Plans-FINAL PLANS AO2023 14.pdf

PDF 11 MB Posted

Attached to
AO2023-14 UST and AST Closure, Kawaihapai Airfield, Waialua Oahu
Solicitation number
B27000820
Issued by
Hawaii

About this file

Document Summary

This file contains 100% construction documents for the UST and AST Closure project at Kawaihapai Airfield in Mokuleia, Oahu, Hawaii (Project No. AO2023-14), prepared for the State of Hawaii Department of Transportation Airports. The scope of work consists of demolishing and removing the existing 12,000-gallon underground storage tank (UST) system for aviation fuel (Avgas), associated above-ground storage tank (AST) infrastructure, underground piping, fuel dispensing equipment, control panels, flow meters, hose reels, electrical conduits, grounding systems, concrete pads and aprons, and all related appurtenances. The project includes backfilling excavation areas with appropriate fill materials, restoring pavements with asphalt concrete, stabilizing restored surfaces with topsoil and grass (El Toro Zoysia), and conducting verification soil sampling following tank removal in accordance with Hawaii Department of Health Technical Guidance Manual requirements. Construction activities are limited to 8:00 a.m. to 3:30 p.m., Monday through Friday, excluding holidays unless otherwise permitted by the State. The civil engineer is Toru R. Kumagai of Lokahi Environmental; mechanical and electrical engineering is provided by The Chong Group, LLC. The construction documents are dated July 24, 2026, with revision 16 showing 16 total sheets.

The contractor must comply with Hawaii Administrative Rules Chapter 11-280.1 regarding underground storage tank removal, obtain all necessary permits and notifications to the Hawaii Department of Health, prepare a comprehensive work plan including tank and piping cleaning and confirmation sampling, properly dispose of residual fuel and tank sludge per federal, state, and local regulations, conduct verification sampling of excavation areas using multi-increment sampling methodology, and submit a tank closure report with analytical results upon completion. Additional requirements include comprehensive erosion and sediment control measures with temporary and permanent stabilization, AOA traffic control procedures with continuous radio monitoring, storm water pollution prevention compliance including NPDES permitting for construction activities disturbing one or more acres, and archaeological monitoring protocols with immediate notification to authorities if human remains or artifacts are discovered. The contractor must provide full site safety responsibility, defend and indemnify the State and Engineer from liability, install all temporary erosion control measures prior to ground disturbance with AIR-EE inspection approval before commencing work, maintain weekly inspections throughout construction, and remove temporary controls only after permanent stabilization is established and approved.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE SHEET, PROJECT LOCATION,

AND AIRPORT VICINITY MAP

G-001

P:

\P

R O

JE

C

TS

\2

PR

O

JE

C

TS

\1

8-

H D

O T

AI

R

PO

R

TS

U

ST

C

LO

SU

R

E\

D

ES

IG

N

\A O

-1

H D

H \1

C O

N

ST

R U

C

TI

O N

D O

C U

M

EN

TS

R

EV

IS

O N

\P

LA

N

S\

-G

EN

ER

AL

\A O

-1 4_

1_

G

1.

D

W G

, 8 /2

5/

:3

PM

Hilo International Airport

Dillingham Airfield

Hilo International Airport

Dillingham Airfield

PROJECT TEAM

PROJECT LOCATION

PROJECT NO. AO2023-14

TORU R. KUMAGAI

CIVIL ENGINEER

CIVIL:

LOKAHI ENVIRONMENTAL

2024 NORTH KING STREET

SUITE 200

HONOLULU HI 96819

(808) 842-1133

UST AND AST CLOSURE

MECHANICAL:

THE CHONG GROUP, LLC

900 FORT STREET MALL

SUITE 1230

HONOLULU HI 96813

(808) 791-9855

ELECTRICAL:

THE CHONG GROUP, LLC

900 FORT STREET MALL

SUITE 1230

HONOLULU HI 96813

(808) 791-9855

MICHAEL A. CHONG

MECHANICAL ENGINEER

MICHAEL A. CHONG

ELECTRICAL ENGINEER

DSGN. DRWN. CHKD. APPD.

OF

NO. DATE REVISION

AO2023-14

SHEETS

04/30/2026

5/2/2025

DATE

100% CONSTRUCTION

DOCUMENTS

MAY 2, 2025

UST AND AST CLOSURE

AT

KAWAIHAPAI AIRFIELD

MOKULEIA, OAHU, HAWAII

This work was prepared by me or under my supervision.

Licensed Expiration Date

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PROJECT TITLE :

DATE : DWG. NO.

SHEET :

PROJECT NO.:

SHEET TITLE:

PROJECT LOCATION

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PLANS FOR

AT

KAWAIHAPAI AIRFIELD (HDH)

MOKULEIA, OAHU, HAWAII

AIRPORT VICINITY MAP

DEPARTMENT OF TRANSPORTATION

STATE OF HAWAII

APPROVED:

DATEFOR DIRECTOR OF TRANSPORTATION

HAWAII

MAUI

KAHOOLAWE

LANAI

MOLOKAI

OAHU

KAUAI

NIIHAU

Upolu Airport

Waimea-Kohala Airport

Hilo International Airport

Kalaupapa Airport Molokai Airport

Kahului Airport

Lanai Airport Hana Airport

Dillingham Airfield

Lihue Airport

Port Allen Airport

Kapalua Airport

Kalaeloa Airport

Daniel K. Inouye International Airport

Ellison Onizuka Kona International Airport At Keahole

P a c i f i c O c e a n

North

South

EastWest

NENW

SESW

NOT TO SCALE

P a c i f i c O c e a n

TK TK TK TK

SHEET INDEX, CONSTRUCTION

NOTES, AND ABBREVIATION LIST

G-002

P:

\P

R O

JE

C

TS

\2

PR

O

JE

C

TS

\1

8-

H D

O T

AI

R

PO

R

TS

U

ST

C

LO

SU

R

E\

D

ES

IG

N

\A O

-1

H D

H \1

R

EV

IS

IO

N

\P

LA

N S\

-G

EN

ER

AL

\A

O

-1

4_

2_ G

2.

D W

G , 7

/2 4/

:5

PM

SHEET DESCRIPTION

SHEET INDEX

DWG.

NO.

SHT.

NO.

T I T L E

1 G-001 TITLE SHEET, PROJECT LOCATION, AND AIRPORT VICINITY MAP

2 G-002 SHEET INDEX, CONSTRUCTION NOTES, AND ABBREVIATION LIST

C-001

C I V I L

GENERAL CIVIL NOTES 1

E L E C T R I C A L

C-002

C-101

4 GENERAL CIVIL NOTES 2

GENERAL SITE PLANC-102

EROSION AND SEDIMENT CONTROL PLANC-103

EXISTING CONDITIONS PLAN

15 ELECTRICAL SITE PLAN, SINGLE LINE DIAGRAM REMOVAL OF WORK, DETAIL

E-001

16 GROUNDING PLAN AND DETAILS, REMOVAL OF EXIST. ELECT. EQUIPMENT

E-002

E-003

M E C H A N I C A L

PAVEMENT SECTION DETAILS

M-001

M-002

SITE PLAN, MECHANICAL GENERAL NOTES, LEGEND AND ABBREVIATIONS

FUELING SYSTEM PLAN, EQUIPMENT SCHEDULE, PIPING SUMP DETAIL

ABBREVIATION LIST

A.C. ASPHALTIC CONCRETE

AOA AIRPORT OPERATIONS AREA

APPROX. APPROXIMATELY

ARCH. ARCHITECTURAL

ARFF AIRCRAFT RESCUE AND FIRE FIGHTING

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

BC BOTTOM OF CURB

BL BASE LINE

BRL BUILDING RESTRICTION LINE

BMP BEST MANAGEMENT PRACTICES

BOT. BOTTOM

BW BOTTOM OF WALL

C.L. CENTERLINE

CL. CLASS

CMU CONCRETE MASONRY UNITS

C.O. CLEAN OUT

CONC. CONCRETE

CONT. CONTINUED

D6 DRAIN LINE WITH SIZE

DET. DETAIL

DIAM. DIAMETER

D.L. DRAIN LINE

DOTA DEPARTMENT OF TRANSPORTATION AIRPORTS

DWG. DRAWING

E EAST

ELEV. ELEVATION

EP EDGE OF PAVEMENT

EXIST. EXISTING

GAL GALLONS

GALV GALVANIZED

G.I. GALVANIZED IRON

H/HOR. HORIZONTAL

HDOT HAWAII DEPARTMENT OF TRANSPORTATION

HDPE HIGH DENSITY POLYETHYLENE

INV. INVERT

LCJ LONGITUDINAL CONTRACTION JOINT

LONG. LONGITUDINAL

LT. LEFT

M MECHANICAL

MIL MILLIMETER

MIN. MINIMUM

MAX. MAXIMUM

N NORTH

NTS NOT TO SCALE

O.C. ON CENTER

O/S OFFSET

PARA. PARAGRAPH

P.C. PORTLAND CEMENT CONCRETE

PFAS PER- AND POLYFLUOROALKYL SUBSTANCES

R RADIUS

REF. REFERENCE

REINF. REINFORCED

ROFA RUNWAY OBJECT FREE AREA

RSA RUNWAY SAFETY AREA

RT. RIGHT

RWY RUNWAY

S SLOPE

SECT. SECTION

SCH./SCHED. SCHEDULE

SCHED. SHEET

ST STREET

STA STATION

SQ. SQUARE

TCJ TRANSVERSE CONTRACTION JOINT

TCSJ TRANSVERSE CONSTRUCTION JOINT

TWY TAXIWAY

TXL TAXILANE

TC TOP OF CURB

TW TOP OF WALL

TYP. TYPICAL

VERT. VERTICAL

WWF WELDED WIRE FABRIC

GENERAL CONSTRUCTION NOTES

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STATE

OF HAWAII, "2005 STANDARD SPECIFICATIONS FOR ROAD AND

BRIDGE CONSTRUCTION" AND STATE OF HAWAII DOT

HIGHWAYS DIVISION "STANDARD PLANS" DATED 2008.

2. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL

EXISTING UTILITIES, WHETHER SHOWN ON THE PLAN OR NOT,

AND SHALL BE RESPONSIBLE FOR THE REPAIR OR

REPLACEMENT OF SAME IN THE EVENT OF DAMAGES DUE TO

HIS CONSTRUCTION PRACTICES. THE CONTRACTOR SHALL

COORDINATE HIS WORK WITH THE RESPECTIVE UTILITY

COMPANIES.

3. THE CONTRACTOR SHALL NOTIFY THE STATE 48 HOURS

BEFORE THE COMMENCEMENT OF ANY UTILITY LINE WORK

TO SCHEDULE A FIELD REVIEW AND SECURE APPROVAL OF

THE PROPOSED UTILITY LINE LOCATION.

4. THE PROPOSED UTILITY LINE LOCATION SHALL BE LAID OUT

IN THE FIELD PRIOR TO THE CONDUCTING OF THE FIELD

REVIEW BY THE STATE.

5. FIELD ADJUSTMENTS SHALL BE MADE AS DIRECTED BY THE

STATE PRIOR TO THE COMMENCEMENT OF ANY UTILITY LINE

WORK.

6. THE EXISTING PAVEMENT SHALL BE SAW-CUT BEFORE

COMMENCEMENT OF GRADING OR TRENCHING WORK.

7. ANY PAVEMENT MARKINGS, STRUCTURES AND

APPURTENANCES (WITHIN OR OUTSIDE THE CONTRACT ZONE

LIMITS) DAMAGED AND/OR WORN AWAY AS A RESULT OF

CONSTRUCTION OPERATIONS SHALL BE RESTORED TO ITS

ORIGINAL CONDITION, OR BETTER, AS DIRECTED BY THE

STATE.

8. ANY PAVEMENT MARKINGS, STRUCTURES, AND

APPURTENANCES (WITHIN OR OUTSIDE OF THE CONTRACT

ZONE LIMITS) DAMAGED AND/OR WORN AWAY UNDER THE

PERMIT SHALL BE REPAINTED OR RECONSTRUCTED AS

DIRECTED BY THE STATE.

9. NO TRENCHING SHALL BE LEFT OPEN FOR MORE THAN FIVE

(5) WORKING DAYS.

10. DIMENSIONS TAKE PRECEDENCE OVER SCALE.

11. THE CONTRACTOR SHALL VERIFY AND CHECK ALL

DIMENSIONS AND DETAILS ON THE CONSTRUCTION

DRAWINGS AND SPECIFICATIONS FOR ANY DISCREPANCIES.

IF ANY DISCREPANCY OR CONFLICT OCCURS, THE

CONTRACTOR SHALL NOTIFY THE ENGINEER AND SHALL

WAIT FOR CLARIFICATION BEFORE RESUMING OR

COMMENCING WORK ON THE DISCREPANCY ITEM.

12. THE CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL

FEDERAL, STATE, AND LOCAL LAWS REQUIRED FOR THE

PROTECTION OF PUBLIC HEALTH, SAFETY, AND

ENVIRONMENTAL QUALITY.

13. WORK INCIDENTAL TO THE CONTRACT AND NECESSARY TO

COMPLETE THE PROJECT, ALTHOUGH NOT SPECIFICALLY

REFERRED TO ON THE CONTRACT DOCUMENTS, SHALL BE

FURNISHED AND PERFORMED BY THE CONTRACTOR.

14. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE

AND COMPLETE RESPONSIBILITY FOR THE JOB SITE AND

CONDITIONS DURING THE COURSE OF CONSTRUCTION OF

THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS

AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY

CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING

HOURS: AND THAT THE CONTRACTOR SHALL DEFEND,

INDEMNIFY AND HOLD THE STATE AND ENGINEER HARMLESS

FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN

CONNECTION WITH THE PERFORMANCE OF WORK ON THIS

PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE

SOLE NEGLIGENCE OF THE STATE OR THE ENGINEER.

15. ALL PERMITS SHALL BE OBTAINED BY THE CONTRACTOR.

16. CONSTRUCTION WORK WILL BE PERMITTED ONLY DURING

THE HOURS BETWEEN 8:00 A.M. AND 3:30 P.M. MONDAY

THROUGH FRIDAY EXCEPT HOLIDAYS UNLESS OTHERWISE

PERMITTED BY THE STATE.

17. SURVEY MONUMENT STAKEOUT SHALL BE MADE BY

REGISTERED SURVEYORS ENGAGED BY THE CONTRACTOR.

18. REGISTERED SURVEYORS ENGAGED BY THE CONTRACTOR

SHALL SUBMIT A LETTER TO THE STATE CERTIFYING THAT

THE MONUMENT STAKEOUT AND INSTALLATION IS CORRECT.

19. ALL CONSTRUCTION AND GRADING STAKEOUT SHALL BE

DONE BY A REGISTERED SURVEYOR TO BE ENGAGED BY THE

CONTRACTOR.

20. BENCHMARK INFORMATION LOCATED ON SHEET C002.

21. THE STATE RESERVES THE RIGHT TO MAKE CHANGES TO THE

DRAINAGE SYSTEM AS SUCH CHANGES ARE FOUND TO BE

NECESSARY AS THE LAND IS CLEARED AND EROSION

CONTROL CONSTRUCTION PROGRESSES.

22. THE CONTRACTOR SHALL PROVIDE TO THE STATE RECORD

DRAWINGS OF ALL UTILITIES AND STRUCTURES UPON

COMPLETION OF WORK. SPOT ELEVATIONS SHALL ALSO BE

PROVIDED TO VERIFY THE FINISHED GRADES.

23. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR

UTILITIES SUCH AS ELECTRICITY, WATER, ETC., REQUIRED

FOR HIS OPERATIONS AND ALL COSTS SHALL BE BORNE BY

THE CONTRACTOR.

24. NO BLASTING SHALL BE PERMITTED ON THIS PROJECT.

25. THE CONTRACTOR SHALL COORDINATE THE STORAGE OF HIS

MATERIAL WITH THE STATE AND OWNER.

26. THE CONTRACTOR SHALL PROVIDE VEHICULAR ACCESS TO

ALL EXISTING STRUCTURES.

27. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE

ADEQUATE, SAFE, NONSKID BRIDGING MATERIAL OVER THE

TRENCH, INCLUDING SHORING WHEN TRENCHING IN

PAVEMENT AREAS TO HANDLE ALL TYPES OF VEHICULAR

TRAFFIC. NO TRENCH SHALL BE LEFT OPEN DURING

NON-WORKING HOURS, STRIKES, OR JOB SHUTDOWN.

AC ASPHALT CONCRETE

B BOTTOM

BC BOTTOM CURB

BW BOTTOM WALL

CONC. CONCRETE

DSP DRY STANDPIPE

EB ELECTRICAL BOX

EP EDGE OF PAVEMENT

FAA FEDERAL AVIATION ADMINISTRATION

G GROUND

GP GUARD POST

H HEIGHT

HH HANDHOLE

HT/HTC HAWAIIAN TELCOM

LP LIGHT POLE

MH MANHOLE

MW MONITORING WELL

STA STATION

T TOP

TC TOP CURB

TW WATER

TOPOGRAPHIC SURVEY ABBREVIATION LIST

12 M-004 SECTIONS

11 M-003 SECTIONS

GENERAL CONSTRUCTION NOTES CONTINUED

28. CONTRACTOR SHALL SUBMIT FAA FORM 7460-1, NOTICE TO

PROPOSED CONSTRUCTION OR ALTERATION AT LEAST 45

DAYS PRIOR TO THE START OF CONSTRUCTION OR THE DATE

AN APPLICATION OF A CONSTRUCTION PERMIT IS FILLED,

WHICHEVER IS EARLIEST. CONSTRUCTION EQUIPMENT AND

STAGING AREA HEIGHTS INCLUDING HEIGHTS OF

TEMPORARY CONSTRUCTION CRANES SHALL BE INCLUDED IN

THE SUBMITTAL. THE FORM AND CRITERIA FOR SUBMITTAL

CAN BE FOUND ONLINE AT:

HTTPS://OEAAA.FAA.GOV/OEAAA/EXTERNAL/CONTENT/FORMS.JSP

AOA TRAFFIC CONTROL NOTES

1. THE CONTRACTOR SHALL FURNISH ALL ESCORTS, FLAG

PEOPLE, AND COMMUNICATION DEVICES; AS WELL AS, ALL

AOA TRAFFIC CONTROL DEVICES SPECIFIED IN THE

TECHNICAL PROVISION SECTION 01800 - SPECIAL

REQUIREMENTS FOR CONTRACTORS ON THE AOA.

2. THE CONTRACTOR'S ESCORTS SHALL CONTINUOUSLY

MONITOR RADIO FREQUENCY, INDICATED IN THE TECHNICAL

PROVISION SECTION 01800, FOR ALL POTENTIAL AIRCRAFT

ACTIVITY THAT IS UNFORESEEN.

3. BEFORE STARTING ANY WORK AT EACH WORKDAY, THE

CONTRACTOR SHALL SET UP ALL AOA TRAFFIC CONTROL

DEVICES IN THE ORDER REQUIRED BY THE CONTRACT. AT

THE END OF EACH WORKDAY, THE CONTRACTOR SHALL TAKE

DOWN ALL AOA TRAFFIC CONTROL DEVICES IN THE REVERSE

ORDER.

4. THE CONTRACTOR SHALL NOT TAKE DOWN ANY AOA TRAFFIC

CONTROL DEVICES UNTIL WORK IS COMPLETED IN THE AOA.

5. THE CONTRACTOR SHALL NOT LEAVE THE AOA UNTIL ALL

AOA TRAFFIC CONTROL DEVICES HAVE BEEN TAKEN DOWN.

6. THE CONTRACTOR SHALL NOT LEAVE THE AIRPORT UNTIL

ALL STAGING AREAS ARE CLEARED ACCORDING TO

TECHNICAL PROVISION SECTION 01700 - MOBILIZATION AND

DEMOBILIZATION.

DSGN. DRWN. CHKD. APPD.

OF

NO. DATE REVISION

AO2023-14

SHEETS

04/30/2028

7/24/2026

DATE

100% CONSTRUCTION

DOCUMENTS

JULY 24, 2026

UST AND AST CLOSURE

AT

KAWAIHAPAI AIRFIELD

MOKULEIA, OAHU, HAWAII

This work was prepared by me or under my supervision.

Licensed Expiration Date

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PROJECT TITLE :

DATE : DWG. NO.

SHEET :

PROJECT NO.:

SHEET TITLE:

C-5018

14 ELECTRICAL SITE DISTRIBUTION PLAN, SYMBOLS

13 M-005 FUELING SYSTEM PIPING DIAGRAM

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text W

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text No. 17517-C

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

ENGINEER

DSGN. DRWN. CHKD. APPD.

OF

NO. DATE REVISION

AO2023-14

SHEETS

04/30/2028

7/24/2026

DATE

100% CONSTRUCTION

DOCUMENTS

JULY 24, 2026

UST AND AST CLOSURE

AT

KAWAIHAPAI AIRFIELD

MOKULEIA, OAHU, HAWAII

This work was prepared by me or under my supervision.

Licensed Expiration Date

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PROJECT TITLE :

DATE : DWG. NO.

SHEET :

PROJECT NO.:

SHEET TITLE:

CIVIL GENERAL NOTES 1

C-001

CONSTRUCTION NOTES:

1. ALL APPLICABLE CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH THE

STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION, SEPTEMBER 1984, AS

AMENDED, OF THE DEPARTMENT OF PUBLIC WORKS, CITY & COUNTY OF HONOLULU AND

THE COUNTIES OF KAUAI, MAUI, AND HAWAII.

2. VERIFY AND CHECK ALL DIMENSIONS AND DETAILS SHOWN ON THE DRAWINGS PRIOR TO

THE START OF CONSTRUCTION. ALL CONFLICTS SHALL BE IMMEDIATELY BROUGHT TO THE

ATTENTION OF THE CONTRACTING OFFICER.

3. THE UNDERGROUND PIPES, CABLES OR DUCTING LINES KNOWN TO EXIST BY THE ENGINEER

FROM HIS SEARCH OF RECORDS ARE INDICATED OF THE PLANS. THE CONTRACTOR SHALL

VERIFY THE LOCATIONS AND DEPTHS OF THE FACILITIES AND EXERCISE PROPER CARE IN

EXCAVATING IN THE AREA, WHEREVER CONNECTIONS OF NEW UTILITIES TO EXISTING

UTILITIES ARE SHOWN ON THE PLANS. THE CONTRACTOR SHALL EXPOSE THE EXISTING

LINES AT THE PROPOSED CONNECTIONS TO VERIFY THEIR LOCATIONS AND DEPTHS PRIOR

TO EXCAVATION FOR THE NEW LINES.

4. NO CONTRACTOR SHALL PERFORM ANY CONSTRUCTION OPERATION AS TO CAUSE FALLING

ROCKS, SOIL OR DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW INTO EXISTING CITY OR

STATE DRAINAGE SYSTEMS, OR ADJOINING PROPERTIES, STREETS OR NATURAL

WATERCOURSES. SHOULD SUCH VIOLATIONS OCCUR, THE CONTRACTOR MAY BE CITED

AND THE CONTRACTOR SHALL IMMEDIATELY MAKE ALL REMEDIAL ACTIONS NECESSARY.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH THE APPLICABLE

PROVISIONS OF THE WATER QUALITY AND WATER POLLUTION CONTROL STANDARDS

CONTAINED IN HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 55, “WATER POLLUTION

CONTROL”, AS WELL AS CHAPTER 14 OF THE REVERSED ORDINANCES OF HONOLULU, AS

AMENDED, BEST MANAGEMENT PRACTICES SHALL BE EMPLOYED AT ALL TIMES DURING

CONSTRUCTION.

6. CONFINED SPACE

FOR ENTRY BY STATE PERSONNEL, INCLUDING INSPECTORS AND REPRESENTATIVES, INTO A

PERMIT REQUIRED CONFINED SPACE AS DEFINED IN 29 CFR PART 1910.146(B), THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROVIDING:

I. ALL SAFETY EQUIPMENT REQUIRED BY THE CONFINED SPACE REGULATIONS APPLICABLE

TO ALL PARTIES OTHER THAN THE CONSTRUCTION INDUSTRY, TO INCLUDE, BUT NOT

LIMITED TO, THE FOLLOWING:

a. FULL BODY HARNESSES FOR UP TO TWO PERSONNEL

b. LIFELINE AND ASSOCIATED CLIPS

c. INGRESS/EGRESS AND FULL PROTECTION EQUIPMENT

d. TWO-WAY RADIOS (WALKIE-TALKIES) IF OUT OF LINE-OF-SIGHT,

e. EMERGENCY (ESCAPE) RESPIRATOR (10 MINUTE DURATION).

f. CELLULAR TELEPHONE TO CALL FOR EMERGENCE ASSISTANCE.

g. CONTINUOUS GAS DETECTOR (CALIBRATED) TO MEASURE OXYGEN, HYDROGEN

SULFIDE, CARBON MONOXIDE AND FLAMMABLES (CAPABLE OF MONITORING AT A

DISTANCE AT LEAST 20 FEET AWAY).

h. PERSONAL MULTI-GAS DETECTOR TO BE CARRIED BY INSPECTOR.

II. CONTINUOUS FORCED AIR VENTILATION ADEQUATE TO PROVIDE SAFE ENTRY CONDITIONS.

III. ONE ATTENDANT/RESCUE PERSONNEL TOPSIDE (TWO, IF CONDITIONS WARRANT IT).

IV. ALL SAFETY EQUIPMENT SHALL COMPLY WITH THE STANDARDS OF THE OCCUPATIONAL

SAFETY AND HEALTH ADMINISTRATION AND ALL APPLICABLE FEDERAL, STATE, AND CITY

LAWS AND REGULATIONS RELATING TO SAFETY.

8. ALL EXISTING UTILITIES TO REMAIN IN USE, WHETHER OR NOT SHOWN ON THE PLANS BY

THE CONTRACTOR DURING CONSTRUCTION. ALL DAMAGES TO EXISTING UTILITIES SHALL BE

REPAIRED AND PAID FOR BY THE CONTRACTOR.

9. WHEN TRENCH EXCAVATION IS CLOSE TO OR UNDER EXISTING STRUCTURES OR FACILITIES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY SHEETING, SHORING AND

BRACING THE EXCAVATION AND STABILIZING THE EXISTING GROUND TO RENDER IT SAFE

AND SECURE FROM POSSIBLE SLIDES, CAVE-INS AND SETTLEMENT AND FOR PROPERLY

SUPPORTING EXISTING STRUCTURES AND FACILITIES WITH BEAMS, STRUTS OR

UNDER-PINNING TO FULLY PROTECT THEM FROM DAMAGE.

10. THE CONTRACTOR SHALL RESTORE TO THEIR ORIGINAL CONDITION OR BETTER, ALL

IMPROVEMENTS DAMAGED AS A RESULT OF THE CONSTRUCTION, INCLUDING PAVEMENTS,

EMBANKMENTS, CURBS, SIGNS, LANDSCAPING, STRUCTURES, UTILITIES, WALLS, FENCES,

ETC. UNLESS PROVIDED FOR SPECIFICALLY IN THE PROPOSAL. DEMOLITION AND

RESTORATION OF EXISTING ITEMS SHALL BE INCIDENTAL AND INCLUDED WITHIN THE

AMOUNT PAID FOR UNCLASSIFIED TRENCH EXCAVATION.

11. ALL CONCRETE AND A.C. PAVEMENT TO BE TRENCHED OR RECONSTRUCTED SHALL BE

SAW-CUT TO THE REQUIRED WIDTH PRIOR TO THE CONSTRUCTION.

12. PURSUANT TO CHAPTER 6E, HRS, IN THE EVENT ANY ARTIFACTS OR HUMAN REMAINS ARE

UNCOVERED DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY

SUSPEND WORK AND NOTIFY THE HONOLULU POLICE DEPARTMENT AND THE STATE

DEPARTMENT OF LAND AND NATURAL RESOURCES-HISTORIC PRESERVATION DIVISION

(692-8015). IN ADDITION, FOR NON-CITY PROJECTS, THE CONTRACTOR SHALL INFORM THE

CITY DEPARTMENT OF PLANNING PERMITTING, CIVIL ENGINEERING BRANCH.

STOCKPILING NOTES:

1. ALL STOCKPILING WORK SHALL BE DONE IN ACCORDANCE WITH CHAPTER 18A, ARTICLES 1, 2, 3 AND 4, AS RELATED TO STOCKPILING, SOIL EROSION AND SEDIMENT CONTROL, OF THE

REVISED ORDINANCES OF HONOLULU, 2021, AS AMENDED.

2. NO CONTRACTOR SHALL PERFORM ANY STOCKPILING OPERATION SO AS TO CAUSE FALLING

ROCKS, SOIL OR DEBRIS IN ANY FORM TO FALL, SLIDE OR FLOW ONTO ADJOINING

PROPERTIES, STREETS OR NATURAL WATERCOURSES. SHOULD SUCH VIOLATIONS OCCUR,

THE CONTRACTOR MAY BE CITED AND THE CONTRACTOR SHALL IMMEDIATELY MAKE ALL

REMEDIAL ACTIONS NECESSARY.

3. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AREA AND

SURROUNDING AREA FREE FROM DUST NUISANCE. THE WORK SHALL BE IN CONFORMANCE

WITH THE AIR POLLUTION CONTROL STANDARDS CONTAINED IN THE HAWAII

ADMINISTRATIVE RULES, TITLE 11, CHAPTER 60.1, “AIR POLLUTION CONTROL”.

4. THE UNDERGROUND PIPES, CABLES OR DUCTLINES KNOWN TO EXIST BY THE ENGINEER

FROM HIS SEARCH OF RECORDS ARE INDICATED ON THE PLANS. THE CONTRACTOR SHALL

VERIFY THE LOCATIONS AND DEPTHS OF THE FACILITIES AND EXERCISE PROPER CARE IN

EXCAVATING IN THE AREA. WHEREVER CONNECTIONS OF NEW UTILITIES ARE SHOWN ON

THE PLANS, THE CONTRACTOR SHALL EXPOSE THE EXISTING LINES AT THE PROPOSED

CONNECTIONS TO VERIFY THEIR LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR THE

NEW LINES.

5. ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SURFACE WATERS FROM DAMAGING

THE CUT FACE OF AN EXCAVATION OR THE SLOPED SURFACES OF A FILL. FURTHERMORE,

ADEQUATE PROVISIONS SHALL BE MADE TO PREVENT SEDIMENT-LADEN RUNOFF FROM

LEAVING THE SITE.

6. ALL SLOPES AND EXPOSED AREAS SHALL BE SODDED OR PLANTED AS SOON AS FINAL

GRADES HAVE BEEN ESTABLISHED. PLANTING SHALL NOT BE DELAYED UNTIL ALL

STOCKPILING WORK HAS BEEN COMPLETED. STOCKPILING TO FINAL GRADE SHALL BE

CONTINUOUS, AND ANY AREA WITHIN WHICH WORK HAS BEEN INTERRUPTED OR DELAYED

SHALL BE PLANTED.

7. FILLS ON SLOPES STEEPER THAN 5:1 SHALL BE KEYED.

8. THE CITY SHALL BE INFORMED OF THE LOCATION OF THE BORROW SITE FOR THE PROJECT

WHEN THE APPLICATION FOR A STOCKPILING PERMIT IS MADE. THE BORROW SITE MUST

ALSO FULFILL THE REQUIREMENTS OF THE GRADING ORDINANCE.

9. NO STOCKPILING WORK SHALL BE DONE ON SATURDAYS, SUNDAYS AND HOLIDAYS AT ANY

TIME WITHOUT PRIOR NOTICE TO DOT-AIR, PROVIDED SUCH STOCKPILING WORK IS ALSO IN

CONFORMANCE WITH THE COMMUNITY NOISE CONTROL STANDARDS CONTAINED IN THE

HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 46, “COMMUNITY NOISE CONTROL”.

10. THE LIMITS OF THE AREA TO BE STOCKPILED SHALL BE FLAGGED BEFORE THE

COMMENCEMENT OF THE STOCKPILING WORK.

11. THE GENERAL CONTRACTOR/DEVELOPER/OWNER OF THE PROJECT SHALL BE RESPONSIBLE

FOR ALL STOCKPILING OPERATIONS TO BE PERFORMED IN CONFORMANCE WITH

APPLICABLE PROVISIONS OF THE HAWAII ADMINISTRATIVE RULES, TITLE 11, CHAPTER 54,

"WATER QUALITY STANDARDS," AND TITLE 11, CHAPTER 55, "WATER POLLUTION CONTROL",

AS WELL AS CHAPTER 14 OF THE REVISED ORDINANCES OF HONOLULU, AS AMENDED. BEST

MANAGEMENT PRACTICES SHALL BE EMPLOYED AT ALL TIMES DURING CONSTRUCTION.

THE GENERAL CONTRACTOR/DEVELOPER/OWNER OF THE PROJECT SHALL OBTAIN NATIONAL

POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT COVERAGE(S) FOR THE

FOLLOWING:

1. STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES THAT DISTURB

ONE (1) ACRE OR MORE, AND

2. DISCHARGES OF HYDROTESTING EFFLUENT, DEWATERING EFFLUENT, AND WELL DRILLING

EFFLUENT TO STATE WATERS.

IN ACCORDANCE WITH STATE LAW, ALL DISCHARGES RELATED TO PROJECT CONSTRUCTION OR

OPERATIONS ARE REQUIRED TO COMPLY WITH STATE WATER QUALITY STANDARDS (HAWAII

ADMINISTRATIVE RULES, CHAPTER 11-54). BEST MANAGEMENT PRACTICES SHALL BE USED TO

MINIMIZE OR PREVENT THE DISCHARGE OF SEDIMENT, DEBRIS, AND OTHER POLLUTANTS TO

STATE WATERS. PERMIT COVERAGE IS AVAILABLE FROM THE DEPARTMENT OF HEALTH, CLEAN

WATER BRANCH AT HTTP://HEALTH.HAWAII.GOV/CWB. THE OWNER/DEVELOPER/CONTRACTOR IS

RESPONSIBLE FOR OBTAINING OTHER FEDERAL, STATE, OR LOCAL AUTHORIZATIONS AS

REQUIRED BY LAW.

12. WHERE APPLICABLE AND FEASIBLE THE MEASURES TO CONTROL EROSION AND OTHER

POLLUTANTS SHALL BE IN PLACE BEFORE ANY STOCKPILING WORK IS INITIATED.

13. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED BEFORE PERMANENT EROSION

CONTROLS ARE IN-PLACE AND ESTABLISHED.

14. IF THE STOCKPILING WORK INVOLVES CONTAMINATED SOIL, THEN ALL STOCKPILING WORK

SHALL BE DONE IN CONFORMANCE WITH APPLICABLE STATE AND FEDERAL REQUIREMENTS.

15. ALL STOCKPILING AND CONSTRUCTION WORK SHALL IMPLEMENT MEASURES TO ENSURE

THAT THE DISCHARGE OF POLLUTANTS FROM THE CONSTRUCTION SITE WILL BE REDUCED

TO THE MAXIMUM EXTENT PRACTICABLE AND WILL NOT CAUSE OR CONTRIBUTE TO AN

EXCEEDANCE OF WATER QUALITY STANDARDS.

16. NON-COMPLIANCE TO ANY OF THE ABOVE REQUIREMENTS SHALL MEAN IMMEDIATE

SUSPENSION OF ALL WORK, AND REMEDIAL WORK SHALL COMMENCE IMMEDIATELY. ALL

COSTS INCURRED SHALL BE BILLED TO THE VIOLATOR. FURTHERMORE, VIOLATORS SHALL

BE SUBJECTED TO ADMINISTRATIVE, CIVIL AND/OR CRIMINAL PENALTIES.

17. FOR BENCH MARK, SEE SHEET C101.

18. LIFE OF THE STOCKPILE SHALL BE 30 DAYS.

EROSION PREVENTION/ SEDIMENT CONTROL NOTES:

1. THE CONTRACTOR SHALL FOLLOW THE GUIDELINES IN THE STATE OF HAWAII, DEPARTMENT

OF TRANSPORTATION - AIRPORTS (DOTA) CONSTRUCTION SITE RUNOFF/PBMP PROGRAM,

WHICH INCLUDES, BUT IS NOT LIMITED TO, THE DOTA CONSTRUCTION ACTIVITIES BMP

MANUAL AND ENVIRONMENTAL REQUIREMENTS FOR CONSTRUCTION PROJECTS STANDARD

OPERATING PROCEDURES.

2. PRIOR TO ANY EARTH DISTURBING ACTIVITIES, THE CONTRACTOR SHALL INSTALL

TEMPORARY EROSION CONTROL MEASURES. THE AREA OF SOIL DISTURBANCE SHALL BE

LIMITED TO THAT NECESSARY TO INSTALL THE THE TEMPORARY EROSION CONTROL

MEASURES. UPON COMPLETION OF THE TEMPORARY EROSION CONTROL INSTALLATION,

THE CONTRACTOR SHALL REQUEST AN INSPECTION CONDUCTED BY AIR-EE. THE SCHEDULE

OF THE INSPECTION IS SUBJECT TO THE AVAILABILITY OF THE AIR-EE INSPECTOR.

CONSTRUCTION ACTIVITIES CAN ONLY COMMENCE AFTER ALL DEFICIENCIES THAT ARE

OBSERVED DURING THE INSPECTION ARE PROPERLY ADDRESSED AND DOCUMENTED.

3. SLOPE PROTECTION IS REQUIRED ON AREAS WITH SLOPES GREATER THAN 15% AND ON

AREAS OF MODERATE SLOPE THAT ARE PRONE TO EROSION UNLESS THEY ARE BEING

ACTIVELY WORKED. USE DIVERSION UPSTREAM OF SLOPE (DIKES, SWALES, SLOPE DRAINS)

TO DIVERT WATER AROUND THE SLOPE. PROVIDE A 10-FT BUFFER ZONE AT THE TOE OF

SLOPE. ONLY 5 ACRES MAY BE DISTURBED AT ANYTIME ON SLOPES GREATER THAN 15%.

4. TEMPORARY STABILIZATION IS REQUIRED ON DISTURBED AREAS WHICH ARE AT FINAL

GRADE OR WHEN THE DISTURBED AREA WILL NOT BE WORKED FOR 14 CONSECUTIVE DAYS

OR MORE. STABILIZATION MUST COMMENCE IMMEDIATELY AND BE COMPLETED WITHIN THE

14 DAY PERIOD.

5. TEMPORARY EROSION CONTROLS SHALL NOT BE REMOVED PRIOR TO THE PERMANENT

STABILIZATION OF THE SITE. THE CONTRACTOR SHALL SUBMIT THEIR REQUEST FOR FINAL

BMP INSPECTION TO AIR-EE ONCE PERMANENT STABILIZATION IS ESTABLISHED. SCHEDULE

OF THE FINAL BMP INSPECTION IS SUBJECT TO THE AVAILABILITY OF THE AIR-EE

INSPECTOR. TEMPORARY EROSION CONTROL MEASURES CAN ONLY BE REMOVED AFTER

ALL DEFICIENCIES THAT ARE OBSERVED DURING THE FINAL BMP INSPECTION ARE

PROPERLY ADDRESSED AND DOCUMENTED.

6. MINIMIZE SOIL COMPACTION AREAS WHERE FINAL STABILIZATION OR INFILTRATION

PRACTICES WILL BE INSTALLED SHALL BE PROTECTED FROM EXCESSIVE COMPACTION

DURING CONSTRUCTION. VEHICLE AND EQUIPMENT USE SHALL BE RESTRICTED OR

TECHNIQUES TO CONDITION THE SOILS TO SUPPORT VEGETATION SHALL BE IMPLEMENTED

IN THE AREAS THAT HAVE BEEN COMPACTED AND ARE DESIGNATED TO REMAIN

VEGETATIVE OR POST-CONSTRUCTION INFILTRATION AREAS.CLEARLY MARK THE AREAS TO

BE AVOIDED WITH FLAGS OR TEMPORARY FENCING. WHERE TEMPORARY FENCING IS USED,

FENCING MUST BE ADEQUATELY SUPPORTED BY POSTS AND MAINTAINED IN AN UPRIGHT

POSITION.

7. PERIMETER CONTROLS ARE REQUIRED DOWN SLOPE OF ALL DISTURBED AREAS. MAINTAIN

DOWNSTREAM VEGETATED AREA.

8. INLET PROTECTION

A. ALL STORM DRAIN INLETS ONSITE AND THOSE OFFSITE WHICH MAY RECEIVE RUNOFF FROM

THE SITE SHALL USE AN INLET PROTECTION DEVICE UNLESS THEY ARE DIRECTED TO A

SEDIMENT BASIN.

B. SEDIMENT LEVELS MAY NOT EXCEED ONE THIRD OF THE HEIGHT OF A SEDIMENT BARRIER

OR INLET PROTECTION DEVICE AT ANY POINT ALONG THE LENGTH OF THE SEDIMENT

BARRIER OR THE INLET PROTECTION DEVICE.

C. SEDIMENT BARRIERS AND INLET PROTECTION DEVICES MUST BE UNCLOGGED AND

CLEANED WHEN PERFORMANCE IS COMPROMISED.

D. TORN, WEATHERED OR SAGGING SEDIMENT BARRIERS OR INLET PROTECTION DEVICES

MUST BE REPAIRED OR REPLACED IMMEDIATELY.

E. EACH INLET PROTECTION MUST BE INSPECTED AFTER EVERY RAINFALL EVENT, AND ANY

ACCUMULATED SEDIMENT AND DEBRIS MUST BE REMOVED.

10. TRACKING CONTROL

A. MINIMIZE SEDIMENT TRACK-OUT ONTO OFF-SITE STREETS, OTHER PAVED AREAS, AND

SIDEWALKS FROM VEHICLES EXITING THE CONSTRUCTION SITE BY RESTRICTING VEHICLE

TRAFFIC TO PROPERLY DESIGNATED AREAS AND USING ADDITIONAL CONTROLS TO

REMOVE SEDIMENT FROM VEHICLE TIRES PRIOR TO EXITING THE SITE.

B. VEHICULAR PARKING AND MOVEMENT ON PROJECT SITES MUST BE CONFINED TO PAVED

SURFACES OR PREDEFINED PARKING AREAS AND VEHICLE PATHS, WHICH SHALL BE

MARKED WITH FLAGS OR BOUNDARY FENCING.

C. ALL POLLUTANTS AND MATERIALS THAT ARE DROPPED, WASHED, TRACKED, SPILLED, OR

OTHERWISE DISCHARGED FROM A PROJECT SITE TO OFF-SITE STREETS, SIDEWALKS MUST

BE CLEANED USING DRY METHODS SUCH AS SWEEPING OR VACUUMING.

D. WASHING POLLUTANTS AND MATERIALS THAT ARE DISCHARGED FROM THE PROJECT SITE

TO THE MS4 INTO DRAIN INLETS OR CATCH BASINS IS PROHIBITED UNLESS THE MATERIAL IS

SEDIMENT AND THE INLETS ARE DIRECTED TO A SEDIMENT BASIN OR SEDIMENT TRAP.

PROJECT SEQUENCE

1. INSTALL TEMPORARY EROSION CONTROL MEASURES INCLUDING BUT NOT LIMITED TO,

STABILIZED CONSTRUCTION ENTRANCES, PERIMETER CONTROLS, AND INLET PROTECTION

FOR PROTECTED AREAS, CLEARING AND GRUBBING AS NECESSARY FOR THE INSTALLATION

OF THESE BMPS.

2. SCHEDULE AN INSPECTION OF THE TEMPORARY BMPS WITH AIR-EE. THE SCHEDULE OF THE

INSPECTION IS SUBJECT TO THE AVAILABILITY OF THE AIR-EE INSPECTOR. DOCUMENT AND

ADDRESS ANY DEFICIENCIES FOUND DURING THE INSPECTION.

3. RELOCATE, RECONSTRUCT AND MAINTAIN BMPS AS NEEDED TO KEEP THEM EFFECTIVE AT

ALL TIMES. INITIATE TEMPORARY STABILIZATION IMMEDIATELY ONCE GRADING IS

COMPLETED.

4. PROCEED WITH CONSTRUCTION WITH LEAST POSSIBLE DISTURBANCE OF VEGETATIVE

AREAS AND TEMPORARY STRUCTURES.

5. SCHEDULE FINAL BMP INSPECTION WITH AIR-EE (SCHEDULE SUBJECT TO THE AVAILABILITY

OF THE AIR-EE INSPECTOR). DOCUMENT AND ADDRESS ANY OBSERVED DEFICIENCIES

DURING THE FINAL BMP INSPECTION.

6. REMOVE OR DISMANTLE TEMPORARY EROSION CONTROL STRUCTURES AFTER FULL

ESTABLISHMENT OF PERMANENT VEGETATIVE COVER, PAVEMENT, OR PROPOSED FINISHED

SURFACE.

7. PRACTICE GOOD HOUSEKEEPING MEASURES THROUGHOUT THE DURATION OF

CONSTRUCTION.

8. INSPECTIONS SHALL BE PERFORMED WEEKLY.

RAIN RESPONSE PLAN

1. THE FOLLOWING WILL BE PERFORMED WHEN HEAVY RAINS, TROPICAL STORM OR

HURRICANE IS IMMINENT OR IS FORECASTED IN THE NEXT 48 HOURS:

A. TEMPORARY SUSPENSION OF ACTIVE GRADING, GRUBBING AND TRENCHING.

B. INSPECT ALL PERIMETER CONTROLS AND INLET PROTECTION DEVICES, AND MAINTAIN AS

NEEDED. INLET PROTECTION DEVICES ARE NOT ALLOWED TO BE REMOVED UNTIL DIRECTED

BY THE AIRPORT MANAGER OR WHEN THERE IS AN IMMEDIATE THREAT OCCURRING TO

PUBLIC SAFETY. THE AIRPORT MANAGER WILL JUDGE THE SEVERITY OF ANY APPROACHING

STORM AND ISSUE DIRECTIVES, AS NEEDED. ALL INLET PROTECTION DEVICES MUST BE

REINSTALLED IMMEDIATELY HAVE THE CESSATION OF THE SEVERE WEATHER AND THREAT

TO PUBLIC SAFETY.

C. RE-INSPECT AFTER THE APPROACHING HEAVY RAINS, TROPICAL STORM OR HURRICANE

AND REPLACE OR MAINTAIN BMPS AS NEEDED.

GOOD HOUSEKEEPING BMPS

1. STREET SWEEPING AND VACUUMING. ALL POLLUTANTS DISCHARGED FROM CONSTRUCTION

SITE TO OFF-SITE AREAS MUST BE SWEPT OR VACUUMED EACH DAY BEFORE LEAVING THE

JOB SITE.

2. MATERIALS DELIVERY, STORAGE AND USE MANAGEMENT. PREVENT, REDUCE, OR ELIMINATE

THE DISCHARGE OF POLLUTANTS FROM MATERIAL DELIVERY, STORAGE, AND USE TO THE

STORM WATER SYSTEM OR WATERCOURSED BY MINIMIZING THE STORAGE OF HAZARDOUS

MATERIALS ONSITE, STORING MATERIALS IN A DESIGNATED AREA, INSTALLING SECONDARY

CONTAINMENT. CONSTRUCTION MATERIALS, WASTE, TOXIC AND HAZARDOUS SUBSTANCES,

STOCKPILES AND OTHER SOURCES OF POLLUTION SHALL NOT BE STORED IN BUFFER

AREAS, NEAR AREAS OF CONCENTRATED FLOW, OR AREAS ABUTTING THE MS4, RECEIVING

WATERS, OR DRAINAGE IMPROVEMENTS THAT DISCHARGE OFF-SITE. PRIMARY AND

SECONDARY CONTAINMENT CONTROLS AND COVERS SHALL BE IMPLEMENTED TO THE MEP.

3. SPILL PREVENTION AND CONTROL. CREATE AND IMPLEMENT SPILL PREVENTION AND

RESPONSE PLANS TO ELIMINATE AND MINIMIZE THE DISCHARGE OF POLLUTANTS TO THE

MS4 AND RECEIVING WATERS FROM LEAKS AND SPILLS BY REDUCING THE CHANCE FOR

SPILLS, ABSORBING, CONTAINING, AND CLEANING UP SPILLS AND PROPERLY DISPOSING OF

SPILL MATERIALS. AT A MINIMUM, ALL PROJECTS SHALL CLEANUP ALL LEAKS AND SPILLS

IMMEDIATELY.

4. STOCKPILE MANAGEMENT. STOCKPILES SHALL NOT BE LOCATED IN DRAINAGE WAYS,

WITHIN 50 FEET FROM AREAS OF CONCENTRATED FLOWS, AND ARE NOT ALLOWED IN THE

STATE RIGHT-OF-WAY. SEDIMENT BARRIERS OR SILT FENCES SHALL BE USED AROUND THE

BASE OF ALL STOCKPILES. STOCKPILES SHALL NOT EXCEED 15 FEET IN HEIGHT.

STOCKPILES GREATER THAN 15 FEET IN HEIGHT SHALL REQUIRE 8 FOOT WIDE BENCHING.

STOCKPILES MUST BE COVERED WITH PLASTIC SHEETING OR A COMPARABLE MATERIAL

WHEN THEY ARE INACTIVE OR BY THE END OF THE WORK SHIFT, WHICHEVER IS SOONER.

5. HAZARDOUS MATERIALS. PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS TO

STORM WATER FROM HAZARDOUS WASTE THROUGH PROPER MATERIAL USE, MATERIAL

STORAGE, AND WASTE DISPOSAL. IN THE EVEN THAT HAZARDOUS MATERIALS ARE

DISCHARGED ONTO THE GROUND OR MS4, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY

THE HAWAII DEPARTMENT OF HEAL TH (DOH) HAZARD EVALUATION AND EMERGENCY

RESPONSE (HEER) OFFICE, DOH CLEAN WATER BRANCH (CWB), THE AIRPORT MANAGER,

DOTA STATE PROJECT MANAGER, AND DOTA AIR-EE. A WRITTEN REPORT DESCRIBING THE

DATE AND TIME OF DISCHARGE, DESCRIPTION OF EVENTS, POLLUTANTS THAT WERE

DISCHARGED, THE REASONS OR CAUSE FOR THE DISCHARGE, SPILL RESPONSE, AND THE

MEASURES THAT HAVE BEEN TAKEN OR WILL BE TAKEN TO PREVENT A RECURRENCE OF

THE DISCHARGE SHALL BE SUBMITTED TO DOH HEER OFFICE AND DOTA AIR-EE WITHIN 30

DAYS OF THE DISCHARGE. A SPILL REPORTING FORM SHALL ALSO BE FILLED OUT AND

SUBMITTED TO AIR-EE WITHIN 30 DAYS OF THE DISCHARGE. THE CONTRACTOR SHALL

REFER TO THE HNL SPILL REPORTING FACT SHEET FOR THE SPILL REPORTING FORM AND

ADDITIONAL INFORMATION.

6. NONHAZARDOUS MATERIALS. IN THE EVENT THAT NONHAZARDOUS MATERIALS ARE

DISCHARGED TO THE MS4, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DOH HEER

OFFICE, DOH CWB, AIRPORT MANAGER, DOTA STATE PROJECT MANAGER, AND DOTA AIR-EE.

A WRITTEN REPORT DESCRIBING THE DATE AND TIME OF DISCHARGE, DESCRIPTION OF

EVENTS, POLLUTANTS THAT WERE DISCHARGED, THE REASONS OR CAUSE FOR THE

DISCHARGE, SPILL RESPONSE, AND THE MEASURES THAT HAVE BEEN TAKEN OR WILL BE

TAKEN TO PREVENT A RECURRENCE OF THE DISCHARGE SHALL BE SUBMITTED TO DOH

HEER OFFICE, DOH CWB, AND DOTA AIR-EE WITHIN 30 DAYS OF DISCHARGE. A SPILL

REPORTING FORM SHALL ALSO BE FILLED OUT AND SUBMITTED TO AIR-EE WITHIN 30 DAYS

OF THE DISCHARGE. THE CONTRACTOR SHALL REFER TO THE HNL SPILL REPORTING FACT

SHEET FOR THE SPILL REPORTING FORM AND ADDITIONAL INFORMATION.

7. VEHICLE AND EQUIPMENT CLEANING. ELIMINATE AND MINIMIZE THE DISCHARGE OF

POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT CLEANING OPERATIONS

BY USING OFF-SITE FACILITIES WHEN FEASIBLE, WASHING IN DESIGNATED, CONTAINED

AREAS ONLY, AND ELIMINATING DISCHARGES TO THE STORM DRAIN SYSTEM BY

EVAPORATING AND/OR TREATING WASH WATER, AS APPROPRIATE OR INFILTRATING WASH

WATER FOR EXTERIOR CLEANING ACTIVITIES THAT USE WATER ONLY.

8. VEHICLE AND EQUIPMENT FUELING. PREVENT FUEL SPILLS AND LEAKS BY USING OFF-SITE

FACILITIES, FUELING ONLY IN DESIGNATED AREAS, ENCLOSING OR COVERING STORED

FUEL, AND IMPLEMENTING SPILL CONTROLS SUCH AS SECONDARY CONTAINMENT AND

ACTIVE MEASURES USING SPILL RESPONSE KITS.

9. VEHICLE AND EQUIPMENT MAINTENANCE. ELIMINATE AND MINIMIZE THE DISCHARGE OF

POLLUTANTS TO STORM WATER FROM VEHICLE AND EQUIPMENT MAINTENANCE

OPERATIONS BY USING OFF-SITE FACILITIES WHEN FEASIBLE, PERFORMING WORK IN

DESIGNATED AREAS ONLY, USING SPILL PADS UNDER VEHICLES AND EQUIPMENT,

CHECKING FOR LEAKS AND SPILLS, AND CONTAINING AND CLEANING UP SPILLS

IMMEDIATELY.

10. SOLID WASTE MANAGEMENT. PREVENT OR REDUCE DISCHARGE OF POLLUTANTS TO THE

LAND, GROUNDWATER, AND IN STORM WATER FROM SOLID WASTE OR CONSTRUCTION AND

DEMOLITION WASTE BY PROVIDING DESIGNATED WASTE COLLECTION AREAS, COLLECT SITE

TRASH DAILY, AND ENSURING THAT CONSTRUCTION WASTE IS COLLECTED, REMOVED, AND

DISPOSED OF ONLY AT AUTHORIZED DISPOSAL AREAS. SOLID WASTE SHALL BE COVERED

OR PLACED UNDER COVER TO PREVENT CONTACT WITH STORM WATER. TRUCKS HAULING

SOLID WASTE, SOIL, OR AGGREGATE MUST BE COVERED WHEN USING THE HAUL

ROADS/ROUTES WITHIN THE AOA.

11. SANITARY/SEPTIC WASTE MANAGEMENT. TEMPORARY AND PORTABLE SANITARY AND

SEPTIC WASTE SYSTEMS SHALL BE MOUNTED OR STAKED IN, WELL-MAINTAINED AND

SCHEDULED FOR REGULAR WASTE DISPOSAL AND SERVICING. SOURCES OF SANITARY

AND/OR SEPTIC WASTE SHALL NOT BE SORTED NEAR THE MS4 OR RECEIVING WATERS.

12. LIQUID WASTE MANAGEMENT. LIQUID WASTE SHALL BE CONTAINED IN A CONTROLLED AREA

SUCH AS A ROLL-OFF BIN OR PORTABLE TANK OF SUFFICIENT VOLUME AND TO CONTAIN

THE LIQUID WASTES GENERATED. CONTAINMENT AREAS OR DEVICES MUST BE

IMPERMEABLE AND LEAK FREE AND SHOULD NOT BE LOCATED WHERE ACCIDENTAL

RELEASE OF THE CONTAINED LIQUID CAN DISCHARGE TO WATER BODIES, CHANNELS, OR

STORM DRAINS. THE LIQUID WASTE SHALL BE UNDER COVER, IN A COVERED CONTAINER OR

IN CONTAINER WITH A LID TO PREVENT CONTACT WITH STORM WATER. IF THE LIQUID

WASTE IS HAZARDOUS MATERIAL, IT MUST BE STORED WITH SECONDARY CONTAINMENT

AND COVERED OR UNDER COVER.

13. CONCRETE WASTE MANAGEMENT. PREVENT OR REDUCE THE DISCHARGE OF POLLUTANTS

TO STORM WATER FROM CONCRETE WASTE BY CONDUCTING WASHOUT OFFSITE OR

PERFORMING ONSITE WASHOUT IN A DESIGNATED AREA CONSTRUCTED AND MAINTAINED IN

SUFFICIENT QUANTITY AND SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE

GENERATED BY WASHOUT OPERATIONS. PLASTIC LINING MATERIAL SHOULD BE A MINIMUM

OF 10 MILLIMETER POLYETHYLENE SHEETING AND SHOULD BE FREE OF HOLES, TEARS, OR

OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL

CONTAINMENT AREAS OR DEVICES SHOULD NOT BE LOCATED WHERE ACCIDENTAL

RELEASE OF THE CONTAINED LIQUID CAN DISCHARGE TO WATER BODIES, CHANNELS, OR

STORM DRAINS. WASHOUT FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE

CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75 PERCENT FULL. FOUR (4)

INCHES OF FREEBOARD MINIMUM MUST BE MAINTAINED. ONCE CONCRETE WASTES ARE

WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHOULD

BE BROKEN UP, REMOVED, AND DISPOSED OF AS SOLID WASTES.

14. FOR MANAGEMENT OF CONTAMINATED SOIL, IF ENCOUNTERED, THE PROJECT WILL NEED

TO FOLLOW THE DOTA PROGRAMMATIC EHE-EHMP

(https://hidot.hawaii.gov/airports/doing-business/engineering/env...rammatic-ehe-ehmp/).

15. MEASURES TO CONTROL EROSION AND OTHER POLLUTANTS AS REFLECTED ON PLANS

SHALL BE IN PLACE BEFORE ANY WORK IS INITIATED. THESE MEASURES SHALL BE

PROPERLY CONSTRUCTED AND MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.

16. ALL CONTROL MEASURES SHALL BE CHECKED DAILY AND REPAIRED AS NECESSARY.

17. CONTRACTOR SHALL OBSERVE AND COMPLY WITH THE STATE DEPARTMENT OF HEALTH

REGULATIONS REGARDING STORM WATER DISCHARGE.

18. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AREAS AND

SURROUNDING AREAS FREE FROM DUST NUISANCE. THE WORK SHALL BE IN

CONFORMANCE WITH AIR POLLUTION CONTROL STANDARDS CONTAINED IN HAWAII

ADMINISTRATIVE RULES: CHAPTER 11-60, "AIR POLLUTION CONTROL".

19. THE CONTRACTOR SHALL ENSURE THAT ALL TIRES OF CONSTRUCTION VEHICLES ARE

SUFFICIENTLY CLEANED OFF SO THAT DIRT OR DEBRIS IS NOT TRACKED OFF THE

CONSTRUCTION SITE. WASHING OFF TIRES WITH WATER WILL NOT BE ACCEPTABLE UNLESS

THE RUNOFF IS CONTAINED AND DOES NOT ENTER THE STORM DRAIN SYSTEM.

20. COVER OR RELOCATE MATERIAL STOCKPILES AND LIQUID MATERIAL CONTAINERS TO AVOID

CONTACT WITH RAINWATER.

21. PLACE SPILL PANS OR OIL-ONLY SPILL PADS UNDER CONSTRUCTION VEHICLES TO PREVENT

RUNOFF FROM CONTACTING ANY SPILLED PETROLEUM PRODUCTS. PROPERLY DISPOSE OF

ANY ACCUMULATED OILY WATER AFTER THE RAIN EVENT.

ARCHAEOLOGICAL NOTES:

1. PURSUANT TO CHAPTER 6E, HRS, IN THE EVENT ANY ARTIFACTS OR HUMAN REMAINS ARE

UNCOVERED DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY

SUSPEND WORK AND NOTIFY THE HAWAII POLICE DEPARTMENT AND THE STATE

DEPARTMENT OF LAND AND NATURAL RESOURCES, HISTORIC PRESERVATION DIVISION

(692-8015).

2. THE CONTRACTOR MUST FOLLOW THE APPROVED AND MOST CURRENT ARCHAEOLOGICAL

MONITORING AND POST-REVIEW DISCOVERIES PLAN AND U.S. ARMY CULTURAL RESOURCE

INVESTIGATION PERMIT, AND NATIVE AMERICAN GRAVES PROTECTION AND REPATRIATION

ACT (NAGPRA) COMPREHENSIVE AGREEMENT (CA) .

3. THE CONTRACTOR MUST PROVIDE A U.S. ARMY CULTURAL RESOURCE INVESTIGATION

PERMIT PRIOR TO ANY EXCAVATION WORK.

4. THE CONTRACTOR MUST NOTIFY THE STATE ENGINEER PRIOR TO ANY EXCAVATION WORK.

PUBLIC HEALTH, SAFETY, AND CONVENIENCE NOTES:

1. CONTRACTOR SHALL OBSERVE AND COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS

REQUIRED FOR THE PROTECTION OF PUBLIC HEALTH, SAFETY AND ENVIRONMENTAL

QUALITY.

2. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND ITS

SURROUNDING AREAS FREE FROM DUST NUISANCE. THE WORK SHALL BE IN

CONFORMANCE WITH THE AIR POLLUTION STANDARDS AND REGULATIONS OF THE STATE

DEPARTMENT OF HEALTH. THE COUNTY AND STATE SHALL REQUIRE SUPPLEMENTARY

MEASURES IF REQUIRED.

3. THE CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL NECESSARY SIGNS, LIGHTS, FLARES, BARRICADES, MARKERS, CONES, AND OTHER PROTECTIVE FACILITIES AND SHALL

TAKE ALL NECESSARY PRECAUTIONS FOR THE PROTECTION, CONVENIENCE AND SAFETY

OF THE PUBLIC.

UST NOTES:

1. CONDUCT UST REMOVAL WORK IN ACCORDANCE WITH HAWAII ADMINISTRATIVE RULES (HAR)

CHAPTER 11-280.1 UNDERGROUND STORAGE TANKS.

2. PROVIDE/OBTAIN ALL NECESSARY NOTIFICATIONS AND PERMITS REQUIRED TO REMOVE THE

EXISTING UST AND INSTALL NEW AST.

3. PREPARE A WORK PLAN, WHICH INCLUDES NOTIFICATION TO THE HAWAII DEPARTMENT OF HEALTH

(HDOH), TANK AND PIPING CLEANING, REMOVAL, AND CONFIRMATION SAMPLING.

4. DISPOSED OF RESIDUAL FUEL, TANK SLUDGE, AND OTHER WASTE IN ACCORDANCE WITH

APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS AND REQUIREMENTS.

5. UPON REMOVAL OF THE UST AND ASSOCIATED PIPING, CONDUCT VERIFICATION SOIL SAMPLING

USING A MULTI-INCREMENT SAMPLING METHOD IN ACCORDANCE WITH THE HDOH TECHNICAL

GUIDANCE MANUAL (TGM). COMPLY WITH THE APPLICABLE GUIDANCE IN THE DOH TGM, DOH

ENVIRONMENTAL ACTION LEVEL (EAL) GUIDANCE AND OTHER GUIDANCE DOCUMENTS ON THE HDOH

HAZARD EVALUATION AND EMERGENCY RESPONSE (HEER) WEBSITE. IF GROUNDWATER IS

ENCOUNTERED, COLLECT GROUNDWATER SAMPLES FOR ANALYSIS.

6. IF ANY SIGNS OF CONTAMINATION ARE OBSERVED DURING UST REMOVAL, INFORM THE FINDING

IMMEDIATELY TO THE CONTRACTING OFFICER. CONDUCT EXCAVATION AND REMOVAL OF

CONTAMINATED SOIL IF ENCOUNTERED AFTER OBTAINING APPROVALS FROM THE CONTRACTING

OFFICER.

prop

7. SUBMIT A TANK CLOSURE REPORT INCLUDING THE VERIFICATION SAMPLING AND ANALYTICAL

RESULTS.

TK TK TK TK

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text W

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text No. 17517-C

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

NO. DATE REVISION

AO2023-14

SHEETS

04/30/2028

7/24/2026

DATE

100% CONSTRUCTION

DOCUMENTS

JULY 24, 2026

UST AND AST CLOSURE

AT

KAWAIHAPAI AIRFIELD

MOKULEIA, OAHU, HAWAII

This work was prepared by me or under my supervision.

Licensed Expiration Date

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PROJECT TITLE :

DATE : DWG. NO.

SHEET :

PROJECT NO.:

SHEET TITLE:

CIVIL GENERAL NOTES 2

C-002

ABBREVIATIONS

AC ASPHALT CONCRETE

BC BOTTOM CURB

BFE BASE FLOOD ELEVATION

BLDG BUILDING

BOT. BOTTOM

BW BOTTOM WALL

C CENTERLINE

C.L. CHAIN-LINK

CONN CONNECT

COTG CLEANOUT TO GRADE

CONC. CONCRETE

D DIAMETER OR DRAIN

DET. DETAIL

DWG DRAWING

EA EACH

ELEV./EL. ELEVATION

EP EDGE OF PAVEMENT

ESCP EROSION AND SEDIMENT

CONTROL PLAN

EXIST. EXISTING

FF FINISH FLOOR

FH FIRE HYDRANT

FT FEET

FL FLANGE

GND. GROUND

G.P. GUARD POST/GUY POLE/GATE POST

GV GATE VALVE

HB HOSE BIBB

HDPE HIGH-DENSITY POLYETHYLENE

ICV IRRIGATION CONTROL VALVE

INV INVERT

L LENGTH

LF LINEAR FOOT

LP LIGHT/LAMP POLE

MAX. MAXIMUM

MECH MECHANICAL

MIN. MINIMUM

MH MANHOLE

MJ MECHANICAL JOINT

NOI NOTICE OF INTENT

NPDES NATIONAL POLLUTANT DISCHARGE

ELIMINATION SYSTEM

O/H OVERHEAD

O.C.A. ON CENTER

PAV'T PAVEMENT

P PROPERTY LINE

PVC POLYVINYL CHLORIDE

RD. ROAD

ROW RIGHT OF WAY

RPBP REDUCED PRESSURE

BACKFLOW PREVENTER

S SEWER OR SPREAD

S.L. STREET LIGHT

SMH SEWER MANHOLE

STD. STANDARD

STRUCT. STRUCTURAL

TC TOP OF CURB

TMK TAX MAP KEY

TP TOP PIPE OR TOP PAVEMENT

TS TOP STEM

TW TOP WALL

TYP. TYPICAL

U/G UNDERGROUND

UP UTILITY POLE

U.P./S.L UTILITY POLE W/ STREET LIGHT

W WATER / WIDTH

WL WATER LINE

WM WATER METER

WMH WATER MANHOLE

WV WATER VALVE BOX

L

L

24" MIN OVERLAP

(TYP)

12" DIA. BIOSOCK

COMPOST FILTER SOCK

OR APPROVED EQUAL

(TYP)

AC

P

AV

EM

EN

T

EDGE AC

PAVEMENT

AC PAVEMENT

12" DIA. BIOSOCK COMPOST

FILTER SOCK OR APPROVED

EQUAL (TYP)

PLAN

SECTION

24" MIN OVERLAP

(TYP)

8"X8"X16" CONC BL0CKS AT

10' MAX SPACING TO

STABILIZE SOCKS IN PAVED

AREAS (TYP)

8"X8"X16" CONC BL0CKS AT 10'

MAX SPACING TO STABILIZE

SOCKS IN PAVED AREAS (TYP)

RUNOFF

NOTES:

1. COMPOST SHALL NOT CONTAIN BIOSOLIDS AND SHOULD COMPLY WITH

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY GUIDELINES IN

ACCORDANCE WITH THE CITY AND COUNTY OF HONOLULU STORM

WATER BEST MANAGEMENT PRACTICE MANUAL, NOVEMBER 2011.

2. STAKING IS NOT REQUIRED.

3. OVERLAP ENDS OF BIOSOCK COMPOST FILTER SOCKS MINIMUM

12-INCHES.

SECTION

PLAN

STORM SEWER GRATE

LIFT STRAPS USED

FOR EASY MOVEMENT

AND INSPECTION OF

UNIT

VELCRO CLOSURE

STORM SEWER GRATE DANDY BAGOR

APPROVED EQUAL

HI-FLOW DANDY BAG OR APPROVED EQUAL (SAFETY ORANGE)

MECHANICAL PROPERTIES TEST METHOD UNITS MARV

ASTM D 4632 1.62 (365) X 0.89 (200)

ASTM D 4632 24 X 10

ASTM D 4833 0.40 (90)

ASTM D 3786 3097 (450)

ASTM D 4533 0.51 (115) X 0.33 (75)

ASTM D 4355 90

ASTM D 4751 0.425 (40)

ASTM D 4491 5907 (145)

ASTM D 4491 Sec 2.1-1

*NOTE: ALL DANDY BAGS OR APPROVED EQUAL CAN BE

ORDERED WITH OPTIONAL OIL ABSORBENT PILLOWS

1/min/m (gal/min/ft ) Mm (US Std Sieve) kN (lbs) kPa (psi) kN (lbs) kN (lbs)

PERMITTIVITY

FLOW RATE

APPARENT OPENING SIZE

UV RESISTENCE

TRAPEZOID TEAR STRENGTH

MULLEN BURST STRENGTH

PUNCTURE STRENGTH

GRAB TENSILE ELONGATION

GRAB TENSILE STRENGTH

COMPOST FILTER SOCK DETAIL

SCALE:NTS

C-002

DRAIN INLET PROTECTION DETAIL

SCALE:NTS

C-002

OR EQUIVALENT

ACCESS (VELCRO)

AGGREGATE POUCH

AGGREGATE POUCH

"TRUE DAM" BY DANDY PRODUCTS, INC.

3" DIAMETER DAM

WOOVEN MONOFILAMENT

OVERFLOW GAP OF DAM

EXISTING CURB AND GUTTER

CURB DROP INLET

EXISTING 6" HIGH CURB

6" MINIMUM

SEDIMENT FILTER FOR CATCHBASIN DETAIL

SCALE:NTS

C-002

TK TK TK TK

STABILIZED CONSTRUCTION ENTRANCE

SCALE:NTS

C-002

EXISTING

GROUND

6" THICK, CRUSHED

ROCK NO.2

10' WIDE STABILIZED

INGRESS/EGRESS ACCESS WAY

SEE PLAN FOR LENGTH

6"

FINISH GRADE TO MATCH

EXISTING GRADE

AutoCAD SHX Text

LICENSED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text W

AutoCAD SHX Text H

AutoCAD SHX Text A

AutoCAD SHX Text No. 17517-C

AutoCAD SHX Text U

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

EX. 2" VTR

EX. 2" FUEL SUPPLY

EX

. 1

-1 /4"

C F

DR

C

EX. GRD TERMINAL

EX. U/G #1/0

EX. GRD TERMINALEX. GRD ROD DSGN. DRWN. CHKD. APPD.

OF

NO. DATE REVISION

AO2023-14

SHEETS

04/30/2028

7/24/2026

DATE

100% CONSTRUCTION

DOCUMENTS

JULY 24, 2026

UST AND AST CLOSURE

AT

KAWAIHAPAI AIRFIELD

MOKULEIA, OAHU, HAWAII

This work was prepared by me or under my supervision.

Licensed Expiration Date

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

AIRPORTS

PROJECT TITLE :

DATE : DWG. NO.

SHEET :

PROJECT NO.:

SHEET TITLE:

SITE PLAN

C-102

ASPHALT PAVEMENT

RESTORATION

LEGEND

LIMITS OF WORK

CENTER LINE

NORTH

0' 40'20'20' 10'

1" = 20'-0"

GENERAL SITE PLAN1

NOTES:

1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE

BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS.

THEREFORE, THEIR LOCATION MUST BE CONSIDERED

APPROXIMATE ONLY. THERE MAY BE OTHERS, THE EXISTENCE

OF WHICH IS NOT PRESENTLY KNOWN. BEFORE STARTING ANY

WORK, LOCATE AND PROTECT ALL EXISTING BURIED UTILITY

LINES, WHETHER OR NOT SHOWN ON THESE DRAWINGS, DURING

THE COURSE OF CONSTRUCTION

2. CONTRACTOR SHALL VERIFY THE LOCATION OF MONITORING

WELL PRIOR TO ANY GROUND DISTURBING ACTIVITIES. IF

MONITORING WELLS ARE FOUND WITHIN THE PROJECT LIMITS,

THE CONTRACTOR SHALL NOTIFY THE STATE PROJECT

MANAGER AND ADEQUATELY PROTECT THE MONITORING WELLS

FROM DAMAGE DURING CONSTRUCTION.

3. CONTRACTOR TO FIELD VERIFY THE EXISTING WATER LINES,

ELECTRICAL, TELCOM LINES AND FUEL LINES.

4. CONTRACTOR SHALL NOTIFY THE STATE PROJECT MANAGER

AND COORDINATE WITH HDOTA HDH MAINTENANCE AND ANY

EXISTING TENANTS FOR ACCESS AND USE OF THE AREA NEAR

THE NORTH SHORE AVIATION HANGAR AND ADJACENT LOT.

5. CONTRACTOR SHALL RESTORE ALL EXISTING IMPROVEMENTS

DISTURBED DURING CONSTRUCTION TO MATCH OR EXCEED

EXISTING CONDITION AND QUALITY.

6. SEE MECHANICAL DRAWINGS FOR PIPING AND EQUIPMENT

REMOVAL.

7. COORDINATE ALL SITE DEMOLITION WITH PROPOSED SITE

IMPROVEMENTS.

8. SAWCUT PAVEMENTS AND CURBING TO FULL DEPTH PRIOR TO

REMOVAL OR REMOVE TO NEAREST JOINT.

9. THE CONTRACTOR SHALL CONTACT HAWAII ONE CALL CENTER

(811 OR (866) 423-7287 OR https://digsafelyhawaii.com/) AT LEAST

FIVE (5) WORKING DAYS, BUT NOT MORE THAN TWENTY-EIGHT

(28) CALENDAR DAYS, PRIOR TO BEGINNING PLANNED

EXCAVATION.

DEMOLISH AND REMOVE CONCRETE

PAD. PROVIDE AC PAVEMENT AND

SMOOTH CONNECTION TO EXISTING

GRADE, TYP.

DEMOLISH AND REMOVE CONCRETE

PAD. PROVIDE BACKFILL, STABILIZE

SURFACE WITH 6" THICK GRAVEL AND

SMOOTH CONNECTION TO EXISTING

GRADE.

EXISTING 12,000 GALLON

UNDERGROUND STORAGE TANK

FOR REMOVAL SPECIFICATIONS SEE

MECHANICAL AND ELECTRICAL

DRAWINGS. BACKFILL AS NECESSARY

AND STABILIZE WITH TOP SOIL AND

GRASS (EL TORO ZOYSIA), TYP.

EXISTING DISPENSER SYSTEM

FOR REMOVAL SPECIFICATIONS SEE

MECHANICAL AND ELECTRICAL

DRAWINGS

EXISTING CONTROL PANEL

FOR REMOVAL SPECIFICATIONS

SEE ELECTRICAL DRAWINGS

LIMITS OF WORK AND

DISTURBANCE

AC PAVEMENT TRENCH

RESTORATION

PROVIDE AC

PAVEMENT TRENCH

RESTORATION, TYP.

AC PAVEMENT TRENCH

RESTORATION

EXISTING 2" VTR

FOR REMOVAL

SPECIFICATIONS SEE

MECHANICAL DRAWINGS.

PROVIDE BACKFILL,

STABILIZE SURFACE WITH

TOP SOIL, GRASS (EL

TORO ZOYSIA) AND

SMOOTH CONNECTION TO

EXISTING GRADE, TYP.

EXISTING ELECTRICAL

CONDUITS AND HANDHOLES.

FOR REMOVAL DETAILS SEE

ELECTRICAL DRAWINGS.

PROVIDE BACKFILL,

STABILIZE SURFACE WITH

GRASS AND SMOOTH

CONNECTION TO EXISTING

GRADE, TYP.

EXISTING POWER POLE

AND TRANSFORMER

(PROTECT)

FIELD VERIFY

EXISTING POWER POLE

(PROTECT)

FIELD VERIFY

LANDSCAPE

RESTORATION

EXISTING NORTH SHORE

AVIATION HANGAR

(PROTECT DURING

CONSTRUCTION)

EXISTING QUONSET HUT

(PROTECT DURING

CONSTRUCTION)

EXISTING ACCESS ROAD

DEMOLISH AND REMOVE CONCRETE

PAD. PROVIDE AC PAVEMENT AND

SMOOTH CONNECTION TO EXISTING

GRADE, TYP.

EXISTING GROUNDING SYSTEM

FOR REMOVAL SPECIFICATIONS SEE

MECHANICAL AND ELECTRICAL

DRAWINGS. PROVIDE AC PAVEMENT

RESTORATION AND SMOOTH

CONNECTION TO EXISTING GRADE,

TYP.

SCALE: 1" = 20'

TK TK TK TK

EXISTING DRAIN INLET

(PROTECT)

RESTORE CONCRETE CURB

SEE C&C OF HONOLULU STD DETAIL R-1

5 LF

AutoCAD SHX Text

TREES

AutoCAD SHX Text D=0.5

AutoCAD SHX Text H=10

AutoCAD SHX Text H=10

AutoCAD SHX Text D=0.5

AutoCAD SHX Text

TREES

AutoCAD SHX Text

TREES

AutoCAD SHX Text D=0.5

AutoCAD SHX Text H=15

AutoCAD SHX Text

TREES

AutoCAD SHX Text D=2

AutoCAD SHX Text H=25

AutoCAD SHX Text H=30

AutoCAD SHX Text D=1.5

AutoCAD SHX Text H=20

AutoCAD SHX Text D=0.5

AutoCAD SHX Text H=30

AutoCAD SHX Text D=1

AutoCAD SHX Text

TREES

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

TOP SLOPE

AutoCAD SHX Text

BOTTOM SLOPE

AutoCAD SHX Text 12.89

AutoCAD SHX Text 12.89

AutoCAD SHX Text 12.96

AutoCAD SHX Text

ELEC BOX

AutoCAD SHX Text

ELEC BOX

AutoCAD SHX Text 13.23

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text

TW 15.75

AutoCAD SHX Text

DS

AutoCAD SHX Text

DS

AutoCAD SHX Text 12.34

AutoCAD SHX Text 12.46

AutoCAD SHX Text

SIGN

AutoCAD SHX Text

DI

AutoCAD SHX Text

TOP=11.56

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AC 12.72

AutoCAD SHX Text

AC 11.02

AutoCAD SHX Text

AC 11.02

AutoCAD SHX Text

CC 12.17

AutoCAD SHX Text

CC 12.08

AutoCAD SHX Text

CC 12.01

AutoCAD SHX Text

CC 13.00

AutoCAD SHX Text

CC 12.95

AutoCAD SHX Text

AC 11.35

AutoCAD SHX Text

AC 11.22

AutoCAD SHX Text

AC 11.15

AutoCAD SHX Text

AC 11.07

AutoCAD SHX Text

CC 12.79

AutoCAD SHX Text 11.37

AutoCAD SHX Text 11.37

AutoCAD SHX Text 11.56

AutoCAD SHX Text 11.89

AutoCAD SHX Text 12.09

AutoCAD SHX Text 12.22

AutoCAD SHX Text 12.36

AutoCAD SHX Text 12.39

AutoCAD SHX Text 12.42

AutoCAD SHX Text 12.38

AutoCAD SHX Text 12.39

AutoCAD SHX Text 12.35

AutoCAD SHX Text 12.38

AutoCAD SHX Text 12.37

AutoCAD SHX Text 12.42

AutoCAD SHX Text 12.43

AutoCAD SHX Text 12.43

AutoCAD SHX Text 12.47

AutoCAD SHX Text 12.39

AutoCAD SHX Text 12.42

AutoCAD SHX Text 12.38

AutoCAD SHX Text 12.38

AutoCAD SHX Text 12.35

AutoCAD SHX Text 12.33

AutoCAD SHX Text 12.33

AutoCAD SHX Text 12.18

AutoCAD SHX Text 12.23

AutoCAD SHX Text 12.09

AutoCAD SHX Text 11.31

AutoCAD SHX Text 11.39

AutoCAD SHX Text 11.40

AutoCAD SHX Text 11.40

AutoCAD SHX Text 10.98

AutoCAD SHX Text 11.03

AutoCAD SHX Text 11.05

AutoCAD SHX Text 11.04

AutoCAD SHX Text 12.71

AutoCAD SHX Text 12.90

AutoCAD SHX Text 11.29

AutoCAD SHX Text 11.16

AutoCAD SHX Text 10.90

AutoCAD SHX Text 10.94

AutoCAD SHX Text 10.87

AutoCAD SHX Text 10.90

AutoCAD SHX Text 10.86

AutoCAD SHX Text 10.94

AutoCAD SHX Text 10.97

AutoCAD SHX Text 11.02

AutoCAD SHX Text 11.01

AutoCAD SHX Text 11.12

AutoCAD SHX Text 11.11

AutoCAD SHX Text 11.12

AutoCAD SHX Text 11.20

AutoCAD SHX Text 11.17

AutoCAD SHX Text 11.35

AutoCAD SHX Text 11.38

AutoCAD SHX Text 11.38

AutoCAD SHX Text 11.39

AutoCAD SHX Text 11.33

AutoCAD SHX Text 11.23

AutoCAD SHX Text 11.16

AutoCAD SHX Text 11.15

AutoCAD SHX Text 10.96

AutoCAD SHX Text 11.06

AutoCAD SHX Text 11.11

AutoCAD SHX Text

CC 12.97

AutoCAD SHX Text 12.95

AutoCAD SHX Text 12.89

AutoCAD SHX Text 12.89

AutoCAD SHX Text 12.84

AutoCAD SHX Text 12.75

AutoCAD SHX Text 12.79

AutoCAD SHX Text 12.80

AutoCAD SHX Text 12.84

AutoCAD SHX Text 12.84

AutoCAD SHX Text 12.89

AutoCAD SHX Text 12.94

AutoCAD SHX Text 12.87

AutoCAD SHX Text 12.76

AutoCAD SHX Text 12.74

AutoCAD SHX Text 12.73

AutoCAD SHX Text 12.75

AutoCAD SHX Text 12.72

AutoCAD SHX Text 12.75

AutoCAD SHX Text 12.67

AutoCAD SHX Text 12.48

AutoCAD SHX Text 12.48

AutoCAD SHX Text 12.51

AutoCAD SHX Text 12.05

AutoCAD SHX Text 12.06

AutoCAD SHX Text

CC 12.47

AutoCAD SHX Text

CC 12.36

AutoCAD SHX Text

CC 12.51

AutoCAD SHX…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .