Plans - FW_CAVA 102(1) 905(1).pdf
PDF 21 MB Posted
- Attached to
- Canaan Valley National Wildlife Refuge
- Solicitation number
- 693C73-21-B-000007
About this file
This document provides details for a federal contract solicitation to reconstruct roads and trails at the Canaan Valley National Wildlife Refuge in West Virginia. The solicitation is open only to certified small business concerns and seeks bids to complete aggregate surface course, aggregate base, cellular confinement system, drainage improvements, and other miscellaneous work. The project value is estimated between $500,000 and $1,000,000. Interested vendors must register at www.beta.sam.gov in order to receive email notifications or bid documents. Bids are due by the date specified in solicitation number 693C73-21-B-000007. In addition to electronic registration requirements, all visitors to the bid opening must present photo ID, sign in at the main entrance of Quantum Park facility one hour prior, and be escorted within the building. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - FW-CAVA 102(1) 905(1).pdf | ||
| Hydraulics Report.pdf | ||
| Environmental Report.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Geotech Report.pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212 Form.pdf | ||
| Categorical Exclusion (NEPA) .pdf | ||
| IFB Solicitation - FW-CAVA 102(1) 905(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL WILDLIFE REFUGE
U.S. DEPARTMENT OF THE INTERIOR
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH:
ADT (2020)
ADT (2030)
DHV
%Truck
D
V (MPH)
SPECIFICATIONS:
INDEX TO SHEETS
PLANS FOR PROPOSED
SAMMS # 10040592
DESIGN DESIGNATION:
TUCKER COUNTY, WEST VIRGINIA
e(max)
C/A
Know what'sbelow.
before you dig.Call
R
U.S. FISH AND WILDLIFE SERVICE
LANE MILES:
STATE PROJECT
NUMBER
SHEET
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
1-
C A
V A
C a m p
R O
A D tt l.
d g n
BRIDGE:
ROAD: WIDTH SURFACE BASE SUBGRADE
Project Manager Lead DesignerHighway Design Manager
Title Sheet
Location Map
Typical Sections
DESCRIPTION
NO
A01
A02
A03
Horizontal Alignment Description
Survey Information
T01-T10
Tabulation of Quantities
S01-S19
Gravel
Gravel
C01
CANAAN VALLEY
PLANS PREPARED BY
3101 WILSON BOULEVARD, SUITE 900
ARLINGTON, VIRGINIA 22201
PLANS PREPARED FOR
DAN WESTON JOE HUESMANNTIFFANY MCCARTHY
KEY MAP
N
CHARLESTON
MORGANTOWN
PA
MD
V A
K Y
O H
STATE OF WEST VIRGINIA
0.257 Miles
N/A
None and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
N/A
N/A
N/A
<100
<100
<100<100
<100
A04-A06
A07-A09
D04-D06
K01-K02
M01-M02
Gravel5.0'River's Edge Trail
Parking Lot
Symbols and Abbreviations
U01-U05 Trail Cross Sections
WV FW-CAVA 102(1), 905(1)
A01
Varies
RIVER'S EDGE TRAIL
RECONSTRUCTION - CO ROUTE 32/18-CAMP 70 ROAD, PARKING LOT,
CO Route 32/18-Camp 70 Road
(River's Edge Trail)
0.2 Miles (CO Route 32/18-Camp 70 Road), 0.057 Miles
Gravel CCS
Gravel CCS
Gravel
B01-B03
C02-C04 Summaries and Schedules
D01-D03
Grading Plan
Drainage Profiles
M03-M05
N01 Transportation Management Plan
N02 Traffic Control Plan
P01-P02 Permanent Signing Plan improvement of gravel trail.
wide gravel road, enlargement of gravel parking lot, and
Reconstruction and drainage improvement of existing 8-12'
Existing/Select Borrow
Existing/Select Borrow
Existing/Select Borrow
0 25 50 100
SCALE IN MILES
PROJECT FW-CAVA 102(1), 905(1)
AQUA DR
A P P A L A C
H
IA
N H
W Y
R
IV
E R S T O
N E R
D
BROWN
MOUNTAI
N
RD
N
DAVIS, WV
CAMP 70 RD
CO ROUTE 32/18-
CAMP 70 RDCO ROUTE 32/18
SCALE IN FEET
0 2000 4000
FW-CAVA 102(1), 905(1)
BLACKWATER RIVER
905(1)
102(1), FW-CAVA
12.0'
Road Cross Sections
JULY 2020
Plan and Profile
Erosion and Sediment Control Narrative
Erosion and Sediment Control
Standards and Details
STATE OF
12015
AI
NIGRIV
TS
E W
RE
GIS
TERED
R E
E
NI
GNELANOI
SSEF
O R
P
D
A V
ID
L.WEA
E
V
SIGNED...................................................DATE:.................WV REG. P.E
12015
R/W R/W
P/E
No Symbol
TB or TP
P P or
UD UD
W W
P/E
No Symbol
TB or TP
P P or or
UD UD
W W
FOUND
36 31
6 1
36 31
6 1
No Symbol
No Symbol
FOUND
36 31
6 1
36 31
6 1
400 No Symbol x 99.9
T-45
2,645.9
T-3 x 99.9
T-45
2,645.9
T-3
26 25 69426 25 694
PROPOSEDEXISTING
PROJECTED
INTERSTATE U.S. STATE
TREELINE; TREE
BUILDING
UNDERDRAIN
BOX CULVERT
PIPE CULVERT with HEADWALL
PIPE CULVERT with END SECTION
PIPE CULVERT (arrow shows flow)
BRIDGE
STREET LIGHT
TELEPHONE BOOTH or PEDESTAL
SUPPORT POLE with ANCHOR
RETAINING WALL
SIGNS
GUARDRAIL
CATTLEGUARD
GATE with FENCE
FENCE
MATERIAL SOURCE
NORTH ARROW
EXISTING PROPOSED
wall facewall face
TB or TP or
P/LP/L
MEDIAN & SIDE (CONCRETE) BARRIER
FOREST BOUNDARY
NATIONAL PARK or
SECTION LINE16
SECTION LINE4
SECTION LINE
COUNTY BOUNDARY
CITY BOUNDARYCITY BOUNDARY
NATIONAL BOUNDARY
STATE BOUNDARY
PROPERTY LINE
BRASS CAP
STEEL PIN
Top of Triangle Points North
TRAVERSE POINT (Horizontal & Vertical)
TRAVERSE POINT (Horizontal)
COORDINATE GRID TICK
SPOT ELEVATION
HUB & TACK
BORING LOCATION
RIPRAP/CULVERT RIPRAP
CHECK DAM
DIVERSION BERM
SECTION CORNER
SECTION CORNER4
SECTION16
PROPERTY CORNER
PARCEL NUMBER
EASEMENT (Permanent - Construction)
ROUTE NUMBERS
RIGHT-OF-WAY LINE
with MONUMENT
RIGHT-OF-WAY LINE
TOP OF CUT
TOE OF FILL
TRANSITION
SINGLE TRACK
ROADWAY, EXISTING
SPRING
LARGE CREEK/RIVER
RAILROAD
TRAIL
MULTIPLE TRACK
N
FO=Fibre optics
T=Telephone, E&T=Joint Electrical and Telephone
E=Electrical for distribution line
P=Electrical for transmission line
OVERHEAD(POWER POLE) UTILITIES
DIVERSION CHANNEL
TEST PIT
B-1
TP-1
ABBREVIATIONS
SYMBOLS AND
EOP
EOG
E=electrical, FO=fiber optics SD=storm drain, T=telephone, W=water G=gas, O=oil, P=power, SS=sanitary sewer, UNDERGROUND UTILITIES c
Inside diameter ID
High water HW
Hexagon hex.
Headwall hdwl.
Joint jt.
L
Concrete Pavement
GACPGyratory Mix, Asphalt
Gage(gauge) ga.
Galvanized galv.
Average daily traffic ADT
Alternate alt.
Ahead AH
Aggregate aggr.
Abutment Abut.
Footing ftg.
FATFlared Anchor Terminal
Drop Inlet DI
Drawing(s) dwg(s), or drwg(s)
DSYDouble Solid Yellow
Distance dist.
Diaphragm diaph.
Diameter D, dia., or
Diagonal diag.
Design speed V
Design hourly volume DHV
West W
Vertical point of intersection VPI
Vehicle per hour vph
Typical typ.
Township T.
Thread thd.
easement
Temporary construction TCE
Temporary benchmark TBM
(spiral curve transition)
Tangent distance Ts
(tangent length)
Tangent distance T
On centers o. c.
Outside diameter OD
Out to out o. to o.
Original ground OG
North N
Normal crown NC or NCR
Nominal Max. Size Aggregate NMSA
Symmetrical sym.
Superelevation rate e
Structure struc.
Stringer stgr.
Stiffener stiff.
SBTSteel Backed Timber
Station Sta.
Standard std.
Spiral central angle s
Spacing, spaces or spaced spa.
South S
SWSolid White
Section Sec.
A02
CULVERT with DROP INLETINTERMITTENT DRAINAGE/ SMALL CREEK
TOWNSHIP or RANGE LINE
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:-
SLOPE STAKE
TEMPORARY
POST MOUNTED
BWBroken White
Bench mark BM
Beginning beg.
Bearing brg.
BBaseline
Balance point BP
BATBackslope Anchor Terminal
Back BK
Longitudinal(longitude) long.
Length of spiral Ls
(spiral curve transition)
Length of curve Lc
Length of curve(simple curve) L
Left lt., Lt. or LT
Latitude lat.
Lamination lam.
embankment
Mechanically stabilized MSE
Monument mon. or MON
Minimum min.
Mile[Kilometer] post M.P[K.P.]
Maximum max.
Material matl.
Mainline M.L.
Low water LW
L
Point on tangent POT
Point on spiral POS
Point on curve POC
Point of tangent to spiral PS or TS
Point of tangent PT
Point of spiral to tangent PST or ST spiral
Point of spiral to reverse SRS
Point of spiral to curve PSC or SC
Point of intersection PI
Point of curve to spiral PCS or CS
Point of curve PC
Portland cement concrete PCC
Plate pl.
Pavement pvmt.
LAKE, POND or RESERVOIR; MARSHLAND, WETLAND
Expansion joint exp. jt.
exist. Existing
Excavation exc.
ESALEquivalent Single Axle Load
Equation EQ or eq.
End section ES
Embankment emb.
[El. 94.16]
Elevation with number El. 94.161
Elevation elev.
Edge of pavement EP or EOP
East E
LOD
LIMIT OF DISTURBANCE
MUTCD TYPE 3 BARRICADE, LENGTH = 8'
(curve delta or deflection)
Curve total angle
(spiral curve transitions)
Curve central angle
Culvert culv.
Corrugated metal pipe CMP
COContracting Officer
Continuous cont.
Construction joint Constr. jt.
Connection conn.
Column col.
Clear clr.
Centers ctrs.
Center to center cc, c-c or c. to c.
Centerline C
DITCH CENTER LINE
TP
WIRE-BACKED SILT FENCE, E157-02
TREE PROTECTION FENCE, E619-B
Rolled Erosion Control Product RECP
Route Rte.
Roadway Rdwy.
Right-of-way R/W
Right Rt., rt.or RT
Required reqd.
Reinforcement (reinforced) reinf.
Reinforced circular concrete pipe RCCP
Radius R
HIGH DENSITY POLYETHYLENE HDPE
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (1 s y m .d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (1 s y m .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
WV
WILDLIFE REFUGE CAMP 70 ROAD
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
LOCATION MAP
SCALE IN FEET
200010000
AQUA DR
A P P A L A C
H
IA
N H
W Y
48R
IV
E R S T O
N E R
D BROWN
MOUNTAI
N
RD
DAVIS
A03
CO ROUTE 32/18-CAMP 70 RD
CO ROUTE 32/18
-CAMP 70 RD
Parking Lot
FW-CAVA 102(1), 905(1)BLACKWATER RIVER E: 1995326.21
N: 231581.02
Sta. 109+97.65
End Road Work
E: 1995343.15
N: 231464.36
Sta. 10+00.00
Begin Trail Work
E: 1994371.30
N: 231864.48
Begin Road Work Sta. 100+00
E: 1995310.92
N: 231261.29
End Trail Work Sta. 12+27.93 a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D lo c .d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D lo c .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (1 s u r .d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (1 s u r .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
19DEED B
OOK 1
70, OF AMERIC
A
UNIT
ED S
TATES
RIG
HT OF WAY
AEC1
AEC2 AEC3
GRAVEL ROAD
GRAVEL ROAD
6"
6"
26"
REFUGE B
OUNDARY MARKER
(PIC
6)SIG
N "
CAMPIN
G"
RED F
LAG
BOUNDARY L
INE (
BLUE P
AIN
T)
TREES
MARKED AS
POSSI
BLE
BOUNDARY L
INE (
BLUE P
AIN
T-TYP)
TREES
MARKED AS
POSSI
BLE
(PIC
8)
DEED B
OOK 2
09, DIV
ISIO
N OF NATURAL R
ESOURCES
DEPARTMENT OF C
OMMERCE
STATE
OF WEST VIR
GIN
IA,
DEED B
OOK 1
70, UNIT
ED S
TATES
OF AMERIC
A
BOUNDARY L
INE
CL R/W
CAMP 70 ROAD 15' R/W
CLUSTER,
4"
MAX HAWTHORNE
6"
MAPLE
6"
BEECH
6"
BEECH
7"
UNK.,
HEAVILY DIS
EASED
DEED B
OOK 1
70, UNIT
ED S
TATES
OF AMERIC
A
17"
RED MAPLE
12"
RED MAPLE,
DIS
EASED
WV S
TATE
LANDS
POTENTIAL WETLAND
WET I
BRUSH
GRAVEL
LIT
TLE
CANAAN
WOOD
BRUSH
5 3
UTIL
AEC1
CLUSTER,
4"
MAX HAWTHORNE
AEC2
GRAVEL ROAD
6"
AEC3
CL R/W
7"
UNK.,
HEAVILY DIS
EASED
A E C A
R
M
P
LE
R
P
LE
D
IS
E A S E D
G R
A V E
S T
O N E
AEC1A
STONE
SURVEY INFORMATION
See inset below.
Horizontal and Vertical Control
North East Elevation DescriptionTraverse Point
SCALE IN FEET
0 10 20
SCALE IN FEET
0 10 20
TRAV POINT AEC1 TRAV POINT AEC2
N
SCALE IN FEET
0 20 40
See inset below.
A04
SCALE IN FEET
0 10 20
TRAV POINT AEC3
See inset below.
M a tc h li n e S e e S h e e t
A
N N
N
R-1 ground. No real evidence of utility markings.
4. The blue and red flags located on this site were found laying on the to any excavation.
measurements of observable evidence. Verification should be made prior
3. Any utilities shown hereon have been located by actual field
Combined scale factor: (AEC4 - Grid to Ground) 1.0001741
(Maghub)El. 3160.32'E 1,995,056.9160N 231,670.7283AEC4 (Maghub)El. 3159.04'E 1,994,812.7850N 231,749.7933AEC3 observations use OPUS processed through NGS.
NAD83(2011) horizontal datum (grid) and NAVD88 Vertical Datum. Primary control is based on GPS
2. Survey information shown hereon is based on West Virginia State Plane-North Coordinate System
1. Existing features shown hereon were taken from actual field measurements during October 2019.
Notes:
M a tc h li n e S e e T h is S h e e t
Matchline See This Sheet
TRAV POINT AEC1A
SCALE IN FEET
0 10 20
N
See inset below.
L=55.56' L=10.32'
L=20.94'
L=55.74'
AEC3
AEC2
AEC1
AEC1A
231749.7933
231822.7049
231847.6669
231757.33
1994812.7850
1994606.3547
1994429.3154
1994299.85
3159.04
3157.27
3154.27
3145.86
TRAV MAGHUB
TRAV MAGHUB
TRAV MAGHUB
TRAV MAGHUB
RIG
HT OF WAY
AEC4
AEC5
GRAVEL ROAD
GRAVEL R
OAD
(PIC
7 &
W/
PLAQUEBOULDER
4"( 2)
BRUSH
BLUE F
LAG
RED F
LAG
RED F
LAG
BLUE F
LAG
BRUSH
(PIC
7)INFORMATIO
N S
IGN
WOODEN
GRAVEL
6" 6"
28"
(PIC
8)TRAIL
MARKER
(PIC
4)NO ATV'S
"LANDIN
G-SIG
N "
LAUREL
G R
A V E L
P
A T H
RED F
LAG
CAMP 70 ROAD 15' R/W
CAMP 70 ROAD 15' R/W
CL R/W
2"
EASTERN HEMLOCK
10"
BLACK C
HERRY
CLUSTER,
4"
MAX
4"
HAWTHORN
4"
HAWTHORN
CLUSTER,
8"
MAX HAWTHORN
CLUSTER,
6"
MAX HAWTHORN
CLUSTER,
8"
MAX HAWTHORN
CLUSTER,
6"
MAX HAWTHORN
MAX HAWTHORN
28"
CLUSTER,
6"
WET C
WET B
-C
WET B
-A
WET D
WET E
WET A
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (2 s u r .d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (2 s u r .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
AEC4
4"
HAWTHORN
AEC5
GRAVEL
N
SURVEY INFORMATION
Horizontal and Vertical Control
North
231568.5985
231670.7283
East Elevation DescriptionTraverse Point
SCALE IN FEET
0 10 20
SCALE IN FEET
0 10 20
SCALE IN FEET
0 20 40
TRAV POINT AEC4 TRAV POINT AEC5
AEC5
AEC4
1995371.2300
1995056.9160
See inset below.
A05
See inset below.
3160.32
3160.32
Matchline See She et A06
M a tc h li n e S e e S h e e t
A
N N
R-2
R-3
R-4
L= 68.88'
L= 76.81
Maghub
Maghub utility markings.
4. The blue and red flags located on this site were found laying on the ground. No real evidence of
Verification should be made prior to any excavation.
3. Any utilities shown hereon have been located by actual field measurements of observable evidence.
Combined scale factor: (AEC4 - Grid to Ground) 1.0001741
(Maghub)El. 3160.32'E 1,995,056.9160N 231,670.7283AEC4 (Maghub)El. 3159.04'E 1,994,812.7850N 231,749.7933AEC3 observations use OPUS processed through NGS.
NAD83(2011) horizontal datum (grid) and NAVD88 Vertical Datum. Primary control is based on GPS
2. Survey information shown hereon is based on West Virginia State Plane-North Coordinate System
1. Existing features shown hereon were taken from actual field measurements during October 2019.
Notes:
RAMP
B E E C
H
B E E C
H 2
B E E C
H
P V C
IN
V
E L E V
.8
P V C
IN
V
E L E V
.9
(D
IR
E C T
IO
O
L Y
G O E S
IP
P
C M P
IN
V
E L E V
.6
A E C
C O
N C
R E T E
F L U
H
W
IT
G
O U
N D
B R
U S
H
(P
IC
V 'S
L A N
D
IN
G
S
IG
N
"L
A U
R
D
F L A G
"E
L E C T R
IC
C O
N C
R E T E
GRAVEL PATH
R O
C K
P
IL
E
P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T W
IN
E A S T E
M L O
C K
E A S T E
M L O
C K
H E
M L O
C K
E A S T E
E A S T E
M L O
C K
S T U
M P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T
IN
C
U S T E R
M
X
W T H
O R
N
C L U S T E R
M
W T H
O R
N
C L U S T E R
M
W T H
O R
N
B
LA
C K
W A
TE
R
R
IV
E R
W
A
W
I N
V
I N
V
I N
V
I N
V
I N
V
I N
V a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (3 s u r .d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p
R O
A D (3 s u r .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
B E E C
H
B E E C
H
A E C
E A S T E
M L O
C K
T W
IN
E A S T E
M L O
C K
E A S T E
M L O
C K
S T U
M P
N
SURVEY INFORMATION
A06
Horizontal and Vertical Control
North East Elevation DescriptionTraverse Point
SCALE IN FEET
0 10 20
SCALE IN FEET
0 20 40
TRAV POINT AEC6
See inset below.
AEC6 231293.3459 1995293.8359 TRAV MAGHUB
M a tc h li n e S e e S h e e t
A
3138.67
N
T-1 T-2
L= 23.48' utility markings.
4. The blue and red flags located on this site were found laying on the ground. No real evidence of
Verification should be made prior to any excavation.
3. Any utilities shown hereon have been located by actual field measurements of observable evidence.
Combined scale factor: (AEC4 - Grid to Ground) 1.0001741
(Maghub)El. 3160.32'E 1,995,056.9160N 231,670.7283AEC4 (Maghub)El. 3159.04'E 1,994,812.7850N 231,749.7933AEC3 observations use OPUS processed through NGS.
NAD83(2011) horizontal datum (grid) and NAVD88 Vertical Datum. Primary control is based on GPS
2. Survey information shown hereon is based on West Virginia State Plane-North Coordinate System
1. Existing features shown hereon were taken from actual field measurements during October 2019.
r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (1 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (1 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
P C
.0
P T
.9
P C
.9
P R
C
.3
P T
.5
Cur ve =
BL_WVC_ROAD_1
PI 1
00+
52.4
D
R =
.23'
T = 52.
40'
L =
.99'
L = 51.00'
Curve = BL_WVC_ROAD_2
PI 102+10.19
D
R = 5,375.00'
T = 55.20'
L = 110.39'
Curve = BL_WVC_ROAD_3
PI 103+53.48
D
R = 5,375.00
T = 88.09'
L = 176.17'
L = 196.24'
N
SCALE IN FEET
0 20 40
A07
DESCRIPTION
HORIZONTAL ALIGNMENT
L
M a tc h li n e S ta
.0
S e e S h e e t
A
Easting: 1994371.30
Northing: 231864.48
CO Route 32/18-Camp 70 Road B
Chain = BL_WVC_ROAD r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (2 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (2 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
P C
.7
P T
.3
P C
.0
P T
.9
P C
.6
Curve = B
L_WVC_ROAD_4
PI 106+84.59
D
R = 1,451 .50'
T = 46.80
L = 93.58'
L = 10.67
Curve = BL_WVC_ROAD_5
PI 107+86.99
D
R = 1,451.50'
T = 44.96'
L = 89.89'
L = 179.70'
POT 10+00.00
10+00 10+00
N
SCALE IN FEET
0 20 40
A08
DESCRIPTION
HORIZONTAL ALIGNMENT
L
M a tc h li n e S ta
.0
S e e S h e e t
A
CO Route 32/18-Camp 70 Road B
Matchline Sta. 10+ 00.00, See Shee t A09
Culvert 1
Culvert 2
E: 1995326.21 N: 231581.02 109+97.65 End Road Work, L
P a rk in g L o t C (F o r R e fe re n ce O n ly
Chain = BL_WVC_ROAD r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (3 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \A
-C
A V
A
C a m p h a d (3 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
P O
T
.0
P C
.1
P T
.8
P C
.8
PRC
+04 .8
P T .4
L = 129.11' L = 26
.00'
Curve = BL_WVC_TRAIL_3
PI 12+09.17
D
R = 28.07'
T = 4.31'
L = 8.56'
Curve = BL_WVC_TRAIL_2
PI 11+88.26
D
R = 39.02'
T = 19.40'
L = 36.00'
Curve = BL_WVC_TRAIL_1
PI 11+35.99
D
R = 170.00'
T = 6.88'
L = 13.76'
N
A09
SCALE IN FEET
0 20 40
DESCRIPTION
HORIZONTAL ALIGNMENT
LRiver's Edge Trail B
M a tc h li n e S ta
.0
S e e S h e e t
A
Easting: 1995310.92
Northing: 231261.29
End Trail, 12+13.42
Easting: 1995343.15
Northing: 231464.36
Begin Trail, 10+00.00
BL_WVC_TRAIL
Chain =
TYPICAL SECTIONS
B01
BL
2.5' 2.5'
1V:6H
VariesVaries
Existing Ground
BL
Existing Typical
Varies Varies
Aggregate Surface
RIVER'S EDGE TRAIL
Profile Grade
CO ROUTE 32 / 18 - CAMP 70 ROAD
Existing Ground
BL
2.5' 2.5' VariesVaries
RIVER'S EDGE TRAIL
Profile Grade
2%
2'2'
1V:
2H1V:2H
2' 2'
1V:2H1V:6H
1V:
2H
1.5'1.5'
Fence, Split Rail, 4 Rail* Fence, Split Rail, 4 Rail*
Limit of Disturbance
Existing Ground
Limit of Disturbance
Existing Ground
Limit of Disturbance
Existing Ground
Limit of Disturbance
Turf Establishment
Turf Establishment
Turf Establishment Turf Establishment
2% 2%
Geotextile Filter, Class 2, Type A
Geotextile Filter, Class 2, Type A
2%
Select Borrow
1'
Existing Ground
BL
2.5' 2.5' Varies
Varies
1V:6 H
1V:6 H
RIVER'S EDGE TRAIL
Profile Grade
2%
2'2'
1V:
2H
1V:2H
Limit of Disturbance
Existing Ground
Limit of Disturbance
Turf Establishment
4-Inch Depth Aggregate Base Grading C, Geotextile Filter, Class 2, Type A
2%
1V:6 H1V:6H
1'
1'1'
1'1'
*Split Rail Fence 11+00 to 11+70 11+00 to 11+80
11+80 to 12+13.42
10+00 to 11+00
*8' to 12'
Select Borrow, Depth Varies
Varies*
Varies Varies
4-Inch Depth Aggregate Base Grading C, 4-Inch Depth Aggregate Base Grading C, Turf Establishment
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch Depth
2-Inch Depth
Roadway Aggregate, Method 2 (AASHTO M43 #10) 2-Inch Depth
Roadway Aggregate, Method 2 (AASHTO M43 #10)
2-Inch Depth
Roadway Aggregate, Method 2 (AASHTO M43 #10)
NO SCALE
8. Submit the cellular confinement system for CO review and approval.
aggregate surface course.
7. Place Geotextile Filter between layers of existing soil or select borrow and
6. Use Grass Seed Mixture shown on Sheet M02 for all turf establishment.
provide a minimum of 12 inches of compacted select borrow.
5. When the proposed trail is being widened beyond the limits of the existing trail, Replace unsuitable subbase with compacted select borrow.
4. Verify the integrity of existing subbase, according to the geotechnical report.
cellular confinement system.
3. When cutting within the existing trail limits, remove existing material and place compacted select borrow, and place cellular confinement system.
2. When filling within the existing trail limits, compact existing surface, place
1. Provide smooth transitions between cut and fill sections, E204-01.
Trail Notes:
Furnishing and Placing Topsoil, 4-Inch Depth
4-Inch Depth Furnishing and Placing Topsoil, 4-Inch Depth Furnishing and Placing Topsoil, 4-inch Cellular Confinement System (See Note 8) 4-inch Cellular Confinement System (See Note 8)
4-inch Cellular Confinement System (See Note 8) a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
1-
C A
V A
C a m p
R O
A D ty p (1 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
1-
C A
V A
C a m p
R O
A D ty p (1 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
B02
CO ROUTE 32 / 18 - CAMP 70 ROAD
L
6-Inch Depth
Aggregate Surface Course, L
1V:2H
CO ROUTE 32 / 18 - CAMP 70 ROAD
6-Inch Depth Aggregate Surface Course, B
6'
4%
Turf Establishment
Existing Ground
6'
B
4%
4.5'
Profile GradeProfile Grade
Existing Ground
Limit of Disturbance Limit of Disturbance
Geotextile Filter, Class 2, Type A
Geotextile Filter, Class 2, Type A
L
CO ROUTE 32 / 18 - CAMP 70 ROAD
6-Inch Depth Aggregate Surface Course, 6'
B Profile Grade
Existing Ground
Limit of Disturbance
Geotextile Filter, Class 2, Type A
Varies
CO ROUTE 32 / 18 - CAMP 70 ROAD
L
6-Inch Depth
Aggregate Surface Course, B
6'
Profile Grade
Existing Ground
Limit of Disturbance
Geotextile Filter, Class 2, Type A
Varies
100+00 to 100+29.73
L
1V:2H
CO ROUTE 32 / 18 - CAMP 70 ROAD
6-Inch Depth Aggregate Surface Course, Existing Ground
6'
B
1V:3 H
4%
.5
4.5'
M in
Profile Grade
Limit of Disturbance
Geotextile Filter, Class 2, Type A
Va rie sV a r ie s
V a r ie s
100+29.73 to 102+24.15
109+25 to 110+11.62 102+24.15 to 107+75, 108+25 to 108+75, 100+00 to 101+11
105+25 to 106+75 101+11 to 101+75, L
6-Inch Depth
Aggregate Surface Course, CO ROUTE 32 / 18 - CAMP 70 ROAD
B
6'
1V:3H
4%
Varies
Geotextile
Profile Grade
Existing Ground
Turf Establishment
Limit of Disturbance
106+75 to 109+50 101+75 to 102+25, 102+75 to 105+25, Varies
Varies
Varies
Varies
Varies
Varies
Varies Varies
Varies
Varies
Select Borrow, Depth Varies Select Borrow, Depth Varies
Select Borrow, Depth Varies Select Borrow, Depth Varies
Turf Establishment*
Turf Establishment*
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch Depth
Furnishing and Placing Topsoil, 4-Inch Depth
NO SCALE
surface course.
existing soil or select borrow and aggregate
7. Place Geotextile Filter between layers of M02 for all turf establishment.
6. Use Grass Seed Mixture shown on Sheet of compacted select borrow.
roadway, provide a minimum of 12 inches widened beyond the limits of the existing
5. When the proposed roadway is being select borrow.
Replace unsuitable subbase with compacted according to the geotechnical report.
4. Verify the integrity of existing subbase, inches of aggregate surface course.
limits, remove existing material and place 6
3. When cutting within the existing roadway inches of aggregate surface course.
compacted select borrow, and place 6 limits, compact existing surface, place
2. When filling within the existing roadway fill sections, E204-01.
1. Provide smooth transitions between cut and Roadway Notes:
104+50.
* Place turf reinforcement mat, Rolled Erosion Control Product Type 5.A, Detail E629-02, across entire ditch, Sta 101+35 -a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
-C
A V
A
C a m p
R O
A D ty p (2 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
-C
A V
A
C a m p
R O
A D ty p (2 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
B03
L
CO ROUTE 32 / 18 - CAMP 70 ROAD
6-Inch Depth Aggregate Surface Course, 6'
B
1V:3 H
4%
Profile Grade
Existing Ground
Turf Establishment
Limit of Disturbance
Geotextile Filter, Class 2, Type A
VariesVaries
4-Inch Depth Aggregate Base Grading C, Limit of Disturbance
92.9'9.5' 5.7'
See Plan and Profile Sheet D02
Turf Establishment
Turf Establishment
Limit of Disturbance
VariesVaries
108+75 to 109+25 107+75 to 108+25, L
6-Inch Depth
Aggregate Surface Course, CO ROUTE 32 / 18 - CAMP 70 ROAD
B
6'
4%
Varies
1'
1V:50H
Profile Grade
Existing Ground
Limit of Disturbance
Geotextile Filter, Class 2, Type A
102+25 to 102+75
Wheelstop, Concrete
Varies
Varies
PARKING LOT, SECTION A-A
Varies
Select Borrow, Depth Varies
Select Borrow, Depth Varies
Select Borrow, Depth Varies
Turf Establishment
NO SCALE
Existing Ground
Limit of Disturbance
Geotextile Filter, Class 2, Type A
Varies
Existing Ground
Limit of Disturbance
Geotextile Filter, Class 2, Type A
Varies
Varies Varies
6-Inch Depth*
Aggregate Surface Course, 6-Inch Depth* Aggregate Surface Course, *Minimum, or match existing See Plan and Profile Sheet D01
Varies Varies
CO Route 32/18, SECTION A-A
Furnishing and Placing Topsoil. 4-Inch Depth
Topsoil, 4-Inch Depth Furnishing and Placing
4-Inch Depth Furnishing and Placing Topsoil, Furnishing and Placing Topsoil, 4-Inch Depth
2-Inch Depth
Roadway Aggregate, Method 2 (AASHTO M43 #10)
Grades Existing Match
8. Submit the cellular confinement system for CO review and approval.
aggregate surface course.
7. Place Geotextile Filter between layers of existing soil or select borrow and
6. Use Grass Seed Mixture shown on Sheet M02 for all turf establishment.
provide a minimum of 12 inches of compacted select borrow.
5. When the proposed trail is being widened beyond the limits of the existing trail, Replace unsuitable subbase with compacted select borrow.
4. Verify the integrity of existing subbase, according to the geotechnical report.
cellular confinement system.
3. When cutting within the existing trail limits, remove existing material and place compacted select borrow, and place cellular confinement system.
2. When filling within the existing trail limits, compact existing surface, place
1. Provide smooth transitions between cut and fill sections, E204-01.
Parking Lot Notes:
4-inch Cellular Confinement System (See Note 8) aggregate surface course.
7. Place Geotextile Filter between layers of existing soil or select borrow and
6. Use Grass Seed Mixture shown on Sheet M02 for all turf establishment.
roadway, provide a minimum of 12 inches of compacted select borrow.
5. When the proposed roadway is being widened beyond the limits of the existing
Replace unsuitable subbase with compacted select borrow.
4. Verify the integrity of existing subbase, according to the geotechnical report.
place 6 inches of aggregate surface course.
3. When cutting within the existing roadway limits, remove existing material and compacted select borrow, and place 6 inches of aggregate surface course.
2. When filling within the existing roadway limits, compact existing surface, place
1. Provide smooth transitions between cut and fill sections, E204-01.
Roadway Notes:
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
-C
A V
A
C a m p
R O
A D ty p (3 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \B
-C
A V
A
C a m p
R O
A D ty p (3 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
C01
QUANTITIES
TABULATION OF
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
1-
C A
V A
C a m p
R O
A D q n t.
d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
1-
C A
V A
C a m p
R O
A D q n t.
d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
C02
SCHEDULES
SUMMARIES AND
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
C03
SUMMARIES AND
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
C04
SUMMARIES AND
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \C
-C
A V
A
C a m p
R O
A D q n t.
d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
V
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
1-
C A
V A
C a m p
R O
A D p p (1 d g n
V
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
1-
C A
V A
C a m p
R O
A D p p (1 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
19DEED B
OOK 1
70, OF AMERIC
A
UNIT
ED S
TATES
RIG
HT OF WAY
AEC1
AEC2 AEC3
GRAVEL ROAD
GRAVEL ROAD
6"
6"
26"
REFUGE B
OUNDARY MARKER
(PIC
6)SIG
N "
CAMPIN
G"
RED F
LAG
BOUNDARY L
INE (
BLUE P
AIN
T)
TREES
MARKED AS
POSSI
BLE
BOUNDARY L
INE (
BLUE P
AIN
T-TYP)
TREES
MARKED AS
POSSI
BLE
(PIC
8)
DEED B
OOK 2
09, DIV
ISIO
N OF NATURAL R
ESOURCES
DEPARTMENT OF C
OMMERCE
STATE
OF WEST VIR
GIN
IA,
DEED B
OOK 1
70, UNIT
ED S
TATES
OF AMERIC
A
BOUNDARY L
INE
CL R/W
CAMP 70 ROAD 15' R/W
CLUSTER,
4"
MAX HAWTHORNE
6"
MAPLE
6"
BEECH
6"
BEECH
7"
UNK.,
HEAVILY DIS
EASED
DEED B
OOK 1
70, UNIT
ED S
TATES
OF AMERIC
A
17"
RED MAPLE
12"
RED MAPLE,
DIS
EASED
WV S
TATE
LANDS
POTENTIAL WETLAND
WET I
BRUSH
GRAVEL
LIT
TLE
CANAAN
WOOD
BRUSH
5 3
UTIL
X
X X
X
X
X
X
.5
250.0'
N D01
PLAN & PROFILE
3,135
100+00
3,140
3,145
3,150
3,155
3,160
3,165
3,170
101+00 102+00 103+00 104+00
105+00
+50 +50 +50 +50
+50+50
,1
.7
,1
.0
,1
.4
,1
.7
, 1
.0
,1
.3
,1
.7
,1
.0
,1
.3
,1
.6
,1
.0
,1
.3
,1
.6
,1
.9
,1
.3
,1
.6
,1
.9
,1
.2
,1
.4
,1
.6
,1
.8
,1
.9
P R
O P
O S
E D
E X I S
T I N
G
,1
.7
,1
.5
,1
.8
,1
.1
,1
.1
,1
.1
,1
.8
,1
.2
,1
.0
,1
.3
,1
.3
,1
.9
,1
.2
,1
.5
,1
.2
,1
.4
,1
.8
,1
.7
,1
.0
,1
.0
,1
.5
,1
.8
,1
.3
L
.0
K
E L ,1
.5
V
P I
.0
M a tc h li n e S ta
S e e S h e e t
D
L
1.30% 100+00 Begin Work, M a tc h li n e S ta
Proposed Ground
Existing Ground
HOR. SCALE IN FEET
0 20 40
Proposed Edge of Roadway
0.50%
Existing Edge of Roadway
CO Route 32/18
Proposed Edge of Roadway
Existing Edge of Roadway line and grade Meet existing
See Note 1
CO Route 32/18-Camp 70 Road
Camp 70 Road B Co Route 32/18-
Proposed Fill Limits, Typ.
Legend:
Notes:
Proposed Cut Limits, Typ.
P C
.0
P T
.0
El. 3154.12 Off. 21.66' LT Sta. 100+87.86 edge of roadway Tie to existing
Tree to be Removed
Widening Area
X
To Culvert 3 Sta. 100+08.06 End Ditch 1, Ditch 1 Centerline
Limits, Typ., E204-01 Proposed Transition
A
A
Centerline Ditch 5
E: 1994371.30 N: 231864.48 Sta. 100+00.00 Road Work, Begin Access
See Note 3
See Notes Outfall to Blackwater River and place Riprap, Method A, Class 3 at inlet and outlet, E251-50 Place 28' of 36-Inch Pipe culvert at 3º Skew, 2 End Sections Culvert 3
3. See Sheet D04 for grading and work across CO Route 32/18.
2. See Drainage Profiles Sheets for additional drainage information.
1. Grade intersection to provide positive drainage.
E629-02 Sta 100+08, 7.3' Width, E629-02, Begin RECP Type 5.A, E629-02 Sta 104+50, 7.3' Width, E629-02, End RECP Type 5.A, RIG
HT OF WAY
AEC4
AEC5
CL R/W
WET C
WET B
-C
WET B
-A
WET D
WET E
WET A
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (2 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (2 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
10+00 10+00
X
X X X
X
X
X X
X
N D02
3,135
3,140
3,145
3,150
3,155
3,160
3,165
3,170
106+00 107+00 108+00 109+00+50 +50 +50 +50
P R
O P
O S
E D
E X I S
T I N
G
L
.0
K
E L ,1
.6
V
P I
.0
+50 110+00
,1
.0
,1
.1
,1
.3
,1
.4
,1
.5
, 1
.6
,1
.8
,1
.9
,1
.0
,1
.1
,1
.3
,1
.8
,1
.9
,1
.9
,1
.6
,1
.9
, 1
.2
,1
.1
,1
.9
,1
.5
,1
.7
,1
.0
,1
.2
,1
.8
,1
.6
,1
.6
,1
.4
,1
.7
,1
.1
0.97% E L ,1
.2
S
T A
.6
M a tc h li n e S ta
.0
S e e S h e e t
D
M a tc h li n e S ta
.0
,1
.2
,1
.2
,1
.2
,1
.1
,1
.0
,1
.9
,1
.7
,1
.5
,1
.4
0.50%
L
HOR. SCALE IN FEET
0 20 40
Exist. Boulder (Typical) Remove and Reset
Parking Lot Edge
Existing Edge of Roadway
Reconstruct Parking Lot
Gravel) Actual Striping On For Clarity Only (No Parking Stalls Shown
Matchline Sta. 10+ 00.00, See Shee t D03 (See Signing Plan) Proposed Sign, Typ.
To Match Jeep Trail Access Grade Parking Lot Flare
Existing Edge of Roadway
Proposed Edge of Roadway
Cut Limits Proposed
Camp 70 Road B CO Route 32/18-
CO Route 32/18-Camp 70 Road
Proposed Fill Limits, Typ.
Proposed Cut Limits, Typ.
Proposed Ground
Existing Ground
Proposed Edge of Roadway
Sta. 109+97.65 Confinement System Limits of Cellular
Notes:
Legend:
E: 1995326.06 N: 231581.07 Sta. 109+97.65 End Road Work
Parking Lot CL
A
A
P C
.5
P T
.5
T y p
T y p
T y p for Section A-A Sections Sheet See Typical
Tree to be Removed
Widening Area
X
Ditch 1 Centerline
To Culvert 2 Sta. 109+50 Begin Ditch 3
To Culvert 1 Sta. 109+00 End Ditch 2
1. See Drainage Profiles Sheets for additional drainage information.
Sta. 110+11.62 End Ditch 3
Tree to be Removed, Typ.
Proposed Transition Limits, Typ., E204-01
See Note 1 Outfall to Blackwater River Place Riprap, Method A, Class 3 at inlet and outlet, E251-50 Place 71' of 30-Inch Pipe culvert, 2 End Sections and Culvert 2
To Culverts 3 & 1 Sta. 108+66 Begin Ditches 1 & 2
E609-02 Typ.
6'x0.5' Concrete, Wheelstop, See Note 1 Outfall to Blackwater River and place Riprap, Method A, Class 3 at inlet and outlet, E251-50 Place 32' of 36-Inch Pipe culvert at 17º Skew, 2 End Sections Culvert 1
36" Pipe Culvert
Culvert 1
PLAN AND PROFILE
E E C
H
B E E C
H 2
B E E C
H
P V C
IN
V
E L E V
.8
P V C
IN
V
E L E V
.9
(D
IR
E C T
L Y
G O E S
P
C M P
IN
V
E L E V
.6
A E C
B L U E
F L A G
C O
N C
R E T E
F L U
O U
N D
B R
U S
H
(P
IC
V 'S
L A N
D
IN
G
S
IG
N
"L
A U
R
D
F L A G
"E
L E C T R
IC
C O
N C
R E T E
GRAVEL PATH
R O
C K
P
IL
E
P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T W
IN
E A S T E
M L O
C K
E A S T E
M L O
C K
H E
M L O
C K
E A S T E
E A S T E
M L O
C K
S T U
M P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T
U S T E R
M
W T H
O R
N
C L U S T E R
M
W T H
O R
N
C L U S T E R
M
W T H
O R
N
B
LA
C K
W A
TE
R
R
IV
E R
W
A
W
N
V
I N
V
I N
V
I N
V
I N
V
I N
V a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (3 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (3 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
X
N
D03
3,110
3,115
3,120
3,125
3,130
3,135
3,140
3,145
+50 +50
P R
O P
O S
E D
E X I S
T I N
G
3,150
3,170
3,165
3,160
3,155
+50
-10.00%-5.00%
-4.95%
M a tc h li n e S ta
.0
S e e S h e e t
D
HOR. SCALE IN FEET
0 20 40
L
B la c k w a te r
R iv e r of Trail Proposed Edge
12+13.42 End Trail Work, Existing Ground
River's Edge Trail B
Existing Edge of Trail
Reconstruct River's Edge Trail
11+00.00 to 11+70.00 Fence, Split Rail, 4 Rail 11+00.00 to 11+70.00 Fence, Split Rail, 4 Rail
,1
.8
,1
.8
,1
.9
,1
.1
, 1
.4
,1
.7
,1
.3
,1
. 5
,1
.9
E L ,1
. 4
S
T A
.4
Proposed Ground L
K
E
L ,1
.6
V
P I
.0
L
K
E
L ,1
.6
V
P I
.0
L
K
E
L ,1
.6
V
P I
.0
L
K
E
L ,1
.6
V
P I
.0
-10.00%
-8.00%
Proposed Cut Limits, Typ.
Proposed Fill Limits, Typ.
See Note 1
Notes:
Legend:
E: 1995310.92 N: 231261.29 Sta. 12+13.42 End Trail Work, 10+00 11+00 12+00
E L ,1
.8
S
T A
.0
El. 3153.83 10+00.00 Begin Trail Work, Construction) (Incidental to Remove Wooden Step
E: 1995343.15 N: 231464.36 Sta. 10+00.00 Begin Trail Work, Sta. 10+00.00 Begin Ditch 4, ,1
.8
,1
.8
,1
.8
,1
.8
,1
.6
,1
.3
,1
.6
,1
. 3
,1
.1
E204-01 Limits, Typ., Transition Proposed
Tree to be Removed
Widening Area
X
See Note 2 Outfall to Blackwater River Class 3 at inlet and outlet, E251-50 2 End Sections and place Riprap, Method A, Culvert 4 underlay. Riprap surface flush with ditch invert and Culvert 4 riprap.
3. Place 12'L x 3.8'W x 2'H Class 2 Riprap, with Geotextile, Class 1, Type C
2. See Drainage Profiles Sheets for additional drainage information.
Do not continue work until approved by the CO.
1. Notify the CO if impacts to existing culverts are anticipated.
36" Pipe Culvert Culvert 4
Class 2, E251-50, See Note 3 place Riprap, Method A, Outfall to Blackwater River, Sta. 11+00.00 End Ditch 4, PLAN AND PROFILE r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (4 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (4 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
AEC1
AEC2 AEC3
GRAVEL ROAD
GRAVEL ROAD
6"
6"
26"
REFUGE B
OUNDARY MARKER
(PIC
6)SIG
N "
CAMPIN
G"
RED F
LAG
BOUNDARY L
INE (
BLUE P
AIN
T)
TREES
MARKED AS
POSSI
BLE
BOUNDARY L
INE (
BLUE P
AIN
T-TYP)
TREES
MARKED AS
POSSI
BLE
(PIC
8)
DEED B
OOK 2
09, DIV
ISIO
N OF NATURAL R
ESOURCES
DEPARTMENT OF C
OMMERCE
STATE
OF WEST VIR
GIN
IA,
BOUNDARY L
INE
CL R/W
CAMP 70 ROAD 15' R/W
CLUSTER,
4"
MAX HAWTHORNE
6"
MAPLE
6"
BEECH
6"
BEECH
7"
UNK.,
HEAVILY DIS
EASED
DEED B
OOK 1
70, UNIT
ED S
TATES
OF AMERIC
A
17"
RED MAPLE
12"
RED MAPLE,
DIS
EASED
WV S
TATE
LANDS
POTENTIAL WETLAND
WET I
BRUSH
GRAVEL
LIT
TLE
CANAAN
WOOD
BRUSH
5 3
UTIL
3155 3155 3155
3149.2 3149.2
3151.17
3152.20
A E C A
R
P
LE
R
P
LE
D
IS
E A S E D
G R
A V E
O N
EX
X315
.1
.1
N D04
M a tc h li n e S ta
S e e S h e e t
D
HOR. SCALE IN FEET
0 20 40
E: 1994371.30 N: 231864.48 100+00.00 Begin Work, GRADING PLAN
Legend:
Proposed Minor Countour
Proposed Major Contour XXXX
Wetland General Notes:
into the waterway.
8. Control stormwater runoff from impervious surfaces to prevent the washing of debris
7. Stabilize wetlands with species approved by USACE and WVDEP.
construction.
6. Rectify any wetlands, waterways, or 100-year floodplain temporarily impacted by of that lost under the originally authorized structure or fill.
wetlands, waterways or permanent modification of the 100-year floodplain in excess
5. Repair and maintain any serviceable structure or fill so there is no permanent loss of damange to wetlands, waterways, and the 100-year floodplain.
4. Place heavy equipment on mats or suitably operate the equipment to prevent unsightly debris, toxic materials or another deleterious substance.
3. Do not use the excavated material as backfill if it contains waste metal products, subsurface water flow into or out of wetlands, waterways, or the 100-year floodplain.
2. Place materials in a location and manner which does not adversely impact surface or waterways or the 100-year floodplain.
1. Do not store or stockpile excess fill, construction materials, or debris in wetlands, M a tc h li n e S e e T h is S h e e t
Matchline See This Sheet
N
Blackwater River Outfall to Point C, End Ditch 5, Point A Begin Ditch 5
Point B
R = 67'
R = 67'
1994312.40231809.94C
1994355.42231845.30B
1994357.11231848.76A
EASTINGNORTHINGPOINT
Ditch 5 Notes:
AEC4
AEC5
GRAVEL ROAD
GRAVEL R
OAD
(PIC
7 &
W/
PLAQUEBOULDER
4"( 2)
BRUSH
BLUE F
LAG
RED F
LAG
RED F
LAG
BLUE F
LAG
BRUSH
(PIC
7)INFORMATIO
N S
IGN
WOODEN
GRAVEL
6"
28"
(PIC
8)TRAIL
MARKER
(PIC
4)NO ATV'S
"LANDIN
G-SIG
N "
LAUREL
G R
A V E L
P
A T H
RED F
LAG
CAMP 70 ROAD 15' R/W
CAMP 70 ROAD 15' R/W
CL R/W
10"
BLACK C
HERRY
CLUSTER,
4"
MAX
4"
HAWTHORN
4"
HAWTHORN
CLUSTER,
8"
MAX HAWTHORN
CLUSTER,
6"
MAX HAWTHORN
CLUSTER,
8"
MAX HAWTHORN
CLUSTER,
6"
MAX HAWTHORN
MAX HAWTHORN
28"
CLUSTER,
6"
WET C
WET B
-C
WET B
-A
WET D
WET E
WET A
a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (5 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (5 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
10+00 10+00
3160 3160
3160 3160
3160 3160
N D05
M a tc h li n e S ta
.0
S e e S h e e t
D
HOR. SCALE IN FEET
0 20 40
Matchline Sta. 10+ 00.00, See Shee t D06
GRADING PLAN
A
C
D
E F
G
H
JK
L
N
P
R
Q
B
M
R
20'R
R
R
R
R
EASTINGNORTHINGPOINT
1995269.47231593.27A
1995316.25231525.36C
1995321.26231498.29D
1995331.44231475.18E
1995357.81231464.93F
1995406.18231486.23G
1995416.43231512.60H
1995393.16231565.43J
1995374.49231577.37K
1995341.57231582.31L
1995328.08231586.72M
1995359.41231554.69N
1995353.46231552.07P
1995377.64231497.15Q
1995383.58231499.77R
6' x 0.5' Wheelstop
1995313.87231546.95B
R
14'
Legend:
Proposed Minor Countour
Proposed Major Contour XXXX
E E C
H
B E E C
H 2
B E E C
H
P V C
IN
V
E L E V
.8
P V C
IN
V
E L E V
.9
(D
IR
E C T
L Y
G O E S
P
C M P
IN
V
E L E V
.6
A E C
B L U E
F L A G
C O
N C
R E T E
F L U
O U
N D
B R
U S
H
(P
IC
V 'S
L A N
D
IN
G
S
IG
N
"L
A U
R
D
F L A G
"E
L E C T R
IC
C O
N C
R E T E
GRAVEL PATH
R O
C K
P
IL
E
P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T W
IN
E A S T E
M L O
C K
E A S T E
M L O
C K
H E
M L O
C K
E A S T E
E A S T E
M L O
C K
S T U
M P
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
E A S T E
M L O
C K
T
U S T E R
M
W T H
O R
N
C L U S T E R
M
W T H
O R
N
C L U S T E R
M
W T H
O R
N
B
LA
C K
W A
TE
R
R
IV
E R
W
A
W
N
V
I N
V
I N
V
I N
V
I N
V
I N
V a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (6 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \D
-C
A V
A
C a m p
R O
A D p p (6 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1)
N
D06
M a tc h li n e S ta
.0
S e e S h e e t
D
HOR. SCALE IN FEET
0 20 40
B la c k w a te r
R iv e r
E: 1995343.15 N: 231464.36 10+00.00 Begin Trail Work, E: 1995310.92 N: 231261.29 12+13.42 End Trail Work, GRADING PLAN
Legend:
Proposed Minor Countour
Proposed Major Contour XXXX r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \K
1-
C A
V A
C a m p
R O
A D d p r (1 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \K
1-
C A
V A
C a m p
R O
A D d p r (1 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1) K01
3,135
100+00
3,140
3,145
3,150
3,155
3,160
3,165
3,170
101+00 102+00 103+00 104+00 105+00+50 +50 +50 +50 +50+50
P R
O P
O S
E D
E X I S
T I N
G
L
E L
,1
.0
S
T A
.0
Existing Ground
E L
,1
.9
S
T A
.1
,1
.9
, 1
.1
, 1
.5
,1
.3
,1
. 2
,1
.8
,1
.5
, 1
.5
,1
.8
,1
.2
,1
.2
,1
.5
,1
.3
,1
.6
,1
.2
,1
.9
,1
.0
,1
.1
,1
.7
,1
.2
,1
.7
,1
.3
,1
.2
,1
.0
,1
.9
,1
.7
,1
.4
,1
.2
,1
.8
,1
.5
,1
.2
,1
.9
,1
.5
,1
.2
,1
.9
,1
.3
,1
. 8
,1
.2
,1
.7
, 1
.2
, 1
.6
,1
.1
DRAINAGE PROFILES
L
.0
K
E L ,1
.8
V
P I
.0
2.20%
1.30%
0.50%
ROADWAY DITCH PROFILE
,1
.4
,1
.5
3,135
3,140
3,145
3,150
3,155
3,160
3,165
3,170
106+00 107+00 108+00 109+00+50 +50 +50 +50
P R
O P
O S
E D
E X I S
T I N
G
L
L
.0
K
E L ,1
.9
V
P I
.0
+50 110+00 +50
0.97% 0.97%
Existing Ground
Proposed C Ditch
,1
.7
,1
.1
,1
.5
, 1
.2
,1
.5
,1
.2
,1
.5
,1
.1
,1
.5
,1
.3
,1
.6
,1
.3
,1
.7
,1
.5
,1
.2
,1
.2
,1
.7
,1
.8
,1
.0
,1
.3
,1
.4
, 1
.5
,1
.7
,1
.8
,1
.9
,1
.0
,1
.2
,1
.3
,1
.4
,1
.4
,1
.4
,1
.4
,1
.4
,1
.3
,1
.0
,1
.8
,1
.2
E L ,1
.4
S
T A
.6
0.50%
ROADWAY DITCH PROFILE
M a tc h li n e T h is S h e e t
S ta
M a tc h li n e T h is S h e e t
S ta
.0
Proposed C Ditch 1
End Ditch 1
Ditch 3
BeginEnd Ditch 2
Ditch 3
End Ditch 1,2
Begin
TurfSta. 11+00.00Sta. 10+00.00Ditch 4
TurfSta. 110+11.62Sta. 109+50.00Ditch 3
TurfSta. 109+00.00Sta. 108+66.00Ditch 2
TurfSta. 108+66.00Sta. 100+08.06Ditch 1
LiningToFrom
Roadway Ditch Schedule
E L
.3
S
T A
.0
E L
.0
S
T A
.0
E L
,1
.1
S
T A
.0
E L
,1
.2
S
T A
.0
2.06%
2.79% r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \K
-C
A V
A
C a m p
R O
A D d p r (2 d g n a r li n g to n \A r li n g to n \D
C S \P r o j e c ts \T
R N \6
C A
V A
C a m p R d \9
C A
D
G
IS
\9
C A
D \2
-S
H E
E T
S \K
-C
A V
A
C a m p
R O
A D d p r (2 d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CANAAN VALLEY NATIONAL
FW-CAVA 102(1), 905(1) K02
DRAINAGE PROFILES
3,135
3,140
3,145
+50
P R
O P
O S
E D
E X I S
T I N
G
3,150
3,160
3,155
3,165
10+00 11+00
,1
.5
,1
.4
,1
.5
, 1
.2
,1
.3
E L ,1
.6
S
T A
.0
L
K
E
L
, 1
.2
V
P I
.0
10%
8%
3,135
3,140
3,145
3,150
3,155
3,160
+50
CULVERT PROFILES
0+00 1+00
Existing Ground
3,140
3,145
3,150
3,155
3,160
3,165
+50 +50
Existing Ground Existing Ground
Proposed Grade
LProposed C Ditch
12.01' Lt.
Sta 109+13.24
Inv. 3155.54
20.32' Rt.
Sta. 109+22.98
Inv. 3153.65
CULVERT PROFILES
0+00 1+00 0+00 1+00
CULVERT TYPICAL SECTION
Culvert invert
D ia
Existing Ground
Ditch 4
Begin
Ditch 4
Proposed CL
,1
.4
,1
.4
, 1
.4
,1
.4
,1
.6
@ 5.9% slope, 17º Skew 32' - 36" HDPE Pipe
Culvert 1
@ 5.5% slope 71' - 30" HDPE Pipe
Culvert 2
Proposed Grade
Void-Filled Riprap
Void-Filled Riprap Void-Filled Riprap
Void-Filled Riprap
Ditch 4
End
Placed riprap, E251-50
Placed riprap, E251-50 Placed riprap, E251-50
+50
.5
.8
.0
@ 0.5% slope, 3º Skew 28' - 36" HDPE Pipe, ET 602-5
Culvert 3
Proposed Grade
3,130 void-filled riprap.
Fill invert of pipe to 12" depth using
@ 3.5% slope, 23º Skew 21' - 36" HDPE Pipe, ET 602-5
Culvert 4
+500+00 1+00
8.44' Rt
Sta. 11+21.59
Inv. 3138.56
10.86' Lt
Sta. 11+13.44
Inv. 3137.82
Void-Filled Riprap
E251-50
Placed riprap, .8 'Ditch 5
P R
O P
O S
E D
E X I S
T I N
G
,1
.2
,1
.3
,1
.2
,1
.1
,1
.6
,1
.5
,1
.6
0.5%
DITCH 4 (TRAIL) PROFILE
Begin Ditch 5
DITCH 5 TYPICAL SECTION
4'-0"
1V:2H 1V:
2H
V a r ie s
Proposed Grade Existing Ground
(Bottom & Sides)
Turf Establishment
Placed riprap, E251-50
E251-50
Placed riprap, Placed riprap, E251-50
V
H
Ditch 3
Ditch 1
Fence, Split Rail, 4 RailFence, Split Rail, 4 Rail
E: 1994370.46
N: 231876.12
Inv. 3148.59
E: 1994359.63
N: 231853.93
Inv. 3148.44
E: 1995352.20
N: 231584.06
Inv. 3156.63
E: 1995411.65
N: 231559.56
Inv. 3152.69
Notes:
2. See section 251 for void-filled riprap requirements.
1. Cover shown to top of pipe outside dia.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
M01
PROJECT DESCRIPTION
SOILS
GENERAL NOTES AND GUIDELINES
MAINTENANCE AND INSPECTION PROCEDURES
PROHIBITED DISCHARGES
Sheet 1 of 2
WVDEP GENERAL NOTES
Soils in the project vicinity are Hydrologic Soil Group C. Soils on the upper elevations of the adjacent mountain are HSG A.
construction. The soil is primarily Meckesville silt loam, with a small portion of Blago silt loam.
The pavement surface is gravel, and the proposed surface is gravel. The runoff coefficent will be 0.8 before and after
Soil disturbing activities include clearing and grubbing, and roadway grading.
floodplain (Map 54093C0175E).
The road and parking lot are outside the FEMA 100-year floodplain. Approximately one third of the trail is located in a Zone A
5020004).
The total disturbed area for the project is approximately 1.10 acres. The receiving water is the Blackwater River (HUC gravel parking lot, and reconstruction of approximately 225 ft of gravel pedestrian trail.
This project consists of the reconstruction and drainage improvement of approximately 1000 ft of gravel road, expansion of a
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous water materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste shall not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
any damaged measures immediately.
activities and immediately following any rain event. Repair or replace
Inspect and maintain erosion control facilities daily during construction details shown in the plans, and the individual permitting requirements.
structural erosion control practices according to Section 157, the
Unless stated otherwise, construct and maintain all vegetated and
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
from any measures when ponded water does not drain completely within 48 hours.
Immediately repair or replace as necessary if the materials become damaged, or stone (if any) dislodged. Remove sediment and after any storm event at least 0.25" per 24 hr, for buildup of excess sediment, undercutting, sags, and other failures.
Inspect wire-backed silt fence (E157-02), RECP (E629-01), and temporary stabilization at least once every 4 calendar days, areas.
12. Submit the Notice of Termination by no later than 15 business days after permanent stabilization of all disturbed
Seed by Hydro-seeder at rate shown on Sheet M02.E.
30 bales per acre.
Mulch - wood fiber or chopped straw at rate of 2 tons per acre. Hydro-mulch at rate ofD.
soil prior to Seeding.
Lime (permanent seeding) - agricultural lime spread at rate of 4 tons/acre. Work intoC.
different analysis. Work into soil prior to seeding.
Fertilizer - 500 pounds per acres of 10-20-20 fertilizer or equivalent poundage ofB.
Topsoil - 4 inch minimum for permanent turf.A.
fertilizing as soon after finish grading as possible. Comply with the following seeding requirements:
11. Hydro-seed and fertilize all disturbed areas not paved or built upon. Perform permanent top-soiling, seeding and and sedimentation.
sediment and the disturbed soil areas resulting from the disposition of temporary measures to prevent further erosion temporary measures are no longer needed, unless otherwise authorized by the CO. Permanently stabilize trapped
10. Remove all temporary erosion and sediment control measures within 30 days after final site stabilization or after the
CONTROL NARRATIVE
EROSION AND SEDIMENT
9. Apply stabilization measures to earthen structures such as embankments, and cut slopes immediately after installation.
land disturbing activity, and make these functional before upslope land disturbance takes place.
8. Construct erosion and sediment control devices and other measures intended to trap sediment as a first step in any project.
7. Stabilize or protect soil stockpiles with secured tarps or other method approved by the CO, during construction of the been complete. Apply permanent stabilization to areas that are to be left dormant for more than six months.
dormant (undisturbed) for longer than 14 days. Apply permanent stabilization within four days after construction has site.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .