Plans - Franklin Street Streetscape - Phase 1 and Franklin Street Parking Lot Rehab.pdf
PDF 44 MB Posted
- Solicitation number
- 10492025-01
- Issued by
- Surry County, North Carolina
About this file
This document is a comprehensive set of engineering plans for the Franklin Street Streetscape and Parking Lot Rehabilitation Project, prepared by the City of Mount Airy, North Carolina's Engineering Division. The project involves a phased streetscape and parking lot renovation in downtown Mount Airy, with construction planned for May 2025. The scope includes demolishing and reconstructing Franklin Street and an adjacent parking lot, involving approximately 53,000 square feet of asphalt and 13,000 square feet of concrete removal. The project will transform the existing infrastructure by installing new granite curbs, brick-patterned sidewalks, decorative lighting, landscaping, and reconfiguring the parking lot to increase total parking spaces from 146 to 157, including ADA-compliant spaces.
The project will utilize specific materials including "Mount Airy Granite" from Polycorp, "Main Street Tumbled" brick pavers from Pine Hall Brick, and decorative street signs and lighting from providers like Special Lite Products and Duke Energy. The electrical infrastructure will be comprehensively updated with new underground conduits, pit pads, and lighting installations. Landscaping will include Green Vase Japanese Zelkova trees, Crape Myrtles, and other native plant species. The project emphasizes detailed specifications for materials, drainage, utility adjustments, and construction methods, with all work required to meet NCDOT quality and inspection standards. Funding sources are not explicitly detailed in the document, but the project is marked as being funded by May 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRANKLIN STREET STREETSCAPE: PHASE I &
FRANKLIN STREET PARKING LOT REHAB
Prepared in the office of:
City of Mount Airy, North Carolina
ENGINEERING DIVISION
William Levi Hiatt P.E., City Engineer Dan Speight, Engineering Technician Tim Kennedy, Engineering Technician Post Office Box 70 Mount Airy, North Carolina 27030 Phone: 336.786.3580 Fax: 336.719.7540 www.mountairy.org
C
IT
Y of
MOUNT
AIR
Y
P U B
LIC
W
ORKS DEPA
RT
M E N T
Downtown Mount Airy, NORTH CAROLINA
Funded By:Location:
May, 2025
PLANS FOR:
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
W
IL
L O
W S
T R
E E
T
Masonic Properties Inc 502015649854502Holder Commercial Ventures LLC
502015648860
E X
IS
TI
N G
2"
W A
TE
R
EXISTING
GRANITE CURB
(TO BE
REMOVED)
EXISTING 8" WATER
3+004+005+005+70
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OUL
OULOUL
OUL
OUL
OULOUL
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING ASPHALT PARKING
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING ASPHALT PARKING
EXISTING UTILITY POLES
(TO BE REMOVED BY
DUKE ENERGY)
EXISTING GREEN
VASE ZELCOVA
(TO REMAIN)
EXISTING SHRUBS &
SMALL TREE ALONG
FRANKLIN STREET
(TO BE REMOVED)
EXISTING SHRUBS
ALONG FRANKLIN
STREET
EXISTING SHRUBS &
EXISTING 8" SEWER
M A
T C
H L
I N
E m a r k e t s t r e e t
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
8 X EXISTING UTILITY POLES (TO
BE REMOVED BY DUKE ENERGY)
EXISTING ASPHALT BINDER
EXISTING
UTILITY
POLE (TO
REMAIN)
EXISTING GAS LINE
E X
IS
T
IN
G
R
C P
FRANKLIN STREET
E X
IS
T
IN
G
C O
N C
R E T
E
S
ID
E W
A L K
(T O
B E R
E M
O V
E D
REF Properties LLC 502015742941
The M5 Group LLC 502015741950
Ky The Nguyen 502015740992
The Lara Group LLC 502015740940
Coley Fred Jones Jr 502015742885
Bi lly
R
B illi e Su e C as te ve ns
Fr an kl in
S tre et L
LC
Fr an kl in
S tre et
LL
C
10Te rry
P at ric k
M cC an n
EXISTING GRANITE
CURB (TO BE REMOVED)
EXISTING 8" SEWER
EXISTING CONCRETE
CURB & GUTTER
(TO BE REMOVED)
E X
IS
T
IN
G
A S
P H
A L
T
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L
K
EXISTING
CONCRETE
DRIVEWAY
APRON (TO BE
REMOVED)
0+001+002+003+00
City of Mount Airy
EXISTING CONCRETE
SIDEWALK
(TO BE REMOVED)
8 X EXISTING UTILITY POLE (TO BE
REMOVED BY DUKE ENERGY)
EXISTING CONCRETE
SIDEWALK
(TO BE REMOVED)
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING SIGNS
(TO BE REMOVED &
REINSTALLED BY
CONTRACTOR)
EXISTING 8" WATER
M A
T C
H L
I N
E
FRANKLIN STREET
m a r k e t s t r e e t
N M
A
IN
S T
R E
E T
EXISTING ASPHALT BINDER
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L
K
CURB & GUTTER PROPERTY LINE
SIDEWALK
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
CONTOURS
DEMOLITION LIMITS
CURB/GRATE INLETS
m a r k e t s t r e e t
E X
IS
T
IN
G
" W
A T
E R
E X
IS
T
IN
G
G A
S L
IN
E
Feet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T E X
IS
T
IN
G C
O N D
IT
IO
N S
D E M
O
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
CONTROL
1. Property line information provided by Surry
County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
MATERIALS
1. All granite shall be "Mount Airy Granite" from Polycorp (formerly known as the North Carolina Granite Corporation) or approved equal.
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal).
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be "Deluxe Acorn Style" LED with a black fiberglass pole "Style F" provided and installed by Duke Energy.
5. Asphalt shall be 9.5b "Superpave".
NOTES
DEMOLITION
1. All existing concrete sidewalk shall be removed and hauled off site by the contractor.
2. Existing binder is to remain, other than what needs to be removed to install the proposed granite curb and concrete sidewalks.
M A T C H L I N E (SEE SHEET 3)
M A T C H L I N E (SEE SHEET 3)
M A T C H L I N E
(SEE INSET A)
INSET AM A T C H L I N E
(SEE INSET A)
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. The streetscape shall be demolished and constructed before the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot.
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
EXISTING PROPOSED
GRANITE CURB
PROPERTY LINE
DECORATIVE LIGHTS
SCORED CONCRETE SIDEWALK
W/ BRICK BANDING
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
CONTOURS
COMPOST SOCK INLET PROTECTION
E X
IS
T
IN
G
A S
P H
A L
T
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L
K
CURB FLUSH WITH ASPHALT
(DRIVEWAY APRON)
10.3'6.0'
GRANITE CURB RAMP
6.0'
GRANITE CURB RAMP
R33.31'
R9.32'
8.4'
TOC
1102.35
0+001+002+003+00
7.6'
7.6'
TOC
1101.94
TOC
1102.07
1099.78
1099.86
1105'
1100'
1095'
4 X DECORATIVE LED
TEARDROP LIGHTS (TO
BE INSTALLED BY DUKE
ENERGY)
5'x5' STREET TREE
GRATE (TYP. SEE
DETAIL)WHITE STRIPING (TYP. SEE DETAIL)
BRICK PATTERN STAMPED
ASPHALT CROSSWALK
PARKING RESERVED FOR LOADING BETWEEN 5AM-5PM
PARKING SIGNS
PROPOSED CONCRETE
DRIVEWAY APRON
TOC
1095.08
TOC
1094.39
10.0' 18.4'
TOC
1099.00GRND
1098.28
EOP
1098.46
GRND
1097.86
EOP
1098.04
GRND
1097.44
EOP
1097.62TOC
1096.50
TOC
1097.11
EOP
1096.82
EOP
1096.14
GRND
1095.18
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
CURB RAMP
CURB
RAMP
20.0' 23.1'
20.1'
M A
T C
H L
I N
E
FRANKLIN STREET
m a r k e t s t r e e t
N M
A
IN
S T
R E
E T
BIKE PARKING
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L
K
GREEN VASE
JAPANESE
ZELKOVA TREE
GREEN VASE
JAPANESE
ZELKOVA TREE
23.0' 9.0'
9.0'
8.5'
TOC
1101.98
TOC
1102.26
GRANITE CURB RAMP
5.5'
TOC
1095.54
TOC
1095.33
TOC
1095.09
ADA PARKING
SIGN (TYP.)
TOC
1103.10
DECORATIVE STOP/ONE WAY/
DO NOT ENTER SIGNS (SPECIAL
LITE POLES, SEE DETAIL)
9.5'CONCRETE APRON
W
IL
L O
W S
T R
E E
T
23.0' 24.0'6.0'6.0'6.0' 6.0'
8.9' 7.2'
3+004+005+00
TOC
1091.64
TOC
1091.73
TOC
1092.40TOC
1088.26
TOC
1087.4
TOC
1086.98
TOC
1086.72
LANDSCAPED ISLANDS
W/ GREEN VASE JAPANESE
ZELKOVA TREES
1090'
1085'
TOC
1093.25
EXISTING ASPHALT PARKINGEXISTING ASPHALT PARKING
TOC
1092.31
GRANITE CURB FLUSH W/ ASPHALT
(DRIVEWAY APRON)
WHITE STRIPING
(TYP. SEE DETAIL)
BRICK PATTERN
STAMPED ASPHALT
CROSSWALK
GRANITE CURB FLUSH W/ ASPHALT
(DRIVEWAY APRON)4 X DECORATIVE LED
TEARDROP LIGHTS
(TO BE INSTALLED BY
DUKE ENERGY)
TOC
1094.39
DECORATIVE STOP
SIGN (SPECIAL LITE
POLES, SEE DETAIL)
TOC
1093.19
TOC
1093.44
1096.50
GRND
1095.18
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
OUL
NEW POLES
INSTALLED BY DUKE
ENERGY
OU
L
O U L
O U L
O U L
R30.0'
R30.0'
20.0' M A
T C
H L
I N
E m a r k e t s t r e e t
GRANITE CURB RAMP GRANITE CURB RAMP
GRANITE CURB RAMP
5.5'
GRANITE CURB RAMP GRANITE CURB RAMP
TOC
1095.33
TOC
1095.09
GRANITE CURB
FLUSH W/ ASPHALT
E X
IS
T
IN
G
R
C P
FRANKLIN STREETDECORATIVE DO
NOT ENTER SIGNS
(SPECIAL LITE
POLES, SEE DETAIL)
GENERAL
1. All disturbed asphalt and concrete shall be saw-cut.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. The streetscape shall be demolished and constructed before the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
Proposed sidewalk to be installed at same vertical elevation as existing.
3. Dimensions shown are to face of curb.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments.
3. Contractor shall have all underground utilities located prior to construction. Call NC811.
MATERIALS
1. All granite shall be "Mount Airy Granite" from the North Carolina Granite Corporation (or approved equal).
2. All brick pavers shall be "Main Street Tumbled" from Pine Hall Brick(or approved equal).
3. Decorative street signs shall be a 3-inch smooth black aluminum non-breakaway pole with the "Country Lane" style base, TSB-2 style fluvial, and TSB-205 style sign blade provided by Special Lite Products (specialliteproducts.com)(or approved equal).
4. Decorative street lights shall be Teardrop LED's with a black fiberglass pole "Style F" provided and installed by Duke Energy.
5. Truncated domes used for ADA ramps shall be brick truncated domes.
STREET RESURFACING
1. Contractor responsible for all utility adjustments.
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Compost sock inlet protection measures must be removed before final paving.
NOTES
Feet 0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T P R O
P O
S E D S
T R E E T S C A P E
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
DEMOLITION
1. All existing sidewalk,asphalt, and concrete street shall be removed and hauled off site by the contractor
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
M A T C H L I N E (SEE SHEET 4)
M A T C H L I N E (SEE SHEET 4)
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
.1
4.
AutoCAD SHX Text REF Properties LLC 502015742941
AutoCAD SHX Text The M5 Group LLC 502015741950
AutoCAD SHX Text Ky The Nguyen 502015740992
AutoCAD SHX Text The Lara Group LLC 502015740940
AutoCAD SHX Text Coley Fred Jones Jr 502015742885
AutoCAD SHX Text Billy R & Billie Sue Castevens 502015742844
AutoCAD SHX Text 115 Franklin Street LLC 502015742832
AutoCAD SHX Text 115 Franklin Street LLC 502015742810
AutoCAD SHX Text Terry Patrick McCann 502015741890
AutoCAD SHX Text City of Mount Airy 502015741625
AutoCAD SHX Text Masonic Properties Inc 502015649854502
Holder Commercial Ventures LLC 502015648860
Fr an kl in
S tre et L
LC
Te rry
P at ric k
M cC an n
E X
IS
T
IN
G
W
A T
E R
EXISTING 8" SEWER
EXISTING
CONCRETE
DRIVEWAY
APRON (TO BE
REMOVED)
W
IL
L O
W S
T R
E E T
MOODY INVESTMENT
COMPANY, LLC
502015648565
City of Mount Airy 502015741625
E X
IS
T
IN
G
W
A T
E R
EXISTING
12" RCP
OUL
OUL
OUL
OUL
OULOULOUL
EXISTING CONCRETE SIDEWALK
(TO BE REMOVED)
EXISTING CONCRETE
SIDEWALK
(TO BE REMOVED)
E X
IS
T
IN
G
A S
P H
A L
T P
A R
K
IN
G L
O T
T
O B
E R
E M
O V
E D
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A
LK
(T O
R E
M A
IN
E X
IS
T
IN
G
R
C P
E X
IS
T
IN
G
R
C P
EXISTING 12"
RCP
E X
IS
T
IN
G
R
C P
EXISTING 36" RCP
EXISTING 32" RCP
EXISTING24" RCP
EXISTING
CURB INLET
(TO REMAIN)
EXISTING CURB
INLET (TO
REMAIN)
E X
IST
IN
G C
O N
C R
E T
E
SID
E
W A
LK
(T O
R E
M A
IN
E X
IS
T
IN
G
A S
P H
A L
T
EXISTING CONCRETE
CROSSWALK (TO BE
REMOVED)
EXISTING ASPHALT
(TO BE REMOVED)
EXISTING ASPHALT
(TO BE REMOVED)
EXISTING ASPHALT
(TO BE REMOVED)
EXISTING
CONCRETE
SIDEWALK
(TO BE REMOVED)
EXISTING
CONCRETE
SIDEWALK
(TO BE REMOVED)
EXISTING
LANDSCAPING
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L
K
T
O B
E R
E M
O V
E D
EXISTING GRANITE
PAVERS (TO BE
REMOVED)
EXISTING GRANITE
PAVERS (TO BE
REMOVED)
EXISTING FLAG POLE
(TO BE REMOVED)
E X
IS
T
IN
G
G R
A N
IT
E
W A
L L
T
O R
E M
A
IN
E X
IS
T
IN
G
G R
A N
IT
E
W A
L L
T
O R
E M
A
IN
EXISTING CONCRETE PAD
& FENCE
(TO REMAIN)
E X
IS
T
IN
G
T R
E E
S W
IT
H
G R
A T
E S
T
O B
E
R E
M O
V E
D
EXISTING CONCRETE
RETAINING WALL
(TO REMAIN)
EXISTING CONCRETE ASPHALT PARKING
EXISTING
WOODEN ARCH
(TO BE MOVED)
EXISTING SIGNS
(TO BE REMOVED &
REINSTALLED BY
CONTRACTOR)
EXISTING CRATE
MYRTLES & SHRUBS (TO
BE REMOVED)
E X
IS
T
IN
G
C R
A T
E
M Y
R T
L E
S
M A
P L
E T
R E
E S
S
H R
U B
S
T O
B E
R E
M O
V E
D
E X
IS
T
IN
G
M A
P L
E
T R
E E
S
S H
R U
B S
T
O B
E R
E M
O V
E D
EXISTING PENN OAK
TREES (TO BE REMOVED)
EXISTING PENN
OAK TREES
(TO BE REMOVED)
EXISTING CRATE MYRTLES
& BRADFORD PEAR TREE
(TO BE REMOVED)
EXISTING CRATE MYRTLES
(TO BE REMOVED)
EXISTING CRATE MYRTLES
AND MAPLE TREE
(TO BE REMOVED)
E X
IS
T
IN
G
G R
E E
N V
A S
E
Z E
L C
O V
A , C
R A
T E
M Y
R T
L E
T R
E E
S
S H
R U
B S
T
O
R E
M A
IN
EXISTING GREEN
VASE ZELCOVA
(TO REMAIN)
EXISTING SHRUBS &
SMALL TREE ALONG
FRANKLIN STREET
(TO BE REMOVED)
EXISTING SHRUBS
ALONG FRANKLIN
STREET
(TO BE REMOVED)
EXISTING SHRUBS &
CRATE MYRTLE
TREE
(TO REMAIN)
12 X EXISTING SHOE BOX
LIGHTS & CONDUIT (TO BE
REMOVED BY
CONTRACTOR)
12 X EXISTING SHOE BOX
LIGHTS (TO BE REMOVED
BY CONTRACTOR)
12 X EXISTING
SHOE BOX LIGHTS
(TO BE REMOVED
BY CONTRACTOR)
12 X EXISTING
SHOE BOX LIGHTS
(TO BE REMOVED
BY CONTRACTOR)
EXISTING
GRANITE WALL &
STEPS
(TO REMAIN)
E X
IS
T
IN
G
W A
T E
R
E X
IS
T
IN
G
W A
T E
R
EXISTING 8" SEWER
STREET
E X
IS
T
IN
G
" S
E W
E R
EXISTING MAPLE
& BLUE SPRUCE
TREES (TO BE
REMOVED)
EXISTING
ELECTRICAL
PEDESTAL
(TO REMAIN)
E X
IS
T
IN
G
S E
W E
R
E X
IS
T
IN
G
S
E W
E R
E X
IS
T
IN
G
" S
E W
E R
EXIS
TIN
G 8" S
EWER
U
TC
EXISTING GAS LINE
E X
IS
T
IN
G
R
C P
E X
IS
T
IN
G
R
C P
E X
IS
T
IN
G
C O
N C
R E
T E
S
ID
E W
A L K
(T O
B E
R E
M O
V E
D
GENEVIEVE LYNN BARNHART
50201574192
EXISTING PROPOSED
CURB & GUTTER
PROPERTY LINE
LIGHTS
SIDEWALK
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
CONTOURS
CURB INLETS
DEMOLITION LIMITS
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y
P A R K
IN
G L
O T E X
IS
T
IN
G C
O N D
IT
IO
N S
D E M
O
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
GENERAL
1. All disturbed asphalt shall be milled and all disturbed concrete shall be saw-cut.
2. The streetscape shall be demolished and constructed before the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot.
CONTROL
1. Property line information provided by Surry
County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
MATERIALS
1. Decorative street lights shall be "Deluxe Acorn Style" LED with a black fiberglass pole "Style F" provided and installed by Duke Energy.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. Asphalt shall be 9.5b "Superpave". Entire parking lot area shall be milled 2"-4" down to existing gravel base.
4. All catch basins, frames and grates shall conform to NCDOT Std. 840.02 and 840.03.
PARKING LOT RESURFACING
1. Contractor responsible for all utility adjustments (if needed).
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Current Number of Parking Spaces: 146
(Including ADA)
N O
T E S
DEMOLITION
1. All existing asphalt and the concrete islands shall be removed and hauled off site by the contractor. (Approx.
53,000 sf asphalt, and 13,000 sf of concrete).
Feet 0 15 30
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
Fr an kl in
S tre et L
LC
Te rry
P at ric k
M cC an n
W
IL
L O
W S
T R
E E T
MOODY INVESTMENT
COMPANY, LLC
502015648565
City of Mount Airy 502015741625
W/ GREEN VASE JAPANESE
ZELKOVA TREES BRICK PATTERN
STAMPED ASPHALT
CROSSWALK PARKING RESERVED FOR LOADING BETWEEN 5AM-5PM
PARKING SIGNS
BRICK PATTERN
STAMPED ASHPALT
CROSSWALK
9.5'
10.0'
24.0'
24.0'
24.5'
10.0'
24.5'
25.6'
34.3'
26.6'
R4.75'
R5.00'
9.5'
18.0'
24.5'
15.3'
10.0' 18.4'
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
CURB RAMP
CURB
RAMP
OUL
O
UL
O
UL
NEW POLES
INSTALLED BY DUKE
ENERGY
O U L
R30.0'
STREET
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
REPLACE
EXISTING
CONCRETE
STEPS & HAND
RAILS
KEEP EXISTING
GRANITE
WALLS
5'X5' TREE GRATE
TESLA
SUPERCHARGING
STATIONS
BUS
PARKING
ONLY
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
NEW 35-FT BLACK
ANODIZED ALUMINUM
FLAG POLE
(LIBERTY FLAGPOLES TYP.
SEE DETAIL)
STOP NEW
CONCRETE AT
EXISTING
Z-BRICK
9.0'
8.5'
GRANITE CURB RAMP
5.5'
GRANITE CURB RAMP
5.5'
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
9X PROPOSED
ISLANDS
3X PROPOSED HALF
ISLANDS
P R O P O S E D P A R K I N G S P A C E S
P R O P O S E D P A R K I N G S P A C E S
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES RE-STRIPE ORIGINAL
PARKING SPACES
ADA PARKING SIGN
(TYP.)
ADA PARKING SIGN
(TYP.)
ADA PARKING
SIGN (TYP.)
RE-STRIPE ORIGINAL
PARKING SPACES
ADA
PARKING
SIGN (TYP.)
GENEVIEVE LYNN BARNHART
50201574192
BUS
PARKING
ONLY
POLES, SEE DETAIL)
CONCRETE APRON
6.0'
9.5'
CONCRETE
APRON
BUS
PARKING
ONLY SIGN
(SPECIAL
LITE POLES
SEE DETAIL)
EXISTING PROPOSED
CURB & GUTTER
PROPERTY LINE
DECORATIVE LIGHTS
SIDEWALK
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
LANDSCAPING
Zelcova serrata
Green Vase Japanese Zelkova
3.0-inch Caliper Medium Deciduous
Tree
Lagerstroemia indica Tonto Crape Myrtle
3-feet Tall Small Deciduous
Tree
Rhododendron austrinum Florida Azalea (Red flower)
3-gallon Medium Deciduous
Shrub
Pittosporum tobira 'Nana' Dwarf Pittosporum
3-gallon Medium Evergreen
Shrub
Botanical Name/Common
Name
Planting Size/GroupCountSymbol
LANDSCAPING SCHEDULE
Beltula nigra River Birch
3.5-inch Caliper Large Deciduous
Tree
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y P A R K
IN
G L
O T P R O
P O
S E D I M
P R O
V E M
E N T S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
GENERAL
1. All disturbed asphalt shall be milled and all disturbed concrete shall be saw-cut.
2. The streetscape shall be demolished and constructed before the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
MATERIALS
1. Perimeter parking lot lights shall be "Mitchell Open LED" with a black fiberglass pole
"Style F" and interior parking lot lights shall be "Shoebox LED" with pole "Style A" provided and installed by Duke Energy.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. Asphalt shall be 9.5b "Superpave". Entire parking lot area shall be milled 2"-4" down to existing gravel base.
4. All catch basins, frames and grates shall conform to NCDOT Std. 840.02 and 840.03.
PARKING LOT RESURFACING
1. Contractor responsible for all utility adjustments (if needed).
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Proposed total spaces: 157 (including
ADA)
N O
T E S
DEMOLITION
1. All existing asphalt and the concrete islands shall be removed and hauled off site by the contractor. (Approx. 53,000 sf asphalt, and 13,000 sf of concrete).
Feet 0 15 30
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
W
IL
L O
W S
T R
E E T
W/ GREEN VASE JAPANESE
ZELKOVA TREES
TOC
1101.94
TOC
1102.07
1099.78
1099.86
EXISTING
12" RCP
1095'
1090'
TOC
1100.03
1090'
1085'
1100'
BRICK PATTERN
STAMPED ASPHALT
CROSSWALK PARKING RESERVED FOR LOADING BETWEEN 5AM-5PM
PARKING SIGNS
DRIVEWAY APRON
TOC
1095.08
TOC
1094.39
TOC
1093.19
TOC
1093.44
BRICK PATTERN
STAMPED ASHPALT
CROSSWALK
E X
IS
T
IN
G
R
C P
E X
IS
T
IN
G
R
C P
EXISTING 12"
RCP
E X
IS
T
IN
G
R
C P
EXISTING 36" RCP
EXISTING 32" RCP
EXISTING24" RCP
9.5'
10.0'
24.0'
24.0'
24.5'
10.0'
24.5'
25.6'
34.3'
26.6'
R4.75'
R5.00'
9.5'
18.0'
24.5'
15.3'
10.0' 18.4'
TOC
1099.00GRND
1098.28
GRND
1098.11
EOP
1098.46
GRND
1097.69
GRND
1097.86
EOP
1098.04
GRND
1097.27
GRND
1097.44
EOP
1097.62
GRND
1096.46
TOC
1096.50
GRND
1095.62
TOC
1097.11
EOP
1096.82
EOP
1096.14
GRND
1095.18
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
VALLEY CURB & GUTTER
(TYP. SEE DETAIL)
CURB RAMP
CURB
RAMP
GRND
1099.56
EOP
1098.71
GRND
1098.52
EOP
1098.23
GRND
1098.00
EOP
1097.75
EOP
1097.56
O
UL
O
UL
NEW POLES
INSTALLED BY DUKE
ENERGY
O U L
R30.0'
STREET
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
REPLACE
EXISTING
CONCRETE
STEPS & HAND
RAILS
KEEP EXISTING
GRANITE
WALLS
TOC
1100.03
TOC
1099.53 TOC
1099.53
TOC
1100.03
TOC
1100.03
GRND
1099.56
GRND
1099.55
GRND
1099.56
5'X5' TREE GRATE
TESLA
SUPERCHARGING
STATIONS
BUS
PARKING
ONLY
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
NEW 35-FT BLACK
ANODIZED ALUMINUM
FLAG POLE
(LIBERTY FLAGPOLES TYP.
SEE DETAIL)
STOP NEW
CONCRETE AT
EXISTING
Z-BRICK
9.0'
8.5'
GRANITE CURB RAMP
5.5'
GRANITE CURB RAMP
5.5'
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
9X PROPOSED
ISLANDS
3X PROPOSED HALF
ISLANDS
P R O P O S E D P A R K I N G S P A C E S
P R O P O S E D P A R K I N G S P A C E S
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES RE-STRIPE ORIGINAL
PARKING SPACES
ADA PARKING SIGN
(TYP.)
ADA PARKING SIGN
(TYP.)
ADA PARKING
SIGN (TYP.)
RE-STRIPE ORIGINAL
PARKING SPACES
ADA
PARKING
SIGN (TYP.)
U
TC
E X
IS
T
IN
G
R
C P
BUS
PARKING
ONLY
(SPECIAL LITE
POLES, SEE DETAIL)
CONCRETE APRON
6.0'
9.5'
CONCRETE
APRON
BUS
PARKING
ONLY SIGN
(SPECIAL
LITE POLES
EXISTING PROPOSED
CURB & GUTTER
PROPERTY LINE
SIDEWALK
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
LANDSCAPING
CONTOURS
ASPHALT
GENERAL
1. All disturbed asphalt shall be milled and all disturbed concrete shall be saw-cut.
2. The streetscape shall be demolished and constructed before the parking lot. The parking lot shall remain open to the public during construction of the streetscape. The street shall be reopened to the public during construction of the parking lot.
CONTROL
1. Property line information provided by
Surry County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
MATERIALS
1. Perimeter parking lot lights shall be "Mitchell Open LED" with a black fiberglass pole "Style F" and interior parking lot lights shall be "Shoebox LED" with pole "Style A" provided and installed by Duke Energy.
2. All sidewalks shall be min. 6" - 3500 psi concrete with 4" compacted ABC stone.
3. Asphalt shall be 9.5b "Superpave". Entire parking lot area shall be milled 2"-4" down to existing gravel base.
4. All catch basins, frames and grates shall conform to NCDOT Std. 840.02 and 840.03.
PARKING LOT RESURFACING
1. Contractor responsible for all utility adjustments (if needed).
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
3. Compost sock inlet protection measures must be removed before final paving.
4. Final Number of Parking Spaces: 156
(Including ADA)
N O
T E
S RE
V
IS
IO
N
S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y
P A R K
IN
G L
O T P R O
P O
S E D G
R A D
IN
G
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
DEMOLITION
1. All existing asphalt and the concrete islands shall be removed and hauled off site by the contractor. (Approx.
53,000 sf asphalt, and 13,000 sf of concrete).
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
Feet 0 15 30
SITE SECURITY
1. Contractor is responsible for all signage and equipment necessary to secure the site during demolition and construction.
-M ay -2
.1 4.
AutoCAD SHX Text 115 Franklin Street LLC 502015742810
AutoCAD SHX Text Terry Patrick McCann 502015741890
AutoCAD SHX Text
MOODY INVESTMENT COMPANY, LLC 502015648565
AutoCAD SHX Text City of Mount Airy 502015741625
AutoCAD SHX Text
WM
REF Properties LLC 502015742941
The M5 Group LLC 502015741950
Ky The Nguyen 502015740992
The Lara Group LLC 502015740940
Coley Fred Jones Jr 502015742885
Bi lly
R
B illi e Su e C as te ve ns
Fr an kl in
S tre et L
LC
Fr an kl in
S tre et
LL
C
10Te rry
P at ric k
M cC an n
EXISTING 8" SEWER
E X
IS
T
IN
G
A S
P H
A L
T
E X
IS
T
IN
G
C O N C R E T E
S
ID
E W A L K
0+001+002+003+00
City of Mount Airy 502015741625
SMALL (66"X82")
THREE PHASE PIT
PAD (PROVIDED BY
CONTRACTOR)
1Ø PEDESTAL
120/208 3Ø
VAULT
1Ø PEDESTAL
122 LF PROPOSED 4" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
50 LF 4" SCHEDULE
40 CONDUIT 5' DEEP
(FOR 3Ø POWER)
105 LF PROPOSED 4"
SCHEDULE 40 CONDUIT MIN
3' DEEP (FOR 1Ø POWER)
60 LF PROPOSED 2" SCHEDULE
40 CONDUIT MIN. 3' DEEP (FOR
1Ø POWER SERVICE)
PROPOSED COMMUNICATION
CONDUIT (BY OTHERS)
EXISTING 8" WATER
M A
T C
H L
I N
E
LARGE (98"X104") THREE PHASE PIT
PAD (PROVIDED BY CONTRACTOR)
FRANKLIN STREET
m a r k e t s t r e e t
UULUUL
UULUULUULUULUULUULUULUULUULUUL
U U L
UULUUL
U U L
UULUULUULUULUULUULUULUULUULUUL
U U L
UU
L
UUL UUL UUL UUL UUL UUL UUL UUL
UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL
UU
L
UULUULUULUULUULUULUUL
U U L
U U L
U U L
U U L
N M
A
IN
S T
R E
E T
E X
IS
T
IN
G
C O N C R E T E
S
ID
E W A L K
112LF PROPOSED 4" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR TELECOMMUNICATIONS)
2'x3' FLUSH MOUNT ACCESS
UULUULUULUULUULUULUULUUL
112 LF PROPOSED 2" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
SINGLE PHASE PIT
PAD (PROVIDED BY
DUKE ENERGY)
UTC
UTC
U
TC
UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC
U
TC
U
TC
UT
C
UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC
U
TC
U
TC
U
TC
UTC
UTC
UTC
UTC
UTC
UTC
U
TC
U
TC
U
TC
U
TC
UUL
U U L
U U L
U U L
3' DEEP (FOR 1Ø POWER
SERVICE)
10 LF PROPOSED 2" SCHEDULE
40 CONDUIT MIN. 3' DEEP
(FOR 3Ø POWER SERVICE)
3 LF PROPOSED 2" SCHEDULE
40 CONDUIT MIN. 3' DEEP
(FOR 1Ø POWER SERVICE)
UUL UUL UUL UUL UUL UUL UUL
U U L
UU
L
UUL UUL UUL UUL UUL UUL UUL UUL UUL
115 LF PROPOSED 4"
SCHEDULE 40 CONDUIT MIN
3' DEEP (FOR 3Ø POWER)
NEW SERVICE
METER BOX
NEW SERVICE
METER BOX
NEW SERVICE
METER BOX
30 LF 4" SCHEDULE 40
CONDUIT MIN. 3' DEEP
(FOR 3Ø POWER)
CONCRETE APRON
W
IL
L O
W S
T R
E E
T
Masonic Properties Inc 502015649854502
Holder Commercial Ventures LLC 502015648860
E X
IS
TI
N G
2"
W A
TE
R
EXISTING 8" WATER
3+004+005+005+70
OUL
OUL
OUL
NEW POLES
INSTALLED BY DUKE
ENERGY
OU
L
OU
L
OU
L
OU
L
PROPOSED COMMUNICATION CONDUIT
(BY OTHERS)
210 LF PROPOSED 4" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR TELECOMMUNICATIONS)
305 LF PROPOSED 2" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
310 LF PROPOSED 4" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 3Ø POWER)
PROPOSED
COMMUNICATION
CONDUIT
(BY OTHERS)
EXISTING 8" SEWER
O U L
O U L
O U L
M A
T C
H L
I N
E m a r k e t s t r e e t
UULUULUUL
UULUULUULUULUULUULUULUULUULUULUUL
UULUULUULUULUULUULUUL
UUL
UUL
UUL
UULUULUULUULUULUULUULUULUULUULUUL
UULUULUULUULUULUULUUL
UUL
UUL
UUL
UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UUL UULUULUULUUL
UUL
45 LF PROPOSED 4" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
450 LF PROPOSED 2" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR LIGHTS)
UULUULUULUULUULUULUULUUL
UU
L
UU
L
UTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTCUTC
UTC
UTC
UTC
UTC
UTC UTC UTC UTC
UTC
UTC
UTC
UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC UTC
UTC
SERVICE)
EXISTING GAS LINE
E X
IS
T
IN
G
R
C P
FRANKLIN STREET
1Ø PEDESTAL
LF
PR
OPO
SE
D 2"
SC
HED
ULE
C
ONDUIT
3'
DEE
P (
FO
R 1Ø
PO
WER
m a r k e t s t r e e t
UULUULUUL
UUL UUL UUL UUL
UTC
UTC
UTC
UTC
U
TC
U
TC
UTC UTC UTC UTC
UTC UTC UTC UTC
UUL
U U L
U U L
U U L
U U L
U U L
U U L
U U L
U U L
U U L
80 LF & 40 LF PROPOSED 2"
SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER
SERVICE)
NEW SERVICE
METER BOX
NEW SERVICE
METER BOX
E X
IS
T
IN
G
" W
A T
E R
E X
IS
T
IN
G
G A
S L
IN
E
PROPOSED
DECORATIVE LIGHTS
CIVIL SYMBOLS
FLUSH MOUNTED
ELECTRICAL PEDESTAL
FLUSH MOUNTED
TELECOMMUNICATIONS PEDESTAL
UNDERGROUND
TELECOMMUNICATIONS CONDUIT
UUL
UNDERGROUND ELECTRICAL
CONDUIT
UTC
WALL MOUNTED
ELECTRICAL SERVICE BOX
GENERAL
1. Underground conduit installation shall be coordinated with Surry Telecommunications.
CONTROL
1. Property line information provided by Surry County
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor shall have all underground utilities located prior to construction. Call NC811.
3. Business Underground Power Reconnect Process:
3.1. Contractor will install new service meter boxes on the buildings next to the existing meter boxes.
3.2. Contractor will install 2-inch conduit from ground pedestals to new service meter boxes.
3.3. Contractor will install temporary connection from the new meter box to the existing meter box.
3.4. Surry County Inspections office will be contacted to inspect installation of new meter box.
3.5. Once Surry County Inspections has passed the installation, Duke Energy will be contacted to install the wire in the 2-inch conduit, remove the temporary connection and install a new power meter in the new service meter box.
3.6. After Duke has installed the new meters, the Contractor shall remove the old meter boxes and customer equipment from the buildings.
MATERIALS
1. Decorative street lights shall be
"Teardrop LED" with pole "Style C" provided and installed by Duke Energy.
2. All conduit shall be schedule-40 PVC.
3. All conduit shall have a masonry string installed the full length of each duct in order for Duke to install the wire.
4. Pit-pads shall be pre-cast concrete from a Duke Energy approved supplier.
NOTES
Feet
0 10 20
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y S T R E E T P R O
P O
S E D U
T
IL
IT
IE
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
M A T C H L I N E (SEE SHEET 7)
M A T C H L I N E (SEE SHEET 7)
M A T C H L I N E
(SEE INSET A)
INSET AM A T C H L I N E
(SEE INSET A)
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text G
AutoCAD SHX Text G
Fr an kl in
S tre et L
LC
Te rry
P at ric k
M cC an n
W
IL
L O
W S
T R
E E T
MOODY INVESTMENT
COMPANY, LLC
502015648565
City of Mount Airy 502015741625
EXISTING
12" RCP
SMALL (66"X82")
THREE PHASE PIT
PAD (PROVIDED BY
CONTRACTOR)
E X
IS
T
IN
G
R
C P
E X
IS
T
IN
G
R
C P
EXISTING 12"
RCP
E X
IS
T
IN
G
R
C P
EXISTING 36" RCP
EXISTING 32" RCP
EXISTING24" RCP
O
UL
O
UL
NEW POLES
INSTALLED BY DUKE
ENERGY
50 LF 4" SCHEDULE
40 CONDUIT 5' DEEP
(FOR 3Ø POWER)
105 LF PROPOSED 4"
SCHEDULE 40 CONDUIT MIN
3' DEEP (FOR 1Ø POWER)305 LF PROPOSED 2" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
40 CONDUIT
MIN. 3' DEEP (FOR 3Ø POWER)
53 LF 4"
SCHEDULE 40
CONDUIT
MIN. 3' DEEP
(FOR 3Ø
POWER)
130 LF 4"
SCHEDULE 40
CONDUIT
MIN. 3' DEEP
(FOR 3Ø
POWER)
O U L
LARGE (98"X104") THREE PHASE PIT
PAD (PROVIDED BY CONTRACTOR)
STREET
UULUULUULUULUULUULUULUULUULUULUULUULUUL
UULUULUULUUL
UUL
UUL
U U L
U U L
UUL
UUL
UUL
U U L
U U L
UUL
UUL
UUL
UUL
UUL
UU
L
UU
L
UULUULUULUULUULUULUULUULUULUULUULUULUUL
UULUULUULUULUUL
UUL
UUL
UU
L
UUL UUL UUL UUL
UULUULUULUULUUL
U U L
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
4x SHOEBOX 150W
TYPE IV
AB 3000K DBL MH:25
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
9x OPEN DELUXE
ACORN 70W TYPE III
3000K DBL MH:12
(INSTALLED BY DUKE
ENERGY)
NEW 35-FT BLACK
ANODIZED ALUMINUM
FLAG POLE
(LIBERTY FLAGPOLES TYP.
SEE DETAIL)
UULUULUULUULUULUULUULUULUULUUL
UU
L
UU
L
U U L
U U L
U U L
U U L
U U L
U U L
U U L
U U L
UUL
UUL
UUL
UUL
UUL UUL UUL UUL UUL UUL UUL
U U L
U U L
U U L
U U L
UULUULUULUULUULUULUULUULUULUULUULUUL
U U L
U U L
U U L
U U L
UUL
UUL
UUL UUL UUL UUL UUL
UUL
UUL
UUL
UU
L
UU
L
UU
L
UU
L
UUL
UUL
UUL
UUL
112 LF PROPOSED 2" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
70 LF PROPOSED 2" SCHEDULE 40
CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
190 LF PROPOSED 2" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
70 LF
PROPOSED 2"
SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FO
R 1Ø
POWER)
L
F
PR
O
PO
SE
D
2" S
C
HE
DU
LE
C O
N
DU
IT
M
IN
3' D
EE
P
(F O
R 1Ø
P O
W
ER
60 LF PROPOSED 2"
SCHEDULE 40
CONDUIT
MIN. 3' DEEP (FOR
1Ø POWER)
L
F
PR
O
PO
SE
D
2"
SC
HE
DU
LE
C
O N
DU
IT
M
IN
3'
D
EE
P (F
O R
1Ø P
O W
ER
UUL
UUL
38 LF PROPOSED 2"
SCHEDULE 40
CONDUIT
MIN. 3' DEEP (FOR
1Ø POWER)
UUL
UUL
UUL
UUL
UUL
UUL
104 LF PROPOSED 2" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
SINGLE PHASE PIT
PAD (PROVIDED BY
DUKE ENERGY)
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
GUTTER CONTINUES
FOR POSITIVE
DRAINAGE
9X PROPOSED
ISLANDS
3X PROPOSED HALF
ISLANDS
P R O P O S E D P A R K I N G S P A C E S
P R O P O S E D P A R K I N G S P A C E S
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES RE-STRIPE ORIGINAL
PARKING SPACES
RE-STRIPE ORIGINAL
PARKING SPACES
U
TC
65 LF PRO
PO
SED 2" SC
HEDULE
40 C O
N
DUIT
M
IN
3' DEEP (FO
R 1Ø
PO
W
ER)
67 LF PROPOSED 2" SCHEDULE
40 CONDUIT
MIN. 3' DEEP (FOR 1Ø
POWER)
120 LF PROPOSED 2" SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
3 LF PROPOSED 2" SCHEDULE
40 CONDUIT MIN. 3' DEEP
(FOR 1Ø POWER SERVICE)
CONNECT TO
EXISTING
TRANSFORMER
UU
L
UUL UUL UUL UUL
115 LF PROPOSED 4"
SCHEDULE 40 CONDUIT MIN
3' DEEP (FOR 3Ø POWER)
E X
IS
T
IN
G
R
C P
65 LF PROPOSED 2"
SCHEDULE 40 CONDUIT
MIN. 3' DEEP (FOR 1Ø
POWER)
L
F
PR
O
PO
SE
D
2"
SC
HE
DU
LE
C
O N
DU
IT
M
IN
3'
D
EE
P (F
O R
1Ø
PO
W
ER
LF
PR
OPO
SE
D 2"
SC
HED
ULE
C
ONDUIT
MIN. 3'
DEE
P (
FO
R 1Ø
PO
WER
70 LF PROPOSED 2" SCHEDULE 40
CONDUIT
MIN. 3' DEEP (FOR 1Ø POWER)
30 LF 4" SCHEDULE 40
CONDUIT MIN. 3' DEEP
(FOR 3Ø POWER)
CONCRETE APRON
CONCRETE
APRON
EXISTING PROPOSED
CURB & GUTTER
PROPERTY LINE
DECORATIVE LIGHTS
SIDEWALK
HANDICAP ACCESS RAMP
CIVIL SYMBOLS
FENCE
LANDSCAPING
CONTOURS
CONDUIT
UNDERGROUND UTILITY
HAND BOX
UUL
GENERAL
1. All disturbed asphalt shall be milled and all disturbed concrete shall be saw-cut.
CONTROL
1. Property line information provided by Surry County
2. Contractor responsible for construction stakeout.
UTILITIES
1. All underground utility locations shown are approximate.
2. Contractor responsible for all utility adjustments (if needed).
3. Contractor shall have all underground utilities located prior to construction. Call
NC811.
MATERIALS
1. Perimeter parking lot lights shall be "Mitchell Open LED" with a black fiberglass pole "Style F" and interior parking lot lights shall be "Shoebox LED" with pole "Style A" provided and installed by Duke Energy.
2. All conduit shall be schedule-40 PVC.
3. All conduit shall have a masonry string installed the full length of each duct in order for Duke to install the wire.
4. Pit-pads shall be pre-cast concrete from a Duke Energy approved supplier.
PARKING LOT RESURFACING
1. Contractor responsible for all utility adjustments (if needed).
2. All asphalt paving must meet NCDOT quality/inspection/testing standards.
N O
T E
S RE
V
IS
IO
N
S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y
P A R K
IN
G L
O T E
LE
C T R
IC
A L
P
LA
N
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
DEMOLITION
1. All existing asphalt and the concrete islands shall be removed and hauled off site by the contractor. (Approx. 65,000 sf asphalt, and 13,000 sf of concrete).
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
Feet 0 15 30
M A T C H L I N E (SEE SHEET 6)
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
AutoCAD SHX Text
WM
SLOPE 1/4" PER FT. FOR DRAINAGE
"ENGLISH EDGE FREE RANGE" FROM PINE HALL BRICK
8" x 4" x 2-1/4" BRICK PAVERS WITH POLYMERIC SAND SWEPT
1/16" MIN - 3/16" MAX. SAND FILLED JOINTS
6" 3500 PSI CONCRETE
4" COMPACTED ABC STONE
6"
COMPACTED SUBGRADE
3/4" SAND BED - ASTM C33
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N
T ST-114
1 1
BRICK PAVER BANDING
N.T.S.
08/01/2017
JOINTS
FA
C
E O
F
BU
IL
D
IN
G
/B
AC
K O
F W
AL
K
"MOUNT AIRY" GRANITE CURB
BRICK BANDING -1 OR 2 ROWS - SEE PLAN
EXPANSION JOINT
SCORED JOINTS - TYPICAL
4' SQ. TYP. 45°
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N
T ST-113
1 1
SCORED CONCRETE SIDEWALK
N.T.S.
08/01/2017
33' BACK/BACK
RIGHT OF WAY WIDTH=60'
C 2" BITUMINOUS CONCRETE H-BINDER, PLACED IMMEDIATELY UPON
FINAL PREPARATIONS OF ABC STONE BASE (EXISTING)
E 2" BITUMINOUS SURFACE - SUPER PAVE 9.5B
A STABILIZED SUBGRADE (EXISTING)
SURFACE SCHEDULE
B 8" COMPACTED ABC STONE BASE (EXISTING)
D TACK COAT
R/W
1/4" PER FT.
B
1/4" PER FT.
E
SEE STANDARD
C
D
2'-6" CURB
AND GUTTER
R/W
10'-0" 2'-6"
1'
1/4" PER FT.
10'-0"
MAX.
1/4" PER FT.
A
6'-0"
WATER MAIN
PROPOSED
IF REQUIRED
5' SIDEWALK
2'-6"PAVEMENT=28'
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N
T ST-104
1 1
LOCAL COMMERCIALN.T.S.
08/01/2017
T Y P E
L
5"
6"
2" I-2 ASPHALT
6-8" COMPACTED
ABC STONE
COMPACTED SELECT
6" MIN. CONCRETE
BACKFILL
6" COMPACTED
ABC STONEREINFORCEMENT
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N
T ST-115
1 1
GRANITE CURB W/ BRICK PAVERS
N.T.S.
08/01/2017
"MOUNT AIRY" GRANITEBRICK PAVERS
(SEE ST-114)
CONCRETE SIDEWALK
W/ COMPACTED ABC
STONE
16"
REVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org Engineering Division
City of Mount Airy, North Carolina
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N
T GN-114
1 1
HANDICAP RAMPN.T.S.
08/01/2017
TRUNCATED DOMES
1V:12H MAX.
SIDEWALK SIDEWALK
CURB CURB
1V:10H MAX.
ASPHALT
24"
6"
6"
3' MIN.5' MIN. 5' MIN.
TRANSITION TRANSITION
CURB CURB
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
6" 12"
3" RAD.
6" 1'-6"
1/2" RAD.
1/8" RAD.
12"
1/8" RAD.
1/2"JOINT FILLER
SURFACE OF GUTTER
TOP OF CURB
GENERAL NOTES:
1. CONTRACTION JOINTS SHALL BE SPACED AT 10 FOOT INTERVALS. A 15
FOOT INTERVAL MAY BE USED WHEN THE CURB IS MACHINE PRODUCED,
OR WHEN SATISFACTORY SUPPORT FOR THE FACE CAN BE OBTAINED
WITHOUT THE USE OF TEMPLATES AT THE 10 FOOT INTERVAL.
2. CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES
OR FORMED BY OTHER N.C.D.O.T. METHODS. WHERE SUCH JOINTS ARE
NOT FORMED BY TEMPLATES, A MINIMUM DEPTH OF 1 1/2" SHALL BE
OBTAINED.
3. ALL CONTRACTION JOINTS SHALL BE FILLED WITH JOINT SEALER.
4. EXPANSION JOINTS SHALL BE SPACED AT 90 FOOT INTERVALS, AND BE
ADJACENT TO ALL RIGID OBJECTS.
2'-0" CURB & GUTTER
TRAVERSE EXPANSION JOINT
IN CURB & GUTTER
7"
12"
B
A A
B
4" COMPACTED
STABILIZED SUBGRADE
ABC STONE BASE
___________________SURFACE SCHEDULE
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
08/01/2017 N.T.S.
DRAWING NO. OF
2' STD. CURB AND GUTTER
ST-106
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
lhiatt Rectangle
RE
V
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
GENERAL NOTES:
1. ALL STOP SIGN POLES WILL BE 3" O/D SMOOTH BREAKAWAY POLES, BURIED 2-FT.
2. STOP SIGNS POLES WITH AFFIXED STREET SIGN BLADES WILL BE 12-FT TALL, OR 10-FT
ABOVE GROUND WHEN INSTALLED. OTHERWISE, THEY WILL BE 10-FT TALL, OR 8-FT
ABOVE GROUND WHEN INSTALLED.
3. ALL FLUVIAL TOPPERS FOR STOP SIGN POLES WILL BE THE TSB2 STYLE.
4. ALL SIGN MOUNTS FOR STOP SIGNS WILL BE THE TSB205 STYLE.
5. ALL STOP SIGNS WILL WILL BE AFFIXED WITH A SOLID BLACK BACK PANEL.
6. THE STREET SIGN BLADES AFFIXED TO THE STOP SIGNS SHALL BE AS FOLLOWS:
9" HIGH
DUAL SIDED
FLAT ALUMINUM BLADE
GREEN BACKGROUND AND WHITE LETTERING
FRANKLIN GOTHIC MEDIUM COND FONT.
7. ALL BASES FOR STOP SIGNS WILL BE OF THE COUNTRY LANE STYLE.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
02/27/2025 N.T.S.
DRAWING NO. OF 11
ST-117
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
FLUVIAL
COMPLETE SIGN
DECORATIVE STOP SIGN
SIGN MOUNT
BASE
GENERAL NOTES:
1. ALL TRAFFIC/PARKING SIGN POLES WILL BE 3" O/D SMOOTH
BREAKAWAY POLES, BURIED 2-FT.
2. ALL FLUVIAL TOPPERS FOR TRAFFIC/PARKING SIGN POLES WILL BE
THE TSB2 STYLE.
3. ALL SIGNS MUST BE NCDOT APPROVED DESIGNS.
4. ALL SIGNS WILL WILL BE AFFIXED WITH A SOLID BLACK BACK PANEL
THAT MATCHES THE SHAPE OF THE SIGN.
5. ALL BASES FOR TRAFFIC/PARKING SIGNS WILL BE OF THE COUNTRY
LANE STYLE.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
02/28/2025 N.T.S.
DRAWING NO. OF 11
ST-118
Post Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
SIGNS BASE
DECORATIVE TRAFFIC/PARKING SIGNAGE
GENERAL NOTES:
1. MITCHELL OPEN LED LIGHTS ARE TO HAVE POLE STYLE F.
2. TEARDROP LED LIGHTS ARE TO HAVE POLE STYLE C.
3. SHOEBOX LED LIGHTS ARE TO HAVE POLE STYLE A.
4. ALL DECORATIVE LIGHTS WILL BE ORDERED BY THE CITY OF
MOUNT AIRY.
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
MITCHELL OPEN LED
LIGHTING
SHOEBOX LED
ST-119
1 1
N.T.S.
02/27/2025
TEARDROP LED
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
TREE GRATES
ST-120
1 1
N.T.S.
03/12/2025
5'x5' TREE GRATE
COMPACTED SELECT
BACKFILL
COMPACTED
ABC STONE
CONCRETE
SIDEWALK
CURB
(CONCRETE
OR GRANITE)
TREE
SOIL COMPACTION
BASED ON TREE SPECIES
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
BIKE RACK
ST-121
1 1
N.T.S.
02/27/2025
63 18"
2 38"
GENERAL NOTES:
1. BIKE RACKS SHALL BE FLUSH MOUNTED TO THE PROPOSED CONCRETE SIDEWALK
VIA CONCRETE EXPANSION ANCHOR BOLTS.
2. BIKE RACKS SHALL BE METAL AND HAVE A GLOSS BLACK FINISH.
60 34
8"
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
STAMPED ASPHALT CROSSWALK
ST-122
1 1
N.T.S.
03/13/2025
4" x 8" STAMPED
BRICK PATTERN
ASPHALT SURFACE
ASPHALT BINDER
COMPACTED
STONE BASE
COMPACTED
SELECT BACKFILL
7" WIDE WHITE
STRIPING
GENERAL NOTES:
1. WHITE STRIPING IS TO BE DONE ON BOTH SIDES OF CROSSWALK, PERPENDICULAR TO THE STREET, USING SHERWIN-WILLIAMS PRO-PARK WHITE PAINT.
2. STAMPED BRICK PATTERN IS TO BE PAINTED WITH SHERWIN-WILLIAMS PRO-PARK RED PAINT BASE
TINTED TO CROSSWALK TERRA COTTA COLOR TO MATCH BRICK STRIPING IN SIDEWALK.
GENERAL NOTES:
1. STEEL TREE
GRATES ARE TO
BE ORDERED
FROM JORDAN
IRON WORKS.
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
Z:\Server\Projects\Downtown Mount Airy\Franklin Street Streetscape Project\Drawings and Plans\Draft Drawings\Franklin St Streetscape & Parking Lot Final_20250501.dwg
.1
4.
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
.1
4.
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
-M ay -2
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
.1
4.
IS
IO
N S
N O
D
ES
C
RI
PT
IO
N
D A
TE
BY
C it y o f M o u n t
A ir y E N G
IN
E E R
IN
G
D
IV
IS
IO
N P.
O.
B ox
| M ou nt Ai ry, N
C ww w.
mo un tai ry.
or g
D ra w n by
Sc al e:
in
C he ck ed b y:
A pp ro ve d b y:
Fi le
SH
EE
T N
O
D
RA
W
IN
G D
A
TE
W
.L . H
IA
TT
M . W
IL
LI
A M
S W
.L . H
IA
TT
Do w nt ow n, M ou nt
A ir y D E T A
IL
S
Fr an kl in
S tr ee t
St re et sc ap e
P ar ki ng L ot R eh ab
: P ha se I
Z:
\S er ve r\ Pr oj ec ts \D ow nt ow n
M ou nt A iry \F ra nk lin S tre et
S tre et sc ap e
Pr oj ec t\
D ra w in gs a nd P la ns
\D ra ft D ra w in gs
\F ra nk lin
S t S tre et sc ap e
Pa rk in g
Lo t F in al
_2
1.
dw g
COMPOST SOCK
FLOW
2 IN. X 2 IN.
STAKES
FLOW
WOOD MULCH OR
COMPOST OR #57 STONE
TO 12 HEIGHT OF SOCK
SECTION VIEW
ISOMETRIC VIEW
PLAN VIEW
FLOW
FLO
W
STORM
DRAIN
INLET
FL
OW
Engineering Division City of Mount Airy, North CarolinaREVISIONS:
DATE:
SCALE:
DRAWING NO. OFPost Office Box 70 Mount Airy, North Carolina 27030 www.mountairy.org
STANDARD DETAIL NUMBER
C
IT
Y of MOUNT
AIR
Y
P U
B
LIC
W
ORKS DEPART
M E
N T
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .