Rockbridge Road Bridge Replacement Over Lake Capri - Plans for ITB
This is a set of construction plans and technical drawings for an Invitations to Bid (ITB) issued by Rockdale County, Georgia for the Rockbridge Road Bridge Replacement Over Lake Capri project. The scope includes the complete replacement of an existing bridge over Lake Capri on Rockbridge Road, with associated roadway improvements including milling and overlay, drainage work, utility relocation, signage, and pavement marking. The project encompasses approximately 0.129 miles of roadway from Station 50+50.00 to Station 59+75.00, with a 50-foot-long bridge spanning 36 feet wide to be constructed at Stations 55+40 to 55+90. A mandatory pre-bid conference was scheduled for February 9, 2022 at 10:00 a.m. at Rockdale County Department of Transportation with a mandatory site visit to follow. Bid submissions were due by 2:00 p.m. on March 3, 2022 at the Department of Finance. The project includes bridge construction with precast concrete cored slab beams, H-pile foundations, waterproofing membrane, approach slabs, and concrete barriers, along with extensive roadway work including concrete sidewalks, guardrails, and utilities including water main and gas line relocations. Design traffic data shows an Average Daily Traffic (ADT) of 2,212 vehicles in 2019 projected to 2,970 in 2039, with 5 percent heavy trucks and a 35 mph design speed.
The plans document comprehensive construction details and technical specifications prepared under Project No. ROCK 20514 in Rockdale County, with plans completed September 29, 2021. Summary quantities include precast concrete cored slab beams (578 linear feet), reinforced steel for superstructure (2,833 pounds lump sum), Class A concrete (54 cubic yards), and bridge deck waterproofing membrane (169 square yards), along with roadway items including recycled asphalt concrete, concrete curb and gutter, plastic filter fabric (1,662 square yards), and rip rap (1,662 square yards). The project requires a 5% bid bond and 100% payment and performance bond from the awarded contractor. All work is to be performed in accordance with the Georgia Department of Transportation Standard Specifications 2021 Edition and supplements. Environmental sensitive areas include 25-foot open water buffers around Lake Capri, and the project involves coordination with multiple utility owners including Atlanta Gas Light, AT&T, Comcast, Snapping Shoals EMC, and Rockdale Water Resources for facility relocation and protection during construction.
Text of this file
WATER’S EDGE
STA.58+30.00, 17’RT
MATCH EXIST. PVMT.
EXIST. R/W
EXIST. R/W
EXIST. R/W
EXIST. R/W
MILES
DATE
DEPARTMENT OF TRANSPORTATION
PLANS COMPLETED 09-29-2021
REVISIONS
PLAN AND PROFILE OF PROPOSED
NET LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
NET LENGTH OF ROADWAY
NET LENGTH OF BRIDGES
NET LENGTH OF PROJECT
LENGTH OF PROJECT
PREPARED BY:
TRAFFIC A.D.T.:
TRAFFIC A.D.T.:
DIRECTIONAL DIST:
SPEED DESIGN:
24 HR.TRUCKS %:
ROCKBRIDGE ROAD BRIDGE REPLACEMENT
OVER LAKE CAPRI
LOCATION SKETCH
CHIEF ENGINEER
DESIGN
SUBSECTIONS 102.04, 102.05, AND 104.03 OF THE SPECIFICATIONS.
OF TRANSPORTATION IN ANY WAY. THE ATTENTION OF BIDDER IS SPECIFICALLY DIRECTED TO
SAME ARE SHOWN AS INFORMATION ONLY, ARE NOT GUARANTEED, AND DO NOT BIND THE DEPARTMENT
FIELD INVESTIGATIONS AND ARE BELIEVED TO BE INDICATIVE OF ACTUAL CONDITIONS. HOWEVER, THE
INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, ARE BASED UPON
THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS OR IN ANYWAY
FUNCTIONAL CLASS:
OF 1988.
AMERICAN VERTICAL DATUM (NAVD)
1983)/94 WEST ZONE, AND THE NORTH
COORDINATE SYSTEM OF 1984 (NAD
USING THE HORIZONTAL GEORGIA
THIS PROJECT HAS BEEN PREPARED
01-
ROCKDALE COUNTY
LOCATION
PROJECT R
O C
K B
R I
D G E
R D
INTERSTATE
DR
E
VORG NOINU
EKAL
Y A
W A
K C
O
K A
L
R D
IRPAC
CAPRI
LAKE
LOCAL MAINTENANCE AND IMPROVEMENT GRANT
PROJECT NO. ROCK 20514
EXIT 75
TRAFFIC D.H.V.:
% TRUCKS:
2,212 (2019)
2,970 (2039)
5.0%
35 MPH
223 (2019)
100% IN CONG. DIST. NO. 4.
ROCKDALE COUNTY AND IS
THIS PROJECT IS 100% IN
ROCK20514
Project No.
COUNTY No. 247
0.009
0.129
0.129
0.000
0.129
DESIGN DATA:
51/49
1.0%
25’ OPEN WATER BUFFER
25’ OPEN WATER BUFFER
L A
C
P
I
I
V E
ROCKBRIDGE RD.ROCKBRIDGE RD.
C A P R I
C
O V E
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_01-0001.dgn
GRWCOV
CONCOV
DRAWING No.
60 120 240
SCALE IN FEET
770.263.5945 Duluth, Georgia 30096
Suite 100 2450 Commerce Avenue
P L
P L
P L
P L
PL
PL
PL
PL
PL
PL
PL
PL
ESA OW1
ESA OW1
50’X36’
PROPOSED BRIDGE
S T
A
B E
G I
N
B R I
D G E
S T
A
E N
D
B R I
D G E
E:2329418.9034
N:1352239.2551
STA 59+75.00
END PROJECT
STA 59+00.00
END CONSTRUCTION
E:2329384.9175
N:1351339.8971
ROCKBRIDGE ROAD
STA 50+50.00
BEGIN PROJECT
STA 50+96.00
BEGIN CONSTRUCTION
B. MARK HANSON P.E.
No.PE032208
PROFESSIONAL
AI
GRO
E G
N O
S
NAH KR
A
M
B
REENIGN
E
D
ERETSIG
DESCRIPTIONDESCRIPTION
INDEX
02-
DRAWING NO. DRAWING NO.
A-1 DRIVEWAYS WITH TAPERED ENTRANCES CONCRETE VALLEY GUTTERS (07-2011)
D-7 BERM DITCHES, SIDE DITCHES, SURFACE DITCHES (07-1980)
P-7 PAVEMENT EDGE TREATMENT ASPHALT AND CONCRETE PAVEMENT (11-2011)
T-03A TYPE 7, 8, AND 9 SQUARE TUBE POST INSTALLATION DETAIL (07-2002)
T-05A DETAILS OF REGULATORY SIGNS (SHEET 1 OF 2) (01-2003)
T-05C DETAILS OF WARNING SIGNS (01-2000)
T-11A DETAILS OF PAVEMENT MARKING PLACEMENT ON NON-LIMITED ACCESS ROADWAY (09-2016)
T-15A DETAILS OF RAISED PAVEMENT MARKER LOCATION NON-LIMITED ACCESS ROADWAY (09-2016)
T-15C DETAILS OF RAISED PAVEMENT MARKERS (09-2011)
9102 TRAFFIC CONTROL DETAIL FOR LANE CLOSURE ON TWO-LANE HIGHWAY (03-2006)
9100 TRAFFIC CONTROL GENERAL NOTES, STANDARD LEGEND, AND MISCELLANEOUS DETAILS (03-2006)
9037 TYPICAL FILL DETAIL AT END OF BRIDGE (09-1999)
9032B CONCRETE CURB AND GUTTER, CONCRETE CURBS, CONCRETE MEDIANS (01-2021)
9029B PERFORATED UNDERDRAIN (08-1983)
4961 DETAILS OF PRECAST TEMPORARY BARRIER (09-2006)
4960 CONCRETE BARRIER - TEMPORARY (END TREATMENT OPTIONS) (05-2007)
4384 TYPE 12 31 INCH GUARDRAIL HEIGHT (01-2016)
4383 GUARDRAIL ANCHORAGE TYPE I 31 INCH GUARDRAIL HEIGHT (08-2011)
4382 GUARDRAIL CONNECTION AT BRIDGE END OR AT CONCRETE BARRIER END FOR 31 INCH HIGH GUARDRAIL (01-2016)
4381 POST AND OFFSET BLOCKS FOR "W" (01-2016)
4380 "W" BEAM GUARDRAIL 31 INCH GUARDRAIL HEIGHT (01-2016)
4360 REFLECTORIZED GUARDRAIL WASHERS AND ANCHORAGE NOSE STRIPING (10-2014)
4000W GUARDRAIL WARRANT GUIDES (01-2016)
3054 END POST AND END POST GUARDRAIL ATTACHMENT DETAIL (09-2002)
1122-3 SAFETY END SECTION (METAL) (FOR SIDE DRAIN PIPE-OR STORM DRAIN PIPE PARALLEL TO MAINLINE) (SHEET 3 OF 3) (01-2005)
1122-2 SAFETY END SECTION (METAL) (FOR SIDE DRAIN PIPE-OR STORM DRAIN PIPE PARALLEL TO MAINLINE) (SHEET 2 OF 3) (01-2005)
1122-1 SAFETY END SECTION (METAL) (FOR SIDE DRAIN PIPE-OR STORM DRAIN PIPE PARALLEL TO MAINLINE) (SHEET 1 OF 3) (01-2005)
1120 FLARED END SECTIONS FOR PIPES (06-2006)
4390 "W" BEAM GUARDRAIL TRANSITION 27 INCH GUARDRAIL TO 31 INCH GUARDRAIL EHIGHT (01-2016)
9030C DELINEATORS & OBJECT MARKERS AND ALTERNATE POST (04-2006)
ROADWAY) 31 INCH GUARDRAIL HEIGHT (01-2016)
4388 GUARDRAIL LOCATION DETAILS FOR UNDIVIDED HIGHWAYS AND ROADS (WITH SHOULDERS ADJACENT TO THE
4385 "T" BEAM GUARDRAIL CONNECTION TO 31 INCH HEIGHT "W" BEAM (08-2011)
9017J CONCRETE SPILLWAYS ADJACENT TO APPROACH SLABS (02-1995)
9017R REINFORCED CONCRETE APPROACH SLAB WITH ASPHALT INLAY (09-2002)
http://mydocs.dot.ga.gov/info/gdotpubs/ConstructionStandardsAndDetails/Forms/AllItems.aspx
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_02-0001.dgn
1:29:57 PM
GPLN10/23/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
770.263.5945 Duluth, Georgia 30096
LAKE CAPRI DRIVE
01-0001
02-0001
03-0001
09-0001
15-0001
21-0001
COVER SHEET
INDEX SHEET
REVISION SUMMARY
GENERAL NOTES
TYPICAL SECTIONS
MAINLINE PLAN
MAINLINE PROFILE
DRAINAGE AREA MAP
DRAINAGE PROFILES
CROSS-SECTIONS
UTILITY PLANS
SIGNING AND MARKING PLANS
BRIDGE PLANS
13-0001 TO 13-0002
24-0000 TO 24-0002
26-0001 TO 26-0002
23-0001 TO 23-0005
04-0001 TO 04-0004
06-0001 TO 06-0003
52-0001 TO 52-0007
54-0001 TO 54-0002 BMP LOCATION DETAILS
EROSION CONTROL LEGEND AND NOTES
CONSTRUCTION DETAILS
40-0001
40-0002
40-0003
40-0004
40-0005
40-0006
40-0007
40-0008
40-0009
GEORGIA STANDARDS
GEORGIA STANDARDS (CONTINUED)
41-0001
41-0002
41-0003
41-0004
41-0005
41-0006
41-0007
41-0008
41-0009
41-0010
41-0011
41-0012
41-0013
41-0014
41-0015
41-0016
41-0017
41-0018
41-0019
41-0020
41-0021
41-0022
41-0023
41-0024
52-0001
52-0002
52-0003
52-0004
52-0005
52-0006
52-0007
56-0001
56-0003
56-0004
56-0005
56-0006
56-0008
56-0009
56-0010
56-0011
D-19 TEMPORARY PIPE SLOPE DRAIN WITH DRAIN INLET (02-2000)
D-24A TEMPORARY SILT FENCE (SHEET 1 OF 4) (01-2011)
D-24B TEMPORARY SILT FENCE BERM DITCH INSTALLATION, BRUSH BARRIER (SHEET 2 OF 4) (01-2011)
D-24C TEMPORARY SILT FENCE J-HOOKS, INLET SEDIMENT TRAPS (SHEET 3 OF 4) (01-2011)
D-24D TEMPORARY SILT FENCE FABRIC CHECK DAM (SHEET 4 OF 4) (07-2015)
D-42 INLET SEDIMENT TRAPS (05-2008)
D-55A RIPRAP OUTLET PROTECTION (SHEET 1 OF 2) (04-2016)
D-55B RIPRAP OUTLET PROTECTION (SHEET 2 OF 2) (04-2016)
EC-L1 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 1 OF 7) (03-2017)
EC-L2 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 2 OF 7) (11-2018)
EC-L3 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 3 OF 7) (03-2017)
EC-L4 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 4 OF 7) (03-2017)
EC-L5 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 5 OF 7) (03-2017)
EC-L6 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 6 OF 7) (11-2018)
EC-L7 EROSION CONTROL LEGEND AND UNIFORM CODE SHEET (SHEET 7 OF 7) (03-2017)
BMP LOCATION DETAILS54-0001 TO 54-0002
41-0025
D-41 SD CONSTRUCTION EXIT (11-2020)
05-0001
22-0001 TO 22-0002
35-0001 TO 35-0010
44-000A TO 44-0002 UTILITY RELOCATION PLANS
SUMMARY QUANTITIES
PAY ITEM INDEX
GEORGIA DEPARTMENT OF TRANSPORTATION STANDARDS AND DETAILS CAN BE DOWNLOADED AT:
REVISION
REVISION SUMMARY
03-
DRAWING NO.DATE DATE DRAWING NO. REVISION
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_03-0001.dgn
8:55:35 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
BRIDGE REPLACEMENT
LAKE CAPRI DRIVE
20514
770.263.5945
Duluth, Georgia 30096
2. THE FOLLOWING UTILITIES HAVE FACILITIES IN THE PROJECT AREA:
RELOCATED OR NEWLY INSTALLED POSITION.
UTILITY FACILITIES" MEANS ANY UTILITY THAT EXISTS ON THE PROJECT IN ITS ORIGINAL, RELIEVE THE CONTRACTOR OF THEIR RESPONSABILITY UNDER THE REQUIREMENT. "EXISTING
SUCH AS SERVICE LINES OR UNKNOWN FACILITIES NOT SHOWN ON PLANS WILL NOT
NECESSARILY ACCUTATE IN LOCATION AS TO PLAN OR ELEVATION. UTILITY FACILITIES
1. ALL KNOWN UTILITY FACILITIES ARE SHOWN SCHEMATICALLY ON PLANS, AND ARE NOT
PROJECT GENERAL NOTES
GENERAL NOTES
04-0001
DRIVEWAY REPLACEMENT DATA
DOCUMENTS FOR SPECIFIC TIME RESTRICTION FOR LANE CLOSURES.
RESIDENCIES IS PROVIDED AT ALL TIMES. REFER TO THE CONTRACT
11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ACCESS TO THE
INCLUDED IN THE LUMP SUM COST FOR GRADING COMPLETE
FLOWABLE FILL WITH ENGINEERS APPROVAL. THE COST FOR SUCH WORK SHALL BE
EXISTING PIPES TO BE REMOVED MAY BE LEFT IN PLACE AND FILLED WITH
10. ALL EXISTING PIPES ARE TO REMAIN UNLESS NOTED OTHERWISE ON PLANS.
9. ALL DRIVEWAYS CONSTRUCTED 90° TO CENTERLINE UNLESS OTHERWISE NOTED.
AT ALL TIMES WITHIN THE PROJECT LIMITS
8. THE CONTRACTOR WILL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED
7. NO SUE INVESTIGATION WAS CONDUCTED FOR THIS PROJECT.
DURING CONSTRUCTION UNLESS OTHERWISE INDICATED IN THE PLANS.
6. INGRESS AND EGRESS SHALL BE MAINTAINED AT ALL TIMES TO ADJACENT PROPERTIES
LAKE CAPRI
BRIDGE REPLACEMENT
UTILITY OWNER SERVICE
ATLANTA GAS LIGHT NATURAL GAS
AT&T TELECOMMUNICATIONS
COMCAST TELECOMMUNICATIONS
SNAPPING SHOALS EMC POWER
THE PROPOSED STORM DRAIN.
5. CONTRACTOR SHALL LOCATE AND CONFIRM WATER MAIN ELEVATION PRIOR INSTALATION OF
770-385-2856
SNAPPY SHOALS EMC
CONTACT: BEN BISHOP - ENGINEERING SERVICES FOREMAN
4. DE-ENERGIZING OF POWER LINES MUST BE REQUESTED BY THE CONTRACTOR.
3. COORDINATION WITH UTILITY OWNERS PRIOR CONSTRUCTION IS REQUIRED FOR THIS PROJECT.
21. ANY REQUIRED SHORING WILL BE INCLUDED IN THE PRICE FOR GRADING COMPLETE.
20. AN N.O.1. IS NOT REQUIRED FOR THIS PROJECT.
19. THE TOTAL DOSTURBED AREA FOR THIS PROJECT IS 0.91 AC.
DESCRIPTIONS OF MONUMENTS USED.
18. HORIZONTAL CONTROL IS BASED UPON GEORGIA STATE PLANE COORDINATE SYSTEM. SEE PLANS FOR LOCATIONS AND
DISPOSE OF ANY UNSUITABLE OR WASTE MATERIAL.
17. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO FURNISH SUITABLE BORROW MATERIAL FOR THE PROJECT AND
CLAIMS WILL BE CONSIDERED FOR COMPENSATION IF THE CONTRACTOR RELIES ON THE AREA SHOWN ON THE PLANS.
COMPLETE LUMP SUM AND IT SHALL BE HIS RESPONSIBILITY TO DETERMINE THE ACTUAL AREA TO BE GRASSED. NO
ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. THE CONTRACTOR SHALL BID AS GRASSING
16. THE TOTAL AREA SHOWN IN THE PLANS FOR GRASSING IS FOR INFORMATION ONLY. ROCKDALE COUNTY
INCLUDED IN THE PRICE BID FOR GRADING COMPLETE - LUMP SUM.
CONSTRUCTION LIMITS UNLESS DIRECTED BY THE ENGINEER. COST FOR CLEARING AND GRUBBING SHALL BE
ON THE QUANTITY SHOWN ON THE PLANS. CLEARING AND GRUBBING ON THIS PROJECT IS LIMITED TO THE ACTUAL
TO BE GRADED. NO CLAIMS WILL BE CONSIDERED FOR EXTRA COMPENSATION IF THE CONTRACTOR RELIES
- LUMP SUM AND IT SHALL BE HIS RESPONSIBILITY TO DETERMINE THE ACTUAL EARTHWORK QUANTITY
ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY, THE CONTRACTOR SHALL BID ON GRADING COMPLETE
15. THE TOTAL EARTHWORK QUANTITY SHOWN ON THE PLANS ARE FOR INFORMATION ONLY. ROCKDALE COUNTY
BE INCLUDED IN PRICE BID FOR GRADING COMPLETE - LUMP SUM.
FORMATION MUST BE PERIODICALLY WATERED SUFFICIENT TO RETARD DUST.ALL COSTS FOR DUST CONTROL SHALL
14. THE CONTRACTOR SHALL STRICTLY ADHERE TO DUST CONTROL REGULATIONS. ALL AREAS SUBJECTED TO DUST
INFORMATION CAN BE FOUND AT THE GAUPC.COM WEBSITE.
SUB-SECTION 105.06 OF THE GADOT STANDARD SPECIFICATION "COOPERATION WITH UTILITIES." MORE
COORDINATING THE MARKING OF UNDERGROUND UTILITIES. THE CONTRACTOR’S ATTENTION IS CALLED TO
REQUIRED TO USE THE ONE-CALL CENTER TELEPHONE NUMBER: 811 OR 1-800-282-7411, FOR THE PURPOSE OF
13. UTILITY WORK COORDINATION WILL BE REQUIRED AS PART OF THIS CONTRACT. THE CONTRACTOR SHALL BE
APPROVED BY THE FEDERAL HIGHWAY ADMINISTRATION.
SPECIFICATIONS CONSTRUCTION OF TRANSPORTATION SYSTEMS, 2021 EDITION, AND SUPPLEMENTS THERETO, AS
12. ALL WORK TO BE DONE IN ACCORDANCE WITH THE DEPARTMENT OF TRANSPORTATION OF GEORGIA STANDARD
WATERROCKDALE WATER RESOURCES
CONCRETE VALLEY GUTTER, 6 IN.
CONCRETE - DRIVEWAY CONCRETE, 6" THICK,(URBAN SHOULDER)
- 6" GRADED AGGREGATE BASE
ASPHALTIC - ASPHALTIC CONCRETE 9.5 mm SUPERPAVE (137.5 lb/sy)
RESIDENTIAL DRIVES
DRIVES TO BE CONSTRUCTED. WHERE REQUIRED, THE DRIVES SHALL BE PAVED AS FOLLOWS:
THE ENGINEER PRIOR TO MAKING ANY REVISIONS SUCH AS TO LOCATION, WIDTH, AND/OR NUMBER OF
IN CONFLICT WITH THE RULES AND REGULATIONS. THE CONTRACTOR SHALL OBTAIN THE APPROVAL OF
NEW DRIVEWAYS TO MATCH THE ACTUAL FIELD LOCATION OF EXISTING DRIVEWAYS WHERE THEY ARE NOT
INDICATED ON THE PLANS ARE FROM THE BEST AVAILABLE DATA. THE CONTRACTOR SHALL CONSTRUCT
AGGREGATE SURFACE COURSE WILL BE USED OTHERWISE. THE DRIVEWAY LOCATIONS
ASPHALT, CONCRETE FOR CONCRETE. FOR EARTH DRIVES, ASPHALT PAVING WILL BE REQUIRED.
DRIVEWAYS THAT ARE TO BE RECONSTRUCTED SHALL BE REPLACED IN KIND, I.E., ASPHALT FOR
ACCORDANCE WITH RULES AND REGULATIONS FOR CONTROL AND PROTECTION OF DOT RIGHTS OF WAY. ALL
ALL DRIVEWAYS, WHERE ACCESS IS ALLOWED, SHALL BE PLACED AS DIRECTED BY THE ENGINEER IN
770.263.5945 Duluth, Georgia 30096
Benjamin.Hanson
GPLOT-V8
RK20514_04-0001.dgn
8:55:36 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
PROJECT GENERAL NOTES
GENERAL NOTES
04-0002
SUBGRADE.
DRAINAGE AGGREGATE SHALL BE PLACED AS DIRECTED BY THE ENGINEER TO AID IN DE WATERING THE
28. WHERE WET SUBGRADE IS ENCOUNTERED AND WHERE IDENTIFIED BY THE ENGINEER, UNDERDRAIN PIPE WITH
ZOYSIA ETC. NO SEPARATE PAYMENT WILL BE MADE FOR ANY COST INCURRED TO COMPLY WITH THIS REQUIREMENT.
MAY BE PLANTED AND GROWING ON THE ADJACENT LAWN. I.E. BERMUDA SOD FOR BERMUDA SOD, ZOYSIA FOR
27. TYPE OF GRASS OR SOD USED ON THIS PROJECT WILL BE REQUIRED TO MATCH ANY TYPE OF GRASS OR SOD WHICH
THE PRICE BID FOR OTHER CONTRACT ITEMS.
26. CONSTRUCTION LAYOUT WILL BE REQUIRED BY THE CONTRACTOR. ALL COST FOR THIS ITEM WILL BE INCLUDED IN
CONSTRUCTION ADJACENT TO WATERWAYS AND MAINTAIN WATER QUALITY.
CONTRACTOR SHALL OBTAIN AND ABIDE BY ALL CORPS OF ENGINEERS RULES AND REGULATIONS CONCERNING
G.S.W.C.C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING WETLAND AREAS FREE FROM SILTATION. THE
SPECIFICATIONS REGARDING EROSION CONTROL AND THE MANUAL FOR EROSION AND SEDIMENT CONTROL BY
SHALL BE PLACED ACCORDING TO THE PLANS AND AS DIRECTED BY THE ENGINEER. SEE THE GADOT STANDARD
SHALL BE PLACED IMMEDIATELY AFTER DRAINAGE STRUCTURES ARE IN PLACE. ALL EROSION CONTROL DEVICES
SILT FENCES AND TO REPAIR OR REPLACE ANY SILT FENCE THAT IS NOT SATISFACTORY. EROSION CONTROL GATES
UNTIL SILT FENCE INSTALLATION IS COMPLETE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO MAINTAIN ALL
25. ALL SILT FENCES MUST BE PLACED AS ACCESS IS OBTAINED DURING CLEARING. NO GRADING SHALL BE DONE
INSTALLED IF DEEMED NECESSARY BY ONSITE INSPECTION OR AS DIRECTED BY THE ENGINEER.
AND SHALL BE MAINTAINED AT ALL TIMES. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE
24. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE ACTIVITIES
SPECIFICATIONS.
MULCH SHALL BE USED AS DIRECTED BY THE ENGINEER. REFER TO SECTION 161 OF THE STANDARD
ARE ESTABLISHED IN ORDER TO REDUCE EROSION. IF THE SEASON DOES NOT PERMIT GRASSING, TEMPORARY
23. ALL CUT AND FILL SLOPES SHALL BE GRASSED AS DIRECTED BY THE ENGINEER IMMEDIATELY AFTER THE SLOPES
TO MAINTENANCE OF TRAFFIC DURING CONSTRUCTION..
SPECIFICATIONS AND THE SPECIAL PROVISIONS FOR TRAFFIC CONTROL AND SEQUENCE OF OPERATIONS IN REGARDS
22. THE CONTRACTOR’S ATTENTION IS DIRECTED TO ARTICLES 104.05 AND 107.07 OF THE GADOT STANDARD
BY THE ENGINEER. TRAFFIC SHALL NOT BE ALLOWED ON ANY PAVEMENT NOT PROPERLY STRIPED.
IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION, OR AS DIRECTED
SUCH THAT THE LINES DO NOT CONFUSE THE TRAVELING PUBLIC. ALL REMAINING LINES OR MARKINGS SHALL BE
CONSTRUCTION, THE CONTRACTOR SHALL REMOVE OR OVERLAY LINES TO THE SATISFACTION OF THE ENGINEER
21. WHERE EXISTING PAVEMENT MARKINGS AND LINES ARE IN CONFLICT WITH THE TRAFFIC PATTERN BEING USED ON
SHALL BE INCLUDED IN PRICE BID FOR OTHER CONTRACT ITEMS, EXCEPT WHEN SAWING P.C.C CONCRETE PAVEMENT.
THE ENGINEER TO ENSURE A PAVEMENT REMOVAL TO A NEAT LINE. THE COST FOR SAWED JOINTS, WHEN REQUIRED, WHERE CURBING IS TO BE PLACED ACROSS A PAVED AREA, A JOINT SHALL BE SAWED ON A LINE ESTABLISHED BY
20. AT LOCATIONS WHERE NEW PAVEMENT IS TO BE PLACED ADJACENT TO EXISTING PAVEMENT WITHOUT AN OVERLAY OR
WITH THIS REQUIREMENT.
PIPE INSTALLATION IN TRENCHES. NO SEPARATE PAYMENT WILL BE MADE FOR ANY COST INCURRED TO COMPLY
19. THE CONTRACTOR SHALL OBSERVE ALL APPLICABLE LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS REGARDING
LAKE CAPRI
BRIDGE REPLACEMENT
30. ALL SIDEWALKS, CROSS WALKS, AND RAMPS SHALL MEET ADA STANDARD G.D.O.T. DETAILS.
EDITION AND/OR AS DIRECTED BY THE ENGINEER.
PAVEMENT MARKING SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES LATEST
DEVICES ETC. REQUIRED FOR MAINTENANCE OF TRAFFIC DURING CONSTRUCTION. ALL TEMPORARY SIGNING AND
MAINTENANCE, AND REMOVAL OF TEMPORARY SIGNING AND PAVEMENT MARKINGS, BARRICADES, CHANNELIZING
29. PRICE BID FOR TRAFFIC CONTROL - LUMP SUM SHALL INCLUDE, BUT IS NOT LIMITED TO CONSTRUCTION, BRIDGE CONSTRUCTION DEBRIS AT NO ADDITIONAL COST TO ROCKDALE COUNTY.
SHALL PROVIDE AN ENVIRONMENTALLY APPROVED SITE AS SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF EXISTING
34. THERE IS NO SUITABLE PLACE TO BURY EXISTING BRIDGE AND/OR CONSTRUCTION DEBRIS WITHIN THE PROJECT’S LIMITS. THE CONTRACTOR
EXCISTING / BRIDGE CONSTRUCTION DEBRIS AT NO ADDITIONAL COST TO THE DEPARTMENT.
THE CONTRACTOR SHALL PROVIDE AN ENVIRONMENTALLY APPROVED SITE AS SHOWN IN GA. SPECIFICATION 201 TO DISPOSE OF
33. THERE IS NO KNOWN SUITABLE PLACE TO BURY EXISTING BRIDGE / CONSTRUCTION DEBRIS WITHIN THE PROJECT’S LIMITS.
SEE SECTION 201 OF THE STANDARD SPECIFICATION AND SUPPLEMENTS THERETO FOR ADDITIONAL INFORMATION.
IN EITHER A PERMITTED SOLID WASTE FACITLITY, A PERMITTED INERT WASTE LANDFILL OR IN AN ENGINEERED FILL.
OCCURING IN THEM. ALL COMMON FILL OR EXCESS MATERIAL DISPOSED OUTSIDE THE PROJECT RIGHT OF WAY SHALL BE PLACED
32. ALL BORROW AND WASTE SITES FOR THIS PROJECT SHALL BE ENVIRONMENTALLY APPROVED PRIOR TO CONSTRUCTION ACTIVITIES
THE CORNER RADII OF THE INTERSECTION WHICH SHALL BE 8-INCH THICK INSIDE THE LIMITS OF THE RADIUS RETURNS.
31. ALL SIDEWALKS SHALL BE 4-INCH THICK CONCRETE EXCEPT FOR SIDEWALKS, INCLUDING HANDICAP RAMPS, WITHIN
770.263.5945 Duluth, Georgia 30096
Benjamin.Hanson
GPLOT-V8
RK20514_04-0002.dgn
8:55:38 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
GENERAL NOTES
04-0003
GENERAL NOTES - STANDARD SIGNS
IN THE CENTER OF THE SIGN AND FLUSH WITH THE BACK OF THE SIGN.
� INCH x (WIDTH OF SIGN) ALUMINUM OR GALVANIZED STEEL STRAP LOCATED
6. EACH 42 OR 48 INCH WIDE x 18 OR 24 INCH HIGH SIGN REQUIRES ONE 2 INCH x
INCH DIAMETER, DRILLED OR PUNCHED, AS SHOWN ON THE SIGN PLATE DETAILS.
WIDTH FROM THE EDGE OF THE SIGN. SIGN PLATE BOLT HOLES SHALL BE �
THE SIGN. THE CENTERLINE OF EACH POST SHALL BE INSET 1/6TH OF THE SIGN
WITH THE BACK OF THE SIGN WITH ONE EACH ACROSS THE TOP AND BOTTOM OF
SIGN) ALUMINUM OR GALVANIZED STEEL STRAPS. THE STRAPS SHALL BE FLUSH
SHALL BE MOUNTED ON TWO POSTS WITH 2 EACH 2 INCH x � INCH x (WIDTH OF
5. SINGLE PLATE, HORIZONTAL RECTANGULAR SIGNS OVER 48 INCHES IN WIDTH
UNSTIPULATED DISTANCE BEHIND GUARDRAIL.
4c. WHEN GUARDRAIL IS PRESENT OR BEING PROPOSED, SIGNS SHALL BE POSTED AN
BE AT LEAST 2 FEET FROM THE CURB FACE TO THE NEARER EDGE OF THE SIGN(S).
GREATER. THE HORIZONTAL CLEARANCE IN NON-MOUNTABLE CURB SECTIONS SHALL
NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF THE SIGN(S), WHICHEVER IS
SHALL BE 6 FEET FROM THE EDGE OF THE PAVED SHOULDER OR 12 FEET FROM THE
4b. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON ALL OTHER ROADWAYS
NORMAL EDGE OF PAVED SHOULDER, OR EDGE OF GRADED SHOULDER WHEN PRESENT.
CLEARANCE FOR STANDARD HIGHWAY SIGNS ON RAMPS SHALL BE 2 FEET FROM THE
THE SIGN(S), UNLESS SPECIFIED OTHERWISE IN THE PLANS. HORIZONTAL
SHALL BE 32 FEET FROM THE NORMAL EDGE OF PAVEMENT TO THE NEARER EDGE OF
4a. HORIZONTAL CLEARANCE FOR STANDARD HIGHWAY SIGNS ON INTERSTATE HIGHWAYS
OF 7 FEET ABOVE THE SIDEWALK.
SIDEWALK IS PROPOSED OR EXISTING, THE SIGNS SHALL BE ERECTED AT A HEIGHT
THE NORMAL EDGE OF PAVEMENT TO THE BOTTOM OF THE SIGN OR ASSEMBLY. IF
3. ALL STANDARD HIGHWAY SIGNS SHALL BE ERECTED AT A HEIGHT OF 7 FEET ABOVE
OPERATIONS.
PROJECT ENGINEER WITHOUT PRIOR APPROVAL FROM THE OFFICE OF TRAFFIC
EDITION. NO SIGN LOCATION SHALL BE CHANGED BY THE CONTRACTOR OR BY THE
SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT
FIELD CONDITIONS WHERE NECESSARY, BUT SHALL BE WITHIN THE LIMITATIONS
2. SIGN ERECTION STATIONS ARE APPROXIMATE AND MAY BE ADJUSTED TO MEET
SUPPLEMENTAL SPECIFICATIONS, AND/OR SPECIAL PROVISIONS.
TRAFFIC CONTROL DEVICES, CURRENT EDITION, AND THE GEORGIA SPECIFICATIONS,
ACCORDANCE WITH THE DETAILS SHOWN IN THE PLANS, THE MANUAL ON UNIFORM
1. ALL STANDARD HIGHWAY SIGNS SHALL BE FABRICATED AND ERECTED IN
OR ARE CONTRARY TO THESE SIGN PLANS.
ENGINEER, BE REQUIRED TO REMOVE ANY EXISTING SIGNS THAT ARE DUPLICATED
17. THE CONTRACTOR WILL, AS REQUESTED BY THE DISTRICT TRAFFIC OPERATIONS
BE SHOWN ON ALL R552-1 (LIMITED ACCESS) SIGNS IN THIS PROJECT, IF ANY.
16. REFER TO PLAN SHEETS FOR LOCATION OF THE DISTRICT ENGINEERS OFFICE TO
MISCELLANEOUS SIGNS.
15. FOR DETAILS OF SPECIAL DESIGN HIGHWAY SIGNS, SEE DETAILS OF
UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION, FOR DETAILS.
OR SPUR SHALL USE 4 INCH SERIES "D" LETTERS. REFER TO THE MANUAL ON
14. ALL INTERSTATE, U.S., AND GEORGIA SHIELDS REQUIRING ALT, BUS, CONN, LOOP,
PUNCHED, SHALL BE REQUIRED TO PROPERLY MOUNT THE ASSEMBLY.
ON THE POST(S), ADDITIONAL�INCH DIAMETER HOLE(S), DRILLED OR
13. WHERE SIGNS WITHIN AN ASSEMBLY EXTEND BELOW THE STANDARD MOUNTING HOLES
WITHIN AN ASSEMBLY.
12. A � INCH MINIMUM AIR SPACE SHALL BE REQUIRED BETWEEN ALL SIGN PLATES
SIGNING SHALL HAVE TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING.
PORTION OF THE S5-1) SIGNS. ALL REGULATORY SIGNS WITHIN THE SCHOOL ZONE
SHALL BE USED FOR SCHOOL ZONE (S1-1, S2-1, S3-1, S4-3, AND THE TOP
11. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW GREEN REFLECTIVE SHEETING
BE USED FOR ALL WARNING SIGNS.
10. TYPE 11 (VERY HIGH INTENSITY) FLUORESCENT YELLOW REFLECTIVE SHEETING SHALL
RED SERIES SIGNS (R1-1, R1-2, R1-3P, R5-1, R5-1A, R5-1B).
9. TYPE 11 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR ALL
OR CLASS 2 ADHESIVE BACKING IS PERMISSIBLE.
AS SPECIFIED BELOW OR SPECIFIED OTHERWISE IN THE PLANS. EITHER CLASS 1
ALL STANDARD HIGHWAY SIGNS REQUIRING REFLECTORIZED BACKGROUNDS EXCEPT
8. TYPE 9 (VERY HIGH INTENSITY) REFLECTIVE SHEETING SHALL BE USED FOR
TYPICAL FRAMING DETAILS.
FRAMES. FOR DETAILS AND STRAP SPECIFICATIONS REFER TO SIGN ASSEMBLY-
7. SIGN ASSEMBLIES SHALL BE MOUNTED ON ALUMINUM OR GALVANIZED STEEL STRAP
LAKE CAPRI
BRIDGE REPLACEMENT
770.263.5945 Duluth, Georgia 30096
Benjamin.Hanson
GPLOT-V8
RK20514_04-0003.dgn
8:55:40 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
Benjamin.Hanson
GPLOT-V8
RK20514_04-0004.dgn
8:55:41 AM
GPLN7/31/2015
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE:
P.I. No.
GENERAL NOTES
04-0004 770.263.5945
Duluth, Georgia 30096
BRIDGE REPLACEMENT
LAKE CAPRI
1. THIS PROJECT IS EXEMPT FROM MS4 POST CONSTRUCTION BMP REQUIREMENTS.
TYPICAL SECTIONS
05-
GADOT
PAULDING
PONTIACGADOT
PAULDING
PONTIAC
GADOT
PAULDING
PONTIAC
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_05-0001.dgn
8:55:46 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
000105-
CLASS "B" CONCRETE BASE OR WIDENING DETAIL
COURSE
SURFACE
AREA
EXCAV.
WIDTH
CLASS "B" CONCRETE BASE OR PAVEMENT WIDENING
Item Code 500-9999 - Cu. Yds.
NO SCALE
0.0 < WIDTHS < 5.0
CLASS "B" CONCRETE
6" MIN.
See plans for details of curb and gutter construction.
place base and paving as specified on the typical section.
In excavated areas greater than 5’ in width, the Contractor shall made under "Class B Concrete Base and Pavement Widening".
of the base and paving specified by the typical section. Payment will be that are 5’ or less in width, Class "B" concrete shall be placed in lieu
In excavated areas between the existing paving and new curb and gutterB
A
C
D
E
RECYCLED ASPH CONC 9.5 MM, TP. 11, GP 2 ONLY, INCL BITUM MATL & H LIME (137.5 LB/SY)
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME (220 LB/SY)
RECYCLED ASPH CONC 25 MM SUPERPAVE. GP 1 OR 2, INCL BITUM MATL & H LIME (440 LB/SY)
10" GRADED AGGREGATE BASE COURSE, INCL MATL (10 IN)
ROCK EMBANKMENT
F
G
MILL & OVERLAY, VARIABLE DEPTH
CLASS B PAVEMENT WIDENING
G
LAKE
2%
2:
MAX
2%
L
6% 2%
10’-0"10’-0" 6’-0"
2:1 MAXLAKE
A
3’-6"
TRAVEL LANE TRAVEL LANE GRASS SHLDR.
GUARDRAIL
WITH
SHOULDER SHOULDER
GRADE
PROFILE
1:
MAX
E
GRADE
EXISTING
GRADE
EXISTING
8’-0"
2’-6"
C & G
5’-0"
SIDEWALK
F
G
1’ TO 2’-0"
VARIES
SHLDR
PAVED
0’ TO 2’-0"
VARIES
C
LAKE
2%
2:
MAX
2%
6% 2%
10’-0"10’-0" 6’-0"
2:1 MAXLAKE
A
B
C
D
3’-6" 3’-6"
TRAVEL LANE TRAVEL LANE GRASS SHLDR.
GUARDRAIL
WITH
SHOULDER
GUARDRAIL
WITH
SHOULDER SHOULDER
GRADE
PROFILE
SHLDR.
PAVED
2’-0"
1:1 MAX
1:
MAX
E E
GRADE
EXISTING
GRADE
EXISTING
8’-0"
2’-6"
C & G
5’-0"
SIDEWALK
CL
TYPICAL SECTION #2
STA 51+70.00 TO STA 58+00.00
(NOT TO SCALE)
ROCKBRIDGE ROAD
TYPICAL SECTION #1
STA 51+02.00 TO STA 51+70.00
(NOT TO SCALE)
MILL AND OVERLAY
ROCKBRIDGE ROAD
LAKE
2%2%
L
6% 2%
10’-0"10’-0" 6’-0"
2:1 MAX
A
3’-6"
TRAVEL LANE TRAVEL LANE GRASS SHLDR.SHOULDER
GRADE
PROFILE
GRADE
EXISTING
GRADE
EXISTING
8’-0"
2’-6"
C & G
5’-0"
SIDEWALK
F
G
1’ TO 2’-0"
VARIES
SHLDR
PAVED
0’ TO 2’-0"
VARIES
C
TYPICAL SECTION #3
STA 58+00.00 TO STA 58+25.00
(NOT TO SCALE)
MILL AND OVERLAY
ROCKBRIDGE ROAD
SHOULDER
H
H SAFETY EDGE TREATMENT (SEE CONST. DETAIL P-7)
SUMMARY OF QUANTITIES
SUMMARY QUANTITIES
06-0001
REVISION DATES
10/6/2021
Benjamin.Hanson
GPLOT-V8
RK20514_06-0001.dgn
9:24:07 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
06-0002
REVISION DATES
10/6/2021
Araceli.Orozco
GPLOT-V8
RK20514_06-0002.dgn
8:53:06 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
06-0003
SUMMARY OF QUANTITIES
603-7000 1662 SY PLASTIC FILTER FABRIC
603-2024 1662 SY STN DUMPED RIP RAP, TP 1, 24 IN
540-1101 LUMP LS REMOVAL OF EXISTING BR, STA NO - 54+52
533-0010 169 SY BRIDGE DECK WATERPROOFING MEMBRANE, METHOD A
523-1100 2 EA DYNAMIC PILE TEST
520-4147 1 EA LOAD TEST, STEEL H, HP 14 X 73 (IF REQD)
520-1147 220 LF PILING IN PLACE, STEEL H, HP 14 X 73
520-0573 12 EA H-PILE POINTS, HP 14 X 73
511-3000 LUMP LS SUPERSTR REINF STEEL, BR NO - 1 (2833)
511-1000 6794 LB BAR REINF STEEL
507-1024 578 LF PSC CORED SLAB BEAMS, 24 IN, BR NO - 1
500-3101 54 CY CLASS A CONCRETE
500-1006 LUMP LS SUPERSTR CONCRETE, CL AA, BR NO - 1 (24)
PAY ITEM
NUMBER QUANTITY UNIT PAY ITEM
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_06-0003.dgn
1:44:46 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
RIVER BEND RD AT SR 3
WHITFIELD COUNTY
09-0001
DETAILED ESTIMATEREVISION DATES
10/5/2021
Araceli.Orozco
GPLOT-V8
RK20514_09-0001.DGN
3:45:26 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
EXIST R/W
EXIST R/W
EXIST R/W
E X I S T
R
W
E X I S T
R
W
EXIST R/W
PL
P LP L
PL
18 DPM
N
L
S T R I C T
50.00’ RT
53+72.38
40.99’ RT
53+89.62
ENTRY
RIGHT OF
OF
LIMITS
13-
CONSTRUCTION PLAN
ESA OW1
OP
EN
W
AT
ER
B
UF
FE
R
FENCE
BARRIER
4’ ORANGE
A-1.A
N/F KIM JACKSON GILMORE
TAX PARCEL # 019007053
DB 3392 PG 245
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
N/F ARTHEA MURPHY
TAX PARCEL # 0190050035
DB 3873 PG 130
N/F WILLIE DAVIS
TAX PARCEL # 0190050036
DB 6413 PG 998
PB C PG 18
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
C A P R I
C
O V E
ROCKBRIDGE ROAD
P
E:2329384.9175
N:1351339.8971
ROCKBRIDGE ROAD
STA 50+50.00
BEGIN PROJECT
5’CONC SIDEWALK
CONST CL
16’
16’
STA.53+53.13, 16’RT
TP-12A ANCHOR
BEGIN GUARDRAIL TP-W
BEGIN NC, LT & RT
STA.51+70.00
BEGIN FULL DEPTH PVMT.
END MILLING & INLAY
25’R
30" CONC. C&G
SHLDR.
2’ PAVED
5’CONC S/W
WCR
TP-D
STA 50+96.00
BEGIN CONSTRUCTION
DOMES, W/O CURB
INCL TRUNCATED
FLAT WRC
35’ LT
MILLING & INLAY
LIMIT OF
STA 51+02.00
WIDTH & SLOPE LT & RT
MATCH EXIST. ROAD
BEGIN MILL & INLAY
REMOVE 18" PINE
REMOVE 24" PINE
D W
D W
CONC.
CONC.
WITH WOOD POST
REPLACE MAILBOX POST
STONE WALLS
DO NOT DISTURB
W I
D E
N I
N G
L T
B
G
0 40 80 770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR
EASEMENT FOR CONSTR OF SLOPES
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
M A T
C H
L I
S T
A
A W I o
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_13-0001.DGN
8:56:27 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
000113-
40.60’ RT
57+00.00
50.00’ RT
57+00.00
50.00’ LT
55+54.61
50.00’ LT
58+75.00
39.93’ LT
58+75.00
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
STA.58+30.00, 17’RT
MATCH EXIST. PVMT.
40.60’ RT
57+00.00
50.00’ RT
57+00.00
50.00’ LT
55+54.61
50.00’ LT
58+75.00
39.93’ LT
58+75.00
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F MAMORU SHOJI
TAX PARCEL # 018002003E
DB 2343 PG 234
PB E PG 14
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
L A
K E
C
A P
I
V E
ROCKBRIDGE ROAD
E:2329418.9034
N:1352239.2551
STA 59+75.00
END PROJECT
5’CONC SIDEWALK 5’CONC SIDEWALK
CONST CL
50’X36’
PROPOSED BRIDGE
STA 59+00.00
END CONSTRUCTION
STA.54+00.00, 20’LT
TP-1 ANCHOR
BEGIN GUARDRAIL TP-T
30" CONC. C&G1
STA.56+09.65
BEGIN GUARDRAIL TP-W
END GUARDRAIL TP-T
SHLDR.
2’ PAVED
SHLDR.
2’ PAVED
30" CONC. C&G
STA.55+20.35
BEGIN GUARDRAIL TP-T
END GUARDRAIL TP-W
STA.57+52.00, 18’LT
TP-12A ANCHOR
END GUARDRAIL TP-T
STA.57+47.00, 16’RT
TP-12A ANCHOR
END GUARDRAIL TP-W
DOMES, W/O CURB
INCL TRUNCATED
FLAT WRC
WCR
TP-C
STA 55+40
BEGIN BRIDGE
END APPROACH SLAB
STA 55+90
BEGIN APPROACH SLAB
END BRIDGE
GA.STD.4382 TYP.
ATTACH TO BRIDGE
BEGIN GUARDRAIL TP-T STA 55+89
END GUARDRAIL TP-T STA 55+41
E N
C
B N
C
BEG 2.70%, X-SLOPE LT.
STA.55+20.00
BEGIN APPROACH SLAB
END FULL DEPTH PVMT.
END -2.70%, X-SLOPE LT.
STA.56+10.00
BEGIN FULL DEPTH PVMT.
END APPROACH SLAB
END NC, LT & RT
STA.58+00.00
INLAY & WIDENING
BEGIN MILLING,
END FULL DEPTH PVMT.
& EDGE OF PVMT.
MATCH EXIST. CROSS-SLOPE
STA.59+00.00
END MILLING, INLAY & WIDENING
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F MAMORU SHOJI
TAX PARCEL # 018002003E
DB 2343 PG 234
PB E PG 14
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
P L
PL
" 1
STA.56+09.65
SPILLWAY TP.3
GA STD. 9017J
B-0
B-1
A-1
A-0
A-2
C
A T I
O N
T R E
E30 DPC
F L
F L
18 DPM
13-
CONSTRUCTION PLAN
ESAOW1
ESAOW1
ESAOW1
25’
OPEN
WATER
BUFFE
R
25’ OPEN WATER BUFFER
P
W
T E R
B
U F F E R
FENCE
BARRIER
4’ ORANGE
FENCE
BARRIER
4’ ORANGE
0 40 80 770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
M A T
C H
L I
A
A W I
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_13-0002.DGN
8:56:44 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
20514
VERTICAL SCALE IN FEET
0 20 40
50 100 200
HORIZONTAL SCALE IN FEET
770.263.5945
Duluth, Georgia 30096 Suite 100
2450 Commerce Avenue BRIDGE REPLACEMENT
LAKE CAPRI DRIVE
10/5/2021
Benjamin.Hanson gplotborder-V8i-PO.tbl
RK20514_15.DGN9:34:03 AM
GR2EDG
GPLOT-V8
REVISION DATES
7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
DATE: 15-0001
MAINLINE PROFILE
S T
A
B E
G
N S T
R U
C T I
O N
PROP PGL
EXIST PGL
V I
I
E L
800800
50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00
I
I
E L
C
C
E L
I
I
E L
T
T
E L
C
C
E L
I
I
E L
T
T
E L
C
C
E L
I
I
E L
T
T
E L
-4.0972%
-4.8000%
-1.5000% 1.4409%
45.00 VC
K = 64.03
170.00 VC
K = 51.52
150.00 VC
K = 51.01
E l e v
V L
O W
E N
D
F
U
P T
H
P
A V I
N G
B E
G
M
L L I
N G
I
N L
D E
N I
N G
M A T
C H
E
X I S
A D E
E
M
L L I
N G
I
N L
D E
N I
N G
E
N S T
R U
C T I
O N
S T
A
DRIVEWAY PROFILES
17-0001
Sta. 52+12
DW #1
SCALE IN FEET
0 20 40 770.263.5945
Duluth, Georgia 30096 Suite 100
2450 Commerce Avenue
750750
0+000+100+200+300+400+500+60
5’VC 5’VC
740740
0+00 0+10 0+20 0+30 0+40
I
I
E L
I
I
E L
5’VC 5’VC
DW #2
Sta. 52+69
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_17.dgn9:34:09 AM
7/31/2015
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
I
I
E L
I
I
E L
9.9221%
2.0000%
15.0000%
E L
C K
B R I
D
L
2.00%
E L
C K
B R I
D
C
A T I
O N
F L
18 DPM
F L
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
T R E E
30 DPC
F L
F L
18 DPM
18 DPM
T R E E
T R E E
T R
S T R I C T
STA.58+30.00, 17’RT
MATCH EXIST. PVMT.
DRAINAGE AREA MAP
21-0001
EXIST. R/W
EXIST. R/W EXIST. R/W
EXIST. R/W
STA.56+09.65
SPILLWAY TP.3
GA STD. 9017J
REMOVE 18" PINE
REMOVE 24" PINE
WITH WOOD POST
REPLACE MAILBOX POST
STONE WALLS
DO NOT DISTURB
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_21-0001.dgn
8:56:52 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
E:2329418.9034
N:1352239.2551
STA 59+75.00
END PROJECT
E:2329384.9175
N:1351339.8971
ROCKBRIDGE ROAD
STA 50+50.00
BEGIN PROJECT
ROCKBRIDGE RD.
ROCKBRIDGE RD.
50’X36’
PROPOSED BRIDGE
S T
A
B E
G I
N
B R I
D G E
S T
A
E N
D
B R I
D G E
L A
P
I
V E
C A P R I
C
O V E
200 400
SCALE IN FEET
0 100 770.263.5945
Duluth, Georgia 30096
20514
LAKE CAPRI
LAKE CAPRI
FLOW
F L O
W
FL
OW
FLOW
DRAINAGE PROFILES
22-0001
Suite 100 2450 Commerce Avenue
0 20 40
Benjamin.Hanson
GPLOT-V8
RK20514_22.dgn
9:34:11 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
740740
0+000+100+200+300+400+500+600+700+800+901+001+101+201+30
A-2
A-1
H
I N
V
T O P
O F F
L T
S T
A
G A
S T
D
DA-0
0+200+300+400+500+600+700+800+901+001+101+201+301+401+501+601+701+801+90
EXIST A-3 TO A-1
A-1
750750
750750
2+102+202+302+402+502+602+702+802+903+003+103+203+303+403+503+603+703+803+904+004+104+204+304+404+504+604+70
A-3
2+00
2+00
SEE BELOW
MATCHLINE
SEE ABOVE
MATCHLINE
EXIST A-3 TO A-1
A-2 TO A-0
I N
V
O F F
L T
S T
A
G A
S T
D
B E L
E
I
N F
O R
M A T I
O N
WSE = 722.0’
I N
V
O F F
L T
S T
A
G A
S T
D
COLLAR, IE 742.55’
H
I N
V
O U T
I N
V I
N
A
I N
V I
N
A
T O P
O F F
L T
S T
A
G A
S T
D
A
8" DIP
PROP.
@ 1.00%
16 LF 18" CONC. PIPE
@ 1.00%
8 LF 18" CONC. PIPE
@ 4.52%
EXIST 423 LF 18" CMP@ 4.52%
8 LF 18" CMP
@ 4.52%
EXIST 423 LF 18" CMP
PROP. 8" DIP
ENCASE
CONCRETE
TO BE ABANDONED
EXIST. 8" DIP
DRAINAGE PROFILES
22-0002
0 20 40 770.263.5945
Duluth, Georgia 30096
Benjamin.Hanson
GPLOT-V8
RK20514_22.dgn
3:14:03 PM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
730730
0+000+100+200+300+400+500+60
B-1
H
I N
V
T O P
O F F
L T
S T
A
G A
S T
D
D
B-0
B-1 TO B-0
I N
V
O F F
L T
S T
A
G A
S T
D
WSE = 722.0’
ROCK EMBANKMENT @ 3.00%
8 LF 18" CONC. PIPE EXIST. 8" D.I.P.
CROSS SECTIONS
23-0001
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_23.dgn9:34:14 AM
11/8/2018
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
51+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
51+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
52+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
52+50
LAKE CAPRI DRIVE
BRIDGE REPLACEMENT
SCALE IN FEET
0 20 40 770.263.5945
Duluth, Georgia 30096
6.
4.
2.
9.
1.5%
2.0%
2.0%
2.5%
2.0%
2.0%
2.0%
2.0%
6.0%
6.0%
1.5% 2.5% 2.0%
3:1
2.0% 1.5% 2.5%
3:1
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
23-0002
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_23.dgn9:34:15 AM
11/8/2018
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
53+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
53+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
54+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
54+50
LAKE CAPRI DRIVE
BRIDGE REPLACEMENT
SCALE IN FEET
0 20 40 770.263.5945
Duluth, Georgia 30096
7.
4.
2.
0.
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
6.0%
6.0%
6.0%
6.0%
10.0%
10.0%
2:1
2:1
2:1
2:1
2:1
2:1
2:1
1:1
2:1
2:1
2:1
2:1
ROCK EMBANKMENT
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
PROP. 6" DIP
P R
O P
H Y
D R
A
L V
E
P R
O P
H Y
D R
A N
T
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
23-0003
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_23.dgn9:34:17 AM
11/8/2018
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
55+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
55+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
56+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
56+50
SCALE IN FEET
0 20 40 770.263.5945
Duluth, Georgia 30096 Suite 100
2450 Commerce Avenue BRIDGE REPLACEMENT
8.
6.
7.
7.
2.0% 2.0% 6.0%
2.0% 2.0%
2:1
2:1
1:
1:
2:12:1
2:1
1:1
1:1
6.0%2.0%
2.0% 2.0%2.0% 6.0%
2:1
1:1
2:1
ROCK EMBANKMENT
2.7%
PROP. 8" DIP
TO EXIST. 8" DIP
CONNECTION
PROP. 8" DIP
TO REMAIN IN PLACE
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP TO BE REMOVED
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
PROP. 8" DIP
PROP. 8" DIP
EXIST. 8" DIP TO BE REMOVED
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
23-0004
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_23.dgn9:34:18 AM
11/8/2018
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
57+00
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
57+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
58+00
SCALE IN FEET
0 20 40 770.263.5945
Duluth, Georgia 30096 Suite 100
2450 Commerce Avenue
6.
7.
0.3%
2.0% 2.0%
2.0% 2.0%
1.4%
2:1
2:1
2:1
1:
1:
1:
6.0%
6.0%
6.0%
2.0%
2.0%
2.0%
ROCK EMBANKMENT
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
ABANDONDED LOCATION
APPROX. EXIST. 8" DIP
EXIST. 8" DIP
23-0005
SUXSEW
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO.tbl
RK20514_23.dgn9:34:20 AM
11/8/2018
DRAWING No.CHECKED:
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
58+50
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150-10-20-30-40-50-60-70-80-90-100-110-120-130-140-150
59+00
770.263.5945 Duluth, Georgia 30096
Suite 100 2450 Commerce Avenue
SCALE IN FEET
0 20 40
8.
2:1
1:
6.0%
6.0%
ROCK EMBANKMENT
EXIST. 8" DIP
UTILITY PLANS
24-
770.263.5945 Duluth, Georgia 30096
U
D
E
R
G
R
O
U
N
D
O
V
E
R
H
E
A
D
EXISTING TO BE REMOVED
UTILITY LINECODES
TYPE OF UTILITYPROPOSED EXISTING PROPOSED TEMPORARY
UTILITY SYMBOLS
EXISTING PROPOSED TEMPORARY
QL-D DEPICTED ACCORDING TO UTILITY RECORD INFORMATION AND IN-FIELD VISUAL INSPECTION. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
QL-C EXISTING UTILITY STRUCTURES HAVE BEEN FIELD LOCATED AND SURVEYED TO ASSIST IN DEPICTING THE UTILITIES SHOWN ON RECORDS. NO ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
TELEPHONE PAIR SIZE TELEPHONE CABLE DIAMETER
101 - 2400
0.50 TO 2.00 IN5 - 100
UP TO 3.50 IN
BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS.
SUBSURFACE UTILITIES. QL-B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED
QL-B INFORMATION WAS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROPRIATE HORIZONTAL POSITION OF THE
TELEPHONE PAIR SIZE TABLE
QUALITY LEVELS AND DEFINITIONS
EXACT LOCATION AND POSITION OF THE UTILITY LINE.
NONDESTRUCTIVE EQUIPMENT IN A MANNER AS TO CAUSE NO DAMAGE TO THE UTILITY LINE. AFTER EXCAVATING A TEST HOLE, A FIELD SURVEY SHALL BE PERFORMED TO DETERMINE THE
QL-A OBTAIN PRECISE HORIZONTAL AND VERTICAL POSITION OF THE UTILITY LINE BY EXCAVATING A TEST HOLE. THE TEST HOLE SHALL BE DONE USING VACUUM EXCAVATION OR COMPARABLE
HAND HOLE
TRANSFORMER
LIGHT POLE
MARKER
SPLICE BOX
CABINET
PHONE BOOTH
WELL
STAND PIPE
BACKFLOW PREVENTER
PRESSURE INDICATOR VALVE
AIR RELEASE VALVE
CLEANOUT
GREASE TRAP
VENT
AIR RELEASE VALVE
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC BOX
CABLE TV MANHOLE
WATER VALVE
WATER METER
WATER MANHOLE
WATER VAULT
SANITARY SEWER MANHOLE
GAS PRESSURE REGULATOR
UTILITY POLE/GUY POLE
PETROLEUM VALVE
GAS VAULT
GAS MANHOLE
GAS VALVE
GAS METER
TELECOMMUNICATIONS MANHOLE
TELECOMMUNICATIONS PEDESTAL
CABLE TV PEDESTAL
SANITARY SEWER FORCE MAIN VALVE
WATER VALVE MARKER
##"W(C)
##"W
GAS TEST STATION
ELECTRIC (QL-D)
TELECOMMUNICATIONS (QL-D)
CABLE TV (QL-D)
WATER (QL-D)
WATER FOR LABELED PIPE SIZES (QL-D)
NON-POTABLE WATER (QL-D)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-D)
STEAM (QL-D)
STEAM FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER WITH FLOW DIRECTION (QL-D)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-D)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-D)
GAS (QL-D)
GAS FOR LABELED PIPE SIZES (QL-D)
PETROLEUM (QL-D)
PETROLEUM FOR LABELED PIPE SIZES (QL-D)
TRAFFIC CONTROL (QL-D)
##"W
##"W(B)
GUY ANCHOR
(INCLUDES ASSOCIATED VALVE)
FIRE HYDRANT ASSEMBLY
##"W(C)
##"W
##"W(B)
ELECTRIC (QL-C)
ELECTRIC (QL-B)
TELECOMMUNICATIONS (QL-C)
TELECOMMUNICATIONS (QL-B)
CABLE TV (QL-C)
CABLE TV (QL-B)
WATER (QL-C)
WATER (QL-B)
WATER FOR LABELED PIPE SIZES (QL-C)
WATER FOR LABELED PIPE SIZES (QL-B)
NON-POTABLE WATER (QL-C)
NON-POTABLE WATER (QL-B)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-C)
NON-POTABLE WATER FOR LABELED PIPE SIZES (QL-B)
STEAM (QL-C)
STEAM (QL-B)
STEAM FOR LABELED PIPE SIZES (QL-C)
STEAM FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER WITH FLOW DIRECTION (QL-C)
SANITARY SEWER WITH FLOW DIRECTION (QL-B)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-C)
SANITARY SEWER WITH FLOW DIRECTION FOR LABELED PIPE SIZES (QL-B)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-C)
SANITARY SEWER FORCE MAIN WITH FLOW DIRECTION (QL-B)
GAS (QL-C)
GAS (QL-B)
GAS FOR LABELED PIPE SIZES (QL-C)
GAS FOR LABELED PIPE SIZES (QL-B)
PETROLEUM (QL-C)
PETROLEUM (QL-B)
PETROLEUM FOR LABELED PIPE SIZES (QL-C)
PETROLEUM FOR LABELED PIPE SIZES (QL-B)
TRAFFIC CONTROL (QL-C)
TRAFFIC CONTROL (QL-B)
UNKNOWN UTILITY FOUND IN SUE INVESTIGATION (QL-B)
ELECTRIC
ELECTRIC/TRAFFIC CONTROL
GUY WIRE
TRAFFIC CONTROL
ELECTRIC/CABLE TV
ELECTRIC/CABLE TV/TRAFFIC CONTROL
CABLE TV
CABLE TV/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS
ELECTRIC/TELECOMMUNICATIONS/TRAFFIC CONTROL
TELECOMMUNICATIONS
TELECOMMUNICATIONS/TRAFFIC CONTROL
ELECTRIC/TELECOMMUNICATIONS/CABLE TV
ELECTRIC/TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
TELECOMMUNICATIONS/CABLE TV/TRAFFIC CONTROL
SIGNAL/BUTTON POST
TRAFFIC CONTROL PEDESTRIAN
ELECTRIC COMMUNICATIONS BOX
TRAFFIC CONTROL MANHOLE/
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
REFER TO TRAFFIC SIGNAL PLANS
TRAFFIC CONTROL INFORMATION
FOR PROPOSED/TEMPORARY
POLE ID123
A01
TH
QUALITY LEVEL (QL) DELINEATION
SANITARY SEWER MANHOLE (SSMH) ID
EOI
END OF INFORMATION
TEST HOLE (QL-A ONLY)
C123
UTILITY INVESTIGATION
LIMITS OF OVERHEAD AND SUBSURFACE
(UTILITY IMPACT ANALYSIS (UIA) ONLY)
CONFLICT LOCATION
MISCELLANEOUS
TRANSMISSION TOWER
TELECOMMUNICATIONS/CABLE TV
(aka "SLICK")
SUBSCRIBER LOOP CARRIER
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
RK20514_24-0000.DGN
8:56:54 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
LEGEND
S T R I C T
N/F KIM JACKSON GILMORE
TAX PARCEL # 019007053
DB 3392 PG 245
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
N/F ARTHEA MURPHY
TAX PARCEL # 0190050035
DB 3873 PG 130
N/F WILLIE DAVIS
TAX PARCEL # 0190050036
DB 6413 PG 998
PB C PG 18
EXIST R/W
EXIST R/W
EXIST R/W
E X I S T
R
W
E X I S T
R
W
EXIST R/W
PL
P LP L
PL
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
ESAOW1
OP
EN
W
AT
ER
B
UF
FE
R
A-1.A
N/F KIM JACKSON GILMORE
TAX PARCEL # 019007053
DB 3392 PG 245
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
N/F ARTHEA MURPHY
TAX PARCEL # 0190050035
DB 3873 PG 130
N/F WILLIE DAVIS
TAX PARCEL # 0190050036
DB 6413 PG 998
PB C PG 18
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
C A P R I
C
O V E
ROCKBRIDGE ROAD
E:2329384.9175
N:1351339.8971
ROCKBRIDGE ROAD
STA 50+50.00
BEGIN PROJECT
CONST CL
STA 50+96.00
BEGIN CONSTRUCTION
35’ LT
MILLING & INLAY
LIMIT OF
STA 51+02.00
WIDTH & SLOPE LT & RT
MATCH EXIST. ROAD
BEGIN MILL & INLAY
UTILITY PLANS
24-
EXIST. 8" DIP
ABANDON
EXIST. 8" DIP
4" STEEL GAS MAIN
ABANDON:
INSTALL 17# ANODE AND TEST STATION
NOP: 60 PSIG
WT: UNK/GRADE: UNK
TIE-INTO 4" STEEL GAS MAIN
CUT & CAP
NOP: 60 PSIG
30’ X 4" PLASTIC GAS MAIN
PROPOSED:
NOP: 60 PSIG
1-1/4" PLASTIC GAS MAIN
EXISTING TO REMAIN:
NOP: 60 PSIG
10’ X 2" PLASTIC GAS MAIN
PROPOSED: 1-1/4" PLASTIC GAS MAIN
ABANDON:
NOP: 60 PSIG
TIE-INTO 1-1/4" PLASTIC GAS MAIN
CUT & CAP
ROCKBRIDGE RD ANODE
CP: LAKE CAPRI S/D @
NOP: 60 PSIG
WT: UNK/GRADE: UNK
4" STEEL GAS MAIN
EXISTING TO REMAIN:
NOP: 60 PSIG
GAS MAIN
795’ X 4" PLASTIC
PROPOSED:
PROP. FH
PROP. FH VALVE
REVISION DATES
10/5/2021
Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO-utilities-25.tbl
RK20514_24-0001.DGN
8:57:11 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
0 40 80
BRIDGE REPLACEMENT
LAKE CAPRI DRIVE
770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
M A T
C H
L I
A
A W I
C
A T I
O N
T R E
E30 DPC
F L
F L
18 DPM
26.62’
STA.58+30.00, 17’RT
MATCH EXIST. PVMT.
UTILITY PLANS
24-
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F MAMORU SHOJI
TAX PARCEL # 018002003E
DB 2343 PG 234
PB E PG 14
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
EXIST R/W
EXIST R/W
EXIST R/W
EXIST R/W
P L
PL
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
ESAOW1
ESAOW1
ESAOW1
25’
OPEN
WATER
BUFFE
R
25’ OPEN WATER BUFFER
T E R
B
U F F E R
" 1
STA.56+09.65
SPILLWAY TP.3
GA STD. 9017J
B-0
B-1
A-1
A-0
A-2
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F MAMORU SHOJI
TAX PARCEL # 018002003E
DB 2343 PG 234
PB E PG 14
N/F LAKE CAPRI EST INVESTMENT ASSOCIATION
TAX PARCEL # 0190050015
PB E PG 14
N/F PATRICIA WILLS ETAL
TAX PARCEL # 019007053A
DB 4374 PG 34
PB H PG 359
EXIST. 8" DIP
ABANDON
EXIST. 8" DIP
ABANDON
EXIST. 8" DIP EXIST. 8" DIP
4" STEEL GAS MAIN
ABANDON:
NOP: 60 PSIG
4" PLASTIC GAS MAIN
PROPOSED:
INSTALL 17# ANODE AND TEST STATION
NOP: 60 PSIG
WT: UNK/GRADE: UNK
TIE-INTO 4" STEEL GAS MAIN
CUT & CAP
ROCKBRIDGE RD ANODE
CP: LAKE CAPRI S/D @
NOP: 60 PSIG
WT: UNK/GRADE: UNK
4" STEEL GAS MAIN
EXISTING TO REMAIN:
ROCKBRIDGE RD ANODE
CP: LAKE CAPRI S/D @
NOP: 60 PSIG
WT: UNK/GRADE: UNK
2-1/2" STEEL GAS MAIN
EXISTING TO REMAIN:
PROP. 8"DIP
L A
K E
C
A P
I
V E
ROCKBRIDGE ROAD
E:2329418.9034
N:1352239.2551
STA 59+75.00
END PROJECT
CONST CL
STA 59+00.00
END CONSTRUCTION
REVISION DATES
10/21/2021
Benjamin.Hanson
GPLOT-V8
RK20514_24-0002.DGN
9:51:20 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
0 40 80
BRIDGE REPLACEMENT
LAKE CAPRI DRIVE
770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
M A T
C H
L I
A
A W I
SIGNING AND MARKING PLANS
26-
SIGNING AND MARKING PLANS
26-
50.00’ RT
53+72.38
40.99’ RT
53+89.62
ENTRY
RIGHT OF
OF
LIMITS
STOP
N O
PA
RK
IN
G A
N Y
T
IM
0 40 80 770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
REVISION DATES
10/5/2021
USER:Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO - SIGN.tbl
P:\ROCK20514\Plans\RK20514_26-0001.DGN
8:57:45 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
M A T
C H
L I
A
A W I
C A P R I
C
O V E
ROCKBRIDGE ROAD
CONST CL
A-1.A
5" SOLID WHITE (TYP)
@ 40’ SPACING (TYP)
W/ 2 EA TYPE I RPM’S (YELLOW)
5" SOLID DOUBLE YELLOW
@ 8’ WIDE (TYP)
8" SOLID WHITE CROSSWALK
30"X30"
STA 51+11
R1-1 (30)
X
A
R
ESAOW1
OP
EN
W
AT
ER
B
UF
FE
R
FENCE
BARRIER
4’ ORANGE
SIGNING AND MARKING PLANS
26-
SIGNING AND MARKING PLANS
26-
STA.58+30.00, 17’RT
MATCH EXIST. PVMT.
40.60’ RT
57+00.00
50.00’ RT
57+00.00
50.00’ LT
55+54.61
50.00’ LT
58+75.00
39.93’ LT
58+75.00
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
LIMITS OF RIGHT OF ENTRY LIMITS OF RIGHT OF ENTRY
0 40 80 770.263.5945
Duluth, Georgia 30096
EASEMENT FOR CONSTR OF DRIVES
CONSTRUCTION LIMITS
& MAINTENANCE OF SLOPES
C F
REQUIRED R/W LINE
PROPERTY AND EXISTING R/W LINE PL
ORANGE BARRIER FENCE
LIMIT OF ACCESS
BEGIN LIMIT OF ACCESS............BLA
END LIMIT OF ACCESS..............ELA
REQ’D R/W & LIMIT OF ACCESS
(SEE ERIT TABLE)
ESA - ENV. SENSITIVE AREA
REVISION DATES
10/5/2021
USER:Benjamin.Hanson
GPLOT-V8
gplotborder-V8i-PO - SIGN.tbl
P:\ROCK20514\Plans\RK20514_26-0002.DGN
8:58:05 AM
BACKCHECKED:
CORRECTED:
VERIFIED:
DATE:
DATE:
DATE:
20514
M A T
C H
L I
A
A W I
L A
K E
C
A P
I
V E
ROCKBRIDGE ROAD
CONST CL
" 1
B-0
B-1
A-1
A-0
A-2
30 DPC
F L
F L
18 DPM
B R
ID
G E
IC
ES
B
EFO
R E
RO
A D
B R
ID
G E
IC
ES
B
EF
O R E
RO
A D
N O
PA
RK
IN
G A
N Y
T
IM
E
N O
PA
RK
IN
G A
N Y
T
IM
E
N O
PARKING
A
N Y
T
IM
E
N O
PARKING
A
N Y
T
IM
E
ESAOW1
ESAOW1
ESAOW1
25’
OPEN
WATER
BUFFE
R
25’ OPEN WATER BUFFER
T E R
B
U F F E R
X
S T
A
O M
R
X
A
W
X
S T
A
O M
R
X
S T
A
O M
R
X
S T
A
O M
R
X
A
W
@ 8’ WIDE (TYP)
8" SOLID WHITE CROSSWALK
5" SOLID WHITE (TYP)
@ 40’ SPACING (TYP)
W/ 2 EA TYPE I RPM’S (YELLOW)
5" SOLID DOUBLE YELLOW
X
A
W
X
A
W
X
A
R
X
A
S T
A
R
X
A
R
X
A
R
21’-0"
F L
O W
EL 727.88
500 YEAR
EL 726.28
100 YEAR
1’ - 2�"
1’ - 2�"
P.G.L
2’-0"
BERM
MIN
CAP
NO SCALE
2’-0"
RIP RAP APRON
B.F.P.R.
EL 725.73
50 YEAR
35-0001
P A
R A
P
R A
P E
T
S
ID
E
W A
L K
O
T
LIMIT OF RIP RAP, TYP
20’-0"
FLOODSTAGE EL (100 YR FLOOD) *
ORIGINAL
GROUND
PLASTIC FILTER FABRIC
1"
PLAN AND ELEVATION
PROFILE GRADE LINE AND B.F.P.R. OR c BENTS.
PROFILE GRADE LINE AT THE INTERSECTION OF
STATIONS AND ELEVATIONS ARE ALONG **
SCALE: �" = 1’-0", UNLESS OTHERWISE NOTED
GROUNDLINE
ORIGINAL
APROXIMATE
N
TOTAL LENGTH OF BRIDGE = 50’-0"
* SLOPE NORMAL TO END BENT
AND PAYMENTS, TYP.
SEE ROADWAY PLANS FOR DETAILS
EXISTING FILL TO BE REMOVED
U
G
EORGIA
R
EGISTERE
DR
EGISTERE
D
E
NGINEE
IL
LI
M.D
V A
L
W L
MA
PROFESSIONAL
No. 22100
FIX
EXP
2450 Commerce Avenue Suite 100
Duluth, Georgia 30096-8910
Tel.: (770) 263-5945 oneatlas.com
S T
A
.0
S T
A
.0
E L .8
E L .6
-1.5000%
STA. 55+90.00
END BRIDGE BFPR
BFPR BENT 2BFPR BENT 1
TO UNION GROVE RD.
N 2°-09’-50.8" E
STA. 55+40.00
BEGIN BRIDGE…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| 22-02 Municipal Court Judge | — | |
| Award Information | — | |
| Award Information | — | |
| Award Information | — | |
| Award Information | — | |
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .