposed edge of road
NO SCALE
NO SCALE
D.17
STATE PROJECT
NUMBER
SHEET
D e f a u lt p w w o r k \d
\i d e f f o .d g n
ID
ID
FS ERFO 2018(1)-81(1)
FS ERFO 2017(2)-81(1)
:3
J u n e
K
M il le r K
P a r k e r
/2
/2
C h e c k e d b y
D e s ig n e d b y
OPTION Y
BLACK CANYON ROAD
FSR 250 - MP 55.5
ID FS ERFO 2017(2)-81(1)
OPTION Y
BLACK CANYON ROAD
FSR 250 - MP 59.9
ID FS ERFO 2017(2)-81(1)
shown are approximate.
1. Sites have not been surveyed. Locations and dimensions
NOTE:
See details, Sheet H.14
(protective apron).
method B, class 3
Construct placed riprap, See details, Sheet H.14
(protective apron).
Method B, class 3
Construct placed riprap, m a x
Construction limits
North Fork Clearwater River
Construction limits m a x
OHWM to be determined in field
OHWM to be determined in field
North Fork Clearwater River
See Sheet D.20 for Connection Detail
See Sheet D.20 for Connection Detail
See Sheet D.20 for Connection Detail
See Sheet D.20 for Connection Detail vegetated, contractor-designed). See Sheet G.3 for details earth wall, (Wall #9, welded wire face, Construct mechanically stabilized
50'
37' m in
See headwall detail on Sheet H.15.
class 3 (riprap headwall) at inlet.
with placed riprap, Method A, Install 24" pipe culvert temporary bypass road
Edge of existing mechanically placed. See Sheet C.5 for details
Construct special rock embankment, Scarp
100' (approx.)
edge of road
Proposed
NO SCALE
NO SCALE
Construction limits
Construct ditch
See Sheet D.20 for Connection Detail
See Sheet D.20 for Connection Detail
Construction limits mechanically placed. See Sheet C.5 for details
Construct special rock embankment, Connection Detail
See Sheet D.20 for
Connection Detail
See Sheet D.20 for
Existing edge of road
Existing edge of road
Proposed edge of road See headwall detail on Sheet H.15.
class 3 (riprap headwall) at inlet.
with placed riprap, Method A, Install 24" pipe culvert with
CL
Scarp shown are approximate.
1. Sites have not been surveyed. Locations and dimensions
NOTE:
BASE
BRIDGE CREEK ROAD
FSR 426 - MP 0.5
ID FS ERFO 2017(2)-81(1)
8' 8'
90'
:2
J u n e id e f f r .d p w w o r k \d
\i d e f f p .d g n
BASE
BRIDGE CREEK ROAD
FSR 426 - MP 2.7
ID FS ERFO 2018(1)-81(1)
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.18 contractor designed) [Wall #10] wall, welded wire face (with gabion rock, Construct mechanically-stabilized earth
Connection Detail
See Sheet D.20 for
Construction limits for Connection Detail
See Sheet D.20
Construction limits
Proposed edge of road Scarp
30" pipe culvert
Remove existing
Existing catch basin
See headwall details on Sheet H.15
(Riprap headwall) at inlet and outlet.
placed riprap, method A, class 3
Install 36-inch pipe culvert with
45'
NO SCALE
75'
:5
J u n e
F
S R p w w o r k \d
\i d e f f q .d g n
OPTION Y
SMITH RIDGE ROAD
FSR 700 - MP 8
ID FS ERFO 2017(2)-81(1)
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.19 surface
Existing roadway roadway surface
Proposed
END CONNECTION
E N
D W
O R
K roadway surface
Existing surface roadway
Proposed
B E
G
IN
W O
R K
BEGIN CONNECTION
method 2
Roadway aggregate method 2
Roadway aggregate turnout and approach apron at FSR 660 MP 2.15.
Roadway surface includes turnout at FSR 246 MP 14.6 and [2]
Match depth of aggregate surfacing shown in Typical Section. [1]
D D [1]
25' 25'
STATE PROJECT
NUMBER
SHEET
ID
ID
FS ERFO 2018(1)-81(1)
D.20
J u n e id e f f q
.d p w w o r k \d
\i d e f f r .d g n
DETAILS
CONNECTION
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1.
18013 1838865.620 2661341.896 3641.690 46°42'39.87292"N 115°36'13.67093"W 3588.35 0.99976389 5/8" IR W/FHWA ALUM CAP
18014 1838689.004 2661189.269 3636.510 46°42'38.13227"N 115°36'15.86598"W 3583.17 0.99976389 5/8" IR W/FHWA ALUM CAP
18015 1839146.142 2661189.413 3635.510 46°42'42.64484"N 115°36'15.85177"W 3582.17 0.99976389 5/8" IR W/FHWA ALUM CAP
18016 1839167.101 2661480.280 3639.770 46°42'42.84640"N 115°36'11.67692"W 3586.43 0.99976389 5/8" IR W/FHWA ALUM CAP
18001 1873814.923 2783826.418 4416.480 46°48'18.85152"N 115°06'51.90093"W 4366.14 0.99975542 5/8" IR W/FHWA ALUM CAP
18002 1874120.040 2783955.733 4392.670 46°48'21.85288"N 115°06'50.00649"W 4342.33 0.99975542 5/8" IR W/FHWA ALUM CAP
18003 1874296.397 2784071.316 4378.180 46°48'23.58440"N 115°06'48.32439"W 4327.84 0.99975542 5/8" IR W/FHWA ALUM CAP
18004 1874485.104 2784112.913 4366.340 46°48'25.44372"N 115°06'47.70443"W 4315.92 0.99975542 5/8" IR W/FHWA ALUM CAP
18101 1595553.862 2739849.456 1756.235 46°02'35.002234"N 115°17'47.037634"W 1705.4558 0.99986616 5/8" IR W/FHWA ALUM CAP
18102 1595326.358 2739983.364 1755.510 46°02'32.748761"N 115°17'45.157778"W 1704.7324 0.99986616 5/8" IR W/FHWA ALUM CAP
18103 1595062.610 2740159.744 1762.720 46°02'30.135015"N 115°17'42.678688"W 1711.9522 0.99986616 5/8" IR W/FHWA ALUM CAP
18104 1594899.530 2740223.037 1774.019 46°02'28.521478"N 115°17'41.794543"W 1723.2555 0.99986616 5/8" IR W/FHWA ALUM CAP
18105 1594706.076 2740146.981 1773.050 46°02'26.615984"N 115°17'42.888455"W 1722.292 0.99986616 5/8" IR W/FHWA ALUM CAP
18106 1594373.530 2740296.563 1756.927 46°02'23.324527"N 115°17'40.794965"W 1706.1819 0.99986616 5/8" IR W/FHWA ALUM CAP
18107 1594525.583 2740155.840 1766.324 46°02'24.833544"N 115°17'42.777476"W 1715.5653 0.99986616 5/8" IR W/FHWA ALUM CAP
18101 1622503.259 2668109.366 1817.152 46°07'03.837996"N 115°34'43.275535"W 1764.4793 0.9998501 5/8" IR W/FHWA ALUM CAP
18102 1622502.036 2667896.717 1837.619 46°07'03.830465"N 115°34'46.294396"W 1784.946 0.9998501 5/8" IR W/FHWA ALUM CAP
18103 1622463.277 2667731.406 1853.030 46°07'03.451305"N 115°34'48.642347"W 1800.356 0.9998501 5/8" IR W/FHWA ALUM CAP
18017 1791024.785 2683527.838 3519.670 46°34'47.085993"N 115°30'57.320435"W 3466.8058 0.99977075 5/8" IR W/FHWA ALUM CAP
18018 1790605.498 2683875.793 3566.690 46°34'42.936734"N 115°30'52.357006"W 3513.8487 0.99977075 5/8" IR W/FHWA ALUM CAP
18019 1790831.766 2683632.937 3542.910 46°34'45.177507"N 115°30'55.824009"W 3490.0556 0.99977075 5/8" IR W/FHWA ALUM CAP
18020 1790802.480 2683729.237 3551.450 46°34'44.885542"N 115°30'54.446614"W 3498.5989 0.99977075 5/8" IR W/FHWA ALUM CAP
18021 1790131.194 2684872.766 3629.370 46°34'38.224942"N 115°30'38.104887"W 3576.5681 0.99976634 5/8" IR W/FHWA ALUM CAP
18022 1790132.130 2685022.991 3637.450 46°34'38.229715"N 115°30'35.954354"W 3584.6514 0.99976634 5/8" IR W/FHWA ALUM CAP
18023 1790042.132 2685332.399 3652.120 46°34'37.331960"N 115°30'31.528900"W 3599.3312 0.99976634 5/8" IR W/FHWA ALUM CAP
18024 1790097.709 2685233.940 3647.750 46°34'37.883590"N 115°30'32.935980"W 3594.9579 0.99976634 5/8" IR W/FHWA ALUM CAP
FSR 255 MP 19.45
FSR 443 MP 30.6
FSR 470 MP 0.8
FSR 660 MP 2.15
FSR 660 MP 2.4
PROJECT : Nez Perce-Clearwater Repairs 2017 PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM : Idaho West SPCS NAD83 (2011)
EPOCH DATE : 2010.000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
FSR 246 MP 14.6
c:
\p w -w or k\ d0
ID
F S E
R
FO
7( 2)
-8 1(
1) _c on tr ol sh ee t_
SP
C S .x ls x]
Sh ee t
-M ay
-2
7:
FL
H D
S ur ve y/
D J&
A
W
FL
H
D S ur ve y/ D
J& A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.21
SHEET
NUMBER
FS ERFO 2017(2)-81(1)ID
SURVEY CONTROL
Sheet 1 of 3
FS ERFO 2018(1)-81(1)
STATE PLANE COORDINATES GEO COORDINATES
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1.
18005 1882461.940 2695945.833 2768.950 46°49'49.285705"N 115°27'54.806164"W 2716.6894 0.99981053 5/8" IR W/FHWA ALUM CAP
18006 1882666.750 2695953.361 2759.940 46°49'51.307128"N 115°27'54.687184"W 2707.686 0.99981053 5/8" IR W/FHWA ALUM CAP
18007 1882288.877 2695975.817 2782.940 46°49'47.576345"N 115°27'54.383856"W 2730.6761 0.99981053 5/8" IR W/FHWA ALUM CAP
18008 1882797.309 2695891.859 2753.970 46°49'52.598094"N 115°27'55.564922"W 2701.716 0.99981053 5/8" IR W/FHWA ALUM CAP
18009 1882911.741 2695869.759 2747.790 46°49'53.728430"N 115°27'55.876823"W 2695.5393 0.99981053 5/8" IR W/FHWA ALUM CAP
18010 1883042.118 2695904.242 2735.930 46°49'55.014186"N 115°27'55.374105"W 2683.6825 0.99981053 5/8" IR W/FHWA ALUM CAP
18011 1883189.071 2695888.645 2722.530 46°49'56.465296"N 115°27'55.590680"W 2670.2858 0.99981053 5/8" IR W/FHWA ALUM CAP
18012 1883242.867 2695896.854 2716.580 46°49'56.996066"N 115°27'55.469935"W 2664.3391 0.99981053 5/8" IR W/FHWA ALUM CAP
PROJECT : Nez Perce-Clearwater Repairs 2017 PROJECT UNITS : US SURVEY FOOT COORDINATE SYSTEM : Idaho West SPCS NAD83 (2011)
EPOCH DATE : 2010.000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
FSR 710 MP 1.8-1.9
c:
\p w -w or k\ d0
ID
F S E
R
FO
7( 2)
-8 1(
1) _c on tr ol sh ee t_
SP
C S .x ls x]
Sh ee t ( 2)
-M ay -2
H
D S ur ve y/ D
J& A
W
FL
H D
S ur ve y/
D J&
A
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.22
SHEET
NUMBER
FS ERFO 2017(2)-81(1)ID
SURVEY CONTROL
Sheet 2 of 3
NUMBER NORTH EAST ELEVATION DESCRIPTION
18123 4015.407 1905.083 1993.344 5/8" IR W/FHWA ALUM CAP
18124 4000.000 2000.000 2000.000 5/8" IR W/FHWA ALUM CAP
18125 2082.099 3958.160 2013.268 5/8" IR W/FHWA ALUM CAP
18120 10064.397 4929.384 3991.005 5/8" IR W/FHWA ALUM CAP
18121 10000.000 5000.000 4000.000 5/8" IR W/FHWA ALUM CAP
18122 9843.257 4966.682 4014.453 5/8" IR W/FHWA ALUM CAP
18117 19917.036 9856.306 4981.650 5/8" IR W/FHWA ALUM CAP
18118 20000.000 10000.000 5000.000 5/8" IR W/FHWA ALUM CAP
18119 20139.616 10127.031 5024.484 5/8" IR W/FHWA ALUM CAP
18108 10050.811 5084.590 2990.087 5/8" IR W/FHWA ALUM CAP
18109 10000.000 5000.000 3000.000 5/8" IR W/FHWA ALUM CAP
18110 9992.607 4872.805 3015.230 5/8" IR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .