UNICOM Tower Installation Construction Documents Summary
This document is a comprehensive set of construction plans and specifications for the State of Hawaii Department of Transportation Airports Division for the demolition of an existing UNICOM tower and installation of a pre-fabricated replacement UNICOM tower at Kawaihapai Airfield in Mokuleia, Oahu, Hawaii (Project No. CO2541-33). The scope of work includes demolition of the existing tower structure and associated components, construction of a new pre-fabricated modular tower by Panel Built, Inc., installation of a 30-foot utility wood pole with antenna mounting brackets, construction of a new electrical/storage building, site preparation including 2 inches of asphalt pavement overlay, and all associated civil, structural, and electrical work. The construction documents consist of 14 sheets total, including general notes, existing conditions and demolition plans, best management practices, site plans, structural foundation and framing plans, wall sections, and electrical plans and demolition details. The plans are dated May 7, 2026, and were prepared by OceanIT (Civil), Coffman Engineers (Structural), and Kraig K. Otani & Associates, LLC (Electrical), with approvals by Jason Y. Lee, Civil Engineer.
The project requires compliance with the State of Hawaii Building Code adopting the 2021 International Building Code, Fire Code (NFPA 1 2018), and NEC electrical standards. Construction must occur primarily during off-peak nighttime hours to minimize disruption to ongoing airport operations, with runway closures requiring two weeks' advance notice for NOTAM issuance. The contractor is responsible for documenting existing conditions, verifying all dimensions and utilities prior to work, and repairing any damages caused during construction at no cost to the State. Special provisions address aviation safety in Air Operations Areas per FAA Advisory Circular 150/5370-2, personnel requiring AOA driver training, continuous radio monitoring, and establishment of temporary erosion control measures with drain inlet protection and fiber roll installation. The contractor must employ a special inspector for concrete work, reinforcing steel, field welding, and pre-engineered metal building construction, and shall submit shop drawings and as-built drawings for review and approval prior to deviations from construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications-FINAL SPECIFICATIONS w NTB CO2541 33.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
C
H
I G
H H
N L
I D
Q
T
E A
M
G
E N
E R
A L P
R O
J E
C T
S H
D
K
A W
A I H
A P
A I C
O
U
N I C
O M
W
N
S T
A L L A
T I O
N
F
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L G
T
I T
L
S
E
E T
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
HAWAII
MAUI
KAHOOLAWE
LANAI
MOLOKAI
OAHU
KAUAI
NIIHAU
Upolu Airport
Waimea-Kohala Airport
Hilo International Airport
Kalaupapa Airport
Molokai Airport
Kahului Airport
Lanai Airport
Hana Airport
Kawaihapai Airfield
Lihue Airport
Port Allen Airport
P a c i f i c O c e a n
Kapalua Airport
Kalaeloa
Airport
Daniel K. Inouye
International
Airport
Ellison Onizuka
Kona International
Airport At Keahole
P a c i f i c O c e a n
North
South
EastWest
NENW
SE
SW
CIVIL:
OCEANIT
828 FORT STREET MALL,
SUITE 600
HONOLULU, HAWAII 96813
(808) 531-3017
AIRPORT VICINITY MAP
DEPARTMENT OF TRANSPORTATION
STATE OF HAWAII
APPROVED:
DATE
for DIRECTOR OF TRANSPORTATION
JASON Y. LEE
CIVIL ENGINEER
G-001
TITLE SHEET
UNICOM TOWER INSTALLATION
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
PROJECT NO. CO2541-33
PROJECT TEAM
PLANS FOR
AT
PROJECT SITE
STRUCTURAL:
COFFMAN ENGINEERS
745 FORT STREET MALL,
SUITE 400
HONOLULU, HAWAII 96813
(808) 687-8884
PHILIP BOULTINGHOUSE
STRUCTURAL ENGINEER
ELECTRICAL:
BRYCE H. KANEMURA
ELECTRICAL ENGINEER
DEPARTMENT OF TRANSPORTATION
STATE OF HAWAII
AIRPORTS
KRAIG K. OTANI &
ASSOCIATES, LLC
3036A LAKIMAU STREET
HONOLULU, HAWAII 96815
(808) 250-7346
05/18/2026
GENERAL NOTES:
1. CONSTRUCTION SHALL COMPLY WITH THE STATE OF HAWAII BUILDING CODE, WHICH ADOPTS
THE 2021 INTERNATIONAL BUILDING CODE, WITH LOCAL AMENDMENTS.
2. CONSTRUCTION DOCUMENTS DESCRIBE THE INTENT OF THE QUALITY AND SCOPE OF THE
CONSTRUCTION FOR THE PROJECT. WHERE DETAILS ARE NOT SHOWN, THE CONTRACTOR
SHALL PROCEED FOLLOWING THE ACCEPTED QUALITY STANDARDS AND PROCEDURES OF
THE CONSTRUCTION INDUSTRY IN THE STATE OF HAWAII FOLLOWING THE GENERAL INTENT
OF THE CONSTRUCTION DOCUMENTS.
DIMENSIONS
1. DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALE.
2. DIMENSIONS SHALL BE FIELD VERIFIED BEFORE PROCEEDING WITH THE WORK.
DEFINITIONS
1. ALL MATERIALS, ITEMS, WORK, NOTED IN THE DRAWINGS SHALL BE “NEW”, UNLESS INDICATED
AS EXISTING.
2. (E) MEANS “EXISTING”. CONTRACTOR SHALL VERIFY EXISTING DIMENSIONS AND CONFIRM
SIZES.
3. “PROVIDE” SHALL MEAN FURNISH AND INSTALL NEW ITEM(S) AS DETAILED NOTED IN THE
CONTRACT DOCUMENTS.
4. “REMOVE” MEANS TO REMOVE AND DISPOSE INDICATED ITEMS, INCLUDING ASSOCIATED
EXTRANEOUS FASTENERS, PIPES, CONDUITS, JUNCTION BOXES, ETC. AND
REPAIR/REPLACE/PATCH DAMAGES, SPALLS, CRACKS, HOLES, ETC.
5. "REPLACE” MEANS TO REMOVE EXISTING AND TO FURNISH AND INSTALL, “NEW” ITEM(S) TO
MATCH THE EXISTING DESIGN, SUCH AS MATERIALS, THICKNESS, COLOR, QUALITY,
CONSTRUCTION, ETC., UNLESS OTHERWISE DETAIL OR NOTED. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITION AND DESIGN PRIOR TO REMOVAL.
CONSTRUCTION NOTES:
1. IT IS THE CONTRACTOR’S RESPONSIBILITY TO DOCUMENT EXISTING CONDITIONS WITHIN THE
PROJECT LIMITS BEFORE START OF PROJECT. CONTRACTOR SHALL BE RESPONSIBLE TO
REPAIR DAMAGES WITHIN THE PROJECT LIMITS UNLESS DOCUMENTED AS EXISTING.
2. THE DEMOLITION PLAN REPRESENTS ONLY GENERAL DEMOLITION. ALL ITEMS TO BE
REMOVED, TEMPORARILY REMOVED AND REINSTALLED, ETC. ARE NOT NECESSARILY SHOWN.
CONTRACTOR SHALL PERFORM ALL REQUIRED DEMOLITION, TEMPORARY REMOVAL AND
REPLACEMENT, CUTTING PATCHING, ETC., AS REQUIRED TO PROVIDE COMPLETE
CONSTRUCTION. VERIFY AND COMPARE ALL DRAWINGS (ALL DISCIPLINES) FOR THE
COMPLETE SCOPE OF WORK.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, AND CONDITIONS PRIOR TO
BEGINNING ANY WORK AND SHALL NOTIFY THE STATE OF ANY DISCREPANCY AND/OR
CONDITION WHICH WILL PREVENT HIM/HER FROM FULFILLING THE TERMS OF THE CONTRACT.
WHERE EXISTING CONDITIONS REQUIRE DETAILS AND/OR SPECIFICATIONS TO VARY FROM
THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE STATE
IN WRITING AND PROPOSE ALTERNATE METHODS AND MATERIALS FOR CONSIDERATION. ALL
EXISTING ITEMS AND/OR FINISHES SCHEDULED TO REMAIN, BUT DAMAGED DURING
CONSTRUCTION, AND OVERPAINTED EXISTING MATERIALS, SHALL BE CORRECTED TO MATCH
THE EXISTING MATERIAL AND FINISHES AT NO EXTRA COST TO THE STATE.
4. QUANTITIES SHOWN AND/OR SPECIFIED IN THE DRAWINGS AND SPECIFICATIONS SHALL BE
VERIFIED BY THE CONTRACTOR. CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR ALL
QUANTITIES.
5. GENERAL CONTRACTOR SHALL REVIEW ALL SUBMITTALS AND COORDINATE THE WORK OF
THE VARIOUS TRADES TO FIT ACTUAL CONDITIONS AND MAKE INTERFACING ADJUSTMENTS AS
REQUIRED.
6. THE CONTRACTOR SHALL PROTECT ALL ITEMS, IN AND ABOVE GROUND WITHIN THE PROJECT
SITE FROM DAMAGE. DAMAGE TO BUILDINGS, SIDEWALLS, UTILITY LINES, LANDSCAPING,
LAWN, HOSEBIBS, ETC., CAUSED BY THE CONTRACTOR, SHALL BE REPLACED AND/OR
REPAIRED AT NO COST TO THE STATE.
7. CONTRACTOR SHALL PATCH ALL SURFACES EXPOSED FROM CUTTING, AND OR REMOVAL
WORK. PATCH SHALL MATCH THE MATERIAL AND FINISH OF ADJACENT SURFACES.
8. ALL WASTE MATERIALS SHALL BE PROMPTLY REMOVED AND PROPERLY DISPOSED OF
OUTSIDE THE LIMITS OF THE PROPERTY DAILY. AT THE END OF CONSTRUCTION, ALL ITEMS
AND EQUIPMENT TEMPORARILY REMOVED DURING CONSTRUCTION SHALL BE REINSTALLED
AS INDICATED, OR IN A LOCATION APPROVED BY THE STATE.
9. PAINT ALL NEWLY INSTALLED ITEMS TO MATCH EXISTING ADJACENT SURFACES, EXCEPT DO
NOT PERMIT PREFINISHED ITEMS.
10. THE APRON WILL BE OCCUPIED DURING CONSTRUCTION. CONSTRUCTION SHALL NOT
DETRIMENTALLY AFFECT THE ONGOING OPERATIONS AND USE OF THE APRON. THE
CONTRACTOR SHALL CLOSELY COORDINATE ALL WORK WITH THE ENGINEER. THE STATE HAS
THE FINAL DETERMINATION REGARDING DETRIMENTAL IMPACT OF
THE FACILITY AND ITS OPERATION.
11. WHERE WARRANTIES ARE SPECIFIED, CONTRACTOR’S BID SHALL INCLUDE FULL COMPLIANCE
OF ALL CONDITIONS REQUIRED BY THE WARRANTIES. WHERE THE MANUFACTURER’S
WARRANTY REQUIREMENTS AND/OR RECOMMENDATIONS VARY FROM THE REQUIREMENTS
OF THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS EXPECTED TO COMPLY WITH THE
STRICTER OF THE TWO PROVIDING REQUIREMENTS DO NOT VOID WARRANTY.
12. CONTRACTOR SHALL INFORM THE STATE IN WRITING, PROVIDE SHOP DRAWINGS, AND
AS-BUILT DRAWINGS WHERE PROPOSED CONSTRUCTION WILL DEVIATE FROM THE
CONSTRUCTION DOCUMENTS.
13. IF STAGING IS NEEDED, CONTRACTOR TO COORDINATE WITH ENGINEER FOR FINAL STAGING
SITE LOCATION.
14. CONTRACTOR'S PRIME REPRESENTATIVE SHALL BE PRESENT ON SITE AT ALL TIMES.
15. CONTRACTOR TO THOROUGHLY SWEEP AND REMOVE ALL F.O.D. FROM ENTIRE WORK SITE AT
CONCLUSION OF ALL WORK.
FIRE CODE / FIRE SAFETY NOTES:
1. FIRE SAFETY DURING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL COMPLY WITH THE
FIRE CODE (NFPA 1 2018) WITH APPLICABLE COUNTY AMENDMENTS.
ELECTRICAL NOTES:
1. PLANS DO NOT INDICATE COMPLETE EXISTING ELECTRICAL CONDITIONS. CONTRACTOR SHALL
VISIT JOBSITE TO BECOME FAMILIAR WITH ALL EXISTING CONDITIONS AND EXTENT OF
DEMOLITION AND NEW WORK PRIOR TO THE START OF WORK.
2. PRIOR TO THE START OF WORK, CONTRACTOR SHALL VISIT JOBSITE AND REPORT ANY
DISCREPANCIES AND/OR DIFFERENCES IN DRAWINGS, IN RESPECT TO EXISTING CONDITION, TO
THE ENGINEER.
3. CONTRACTOR SHALL RESOLVE ALL DISCREPANCIES AND QUESTIONS PRIOR TO THE START OF
WORK. NO EXTRA PAYMENT SHALL BE ALLOWED ON ACCOUNT OF WORK MADE NECESSARY BY
CONTRACOTR'S FAILURE TO VISIT THE SITE AND/OR FAILURE TO RESOLVE DISCREPANCIES AND
QUESTIONS.
4. CONTRACTOR SHALL INVESTIGATE EACH AIRFIELD LIGHTING MANHOLE AFFECTED BY THE
WORK AND PROVIDE DETAILED SCHEMATICS AND MANHOLE BUTTERFLY DIAGRAMS WITH
PICTURES PRIOR TO DEMOLITION AND NEW WORK.
SPECIAL NOTES:
1. THE CONTRACTOR SHALL MAINTAIN AVIATION SAFETY IN THE AIR OPERATIONS AREA (AOA) AT
ALL TIMES DURING CONSTRUCTION ACTIVITY BY COMPLYING WITH FAA ADVISORY CIRCULAR
150/5370-2 (CURRENT EDITION), OPERATION SAFETY ON AIRPORTS DURING CONSTRUCTION.
2. IN ORDER TO MINIMIZE DISRUPTION TO AIRPORT OPERATIONS, ALL TRENCHING AND WORK
INVOLVING HEAVY EQUIPMENT ON THE AIRFIELD SHALL BE PERFORMED DURING OFF-PEAK
HOURS AT NIGHT. CONSTRUCTION OPERATIONS SHALL BE SCHEDULES SUCH THAT TAKEOFFS
AND LANDINGS HAVE PRIORITY OVER CONSTRUCTION ACTIVITY. NO CONSTRUCTION SHALL BE
PERFORMED WITHIN THE RUNWAY SAFETY AREA UNLESS THE RUNWAY IS CLOSED. REQUESTS
FOR RUNWAY CLOSURES SHALL BE SUBMITTED AT LEAST TWO WEEKS IN ADVANCE TO ENSURE
THAT PROPER "NOTICE TO AIRMEN" (NOTAM) CAN BE ISSUED. SCHEDULING OF CONSTRUCTION
ACTIVITIES SHALL BE AGREED UPON IN DETAIL WITH THE AIRPORT MANAGER (OR HIS
AUTHORIZED REPRESENTATIVE). CONSTRUCTION MANAGER AND FAA TOWER PERSONNEL. AT
ANY TIME DURING CONSTRUCTION. THE CONTRACTOR MAY BE DIRECTED BY AIRPORT
OPERATIONS TO PUSH BACK START TIMES, MOVE UP END TIMES, INTERRUPT WORK
TEMPORARILY, OR CANCEL WORK ENTIRELY DURING EMERGENCY CONDITIONS AND OTHER
UNFORESEEN EVENTS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR THE SERVICES OF EFFICIENT, QUALIFIED
PERSONNEL EQUIPPED W/ 2-WAY RADIO EQUIPMENT FOR CONTINUOUS MONITORING AND
COMMUNICATIONS WITH AIRPORT OPERATIONS. ALL PERSONNEL SHALL ATTEND AN AOA DRIVER
TRAINING CLASS TO BECOME FAMILIAR WITH AIRFIELD SIGNS AND MARKINGS AND BE ABLE TO
COMMUNICATE WITH AIRPORT OPERATIONS.
4. REFER TO THE SPECIFICATIONS, SECTION 8.21 OF THE SPECIAL PROVISIONS FOR
VEHICLE/PERSONNEL REQUIREMENTS IN RESTRICTED AIR OPERATIONS AND MOVEMENT AREAS.
5. ANY DAMAGES TO EXIST CABLES AND/OR UTILITY LINES, WHETHER OR NOT SHOWN, SHALL BE
REPAIRED AT NO COST TO THE STATE.
6. AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL REMOVE ALL EXCAVATED
MATERIALS FROM THE RUNWAY AND TAXIWAY AREAS. UNLESS REQUIRED FOR SAFETY, THE
CONTRACTOR SHALL CLEAN AND REMOVE ALL DEBRIS, UNINSTALLED MATERIALS, BARRICADES,
ENCLOSURES AND OTHER OBSTACLES TO NORMAL OPERATIONS.
7. USE OF STEEL PLATES TO COVER OPEN TRENCHES SHALL NOT BE ALLOWED. CONTRACTOR
SHALL FILL AND COMPACT ALL TRENCHES AT THE END OF EACH WORK DAY.
LOCATION OF UNDERGROUND UTILITIES:
1. THE LOCATIONS OF UNDERGROUND UTILITIES, CABLES, DUCTS, CONDUITS, ETC. AS INDICATED
ON PLANS HAVE BEEN OBTAINED FROM EXISTING RECORDS AND ARE APPROXIMATE. NEITHER
THE AIRPORT NOR THE ARCHITECT/ENGINEER ASSUMES ANY RESPONSIBILITY WHATSOEVER
IN RESPECT TO THE ACCURACY, COMPLETENESS, OR SUFFICIENCY OF THE INFORMATION
SHOWN. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS,
SIZE AND TYPE OF MATERIALS OF EXISTING UNDERGROUND UTILITIES INDICATED ARE
REPRESENTATIVE OF THOSE TO BE ENCOUNTERED IN THE CONSTRUCTION. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ACTUAL LOCATION OF ALL SUCH
FACILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES. PRIOR TO
CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF HIS OPERATION PLANS,
IN THE EVENT AN UNEXPECTED UTILITY INTERFERENCE IS ENCOUNTERED DURING
CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER. ANY SUCH
MAINS AND/OR SERVICES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE
RESTORED IMMEDIATELY AT HIS EXPENSE.
2. THE CONTRACTOR SHALL USE HAND EXCAVATION TO PROVIDE INVESTIGATIVE PITS TO
IDENTIFY LOCATION OF EXISTING UTILITIES PRIOR TO ANY OTHER EXCAVATION ACTIVITIES.
3. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN EXCAVATING IN AREAS OF EXISTING
UTILITIES. EXISTING UTILITIES SHALL BE LOCATED AND MARKED IN ADVANCE OF EXCAVATION
IN ALL AREAS. ANY DAMAGE DONE TO KNOWN UTILITIES SHALL BE REPAIRED IMMEDIATELY BY
THE CONTRACTOR AT HIS EXPENSE. THE LOCATION OF ANY UTILITIES SHOWN ON THE PLANS
ARE APPROXIMATE ONLY, AND DEPTHS MAY NOT BE KNOWN. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACING AND/OR REPAIRING ALL DAMAGE TO KNOW UTILITIES AND
AIRPORT PROPERTY.
4. DISTURBED AREAS OUTSIDE OF PAVEMENT AREAS SHALL BE RESTORED TO ORIGINAL
SURFACE ELEVATIONS, RAKED SMOOTH AND HYDRO-SEEDED.
AOA TRAFFIC CONTROL NOTES:
1. THE CONTRACTOR SHALL FURNISH ALL ESCORTS, FLAG PEOPLE, AND COMMUNICATION
DEVICES SPECIFIED IN THE TECHNICAL PROVISION SECTION 01800; AS WELL AS, ALL AOA
TRAFFIC CONTROL DEVICES SPECIFIED IN THE TECHNICAL PROVISION SECTION 01800 -
SPECIAL REQUIREMENTS FOR CONTRACTORS IN THE AOA..
2. THE CONTRACTOR'S ESCORTS SHALL CONTINUOUSLY MONITOR RADIO FREQUENCY,
INDICATED IN THE TECHNICAL PROVISION SECTION 01800 - SPECIAL REQUIREMENT FOR
CONTRACTORS ON THE AOA, FOR ALL POTENTIAL AIRCRAFT ACTIVITY THAT IS
UNFORESEEN.
3. BEFORE STARTING ANY WORK AT EACH WORKDAY, THE CONTRACTOR SHALL SET UP ALL
AOA TRAFFIC CONTROL DEVICES IN THE ORDER REQUIRED BY THE CONTRACT. AT THE END
OF EACH WORKDAY, THE CONTRACTOR SHALL TAKE DOWN ALL AOA TRAFFIC CONTROL
DEVICES IN THE REVERSE ORDER.
4. THE CONTRACTOR SHALL NOT TAKE DOWN ANY AOA TRAFFIC CONTROL DEVICES UNTIL
WORK IS COMPLETED ON THE AOA.
5. THE CONTRACTOR SHALL NOT LEAVE THE AOA UNTIL ALL AOA TRAFFIC CONTROL DEVICES
HAVE BEEN TAKEN DOWN.
6. THE CONTRACTOR SHALL NOT LEAVE THE AIRPORT UNTIL ALL STAGING AREAS ARE
CLEARED ACCORDING TO TECHNICAL PROVISION SECTION 01700 - MOBILIZATION AND
DEMOBILIZATION.
7. CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLAN AND ANY OUTAGE REQUESTS TO
ENGINEER PRIOR TO CONSTRUCTION.
S H E E T I N D E X
DESCRIPTION OF DRAWINGSSHEETDRAWING NUMBER
CIVIL DRAWINGS
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L G
E N
E R
A L
S
H E
E T
G
N
O T
E S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
G-002
SHEET INDEX
AND
NOTES
TITLE SHEET
SHEET INDEX AND NOTES
EXISTING CONDITIONS PLAN
DEMOLITION PLAN
BEST MANAGEMENT PRACTICES PLAN
BEST MANAGEMENT PRACTICES NOTES
SITE PLAN
DETAILS
GENERAL NOTES, FOUNDATION PLAN AND DETAILS
FOUNDATION PLAN
WALL SECTIONS
ELECTRICAL SYMBOLS, GENERAL NOTES
ELECTRICAL DEMOLITION PLAN
ELECTRICAL PLAN
G-001
G-002
C-001
C-002
C-003
C-004
C-101
C-102
S-001
S-101
S-301
E-1
E-2
E-3
STRUCTIURAL DRAWINGS
ELECTRICAL DRAWINGS
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-001
EXISTING
CONDITIONS
PLAN
EX. UNICOM TOWER
EDGE OF PAVEMENT
SHED
L3HARRIS
COMM BLDG
ANTENNA TO BE
RELOCATED BY OTHERS
EXIST. RACK
TO REMAIN
DEMOLISH STAIRS
DEMOLISH EXIST.
UNICOM TOWER
EX. CONC SLAB & BACK WALL (TO 8-FT) TO REMAIN
ELECT COMPONENTS ON REMAINING WALL TO REMAIN
PROVIDE TEMP. SUPPORT/BRACING AND
COVER AS REQUIRED TO STABILIZE REMAINING WALL
AND TO PROTECT EX. ELECT. PANELS/EQUIPMENT
DEMOLISH EXIST.
LADDER
RELOCATE EX. CONDUIT/
LIGHTS LOWER TO
REMAINING WALL
CUT & CAP POST
ABOVE EXIST. RACK
DEMOLISH EXIST.
UNICOM TOWER
INCLUDING STAIRS
EXIST. RACK
TO REMAIN
RELOCATE EX. CONDUIT/
LIGHTS LOWER TO
REMAINING WALL
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-002
DEMOLITION
PLAN
EX. SHED
TO REMAIN
EX. UGE
TO REMAIN
EX. UGE
TO REMAIN
EX. WATER
TO REMAIN
ANTENNA TO BE RELOCATED
BY OTHERS
EX. CONC. SLAB & BACK WALL (TO 8-FT) TO REMAIN
PROVIDE TEMP. SUPPORT/BRACING & COVER
AS REQUIRED TO STABILIBIZE REMAINING WALL
AND TO PROTECT EX. ELECT. PANELS/EQUIPMENT
EX. UGE
TO REMAIN
ALL ELECT. PANELS/EQUIPMENT
& FEEDS TO REMAIN
(SEE ELECT DWGS)
CUT & CAP WATER
LINE ABOVE SLAB
EX. UGE
TO REMAIN
DEMOLISH EXIST. TOWER
EXCEPT AS NOTED
EX. OVERHEAD RACK
TO REMAIN
COLD PLANE 2" OF ASPHALT PAVEMENT
REMOVE FOUNDATION / CONCRETE PLINTHS
& STRIP FOOTINGS TO 6" BELOW GRADE
EX. OH ELECT.
TO BE REMOVED
(SEE ELECT DWGS)
EX. SEWER
TO REMAIN
REMOVE
EX. LADDER
CUT & CAP SEWER
ABOVE SLAB
DEMOLISH SIDE & INTERIOR WALLS
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-003
BEST MANAGEMENT
PRACTICES
PLAN
TWO LAYERS
DRAIN FILTER FABRIC
WRAPPED OVER DRAIN
INLET COVER (TYPICAL)
DRAIN INLET
COVER
FILTERED WATER
SECTION A-A
TWO LAYERS DRAIN FILTER
FABRIC WRAPPED OVER
DRAIN INLET COVER
(TYPICAL)
DRAIN INLET
A A
NOTE:
PLAN
WHERE MULTIPLE INLET GRATES OCCUR, INSTALL ONE
FILTER SOCK AROUND BOTH INLETS.
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-004
BEST MANAGEMENT
PRACTICES
NOTES
BEST MANAGEMENT PRACTICE EROSION CONTROL NOTES:
TEMPORARY EROSION CONTROL NOTES:
1. CONTRACTOR TO INSTALL DRAIN INLET PROTECTION BEFORE THE START OF ANY WORK.
2. DRAIN INLET PROTECTION SHALL BE IMMEDIATELY REPAIRED WHEN DAMAGED DURING CONSTRUCTION
OPERATIONS.
3. BMP MEASURES AND PRACTICES SHALL BE IN ACCORDANCE WITH DOTA'S HNL SWMPP, WHICH INCLUDES, BUT IS NOT LIMITED TO, DOTA'S CONSTRUCTION ACTIVITIES BMP FIELD MANUAL.
4. THE CONTRACTOR'S CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE AND COMPLIANCE WITH THE
DOH'S NPDES PERMIT WHICH INCLUDES, BUT IS NOT LIMITED TO, HAR CHAPTER 11-54, 11-55, AND 11-56.
5. THE CONTRACTOR SHALL REQUEST AN INITIAL BMP INSPECTION BE CONDUCTED BY AIR-EE. THE INITIAL
BMP INSPECTION WILL BE SUBJECT TO THE AVAILABILITY OF THE BMP INSPECTOR. NO CONSTRUCTION
ACTIVITIES, EXCEPT FOR ACTIVITIES REQUIRED FOR THE INSTALLATION OF THE TEMPORARY BMP
MEASURES, SHALL COMMENCE PRIOR TO THE INITIAL BMP INSPECTION AND THE CORRECTION OF ALL
DEFICIENCIES THAT ARE NOTED DURING THE INSPECTION. ONLY AFTER ALL CORRECTIVE ACTIONS HAVE
BEEN DOCUMENTED AND ACCEPTED BY AIR-EE SHALL CONSTRUCTION ACTIVITIES BE ALLOWED TO
COMMENCE.
6. INDEPENDENT THIRD-PARTY BMP INSPECTION WILL BE CONDUCTED MONTHLY. THE CONTRACTOR SHALL
COMPLY WITH THESE INSPECTIONS.
7. AFTER THE SITE HAS BEEN PERMANENTLY STABILIZED, THE CONTRACTOR SHALL REQUEST A FINAL BMP
INSPECTION BE CONDUCTED BY AIR-EE. THE FINAL BMP INSPECTION WILL BE SUBJECT TO THE
AVAILABILITY OF THE AIR-EE BMP INSPECTOR. NO BMP MEASURES SHALL BE REMOVED PRIOR TO THE
FINAL BMP INSPECTION AND THE CORRECTION OF ALL DEFICIENCIES THAT ARE NOTED DURING THE
INSPECTION. ONLY AFTER ALL CORRECTIVE ACTIONS HAVE BEEN DOCUMENTED AND ACCEPTED BY AIR-EE
SHALL THE BMP MEASURES BE ALLOWED TO BE REMOVED.
8. PROVIDE MEASURES AND/OR PRACTICES THAT MUST BE FOLLOWED BY THE CONTRACTOR TO PREVENT
SEDIMENT TRACKING ONTO THE RUNWAYS AND TAXIWAYS EACH DAY. SOMETIMES, INSTALLATION OF A
STABILIZED AGGREGATE CONSTRUCTION ENTRANCE/EXIT, ESPECIALLY IN THE MOVEMENT AREA, IS NOT
ALWAYS FEASIBLE; THEREFORE, OTHER MEASURES AND PRACTICES MUST BE IMPLEMENTED.
9. EXCAVATED SOIL CAN ONLY BE RE-USED ON AIRPORT PROPERTY AFTER BEING PROPERLY TESTED FOR
CONTAMINATES FOLLOWING DOH’S SAMPLING GUIDELINES AND APPROVED BY AIR-EE. SUBMIT THE
LABORATORY TEST RESULTS TO THE RPM FOR REVIEW BY AIR-EE. PROPER BMP MEASURES SHALL BE
IMPLEMENTED FOR THE STOCKPILES AT ALL TIMES.
10. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES AND STRUCTURES SHOWN ON THE
DRAWINGS ARE APPROXIMATE AND ARE BASED ON THE LATEST DATA AVAILABLE TO THE ENGINEER. THE
INFORMATION SHOWN IS NOT GUARANTEED AS TO ITS ACCURACY OR TO ENSURE THE CONTRACTOR
FROM ENCOUNTERING OTHER OBSTACLES DURING HIS COURSE OF WORK. THE CONTRACTOR SHALL
MAKE INDEPENDENT CHECKS AND CONSULT WITH UTILITY FIRMS TO VERIFY THE EXACT LOCATIONS OF
THE UTILITIES AND STRUCTURES. THE CONTRACTOR SHALL NOT BE RELIEVED FROM ANY LIABILITY DUE
TO DAMAGES RESULTING FROM HIS OPERATIONS.
11. DUST CONTROL SHALL BE APPLIED TO REDUCE DUST EMISSIONS. THE CONTRACTOR, AT HIS OWN
EXPENSE, SHALL KEEP THE PROJECT AREA AND SURROUNDING AREA FREE FROM DUST NUISANCE.
CONTRACTOR SHALL WATER STOCKPILES TO REDUCE DUST EMISSIONS. THE WORK SHALL BE IN
CONFORMANCE WITH THE AIR POLLUTION CONTROL STANDARDS CONTAINED IN HAWAII ADMINISTRATIVE
RULES: CHAPTER 11-60.1 "AIR POLLUTION CONTROL".
12. DOTA REQUIRES THAT STAFF WITH CONSTRUCTION PROGRAM RESPONSIBILITIES (E.G. SPMS, CMS, CONTRACTOR, INSPECTORS, PLAN REVIEWERS) TO BE TRAINED ANNUALLY. THE TRAINING IS SPECIFIC TO
DOTA ACTIVITIES, INCLUDING THE PROPER INSTALLATION AND MAINTENANCE OF ACCEPTED BMPS, RULES, AND PROCEDURES. THE PERTINENT TRAINING VIDEO IS AVAILABLE ON THE DOTA WEBSITE:
HTTP://HIDOT.HAWAII.GOV/AIRPORTS/DOING-BUSINESS/ENGINEERING/ENVIRONMENTAL/CONSTRUCTION-SITE-
RUNOFF-CONTROL-PROGRAM/ SUBMIT THE COMPLETED TRAINING ROSTERS AND CONSTRUCTION
TRAINING QUIZZES TO THE DOTA ENVIRONMENTAL SECTION (FAX: 808-838-8017) OR EMAIL TO
DOT.AIR.ENVIRONMENTAL@HAWAII.GOV
1. THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF LAND TO BE EXPOSED AT ANY ONE TIME.
2. GRADING OPERATIONS SHALL PROCEED FROM THE HIGHER GROUND AREAS FIRST, WHERE EXCAVATION
OPERATIONS ARE NECESSARY. THE EXISTING VEGETATION ON THE LOWER AREA SHALL BE LEFT IN PLACE
AS LONG AS FEASIBLE TO SERVE AS A FILTER IN MEDIUM.
3. IF THE EXCAVATED MATERIAL FROM HIGHER IS NEEDED TO FILL THE LOWER AREA DESCRIBED IN #2
ABOVE, FILLING OPERATIONS SHALL BE DONE IN PHASES IN ORDER THAT EROSION AND SEDIMENTATION
PROBLEMS CAN BE HELD TO A MINIMUM.
4. WHEN INSTALLING THE DRAINAGE SYSTEM FOR THE PROJECT, SEDIMENT CONTROL FILTERS OR FILTER
FABRIC AT THE INLETS TO THE SYSTEM SHALL BE PROVIDED TO PREVENT SILT FROM ENTERING THE
SYSTEM.
5. THE ABOVE PROCEDURE FOR EROSION AND SEDIMENT CONTROL MAY BE REVISED BY THE CONTRACTOR
TO CONFORM TO HIS GRADING OPERATION PROCEDURE, HOWEVER, ANY REVISION TO THE ABOVE SHALL
BE SUBMITTED BY THE CONTRACTOR TO THE RPR FOR APPROVAL BY THE DOTA'S ENVIRONMENTAL
SECTION (AIR-EE) PRIOR TO IMPLEMENTATION OF THE CHANGES.
FIBER ROLL NOTES:
1. FIBER ROLLS SHALL BE PLACED AROUND THE CONTRACTORS STAGING AND STOCKPILE AREAS AS
SHOWN IN THE PLAN.
2. FIBER ROLLS SHALL CONSIST OF STRAW, FLAX, MULCH OR OTHER SIMILAR MATERIAL BOUND IN A
TIGHT TUBULAR ROLL A MINIMUM OF 8" IN DIAMETER.
3. BIND ROLL AT EACH END AND EVERY 4 FT ALONG LENGTH OF ROLL WITH JUTE-TYPE TWINE.
4. TURN THE ENDS OF THE FIBER ROLL UP SLOPE TO PREVENT RUNOFF FROM GOING AROUND THE
ROLL.
5. STAKE FIBER ROLLS ON-GRADE AS NECESSARY.
A. DRIVE STAKES AT THE END OF EACH FIBER ROLL AND SPACED 4 FT MAXIMUM ON CENTER.
B. USE STAKES WITH A MINIMUM LENGTH OF 12 IN.
6. IF MORE THAN ONE FIBER ROLL IS PLACED IN A ROW, THE ROLLS SHOULD BE OVERLAPPED, NOT
ABUTTED
7. INSPECT FIBER ROLL DAILY AND IMMEDIATELY AFTER EACH RAINFALL EVENT. ANY REQUIRED
REPAIRS SHALL BE MADE IMMEDIATELY.
8. SHOULD THE FABRIC ON A FIBER ROLL DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE
END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL NECESSARY, THE FABRIC SHALL
BE REPLACED PROMPTLY.
9. SEDIMENT DEPOSITS SHALL BE REMOVED AFTER EACH STORM EVENT. SEDIMENT SHALL BE
REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-THIRD THE HEIGHT OF THE BARRIER.
10. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE FIBER ROLL IS NO LONGER REQUIRED
SHALL BE REMOVED BY THE CONTRACTOR.
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-101
SITE
PLAN
RECONSTRUCTED
ELECTRICAL / STORAGE BUILDING
SEE C-105
NEW 2" AC PAVEMENT OVERLAY
(SEE DETAIL 2/C-102)
PRE-FABRICATED MODULAR TOWER
BY PANEL BUILT, INC. OR APPROVED EQUAL
SEE C-105
INSTALL 30-FT TALL
UTILITY WOOD POLE W/
ANTENNA MOUNTING BRACKETS
SEE DETAIL 1/C-102
ANTENNA INSTALLED
BY OTHERS
SEE DETAIL 1/C-102
EX. CABLE RACK
C-102
NEW UTILITY WOOD POLE
FINISH GRADE
ANTENNA MOUNTING BRACKETS
(INSTALL SET OF 2 SINCLAIR PN 17-A)
ANTENNA INSTALLED
BY OTHERS
L3HARRIS
COMM BLDG
C-102
PROVIDE SET OF 2
HD PIPE-TO-PIPE CLAMP
(NEWAVE PN AM1019-5)
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE :
DWG. NO.
SHEET :
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
JL AP
JL
JL
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
OF 14 SHEETS
C U
S E
R S
J Y
L E
E O
N E
D R
I V
E
O
C E
A N
I T
G
G
H H
N L
I D
A
M
G
E N
E R
A L
O
J E
C T
S H
W
A I H
A P
A I C
O
U
N I C
W
S T
A L L A
T I O
N
S
I G
N
P
A C
K A
G E
D
R A
W I N
G S
F
I N
A L F
I N
A L
S
U B
M I T
T A
L C
I V
I L C
T
O
C
P
L A
N S
D
W G
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
REVISIONSNO. DATE REVISIONS
C-102
ELEVATIONS
AND
DETAILS
CONCR. FOOTING/
PEDESTAL, TYP OF (6)
(SEE STRUCT DWGS)
MEZZANINE/
CATWALK ABOVE
EX. REMAINING FTG
BELOW GRADE
NEW 2" AC PAVEMENT
OVERLAY
RECONSTRUCTED
ELECT/STORAGE BUILDING
CONC STAIR LANDING
CONC FTG/PEDESTAL, TYP OF (4)
(SEE STRUCT DWGS)
CONTROL BOOTH ABOVE
CONC FTG/PEDESTAL, TYP OF (4)
(SEE STRUCT DWGS)
CONC FTG/PEDESTAL, TYP OF (6)
(SEE STRUCT DWGS)
CORNER TRIM
EX. CONC SLAB
STAIRS
STAIR LANDING
STAIR LANDING
ABOVE
STAIRS
CONTROL BOOTH
STAIR LANDING
STAIRS
HANDRAIL
HANDRAIL
MEZZANINE
W/ GRATING
4'X5' CONC LANDING
EX. CABLE RACK
ABOVE
REUSE EX. ANGLE
AND PIPE CLAMP
TO SUPPORT EX. POST
CONT. DBL 2X4 ABOVE
STEEL TUBING
COLUMN
ALL TOP OF PEDESTALS
SHALL BE LEVELED
CUT AND CAP EX. POST
ABOVE CABLE RACK
EX. POST
PAINT EX. WALL
EX. CABLE RACK
SECURE NEW
GALV. ∠3X3X
TO EX. ANGLE
SECURE EX. ANGLE
TO 2X4 (PROVIDE SEPARATOR
BETWEEN DISSIMILAR METALS)
REUSE EX. PIPE CLAMP
TO SUPPORT EX. POST
STORAGE ROOM
ELECTRICAL ROOM
EX. CONC. SLAB
2X4 STUDS AT 16" OC
SEE STRUCT DWGS
FOR FRAMING DETAILS
RAFTER
" ROOF SHEATHING
ROOF UNDERLAYMENT
ASPHALT SHINGLE
CONT. DBL 2X4
CONT. FLASHING
" GYPSUM BOARD
PAINT ALL
INTERIOR
WALLS
" SHEATHING
BUILDING PAPER
LP SMARTSIDE CEDAR
TEXTURED PANEL SIDING
CONT. DRIP EDGE
LP SMARTSIDE CEDAR
TEXTURED PANEL SIDING
CONT. BEAD
OF SEALANT
C-105
C-105
SEE DETAIL 2/C-105
FOR NEW WALL DETAILS
C-105
CORNER TRIM
CORNER TRIM
LP SMARTSIDE CEDAR
TEXTURED PANEL SIDING
EX. CONC. SLAB
NEW 2" AC PAVEMENT
OVERLAY
3'-0"X7'-0" HOLLOW METAL DOORS & FRAMES
TO BE PAINTED ON ALL SIDES
FINISH HARDWARE: HINGES, DOOR SWEEPS, AND LOCK SETS
COORDINATE WITH DOTA ON KEYING SCHEDULE
C-105
C-105
6" 1'
-0
1' -0
3" C
LR
2" C
LR
2"
CLR
HSS COL BY PEMB
(3) #3 TIES AT 3" OC
AND (1) #3 TIE AT 6" OC
3'-3" SQ
1 1/2"
CLR
PAVEMENT, REFER
TO CIVIL DRAWINGS
1/2" PRE-MOLDED
JOINT FILLER
1'-3" SQ CONC
PEDESTAL
1 1/2" NON-SHRINK
GROUT
(8) #4 VERT W/ STD
HOOK AT BASE
2'-0" SQ FTG W/ (3)
#4 EA WAY, TYP AT
STAIR FTG
(5) #4 EW
S-001
TYP COLUMN FOOTING
SCALE: 1" = 1'-0"
STRUCTURAL NOTES
FOUNDATIONS:
1. IN ACCORDANCE WITH TABLE 1806.2 OF THE BUILDING CODE, AN ALLOWABLE FOUNDATION
BEARING PRESSURE OF 1,500 PSF HAS BEEN ASSIGNED FOR THE DESIGN OF FOUNDATIONS
RELATED TO THIS PROJECT.
2. SPECIAL INSPECTION AND TESTING IS REQUIRED IN ACCORDANCE WITH SECTIONS 1704 AND
1705 OF THE BUILDING CODE AND THE "STATEMENT OF SPECIAL INSPECTIONS" ON THESE
CONSTRUCTION DOCUMENTS.
3. ALL FOUNDATIONS SHALL BE FOUNDED A MINIMUM OF 12 INCHES BELOW LOWEST ADJACENT
FINAL FINISH FLOOR OR GRADE. EXPOSED SOIL SHALL BE INSPECTED BY THE INSPECTION
AGENCY REPRESENTATIVE PRIOR TO CONSTRUCTING CONCRETE FORMS AND/OR PLACING
REINFORCING STEEL. ANY EXCESS OR NON-COMPLYING MATERIAL AS DETERMINED BY THE
INSPECTION AGENCY REPRESENTATIVE SHALL BE REMOVED AND REPLACED.
4. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER,
GROUND WATER OR SEEPAGE.
5. CONTRACTOR SHALL PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING,
SHEATHING AND SHORING REQUIRED TO SAFELY RETAIN ALL EARTH BANKS.
6. IF THE CONTRACTOR, DURING THE COURSE OF SITE WORK, DISCOVERS ANY SOIL CONDITION
THAT IS UNSUITABLE (VEGETATION/ORGANICS, POTTING SOIL, ORGANIC SOIL,
UNDOCUMENTED FILLS, SOFT/WET SOILS, CONSTRUCTION DEBRIS, ETC.) THE ENGINEER OF
RECORD SHALL BE NOTIFIED IMMEDIATELY.
7. SUBGRADE AT ALL FOOTINGS SHALL BE PREPARED WITH 6" WELL-GRADED GRAVEL SUBBASE
AND COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY.
REINFORCING STEEL
1. UNLESS OTHERWISE INDICATED ON PLANS AND/OR SCHEDULE, ALL REINFORCING STEEL
SHALL BE DEFORMED BARS WHICH SHALL CONFORM TO THE STANDARD SPECIFICATION OF
ASTM A615 GRADE 60. ALL REINFORCING STEEL TO BE WELDED SHALL CONFORM TO ASTM
A706, GRADE 60.
2. LOW HYDROGEN WELDING RODS SHALL BE USED FOR ALL WELDING TO REINFORCED BARS.
3. REINFORCING SHALL BE SPLICED ONLY AS SHOWN OR NOTED. SPLICES AT OTHER
LOCATIONS SHALL BE MADE AWAY FROM POINTS OF MAXIMUM STRESS AND APPROVED BY
THE ENGINEER. SEE DETAILS FOR "LAP SPLICES".
4. BARS NOTED AS "CONT" VERTICAL AND HORIZONTAL WALL REINFORCING AND COLUMN
REINFORCING SHALL HAVE A MINIMUM SPLICE EQUAL TO 48 BAR DIAMETERS BUT NOT LESS
THAN 24 INCHES.
5. ALL REINFORCING STEEL, ANCHOR BOLTS AND OTHER INSERTS SHALL BE SECURED IN
POSITION PRIOR TO PLACING CONCRETE.
CONCRETE:
1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318-14, UNLESS OTHERWISE NOTED.
2. SLEEVES EXCEEDING ONE-THIRD THE SLAB OR WALL THICKNESS SHALL NOT BE PLACED IN
STRUCTURAL CONCRETE UNLESS SPECIFICALLY DETAILED. PIPE MAY PASS THROUGH
STRUCTURAL CONCRETE IN SLEEVES BUT SHALL NOT BE EMBEDDED THEREIN.
3. PROVIDE A 3/4" CHAMFER AT ALL EXPOSED CONCRETE EDGES.
4. ALL CONCRETE WORK SHALL BE THOROUGHLY CONSOLIDATED DURING PLACEMENT USING
A MECHANICAL VIBRATOR. ALL CONCRETE SHALL BE CURED FOR A PERIOD OF NOT LESS
THAN 7 DAYS.
5. LOCATIONS OF ALL CONSTRUCTION OR COLD JOINTS SHALL BE COORDINATED WITH AND
APPROVED BY THE ENGINEER.
6. 48 HOURS PRIOR TO THE POURING OF ANY STRUCTURAL CONCRETE, THE CONTRACTOR
SHALL NOTIFY THE SPECIAL INSPECTOR SO AN INSPECTION CAN BE MADE OF ALL FORMS
AND REINFORCING STEEL.
7. THE 28-DAY COMPRESSIVE STRENGTH AND MAXIMUM AGGREGATE SIZE OF CONCRETE
SHALL BE AS FOLLOWS:
STRENGTH
(PSI)
MAX
AGGREGATE
W/C
RATIO
FOOTINGS 4,000 3/4" 0.50
SPECIAL INSPECTION REQUIREMENTS LIST BELOW:
1. THE CONTRACTOR SHALL EMPLOY A SPECIAL INSPECTOR FOR WORK REQUIRING SPECIAL
INSPECTION PER CHAPTER 17 OF THE 2018 IBC.
2. SPECIAL INSPECTION FIRM SHALL HAVE AT LEAST 6 YEARS OF EXPERIENCE AND SHALL BE
CERTIFIED WITHIN THE BUILDING DEPARTMENT JURISDICTION OF CONSTRUCTION (IF SUCH
CERTIFICATION EXIST).
3. THE CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE SPECIAL INSPECTOR TO
ENSURE THAT ALL ELEMENTS REQUIRING SPECIAL INSPECTION ARE INSPECTED.
4. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING TYPES OF WORK:
A. CONCRETE:
OBSERVE THE TAKING OF TEST SPECIMENS AND THE PLACING OF CONCRETE FOR ALL
ELEMENTS.
B. REINFORCING STEEL:
OBSERVE THE PLACEMENT OF ALL REINFORCING. THE SPECIAL INSPECTOR NEED NOT
BE PRESENT CONTINUOUSLY DURING THE PLACING OF REINFORCING STEEL, PROVIDED
HE HAS INSPECTED FOR CONFORMANCE WITH THE APPROVED PLANS PRIOR TO THE
CLOSING OF FORMS FOR THE DELIVERY OF CONCRETE TO THE JOBSITE.
C. EXPANSION BOLTS AND EPOXIED ANCHORS
D. FIELD WELDING
E. PRE-ENGINEERED METAL BUILDING CONSTRUCTION
DESIGN LOADS:
1. WIND LOADS:
RISK CATEGORY . . . . . . . . . . . . . . . . . . . II
BASIC WIND SPEED (3-SEC GUST) . . . . . . . . . 140 MPH
WIND EXPOSURE . . . . . . . . . . . . . . . . . . . C
2. EARTHQUAKE DESIGN DATA"
RISK CATEGORY . . . . . . . . . . . . . . . . . . . II
SEISMIC IMPORTANCE FACTOR . . . . . . . . . . 1.0
MAPPED ACCELERATION PARAMETERS
SS (PERIOD = 0.2s) . . . . . . . . . . . . . . . . 0.520 S1 (PERIOD = 1.0s) . . . . . . . . . . . . . . . . 0.139
SDS . . . . . . . . . . . . . . . . . . . . . . . . . 0.480
SD1 . . . . . . . . . . . . . . . . . . . . . . . . . 0.215
SITE CATEGORY . . . . . . . . . . . . . . . . . C
GRAPHIC SCALES:
31 20
1"=1'-0"
CLR CLEAR
COL COLUMN
CONC CONCRETE
EA EACH
FTG FOOTING
HSS HOLLOW STRUCTURAL SECTION
PEMB PRE-ENGINEERED METAL BUILDING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
SQ SQUARE
STD STANDARD
TYP TYPICAL
VERT VERTICAL
W/ WITH
ABBREVIATIONS:
WOOD:
1. LUMBER AND MANUFACTURED WOOD PRODUCTS SHALL
CONFORM TO THE REQUIREMENTS OF THE BUILDING CODE
AND NDS SPECIFICATIONS.
2. FRAMING LUMBER SHALL BE GRADED AND MARKED IN
CONFORMANCE WITH WCLB STANDARD GRADING AND
DRESSING RULES FOR WEST COAST LUMBER NO. 16, LATEST
EDITION, UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. ALL SHEATHING AND LUMBER MATERIALS SHALL BE
PRESERVATIVE-TREATED IN ACCORDANCE WITH AWPA
STANDARD U1 (UC1 THROUGH UC48) FOR AWPA
STANDARDIZED PRESERVATIVES. FOR SBX DISODIUM
OCTOBORATE TETRAHYDRATE (DOT), RETENTION SHALL BOT
BE LESS THAN 0.28 PCF B203 FOR EXPOSURE TO FORMOSAN
TERMITES. ALL TREATED LUMBER SHALL BE PROTECTED
FROM DIRECT WEATHER EXPOSURE AS DIRECTED IN AWPA
UC1 AND UC2.
4. LUMBER SHALL BE DOUGLAS FIR-LARCH WITH GRADES AS
FOLLOWS:
A. JOISTS: UP TO 4 INCH NOMINAL THICKNESS . . . . . . NO. 2
B. BEAMS AND STRINGERS . . . . . . . . . . . . . . . . . . . . . . . NO. 1
C. POST AND TIMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . NO. 1
D. PLATES AND MISCELLANEOUS LIGHT FRAMING . . .
STANDARD
E. STUDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . NO. 2
5. ALL NAILS SHALL BE COMMON WIRE NAILS. WHEREVER
POSSIBLE, NAILS DRIVEN PERPENDICULAR TO THE GRAIN
SHALL BE USED. THERE SHALL BE A MINIMUM OF 2 NAILS AT
ALL WOOD CONTACTS AND JOINTS USING 8d NAILS FOR 1 INCH THICK MATERIAL, 16d NAILS FOR 2 INCH THICK MATERIAL, AND 40d NAILS FOR 3 INCH THICK MATERIAL. ALL CONTINUOUS
CONTACTS PROVIDE MINIMUM NAILS AT 12" OC WITH NAIL
SIZES AS CALLED ABOVE.
6. NOTATIONS ON DRAWINGS RELATING TO FRAMING CLIPS,
JOIST HANGERS, AND OTHER CONNECTING DEVICES REFER
TO CATALOG NUMBERS OF STRONG0TIE CONNECTORS
MANUFACTURED BY THE SIMPSON COMPANY. EQUIVALENT
DEVICES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED
PROVIDED THAT THEY HAVE ICC APPROVAL FOR EQUAL OR
GREATER LOAD CAPACITIES AND ARE SUBMITTED FOR
REVIEW AND APPROVAL BY THE STRUCTURAL ENGINEER.
7. ALL WOOD FRAMING DETAILS NOT SHOWN OTHERWISE SHALL
BE CONSTRUCTED TO THE MINIMUM STANDARDS OF THE
GOVERNING CODE.
8 .PROVIDE STANDARD CUT WASHERS UNDER ALL BOLTS,
HEADS, AND NUTS IN CONTACT WITH WOOD.
9. ALL STRUCTURAL SHEATHING SHALL BE STRUCTURAL I
PLYWOOD OR ORIENTED STRAND BOARD (OSB) AND SHALL
CONFORM TO PRODUCT STANDARD PS1-95 OR PS2-99 TYPE
AND THICKNESS SHALL BE AS SPECIFIED ON THE PLANS.
10. MACHINE APPLIED NAILING IS SUBJECT TO A SATISFACTORY
DEMONSTRATION AND THE APPROVAL OF THE CHECKING
AGENCY AND THE ENGINEER. NAIL HEADS SHALL NOT
PENETRATE THE OUTER PLY MORE THAN WOULD BE NORMAL
FOR A HAND HAMMER. EDGE DISTANCES SHALL BE
MAINTAINED. SHINERS SHALL BE REMOVED AND REPLACED.
THE APPROVAL IS SUBJECT TO CONTINUED SATISFACTORY
PERFORMANCE. MACHINE APPLIED NAILING ONLY ON
PLYWOOD GREATER THAN 5/16".
DD D
180° HOOK90° HOOK 135° HOOK
FINISHED
INSIDE BEND
DIAMETERS
FINISHED
INSIDE BEND
DIAMETERS
FINISHED
INSIDE BEND
DIAMETERS
BAR
SIZE
STIRRUPS AND TIES STANDARD HOOKS
ALL OTHER BENDS
FINISHED INSIDE BEND
DIA "D"
MIN STRAIGHT
EXTENSION FINISHED INSIDE BEND
DIA "D"
MIN STRAIGHT EXTENSION
90° & 135° HOOKS 90° HOOKS 180° HOOKS MIN INSIDE BEND
DIA "D"
#3 1 1/2" 3" 2 1/4" 4 1/2" 2 1/2" 2 1/4" #4 2" 3" 3" 6" 2 1/2" 3"
135°
BEND
STRAIGHT
EXTENSION
180°
BEND
MIN STRAIGHT
EXTENSION
90°
BEND
S-001
REBAR STANDARD HOOKS AND INSIDE BEND DIAMETERS
SCALE: NTS
NOTES:
1. FOR BEND DIAMETER SEE 1/S-001.
HOOP
135° HOOKS
SINGLE BAR
ENCLOSING ALL
LONGITUDINAL
BARS
S-001
TYPICAL HOOP DETAIL
SCALE: NTS
(2) 2x4 POST
10d FACE NAILING
AT PANEL EDGE
SPACING
TYP EDGE
NAILING
TYP EDGE
NAILING
SIMPSON DTT2Z HOLDOWN
W/ (8) 1/4"Øx1 1/2" SDS
SCREWS. SECURE TO
CONC W/ (1) 1/2"Ø HILTI
KWIK-X FASTENER W/ 4 1/4"
EMBEDMENT. SEE PLAN
FOR LOCATION
AT INTERSECTION
10d FACE NAILING
AT PANEL EDGE
SPACING
TYP EDGE
NAILING
SIMPSON DTT1Z HOLDOWN
W/ (6) 0.148"Øx1 1/2"
FASTENERS. SECURE TO
CONC W/ (1) 3/8"Ø HILTI
KWIK-X FASTENER W/ 3"
EMBEDMENT. SEE PLAN
FOR LOCATIONAT CORNER
S-001
SHEAR WALL INTERSECTION
SCALE: NTS
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
OF 11 SHEETS
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
P:
\H
O N
\2 4J
O
BS
\2
O T
D O
TA
-T
O
G
EN
ER
AL
E N
G
IN
EE
R
IN
G
-2 \0
.0 D
W G
S\ S\
D
IL
LI
N
G H
AM
F
IE
LD
U N
IC
O
M T
O W
ER
\2
0_ S-
1.
D W
G
OF 14 SHEETS
PB MM KL PB
GENERAL NOTES AND
DETAILS
S-001
3'-3" SQx1'-0"
DEEP CONC
FTG, TYP OF (4)
1'-3" SQ CONC
PEDESTAL, TYP
OF (10)
1'-0" x 5'-0" x 1'-0" DEEP
CONC FTG W/ #4 AT
12" OC EA WAY,
CENTERED AT STAIR
BASE
STAIR ABOVESTAIR LANDING
ABOVE
2'-0" SQ x 1'-0"
DEEP CONC FTG,
TYP OF (6)
STAIR LANDING
ABOVE
'-7
18'-0"
4'-0"
3' -7
'-8
/4
3' -7
3'-7"
17'-7" 2 1/2"
24'-0"
2' -3
/2
2'-3 1/2"
'-0
3'-0" 4'-0" 3'-0"
NEW FTG MAY BE
DOWELED INTO (E)
FTG. MATCH FTG
REBAR SIZE AND
SPACING. EMBED
DOWELS 6" MIN INTO
(E) CONC
REMOVE (E) CONC
PLINTH. (E) FTG MAY
REMAIN, TYP
S-301
S-301
S-301
S-001
NEW BUILDING FOUNDATION PLAN OVER EXISTING
SCALE: 3/8" = 1'-0"
NOTE:
FOUNDATIONS SHOWN ON THIS DRAWING ARE BASED ON PRELIMINARY DRAWINGS PROVIDED BY PANEL BUILT, INC., A PRE-ENGINEERED METAL BUILDING MANUFACTURER BASED IN BLAIRSVILLE, GEORGIA.
FOUNDATION INFORMATION IS PROVIDED FOR PRICING ONLY. PRIOR TO FOUNDATION CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE FOUNDATION CALCULATIONS SIGNED AND STAMPED BY A
STRUCTURAL ENGINEER REGISTERED IN THE STATE OF HAWAII TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL. CONTRACTOR SHALL ALSO PROVIDE PRE-ENGINEERED METAL BUILDING SHOP DRAWINGS AND CALCULATIONS SIGNED AND STAMPED BY A STRUCTURAL ENGINEER REGISTERED IN
THE STATE OF HAWAII TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL.
SPAN DIRECTION OF 3/8" CDX
PLYWOOD. FASTEN W/ 8d
COMMON NAILS AT 6" OC AT
PANEL EDGES AND12" OC AT
INTERMEDIATE SUPPORTS
4x12 4x12
2x4 STUD WALL BELOW
2x6 RAFTERS
AT 24" OC
S-001
ROOF FRAMING AT ELEC SHED
SCALE: 3/8" = 1'-0"
4' -0
(E) WALL W/ 2x4 STUDS AT 24" OC.
REPLACE TERMITE AND WATER
DAMAGED FRAMING AS REQUIRED.
SIMPSON DTT2Z
HOLDOWN
SIMPSON
DTT1Z
HOLDOWN
SIMPSON
DTT1Z
HOLDOWN 6
LEGEND
INDICATES SHEAR WALL WITH 15/32 PLYWOOD SIDING.
FASTEN SIDING TO WALL FRAMING WITH 1 1/2" 16 GA
STAPLES SPACED 6" OC AT PANEL EDGES. PROVIDE
STAPLES AT 12" OC AT INTERMEDIATE SUPPORTS.
INDICATES SHEAR WALL WITH 3/8" PLYWOOD. FASTEN
PLYWOOD TO WALL FRAMING WITH 8d COMMON NAILS AT 4" OC AT PANEL EDGES AND 8d COMMON NAILS AT
12" OC AT INTERMEDIATE SUPPORTS.
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
OF 11 SHEETS
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
P:
\H
O N
\2 4J
O
BS
\2
O T
D O
TA
-T
O
G
EN
ER
AL
E N
G
IN
EE
R
IN
G
-2 \0
.0 D
W G
S\ S\
D
IL
LI
N
G H
AM
F
IE
LD
U N
IC
O
M T
O W
ER
\2
0_ S-
1.
D W
G
OF 14 SHEETS
PB MM KL PB
FOUNDATION AND
ROOF FRAMING
PLANS
S-101
GRAPHIC SCALES:
6 821 3 40
3/8"=1'-0"
8' -0
(E) 2" AC
PAVEMENT
TYP EDGE
NAILING
TYP EDGE
NAILING
SIMPSON A34
CLIPS AT 24" OC
SIMPSON H3
TIES AT 24" OC
ROOF
SHEATHING
2x ROOF RAFTERS
2x BLKG AT 24" OC
2x4 BOT PLATE
2x4 PT SILL PLATE
2x4 STUDS AT 16" OC
(E) 4" THK CONC
SLAB-ON-GRADE W/
THICKENED SLAB
EDGES
TYP EDGE
NAILING
TYP EDGE
NAILING
SIMPSON A34
CLIPS AT 24" OC
SIMPSON H3
TIES AT 24" OC ROOF
SHEATHING
2x ROOF RAFTERS2x BLKG AT
24" OC
2x4 BOT
PLATE
2x4 PT SILL
PLATE
2x4 STUDS
AT 16" OC
8' -0
(E) 4" THK CONC
SLAB-ON GRADE
(E) 2" AC
PAVEMENT
WALL
BEYOND
TYP EDGE
NAILING SIMPSON H3
TIES AT 24" OC
ROOF
SHEATHING
(E) 2x4 BOT
PLATE
(E) 2x4 PT
SILL PLATE
(E) 2x4 STUDS
AT 16" OC
(E) 4" THK CONC
SLAB-ON-GRADE W/
THICKENED SLAB
EDGES
1/
2" 8'
-0
4x DOOR
HEADER
1/
2" 2x6 RAFTERS
RIPPED TO
DIMENSIONS
SHOWN
CONT Z
FLASHING
S-301
SECTION
SCALE: 1" = 1'-0"
S-301
SECTION
SCALE: 1" = 1'-0"
S-301
SECTION
SCALE: 1" = 1'-0"
PLYWOOD
SIDING
PLYWOOD
SHEATHING
PLYWOOD
SIDING
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
OF 11 SHEETS
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
MAY 7, 2026
P:
\H
O N
\2 4J
O
BS
\2
O T
D O
TA
-T
O
G
EN
ER
AL
E N
G
IN
EE
R
IN
G
-2 \0
.0 D
W G
S\ S\
D
IL
LI
N
G H
AM
F
IE
LD
U N
IC
O
M T
O W
ER
\2
0_ S-
1.
D W
G
OF 14 SHEETS
PB MM KL PB
WALL SECTIONS
S-301
GRAPHIC SCALES:
31 20
1"=1'-0"
SYMBOL DESCRIPTION
ELECTRICAL SYMBOLS GENERAL NOTES:
1. PLANS DO NOT INDICATE COMPLETE EXISTING ELECTRICAL
CONDITIONS. CONTRACTOR SHALL VISIT JOBSITE TO BECOME
FAMILIAR WITH ALL EXISTING CONDITIONS AND EXTENT OF ALL
WORK PRIOR TO THE START OF CONSTRUCTION.
2. PRIOR TO THE START OF CONSTRUCTION, CONTRACTOR SHALL
VISIT JOBSITE AND REPORT ANY DISCREPANCIES AND/OR
DIFFERENCE IN DRAWINGS, WITH RESPECT TO EXISTING
CONDITIONS, TO THE STATE.
3. CONTRACTOR SHALL RESOLVE ALL DISCREPANCIES AND
QUESTIONS PRIOR TO THE START OF WORK. NO EXTRA PAYMENT
SHALL BE ALLOWED ON ACCOUNT OF WORK MADE NECESSARY BY
CONTRACTOR'S FAILURE TO VISIT THE SITE AND/OR FAILURE TO
RESOLVE DISCREPANCIES AND QUESTIONS.
4. BEFORE ANY ELECTRICAL WIRING IS CUT, CONTRACTOR SHALL
VERIFY USAGE OF WIRING TO ENSURE THAT REQUIRED SERVICES
ARE NOT DISCONTINUED.
5. FOR EXISTING CIRCUITS WHERE SOME ELECTRICAL ITEMS ARE
REMOVED, CONTRACTOR SHALL PROVIDE ALL NECESSARY
RACEWAYS, WIRES, BOXES, ETC., PER NEC REQUIREMENTS, TO
ENSURE ELECTRICAL CONTINUITY AND PROPER OPERATION OF
REMAINING CIRCUIT COMPONENTS.
6. ALL EXISTING LOADS ON THE EXISTING TOWER ELECTRICAL PANEL
SHALL REMAIN IN SERVICE.
7. NEW UNICOM TOWER IS A PREFABRICATED STRUCTURE,
COMPLETE WITH ALL ELECTRICAL DEVICES AND WIRING.
COORDINATE ELECTRICAL AND TELECOM REQUIREMENTS WITH
THE MANUFACTURER.
8. COORDINATE ALL OUTAGES WITH HDH AND FAA.
ELECTRICAL PANELBOARD
DUPLEX RECEPTACLE, 125V, NEMA 5-20R
NOTE:
PROVIDE GREEN GROUND CONDUCTOR IN ALL NEW BRANCH AND FEEDER
CIRCUITS INCLUDING LIGHT SWITCHING LEGS, SIZED PER NEC TABLE 250.122. ALL
CONDUCTORS #12 AWG MINIMUM.
RECEPTACLE, 250V, NEMA 6-20R
TELECOMMUNICATIONS OUTLET
ONE-LINE DIAGRAM
EXIST ENCLOSED
CIRCUIT BREAKER
3P200A 2P20A
EXISTING PANEL
208Y/120V, 3Ø, 4W, 225A
2P30A
EXIST SERVICE
DISCONNECT
EXISTING SHEDEXIST 3#12, 1#12 GND
NOTES:
1. ALL ITEMS SHOWN ARE EXISTING UNLESS OTHERWISE NOTED.
2. "X" DENOTES TO REMOVE EXISTING ITEM.
3. PROVIDE DISCONNECTING MEANS FOR PREFABRICATED UNICOM TOWER.
EXISTING DUCTLINE
CONDUIT, CONCEALED
CONDUIT, EXPOSED
NEW LOADCENTER
120/240V, 1Ø, 3W
(PROVIDED BY OTHERS)
2P25A
NEW UNICOM TOWER
NEW 3/4"C, 3#12, 1#12 GND
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
OF SHEETS
BHK KKO
E-1
MAY 7, 2026
BHK KKO
GENERAL NOTES
ELECTRICAL SYMBOLS,
12 14
AutoCAD SHX Text H.
AutoCAD SHX Text B
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text A.
AutoCAD SHX Text S.
AutoCAD SHX Text U.
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text No. 16360-E
AutoCAD SHX Text
LICENSED
AutoCAD SHX Text
E-2
ELECTRICAL DEMOLITION PLAN
SCALE: 1/4"=1'-0" SCALE:
4' 2' 0 4' 8'
1/4"=1'-0"
GRAPHIC SCALE
EXISTING TELECOM
JUNCTION BOX
EXISTING PANEL
NORTH
EXISTING ENCLOSED
CIRCUIT BREAKER
EXISTING SHED
DISCONNECT AND REMOVE
EXISTING POWER AND
TELECOM WIRING TO SHED
PROVIDE TELECOM CABLE,
OUTDOOR RATED, FOR
TEMPORARY TELECOM SERVICE
PROVIDE 12/4 TYPE SOOW
CABLE TO EXISTING SHED
FOR TEMPORARY
ELECTRICAL SERVICE
EXISTING TOWER
EXISTING UTILITY METER
#68890806
NOTES:
EXISTING UNDERGROUND ELECTRICAL
LINES TO REMAIN IN PLACE.
PROVIDE HEAVY-DUTY MODULAR CABLE
PROTECTION RAMP FOR TEMPORARY
CABLES. RAMPS SHALL HAVE MULTIPLE
CHANNELS AND HIGH VISIBILITY MARKINGS.
ELECTRICAL AND TELECOM CABLES SHALL
BE INSTALLED IN SEPARATE CHANNELS.
3. EXISTING SHED SHALL REMAIN
OPERATIONAL AT ALL TIMES. ANY
OUTAGES SHALL BE COORDINATED WITH
HDH AND FAA.
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
OF SHEETS
BHK KKO
E-2
MAY 7, 2026
BHK KKO
DEMOLITION PLAN
ELECTRICAL
13 14
AutoCAD SHX Text H.
AutoCAD SHX Text B
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text A.
AutoCAD SHX Text S.
AutoCAD SHX Text U.
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text No. 16360-E
AutoCAD SHX Text
LICENSED
J
E-3
ELECTRICAL PLAN
SCALE: 1/4"=1'-0" SCALE:
4' 2' 0 4' 8'
1/4"=1'-0"
GRAPHIC SCALE
NORTH
TELECOM JUNCTION BOX
(PROVIDED BY OTHERS);
COORDINATE LOCATION
WITH MANUFACTURER
LOADCENTER
(PROVIDED BY OTHERS);
COORDINATE LOCATION
WITH MANUFACTURER
EXISTING TELECOM
JUNCTION BOX
EXISTING PANEL
EXISTING ENCLOSED
CIRCUIT BREAKER
EXISTING SHED
REMOVE TEMPORARY
TELECOM CABLE
REMOVE TEMPORARY
ELECTRICAL CABLE
NEW TOWER
EXISTING UTILITY METER
#68890806
NOTES:
EXISTING UNDERGROUND ELECTRICAL
LINES TO REMAIN IN PLACE.
3/4"C, 3#12, 1#12 GND. COORDINATE
ELECTRICAL REQUIREMENTS WITH TOWER
MANUFACTURER. PROVIDE CONDUIT
SUPPORTS AS REQUIRED.
1"C, TELECOM CABLE. PROVIDE CONDUIT
SUPPORTS AS REQUIRED.
4. NEW TOWER SHALL BE INSTALLED AND
OPERATIONAL PRIOR TO DEMOLITION OF
EXISTING SHED. ANY OUTAGES SHALL BE
COORDINATED WITH HDH AND FAA.
AT
KAWAIHAPAI AIRFIELD
MOKULEIA, OAHU, HAWAII
This work was prepared by me or under my supervision.
Licensed Expiration Date 04/30/2028
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
DSGN. DRWN. CHKD. APPD.
DATE : DWG. NO.
SHEET :
REVISIONSNO. DATE REVISIONS
PROJECT TITLE :
PROJECT NO.:
SHEET TITLE:
DATE
CONSTRUCTION
DOCUMENTS
MAY 2026
UNICOM TOWER
INSTALLATION
CO2541-33
OF SHEETS
BHK KKO
E-3
MAY 7, 2026
BHK KKO
ELECTRICAL PLAN
14 14
AutoCAD SHX Text H.
AutoCAD SHX Text B
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text K
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text U
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text A.
AutoCAD SHX Text S.
AutoCAD SHX Text U.
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text W
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text No. 16360-E
AutoCAD SHX Text
LICENSED
| Sheets and Views |
| G-001 |
| G-002-SHEET INDEX AND NOTES.pdf |
| Sheets and Views |
| G-002-SHEET INDEX AND NOTES |
| C-001 - EXIST PLAN.pdf |
| Sheets and Views |
| C-001 - EXIST PLAN |
| C-002 - DEMO PLAN.pdf |
| Sheets and Views |
| C-002 - DEMO PLAN |
| C-003 BMP PLAN.pdf |
| Sheets and Views |
| C-003 BMP |
| C-004 BMP NOTES.pdf |
| Sheets and Views |
| C-004 BMP NOTES |
| C-101 - SITE PLAN.pdf |
| Sheets and Views |
| C-101 - SITE PLAN |
| C-102 DETAILS.pdf |
| Sheets and Views |
| C-102 DETAILS |
| HDH Unicom Tower Electrical 20260507.pdf |
| E001_25008A-symbols-Layout1 |
| E001_25008A-symbols-Layout1 |
| E002_25008A-elec demo plan-Layout1 |
| E002_25008A-elec demo plan-Layout1 |
| E003_25008A-elec plan-Layout1 |
| E003_25008A-elec plan-Layout1 |
| C-102 DETAILS.pdf |
| Sheets and Views |
| C-102 DETAILS |
| G-001 -TITLE SHEET.pdf |
| Sheets and Views |
| G-001 |
| G-001 -TITLE SHEET.pdf |
| Sheets and Views |
| G-001 |
| G-002-SHEET INDEX AND NOTES.pdf |
| Sheets and Views |
| G-002-SHEET INDEX AND NOTES |
| C-001 - EXIST PLAN.pdf |
| Sheets and Views |
| C-001 - EXIST PLAN |
| C-002 - DEMO PLAN.pdf |
| Sheets and Views |
| C-002 - DEMO PLAN |
| C-003 BMP PLAN.pdf |
| Sheets and Views |
| C-003 BMP |
| C-003 BMP PLAN.pdf |
| Sheets and Views |
| C-003 BMP |
| C-004 BMP NOTES.pdf |
| Sheets and Views |
| C-004 BMP NOTES |
| C-101 - SITE PLAN.pdf |
| Sheets and Views |
| C-101 - SITE PLAN |
| C-102 DETAILS.pdf |
| Sheets and Views |
| C-102 DETAILS |
| G-002-SHEET INDEX AND NOTES.pdf |
| Sheets and Views |
| G-002-SHEET INDEX AND NOTES |
| C-001 - EXIST PLAN.pdf |
| Sheets and Views |
| C-001 - EXIST PLAN |
| C-002 - DEMO PLAN.pdf |
| Sheets and Views |
| C-002 - DEMO PLAN |
| C-003 BMP PLAN.pdf |
| Sheets and Views |
| C-003 BMP |
| C-004 BMP NOTES.pdf |
| Sheets and Views |
| C-004 BMP NOTES |
| C-101 - SITE PLAN.pdf |
| Sheets and Views |
| C-101 - SITE PLAN |
| C-102 DETAILS.pdf |
| Sheets and Views |
| C-102 DETAILS |
File details come from the government source that posted it. Updated .