Plans _ Exhibit 1.pdf
PDF 20 MB Posted
- Solicitation number
- PE-65600-NONST-2024-000000034
- Issued by
- Dodge County, Georgia
About this file
This document appears to be a set of plans and exhibits for a state or local government contract opportunity. The project involves [summarize key details from the document, such as the products/services requested, project overview, quantities, response/due dates, site visits, bidder's meetings, award dates, contract term and renewal options].
Regarding pricing and other salient details, the document outlines [summarize key pricing terms, set asides, incumbents, funding requirements and sources, and any other relevant information from the document].
View the file
Other files
| File | Type | Posted |
|---|---|---|
| _2358_B Kiwanis Park Pickleball Court Constru.pdf | ||
| _2358_B Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet List Table Sheet Title Sheet Number
COVER SHEET G-001
SURVEY V-001
GENERAL CIVIL NOTES, LEGENDS, AND
ABBREVIATIONS C-001
DEMOLITION PLAN CD101
SITE PLAN CS101
SITE LAYOUT PLAN CS201
EROSION AND SEDIMENT CONTROL NOTES AND
LEGEND CE001
EROSION AND SEDIMENT CONTROL NOTES AND
LEGEND CE002
GRADING, PROFILE, AND EROSION CONTROL PLAN CG101
EROSION AND SEDIMENT CONTROL DETAILS CE501
EROSION AND SEDIMENT CONTROL DETAILS CE502
EROSION AND SEDIMENT CONTROL DETAILS CE503
SITE DETAILS C-501
SITE DETAILS C-502
SITE DETAILS C-503
SITE DETAILS C-504
LANDSCAPE NOTES L-001
LANDSCAPE PLAN LP101
LANDSCAPE DETAILS L-501
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
FAYETTE COUNTY PARKS AND RECREATION
KIWANIS PARK PICKLEBALL COURTS
CONSTRUCTION DOCUMENTS FOR
APRIL 20, 2023
100% PERMIT SUBMITTAL
FAYETTE COUNTY PROJECT NUMBER: 226AE
IT IS THE OWNER'S/DEVELOPER'S RESPONSIBILITY TO BE IN COMPLIANCE WITH
APPLICABLE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES)
PERMIT AND CLEAN WATER ACT REQUIREMENTS.
DESIGN TEAM
POND AND COMPANY
3500 PARKWAY LANE SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE (678) 336-7740
FAX (678) 336-7744
WEB: www.pondco.com
PROJECT MANAGER:
SYDNEY THOMPSON, PLA
ThompsonS@pondco.com
CLIENT INFORMATION
OWNER CONTACT (24-HR):
ANITA GODBEE
PHONE (770) 716-4321
agodbee@fayettecountyga.gov
CLIENT INFORMATION:
FAYETTE COUNTY PARKS AND RECREATION
140 STONEWALL AVE W
FAYETTEVILLE, GA 30214
LAND LOT 69, 5TH DISTRICT, FAYETTE COUNTY, GA.
PROJECT
SITE
SCALE: NTS
VICINITY MAP
PROJECT DESCRIPTION:
THE COUNTY IS INSTALLING FOUR (4) PICKLEBALL COURTS IN KIWANIS PARK.
THE PROJECT DESIGN INCLUDES HARDSCAPE, GRADING, AND
INFRASTRUCTURE ASSOCIATED WITH THE INSTALLATION OF THE COURTS. AS
WELL AS REQUIRED EROSION, SEDIMENTATION, AND POLLUTION CONTROL.
PROJECT INFORMATION:
DISTURBED AREA: 0.72 ACRES
REFERENCE DATUM: NAD 1983 (2011)- STATE PLANE COORDINATE SYSTEM OF
GEORGIA - WEST ZONE. VERTICAL IS NAVD 1988.
PROJECT SPECIFICATION:
THE CONTRACTOR SHALL REFER TO AND USE THE SUPPLIED COUNTY
PROJECT SPECIFICATIONS.
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\G
-0
PL
O
TT
ED
B
Y:
T
H O
M
PS
O N
, S
YD
N
EY
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
COVER
SHEET
G-001DESIGN PROFESSIONAL:
MATTHEW FELTS, P.E.
LEVEL II CERTIFICATION
No.: 0000087020
EXPIRES : 05/01/2025
CIVIL ENGINEER
MATTHEW FELTS, P.E.
FeltsM@pondco.com
PROJECT SITE
SCALE: NTS
FEMA FLOOD MAP- 13113C0111E EFFECTIVE DATE 09/26/2008
T C
ETIHCRAEPACSD
N
A No. 001801
PROFESSIONAL
L
DERE
REGIST
04/12/2023
EXHIBIT 1
V-001
8"RCP
8"RCP
8"RCP
8"RCP
EXISTING 8" PVC MAIN
PER COUNTY MARK-UPS.
CIVIL GENERAL NOTES:
1. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY,
STATE, AND FEDERAL REGULATIONS APPLICABLE TO
CONSTRUCTION OF THIS SITE.
2. ALL LABOR, MATERIALS, AND METHODS OF CONSTRUCTION
SHALL BE IN STRICT ACCORDANCE WITH THE MINIMUM
ENGINEERING AND CONSTRUCTION STANDARDS ADOPTED BY
FAYETTE COUNTY. WHERE CONFLICTS OR OMISSIONS EXIST,
FAYETTE COUNTY STANDARDS SHALL DICTATE.
SUBSTITUTIONS AND DEVIATION FROM PLANS AND
SPECIFICATIONS SHALL BE PERMITTED ONLY WHEN WRITTEN
APPROVAL HAS BEEN ISSUED BY FAYETTE COUNTY .
3. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES,
CENTERLINE OF UTILITY, CENTER OF MANHOLE OR CATCH
BASIN, CENTERLINE OF ROAD, FACE OF BUILDING, FACE OF
CURB, FACE OF WALL, OR CENTERLINE OF STRIPING UNLESS
OTHERWISE NOTED.
4. ALL REQUIRED EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE PROVIDED, INSTALLED, AND MAINTAINED AS
REQUIRED BY LOCAL, STATE, AND FEDERAL REQUIREMENTS.
5. CONTRACTOR TO MOVE ALL CONSTRUCTION DEBRIS OFF THE
PROPERTY AND DISPOSE DEBRIS AT A LEGAL, PERMITTED
LANDFILL CONSISTENT WITH ALL LOCAL, STATE, AND FEDERAL
REQUIREMENTS.
6. NO BURNING IS ALLOWED ON FAYETTE COUNTY.
7. CONTRACTOR TO ENSURE ALL EXISTING TOPS OF MANHOLES
AND VALVE BOXES ARE RAISED OR LOWERED TO BE FLUSH
WITH FINISHED GRADES, UNLESS NOTED OTHERWISE.
8. ALL NEW PAVEMENT AND SIDEWALKS SHALL BE CONSTRUCTED
FLUSH WITH EXISTING, WITH NO PONDING OF STORMWATER,
UNLESS NOTED OTHERWISE.
9. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO
ENSURE POSITIVE DRAINAGE AWAY FROM ALL BUILDINGS AND
TO DRAINAGE STRUCTURES OR DITCHES. NATURAL FLOW OF
SURROUNDING WATERS SHALL NOT BE DISTURBED DURING
CONSTRUCTION, UNLESS SHOWN OTHERWISE.
10. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS,
COORDINATES, AND DIMENSIONAL INFORMATION PRIOR TO
CONSTRUCTION. THE CONTRACTOR SHALL BRING ALL
DISCREPANCIES TO THE ATTENTION OF FAYETTE COUNTY .
11. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN
ACCORDANCE WITH THE GEORGIA DEPARTMENT OF
TRANSPORTATION (GDOT).
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING INSTALLATION OF ALL NEW UTILITIES WITH
THOSE THAT ARE EXISTING. IF EXISTING UTILITIES ARE IN
CONFLICT WITH NEW UTILITIES, THE SITE CONTRACTOR SHALL
NOTIFY FAYETTE COUNTY .
13. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE
STOCKPILED IN AN APPROVED AREA DURING CONSTRUCTION.
EXCESS OR UNUSABLE TOPSOIL SHALL BE DISPOSED OF
OFF-SITE IN A MANNER THAT IS LEGAL AND CONSISTENT WITH
ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS. ANY SOIL
REMOVED FROM FAYETTE COUNTY AND RELOCATED OR
REUSED IS REQUIRED TO BE TESTED IN ACCORDANCE WITH
FAYETTE COUNTY SOIL REUSE POLICY.
14. THE LOCATION OF ALL EXISTING UTILITIES AND STORM
DRAINAGE SHOWN ON THE PLANS HAVE BEEN DETERMINED
FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN FOR
THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER
ASSUMES NO RESPONSIBILITY FOR INACCURACY. PRIOR TO
THE START OF ANY CONSTRUCTION ACTIVITY IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE VARIOUS
UTILITIES AND TO MAKE THE NECESSARY ARRANGEMENTS FOR
ANY RELOCATION OF THESE UTILITIES WITH FAYETTE COUNTY .
THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING
UNDERGROUND UTILITIES, WHETHER SHOWN ON THE PLAN OR
LOCATED BY THE UTILITY COMPANY. ALL UTILITIES WHICH
INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE
BROUGHT TO THE ATTENTION OF FAYETTE COUNTY . ANY FEES
ASSOCIATED WITH UTILITY RELOCATIONS SHALL BE BORNE BY
THE CONTRACTOR IN ACCORDANCE WITH RESPECTIVE UTILITY
COMPANY STANDARDS. THE CONTRACTOR SHALL COORDINATE
DISCONNECTION OF EXISTING UTILITIES WITH THE
APPROPRIATE UTILITY PROVIDER.
15. UTILITIES INDICATED SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE
SPECIFICATIONS. GRADING SHALL BE AS INDICATED, AND
SHALL PRODUCE A FINISHED SURFACE WITH NO PONDING OF
WATER, READY TO RECEIVE PLANTING MATERIALS OR
GRASSING.
16. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
ENSURE THAT ALL REQUIRED PERMITS ARE OBTAINED AND IN
HAND BEFORE BEGINNING ANY CONSTRUCTION. NO
CONSTRUCTION OR FABRICATION OF ANY ITEM SHALL BEGIN
UNTIL THE CONTRACTOR HAS RECEIVED ALL PLANS AND ANY
OTHER DOCUMENTATION FROM ALL OF THE PERMITTING AND
ANY OTHER REGULATORY AUTHORITIES. ANY PENALTIES,
STOP WORK ORDERS OR ADDITIONAL WORK RESULTING FROM
THE CONTRACTOR BEING IN VIOLATION OF THE ABOVE
REQUIREMENTS, SHALL BE FULLY BORNE BY THE
CONTRACTOR.
17. ALL CONTRACTORS/SUBCONTRACTORS THAT WILL BE
ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY
WITH ALL EROSION, SEDIMENTATION AND POLLUTION CONTROL
AND STORMWATER POLLUTION PREVENTION REQUIREMENTS
CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS,
AND PERMITS.
18. AREAS DISTURBED BY THE CONTRACTOR, WHICH ARE NOT
PART OF THIS PROJECT, SHALL BE RETURNED TO ORIGINAL OR
BETTER CONDITION PRIOR TO THE COMPLETION OF THE
PROJECT AS DETERMINED BY FAYETTE COUNTY .
19. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE,
TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS
SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS
ALSO RESPONSIBLE FOR COMPLYING WITH ALL HEALTH AND
SAFETY PRECAUTIONS AS REQUIRED BY THE APPLICABLE
REGULATORY AGENCY.
20. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING,
SHORING AND TEMPORARY SUPPORTS, ETC. ARE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
21. PROTECT ALL EXISTING FEATURES AND EXISTING
LANDSCAPING THAT WILL REMAIN. ANY ITEM DAMAGED DURING
THE PERFORMANCE OF THE WORK WILL BE RESTORED TO
ORIGINAL CONDITION, OR REPLACED WITH NEW AT THE
CONTRACTOR'S EXPENSE. CONTRACTOR SHALL TAKE
PRECAUTIONS TO AVOID OVERLOADING PAVEMENTS WHICH
WILL REMAIN.
22. EACH SHEET IS PART OF A MULTI-SHEET SET OF
CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL
SET TO BEST ENSURE PROPER INTERPRETATION.
23. SHEET KEYNOTES ON THE PLANS ARE SPECIFIC TO THAT
SHEET ONLY. MISSING SEQUENTIAL NUMBERS DO NOT APPLY
TO THAT SHEET.
CIVIL DEMOLITION NOTES
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS
ENTIRETY. RESTORE GRADES AND SURFACE IMPROVEMENTS
TO MATCH EXISTING CONDITIONS OR PER REQUIREMENTS OF
NEW WORK, WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND
TEMPORARY CONSTRUCTION FENCING SHALL BE IN PLACE
PRIOR TO COMMENCEMENT OF DEMOLITION WORK.
3. CONTRACTOR SHALL ESTABLISH SURVEY CONTROL NETWORK
OUTSIDE LIMITS OF DEMOLITION PRIOR TO COMMENCEMENT
OF WORK. THIS WORK MUST BE PERFORMED BY LICENSED &
REGISTERED GEORGIA LAND SURVEYOR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH
CONTRACTOR'S SCHEDULE, LOGISTICS PLAN (APPROVED BY
FAYETTE COUNTY ), EROSION, SEDIMENTATION AND POLLUTION
CONTROL PLAN PRIOR TO WORK.
CIVIL SITE NOTES
1. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL
NECESSARY BARRICADES AROUND THE WORK AND PROVIDE
PROTECTION AGAINST WATER DAMAGE AND SOIL EROSION.
2. ALL BUILDING DIMENSIONS SHALL BE VERIFIED AND
COORDINATED WITH THE ARCHITECTURAL PLANS.
3. PAVEMENT MARKINGS, INCLUDING ANY STANDARD HANDICAP
SYMBOLS, PARKING STRIPING AND TRAFFIC ARROWS, SHALL BE
PAINTED ON PAVEMENT AT LOCATIONS SHOWN.
4. ALL SIGNAGE SHALL CONFORM TO THE MOST RECENT GDOT
STANDARDS AND SPECIFICATIONS.
5. THE PROPERTY IS NOT LOCATED IN A 100 YEAR FLOOD HAZARD
AREA BASED ON THE FLOOD INSURANCE RATE MAP FOR THIS
AREA. THE MAP NUMBER FOR THIS AREA IS 13067C0119H AND
THE DATE OF SAID MAP IS 03/04/2013. SEE G-001 FOR FEMA MAP.
GRADING AND DRAINAGE NOTES
1. POSITIVE DRAINAGE SHALL BE MAINTAINED AT ALL TIMES TO
PREVENT SATURATION OF EXPOSED SOILS IN CASE OF SUDDEN
RAINS, AND FOR ALL FINISHED GRADING. CONTRACTOR SHALL
LOCATE ALL EXISTING UTILITIES PRIOR TO ANY EXCAVATION.
2. CONTRACTOR SHALL INSTALL ALL PERIMETER EROSION AND
SEDIMENT CONTROL MEASURES PRIOR TO ANY SITE CLEARING
OR EXCAVATION. CONTRACTOR SHALL INSPECT ALL SEDIMENT
AND EROSION CONTROL MEASURES DAILY AND DURING
PROLONGED PERIODS OF CONTINUOUS RAINFALL EVENTS TO
ENSURE THAT ALL CONTROLS ARE FUNCTIONING PROPERLY.
DAMAGED CONTROLS SHALL BE REPLACED BY THE END OF THE
WORKDAY.
3. ALL BACKFILL AND FILL MATERIAL SHALL BE FREE OF ORGANIC
MATTER AND WASTE.
4. THE CONTRACTOR SHALL REMOVE ALL EROSION CONTROL
FENCING FROM THE SITE PRIOR TO FINAL PROJECT
ACCEPTANCE, AND SHALL SMOOTH THE GROUND SURFACE
WHERE THE FENCE WAS REMOVED THEN MULCH OR SEED &
STRAW (SEASON APPROPRIATE GRASS) THE RESTORED
SURFACE AS SUNLIGHT CONDITIONS WARRANT.
5. CONTRACTOR SHALL MARK, PRESERVE AND PROTECT ALL
SURVEY BENCHMARKS. IF BENCHMARK MUST BE DEMOLISHED
FOR CONSTRUCTION, CONTRACTOR SHALL RELOCATE
BENCHMARK AND PROVIDE NEW DATA ON AS-BUlLTS.
6. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER (SEE
PLANS).
7. ALL SPOT ELEVATIONS NOTED ARE FINISH GRADE.
SHEET NAMING CONVENTION
C-001
2 DIGIT SEQUENTIAL # (01-99)
(FIRST DIGIT INDICATES PLAN
TYPE. SECOND DIGIT INDICATES
FLOOR)
1 DIGIT SHEET TYPE DESIGNATOR
0 - GENERAL
2 - PROFILES
3 - SECTIONS
4 - ENLARGED PLANS
6 - SCHEDULES AND DIAGRAMS
9 - 3D VIEWS (ISO, PERSPECTIVES,
PHOTOS)
2 DIGIT DESCIPLINE
DESIGNATOR
(IF ONLY ONE LETTER IS
USED, THE SECOND
LETTER IS REPLACED
WITH A DASH "-" AS A
PLACEHOLDER)**
PROJECT CONTACTS:
DESIGN PROFESSIONAL FOR THIS PROJECT IS:
POND
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
P: (678) 336.7740
CONTACT: SYDNEY THOMPSON
1 - PLANS
5 - DETAILS
7 - USER DEFINED
8 - USER DEFINED
NOTE:
1. NOT ALL ABBREVIATIONS SHOWN WILL BE USED ON THIS
PROJECT.
CIVIL ABBREVIATIONS
@ AT
& AND
AGG. AGGREGATE
& AND
ALT ALTERNATE
B&B ??L-501
BLDG BUILDING
CAL CALIPER
CH CHAINLINK
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CERTIFICATE OF OCCUPANCY
CONC CONCRETE
CRZ CONTAMINATE REDUCTION ZONE
DI DROP INLET
DBH DIAMETER AT BREAST HEIGHT
EX EXISTING
FFE FINISHED FLOOR ELEVATION
FT FEET
GAL GALLON
G.C. GENERAL CONTRACTOR
GV GAS VALVE
HDPE HIGH-DENSITY POLYETHYLENE
HT HEIGHT
ISA INTERNATIONAL SOCIETY OF
ARBORICULTURE
INV INVERT
HORZ HORIZONTAL
HYD HYDRANT
ICV IRRIGATION CONTROL VALVE
JB JUNCTION BOX
JT. JOINT
LF LINEAR FEET
LOD LIMITS OF DISTURBANCE
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MM MILLIMETER
N.T.S. NOT TO SCALE
OR ORANGE
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RB&C REBAR AND CAP
RCP REINFORCED CONCRETE PIPE
RFI REQUEST FOR INFORMATION
SF SQUARE FEET
SQ SQUARE
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
SWCB SINGLE WING CATCH BASIN
T TELECOMMUNICATION
TPF TREE PROTECTION FENCE
TYP TYPICAL
UFO UNDERGROUND FIBER-OPTIC
VERT VERTICAL
W WATER
W/ WITH
WWM WELDED WIRE MESH
WV WATER VALVE
Know what'sbelow.
before you dig.Call Dial 811
Or Call 800-282-7411
TRANSFORMER
OVERHEAD ELECTRIC
UNDERGROUND ELECTRIC
COMMUNICATION MANHOLET
UE
WATER METER
POWER POLE
LIGHT POLE
GAS VALVEGV
NEW DESCRIPTION
RIP RAP
SS
G
F
STORM DRAIN PIPE
GAS LINE
LIMITS OF DISTURBANCE
1' CONTOUR
35 5' CONTOUR
SPOT ELEVATION
SURFACE FLOW DIRECTION
WATER VALVE
SYMBOLS LEGEND
S
EXISTING
3 33
W
SILT FENCESF
TREE PROTECTION FENCE
TREE
DOUBLE WING CATCH BASIN
SANITARY SEWER MANHOLES
FLARED END SECTION
SIGN
N/A
N/A
N/A
N/A
SANITARY SEWER CLEANOUTCO
N/A
N/A
N/A
N/A DRAINAGE SWALE
POST INDICATOR VALVEN/A
N/A
N/A
CHAINLINK FENCEX XX X X X X
N/A E
N/A
TPF
N/A
N/A
N/A
REDUCERN/A
UC N/A
UNDERGROUND FIBER OPTICFO N/A
W WATER MAIN - DOMESTICW
N/A
18"P
N/A
W MONITORING WELL
M
HEADWALL
JUNCTION BOXN/A
ELEV
DROP INLETN/A
GRATE INLETN/A GI
DI
JUNCTION BOXJBN/A
UNDER DRAINSUD
NUMBER OF PARKING SPACES
DEMOLISH AND REMOVE
EXISTING ASPHALT AND
CONCRETE PAVEMENT
DEMOLISH SITE UTILITY
X DEMOLISH SITE FEATURE
N/A
N/A
N/A
SS
S
N/A
MAIL BOX
N/A
ELEV
UNDERGROUND ROOF DRAIN PIPE
SANITARY SEWER LINE - GRAVITY
WATER MAIN - FIRE
PROTECTION
FIRE DEPARTMENT
CONNECTION
UNDERGROUND
COMMUNICATION
FIRE HYDRANT
N/A
N/A
SPOT ELEVATION
LOD
PROPERTY LINE
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
-0
P
LO
TT
ED
B Y:
T H
O M
PS
O
N , S
YD
N
EY
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
GENERAL
CIVIL NOTES,
LEGENDS,
AND
ABBREVIATIONS
C-001
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
:9901 :1245081.2270 :2205213.9837 :883.02
DOGS ON LEASH
9"MAG
33" PINE
15"HW
13\18"MAG
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
LEGENDS ON REDWINE
GREENSPACE
PB. 42 PG. 45
TPID# 0517 3019
ASPHALT
DRIVE
ASPHALT
DRIVE
SP
EE
D
BU
MP
TENNIS
COURT
RULES
DOGS ON
LEASH
28" OAK
34" OAK
23" OAK
17/10/8" HW
9" PINE
9" PINE
11" PINE
11" PINE
11" PINE
13" PINE
10" PINE
18" PINE
12" PINE
6" PINE
8" PINE
6" PINE
6" PINE
9" PINE
12" PINE
6" PINE
6" PINE
8"RCP
8"RCP
8"RCP
EXISTING 8" PVC MAIN PER
COUNTY MARK-UPS.
TPF
O
R
TPF
OR
TP
F
OR
TPF
OR
TPF OR TPF OR
TPF
O
R
SCALE: 1" = 20'
20 20 40
SCALE:1 DEMOLITION PLAN
1" = 20'
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
D
PL
O
TT
ED
B
Y:
T
H O
M
PS
O N
, S
YD
N
EY
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
EXISTING TENNIS COURT FENCE TO REMAIN AND
BE PROTECTED THROUGHOUT CONSTRUCTION
EXISTING ELECTRICAL BOX TO REMAIN AND BE PROTECTED THROUGHOUT CONSTRUCTION.
CONTRACTOR TO FIELD LOCATE ELECTRICAL LINES. LINES SHALL BE REROUTED IF LOCATED
BENEATH PROPOSED PICKLEBALL LOCATION
EXISTING ELECTRICAL
TRANSFORMER, LINES, AND BOX TO
REMAIN AND BE PROTECTED
THROUGHOUT
CONSTRUCTION. CONTRACTOR TO
FIELD LOCATE ELECTRICAL LINES.
LINES SHALL BE REROUTED IF
LOCATED BENEATH PROPOSED
PICKLEBALL LOCATION
EXISTING SEWER INFRASTRUCTURE TO
REMAIN AND BE PROTECTED
THROUGHOUT CONSTRUCTION
EXISTING PUMP HOUSE, WELL AND ABANDONED
UNDERGROUND LINES TO BE DEMOLISHED
1. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS ENTIRETY.
RESTORE GRADES AND SURFACE IMPROVEMENTS TO MATCH
EXISTING CONDITIONS OR PER REQUIREMENTS OF NEW WORK,
WHICHEVER IS APPLICABLE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES AND
TEMPORARY CONSTRUCTION FENCING SHALL BE IN PLACE PRIOR
TO COMMENCEMENT OR CONCURRENT WITH DEMOLITION.
3. ALL LAND DISTURBANCE TO BE STABILIZED WITH VEGETATION UPON
COMPLETION OF DEMOLITION.
4. ALL TREES TO REMAIN AND HAVE PROPER PROTECTION UNLESS
APPROVED PLANS INDICATE OTHERWISE
5. ALL DEMOLITION DEBRIS TO BE HAULED OFF SITE.
6. DUMPSTERS AND TEMPORARY SANITARY FACILITIES SHALL NOT BE
LOCATED IN THE STREET OR TREE PROTECTION AREA OR OTHER
RIGHT-OF-WAY.
7. TREE PROTECTION FENCING WILL BE INSTALLED PRIOR TO ANY
LAND DISTURBING ACTIVITIES, AND MAINTAINED UNTIL FINAL
LANDSCAPING. NO PARKING, STORAGE, OR OTHER CONSTRUCTION
ACTIVITIES TO OCCUR WITHIN TREE PROTECTION AREAS. REMOVAL
OR DAMAGE OF TREES DESIGNATED AS SAVE WILL RESULT IN A
COURT SUMMONS AND WILL REQUIRE RECOMPENSE WITH 4 INCH
CALIPER TREES # TO BE DETERMINED PER INCIDENT.
8. THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS BASED ON
A SITE SURVEY BY TERRAMARK PROFESSIONAL LAND SURVEYING,
DATED APRIL 15, 2022 AND REVISITED APRIL 26,2022. ADDITIONAL
UTILITIES NOT SHOWN IN THIS PLAN MAY BE ENCOUNTERED DURING
CONSTRUCTION. CONTRACTOR TO VERIFY THE LOCATION OF ALL
UTILITIES PRIOR TO SITE DEMOLITION.
1. REFER TO SHEET C-001 FOR GENERAL CIVIL NOTES, LEGENDS,
AND ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION
PLANS AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE
PROPER INTERPRETATION.
3. SITE PLAN HATCHES FOR IDENTIFICATION ONLY. HATCH DOES NOT
REPRESENT PAVING PATTERN OR DESIRED LAYOUT AND
ORIENTATION.
4. THE CONTRACTOR BARES ALL RESPONSIBILITY FOR VERIFYING
ALL UNDERGROUND UTILITIES, PIPES, STRUCTURES, WALKS AND
CURBS IN THE FIELD PRIOR TO CONSTRUCTION. ANY DAMAGE TO
BEFORE MENTIONED INFRASTRUCTURE THAT ARE TO REMAIN
SHALL BE PREPARED IMMEDIATELY AT NO EXPENSE TO THE
OWNER. POND ASSUMES NO RESPONSIBILITY FOR ANY UTILITIES
NOT SHOWN ON PLANS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL QUANTITIES PER
DRAWINGS AND SPECIFICATIONS, ANY QUANTITIES PROVIDED BY
POND ARE FOR CONVENIENCE ONLY. NOTIFY OWNER
REPRESENTATIVE OF ANY DISCREPANCIES.
6. DETAILS DENOTED AS "TYP." IN THE TITLE BLOCK SHALL APPLY TO
ALL APPLICABLE APPLICATIONS UNLESS NOTED OTHERWISE.
7. IN THE EVENT OF ANY DISCREPANCIES FOUND IN THE DRAWINGS,
OR IF PROBLEMS ARE ENCOUNTERED DURING CONSTRUCTION,
THE CONTRACTOR SHALL BE REQUIRED TO NOTIFY THE OWNER
REPRESENTATIVE BEFORE PROCEEDING WITH THE WORK.
ORANGE TREE PROTECTION FENCE - SEE DETAIL XXX
EXISTING TREE TO REMAIN, TYP.
CRITICAL ROOT ZONE (CRZ), TYP.
LIMITS OF DISTURBANCE, TYP.
EXISTING CHAIN LINK FENCE TO BE DEMOLISHED
EXISTING CONCRETE WALKWAY TO BE DEMOLISHED DEMOLITION
PLAN
CD101
SAWCUT EXISTING
ASPHALT TO PROVIDE A
CLEAN EDGE FOR FUTURE
CURB/PAVEMENT
PROTECT EXISTING WATER METER/VALVES. EXISTING WATER LINES TO BE FIELD LOCATED
AND PROTECTED DURING CONSTRUCTION - CONTRACTOR TO COORDINATE WITH
MAINTENANCE STAFF ON LINES TO REMAIN
EXISTING TREE TO REMAIN, TYP.
EXISTING TREE TO BE REMOVED, TYP.
GENERAL SHEET NOTES
GENERAL DEMOLITION NOTES
3/L-501
SHEET LEGEND
LOD LIMITS OF DISTURBANCE
EXISTING CONTOUR
PROPOSED CONTOUR
TPF OR TREE PROTECTION FENCE - SEE DETAIL
EXISTING TREE TO REMAIN, TYP.
EXISTING TREE TO BE REMOVED, TYP.
CRITICAL ROOT ZONE, TYP.
3/L-501
EXISTING STRUCTURES TO BE
DEMOLISHED IN ENTIRETY.
DEMOLISH SECTION OF
EXISTING CURB
T C
ETIHCRAEPACSD
N
A No. 001801
PROFESSIONAL
L
DERE
REGIST
883 882
881 880
879 878
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
:9901 :1245081.2270 :2205213.9837 :883.02
33" PINE
13\18"MAG
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
LEGENDS ON REDWINE
GREENSPACE
PB. 42 PG. 45
TPID# 0517 3019
ASPHALT
DRIVE
ASPHALT
DRIVE
SP
EE
D
BU
MP
TENNIS
COURT
RULES
28" OAK
17/10/8" HW
9" PINE
9" PINE
11" PINE
11" PINE
11" PINE
13" PINE
10" PINE
18" PINE
12" PINE
6" PINE
8" PINE
6" PINE
6" PINE
9" PINE
12" PINE
6" PINE
6" PINE
TPF
O
R
TPF
OR
TP
F
O R
TPF
OR
TPF
OR
TPF OR TPF OR
TPF
O
R
TPF
O R
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
S1
P
LO
TT
ED
B Y:
T H
O M
PS
O
N , S
YD
N
EY
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
SCALE: 1" = 20'
20 20 40
SCALE:1 SITE PLAN
1" = 20'
1. CONCRETE SIDEWALK TO BE INSTALLED FLUSH WITH TOP OF EXISTING CURB -
SEE DETAIL
2. EXISTING TENNIS FACILITIES TO REMAIN
3. ADA ACCESSIBLE PARKING STALL - SEE DETAIL
4. WHEELCHAIR RAMP TYPE B - SEE DETAIL
5. PROPOSED CURB AND GUTTER. IF THERE IS NO EXISTING CURB, TAPER NEW
CURB FROM 6" HIGH TO 0" IN 4 LINEAR FEET- SEE DETAIL
6. 6' HT, 4' W CHAIN LINK SINGLE ACCESS GATE, TYP. - SEE DETAIL
7. CONTRACTOR TO CLEANLY SAWCUT EXISTING ROADWAY AS NEEDED TO
ENSURE NEW PARKING SPACES ARE FLUSH WITH EXISTING ASPHALT ROADWAY.
8. CONCRETE WHEEL STOP, TYP. - SEE DETAIL
9. PICKLEBALL COURT SURFACING - SEE DETAIL
10. ASBA PICKLEBALL COURT STRIPING - SEE DETAIL
11. ASBA PICKLEBALL NET - SEE DETAIL
12. PEDESTRIAN CONCRETE SIDEWALK - SEE DETAIL
13. CLEANLY TIE EXISTING CURB AND GUTTER
14. SEE CG101 FOR GRADING AND DRAINANGE
15. 6' CHAINLINK FENCE AT PICKLE BALL COURT PERIMETER- SEE DETAIL
16. 3' CHAINLINK FENCE AT PICKLEBALL COURT - SEE DETAIL
17. 3' HT, 3' W CHAIN LINK SINGLE ACCESS GATE, TYP. - SEE DETAIL
PROPOSED CONCRETE PAVING - SEE DETAIL
LOD LOD LIMITS OF DISTURBANCE
EXISTING CONTOUR
PROPOSED CURB AND GUTTER - SEE DETAIL
PROPOSED ASPHALT PAVING - SEE DETAIL
1. REFER TO SHEET C-001 FOR GENERAL CIVIL NOTES, LEGENDS, AND
ABBREVIATIONS.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
3. REFER TO SHEET CD101 FOR TREE REMOVAL AND DEMOLITION PLAN.
4. CONTRACTOR SHALL HAVE ALL UTILITIES FIELD LOCATED PRIOR TO
START OF CONSTRUCTION.
SHEET KEYNOTES
GENERAL SHEET NOTES
SHEET LEGEND
PROPOSED CONTOUR
1/C-502
4/C-501
3/C-501
PROPOSED CHAINLINK FENCE - SEE DETAIL
SITE PLAN
CS101
4/C-502 3/C-502
6/C-501
2/C-502
7/C-501
3/C-501
1/C-501
EXISTING TREE TO REMAIN, TYP.
CRITICAL ROOT ZONE, TYP.
4/C-501 5/C-502
5/C-501
5/C-501
TPF OR TREE PROTECTION FENCE - SEE DETAIL3/L-501
1/C-502
1/C-502 2/C-502
T C
ETIHCRAEPACSD
N
A No. 001801
PROFESSIONAL
L
DERE
883 882
881 880
879 878
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
:9901 :1245081.2270 :2205213.9837 :883.02
33" PINE
13\18"MAG
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
LEGENDS ON REDWINE
GREENSPACE
PB. 42 PG. 45
TPID# 0517 3019
ASPHALT
DRIVE
ASPHALT
DRIVE
SP
EE
D
BU
MP
28" OAK
17/10/8" HW
9" PINE
9" PINE
11" PINE
11" PINE
11" PINE
13" PINE
10" PINE
18" PINE
12" PINE
6" PINE
8" PINE
6" PINE
6" PINE
9" PINE
12" PINE
6" PINE
6" PINE
EXISTING 8" PVC MAIN PER
COUNTY MARK-UPS.
TPF
O
R
TPF
OR
TP
F
O R
TPF
OR
TPF
OR
TPF OR TPF OR
TPF
O
R
TPF
O R
N:1245095.81 E:2205521.08
N:1245036.28 E:2205528.53
N:1245075.86 E:2205279.62
N:1245046.58 E:2205353.54
N:1245081.90 E:2205409.94
N:1245028.22 E:2205512.46
N:1245011.42 E:2205420.47
N:1245055.83 E:2205395.06
N:1245157.25 E:2205245.72
N:1245047.31 E:2205348.43
N:1245050.99 E:2205331.84
N:1245153.03 E:2205222.56
5'-5"
6'-0"
9'-0"TYP.
112'-0"
60'-0"
6'-0"
'-6
TY
P.
'-0
TY
P.
N:1245083.32 E:2205270.71
18'-0"
11'-6"
18'-0"6' -0
R
3' -6
R6"
R6"
R5'-0"
N:1245028.04 E:2205356.35
24'-0"
R3'-0"
R 5'
-0
N:1245015.67 E:2205412.19
16'-6"
TYP.
19'-0"
TYP.
9'-0"
TYP.
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
S1
P
LO
TT
ED
B Y:
T H
O M
PS
O
N , S
YD
N
EY
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
SCALE: 1" = 20'
20 20 40
SCALE:1 LAYOUT PLAN
1" = 20'
1. REFER TO CS101 FOR MORE INFORMATION.
2. THIS SHEET IS PART OF A MULTI-SHEET SET OF CONSTRUCTION PLANS
AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
GENERAL SHEET NOTES
SHEET LEGEND
SITE LAYOUT
PLAN
CS201
PROPOSED CONCRETE PAVING - SEE DETAIL
LOD LOD LIMITS OF DISTURBANCE
EXISTING CONTOUR
PROPOSED CURB AND GUTTER - SEE DETAIL
PROPOSED ASPHALT PAVING - SEE DETAIL
PROPOSED CONTOUR
4/C-501
3/C-501
PROPOSED CHAINLINK FENCE - SEE DETAIL
EXISTING TREE TO REMAIN, TYP.
CRITICAL ROOT ZONE, TYP.
5/C-501
TPF OR TREE PROTECTION FENCE - SEE DETAIL3/L-501
1/C-502
T C
ETIHCRAEPACSD
N
A No. 001801
PROFESSIONAL
L
DERE
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
E0
P
LO
TT
ED
B Y:
T H
O M
PS
O
N , S
YD
N
EY
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
EROSION AND
SEDIMENT
CONTROL
NOTES AND
LEGEND
CE001Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411
DESIGN PROFESSIONAL:
MATTHEW FELTS, P.E.
LEVEL II CERTIFICATION
No.: 0000087020
EXPIRES : 05/01/2025
NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25- OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND
PERMITS..
AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC
COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A SECTION
404 PERMIT.
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL
MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
ALL BUFFERS AND TREE SAVE AREAS SHALL BE CLEARLY IDENTIFIED WITH FLAGGING AND/OR FENCING PRIOR TO
COMMENCEMENT OF ANY LAND DISTURBANCE.
SEDIMENT STORAGE MAINTENANCE INDICATORS MUST BE INSTALLED IN SEDIMENT STORAGE STRUCTURES, INDICATING THE 1/3 FULL VOLUME.
DISTURBED AREA: 0.71 ACRES
TOTAL SITE AREA: 19 ACRES
24-HOUR EROSION AND SEDIMENT CONTROL CONTACT:
NAME OF RECEIVING WATERS: UNKNOWN TRIBUTARY TO PERRY CREEK (NOT IMPAIRED)
AREA OF ON-SITE WETLANDS: 0 AC
ANITA GODBEE (770) 716-4321
PROPOSED LAND USE:
EXISTING LAND USE: OPEN SPACE ADJACENT TO EXISTING PARK PROGRAMMING ELEMENTS (INCLUDING TENNIS
COURTS, PARKING, AND BASEBALL COURTS.
THE PROJECT CONSIST OF INSTALLING FOUR (4) PICKLEBALL COURTS IN KIWANIS
PARK. THE PROJECT DESIGN INCLUDES HARDSCAPE, GRADING, AND
INFRASTRUCTURE ASSOCIATED WITH THE INSTALLATION OF THE COURTS. AS WELL
AS REQUIRED EROSION SEDIMENTATION, AND POLLUTION CONTROL.
CONTRACTOR: TO BE DETERMINED
GPS COORDINATES OF SITE: 33.42249930961369,-84.46618507872655
EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN GENERAL NOTES
OWNER/
PEACHTREE CORNERS, GEORGIA 30092
PHONE: (678) 336-7740
FAX: (678) 336-7744
ENGINEER: POND & COMPANY
3500 PARKWAY LANE, SUITE 500
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO. GAR 100001.)
PRIMARY
PERMITEE:
DESIGN PROFESSIONAL CERTIFICATION:
I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER MY DIRECT SUPERVISION.
MATT FELTS, P.E. DATE
GSWCC LEVEL II CERTIFICATION # 0000087020
EXPIRES: 05/01/2025
CONTACT: MATTHEW FELTS, PE
E&S LEVEL II CERTIFICATION # 0000087020 EXPIRES: 05/01/2025
FAYETTE COUNTY PARKS AND RECREATION DEPARTMENT
ANITA GODBEE, DIRECTOR
140 STONEWALL AVE. W.,
FAYETTEVILLE, GA. 30214
PHONE: (770) 716-4321
AGODBEE@FAYETTECOUNTYGA.GOV
PLAN
NORTH
SCALE: NTS
FEMA FLOOD MAP - 13113C0112E
DATED 09/26/2008
THERE ARE NO KNOWN WETLANDS LOCATED WITHIN 200 FEET OF PROJECT AREA.
STATE WATERS DO NOT EXIST WITHIN 200 FEET OF PROJECT AREA.
Altavista sandy loam, 0 to 3 percent slopes
SOILS LEGEND
AkA
SYMBOL DESCRIPTION
SOIL MAP
Appling sandy loam, 2 to 6 percent slopesAmB
ACTIVITY SCHEDULE (FOR PERMITTING REFERENCE ONLY)
ACTIVITY
TIME / 16 WEEKS
654321
INSTALL SILT FENCE, CONSTRUCTION EXIT
PERMANENT SEEDING
7 8 9 10 11 12
CLEARING AND GRUBBING
ROUGH GRADING OPERATIONS
INSTALLATION OF PROPOSED CULVERTS
FINAL PAVING AND GRADING
DEMOLITION OF SURFACE PAVEMENT, OR ANY
OTHER MISCELLANEOUS REQUIRED BMP ,
FENCES, EXISTING CULVERTS AND UTILITY
POLES
INSTALL REMAINDER OF INITIAL PERIMTER
CONTROLS INCLUDING SEDIMENT BASINS,
CHECK DAMS, ROCK DAMS, DIVERSION BERMS,
ROCK FILTER, DOWN DRAINS, INLET SEDIMENT
TRAPS, AND FILTER RINGS,
REMOVAL OF TEMPORARY EROSION
AND SEDIMENT CONTROL MEASURES
MAINTENANCE OF TEMPORARY EROSION
AND SEDIMENT CONTROL MEASURES
13 14 15 16
UTILITY RELOCATION
SITE
Cartecay loam, 0 to 2 percent slopes, frequently floodedCA Cecil sandy loam, 2 to 6 percent slopesCeB Cecil sandy loam, 6 to 10 percent slopesCeC Cecil sandy clay loam, 6 to 10 percent slopes, erodedCfC2 Pacolet sandy loam, 10 to 25 percent slopesPaE WaterW Wehadkee soils, 0 to 2 percent slopes, frequently floodedWH
SITE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
E0
P
LO
TT
ED
B Y:
T H
O M
PS
O
N , S
YD
N
EY
D
AT
E:
0/
2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.
ST/MF
AB/JU
ST
ST/MF
EROSION AND
SEDIMENT
CONTROL
NOTES AND
LEGEND
CE002Know what's below.
before you dig.Call Dial 811
Or Call 800-282-7411
STRUCTURAL PRACTICES:
THE STRUCTURAL PRACTICES SHOWN ON THIS PLAN HAVE BEEN DESIGNED TO REDUCE EROSION &
SEDIMENTATION OF DISTURBED AREAS.
SILT FENCE (SD1-TYPE "S"), TEMPORARY SEDIMENT BASINS, AND DIVERSION DITCHES WILL BE INSTALLED PRIOR TO CLEARING AND GRADING OPERATIONS TO KEEP SEDIMENT CONTAINED WITHIN THE SITE AS NECESSARY.
DISTURBED AREA STABILIZATION SHALL BE STABILIZED WITH MULCH (Ds1), TEMPORARY SEEDING (Ds2), AND PERMANENT SEEDING (Ds3) AS NECESSARY. INLET SEDIMENT TRAP PROTECTION WILL BE USED TO HELP PREVENT SEDIMENT FROM ENTERING ANY EXISTING INLETS. SEDIMENT STORAGE OF 67 CY PER DISTURBED
ACRE IS PROVIDED BY TEMPORARY SEDIMENT BASINS.
CRITICAL WORK ZONE:
ALL SLOPES 3:1 OR STEEPER AND HIGHER THAN 5 FEET, AND ALL SLOPES ADJACENT TO BUFFERS SHALL RECEIVE SURFACE ROUGHENING, AND EROSION CONTROL MATTING. SILT FENCING WILL BE USED TO PREVENT SEDIMENT FROM LEAVING THE DISTURBED AREA. INLET PROTECTION WILL BE USED TO PREVENT SEDIMENT
FROM ENTERING THE STORM SEWER.
CONSTRUCTION PERIOD STORM WATER POLLUTANT CONTROL:
SEDIMENTATION AND FUEL SPILLS ARE POTENTIAL SOURCES OF STORM WATER POLLUTION DURING THE CONSTRUCTION PROCESS. THESE POLLUTANTS WILL BE REMOVED AND/OR REDUCED VIA THE BMP'S
CONTAINED WITHIN THIS PLAN
STABILIZATION MEASURES:
THE STABILIZATION MEASURES SHOWN ON THESE PLANS HAVE BEEN DESIGNED TO STABILIZE THE DISTURBED AREAS FOLLOWING THE TEMPORARY OR PERMANENT COMPLETION OF CONSTRUCTION. ALL EXPOSED AREAS SHALL BE STABILIZED WITH TEMPORARY MULCHING (DS1) IMMEDIATELY AFTER TRENCHING IF THEY ARE TO REMAIN INACTIVE FOR 14 DAYS OR MORE. ALL DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY (DS2) OR PERMANENT (DS3) VEGETATION AS INDICATED ON THE PLAN. SLOPES GREATER 3:1 ARE TO BE STABILIZED WITH EROSION CONTROL MATTING (MB). DUST CONTROL (DU) SHALL ALSO BE PROVIDED AS NEEDED DURING GRADING ACTIVITIES. SEE EROSION, SEDIMENTATION, AND POLLUTION CONTROL (ESPCP) DETAIL SHEETS FOR
MORE DETAILS REGARDING THESE STABILIZATION MEASURES.
STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR
PERMANENTLY CEASED, EXCEPT:
WHERE THE INITIATION OF STABILIZATION MEASURES BY THE 14TH DAY AFTER CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASED IS PRECLUDED BY SNOW COVER OR OTHER ADVERSE WEATHER
CONDITIONS, STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICAL.
WHERE CONSTRUCTION ACTIVITY WILL RESUME ON A PORTION OF THE SITE WITHIN 21 DAYS FROM WHEN ACTIVITIES CEASED (E.G. THE TOTAL TIME PERIOD THAT CONSTRUCTION ACTIVITY IS TEMPORARILY CEASED IS LESS THAN 21 DAYS) THEN STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE
SITE BY THE 14TH DAY AFTER CONSTRUCTION ACTIVITY TEMPORARILY CEASED.
KEEPING PLANS CURRENT:
THE PRIMARY, SECONDARY OR TERTIARY PERMITTEES, AS APPLICABLE, SHALL AMEND THEIR PLAN WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION , OR MAINTENANCE, WHICH HAS A SIGNIFICANT EFFECT ON BMPS WITH A HYDRAULIC COMPONENT (I.E., THOSE BMPS WHERE THE DESIGN IS BASED UPON RAINFALL INTENSITY, DURATION AND RETURN FREQUENCY STORMS) OR IF THE PLAN PROVES TO BE INEFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING POLLUTANTS FROM SOURCES IDENTIFIED UNDER PART IV.D.3. OF THIS PERMIT. AMENDMENTS TO THE PLAN MUST BE CERTIFIED BY A DESIGN PROFESSIONAL AS PROVIDED IN THIS PERMIT. SECONDARY PERMITTEES MUST NOTIFY THE PRIMARY PERMITTEE WITHIN 24-HOURS OF BECOMING AWARE OF ANY SUSPECTED BMP DESIGNED DEFICIENCIES WHICH ARE NOT EFFECTIVE IN CONTROLLING THE DISCHARGE OF POLLUTANTS FROM THE SECONDARY PERMITTEE'S SITE. THE PRIMARY PERMITTEE MUST EVALUATE WHETHER THESE DEFICIENCIES EXIST WITHIN 48-HOURS OF SUCH NOTICE, AND IF THESE DEFICIENCIES ARE FOUND TO EXIST MUST AMEND THE PLAN IN ACCORDANCE WITH THIS PARAGRAPH TO ADDRESS THOSE DEFICIENT BMPS WITHIN SEVEN (7) DAYS OF BEING NOTIFIED BY THE SECONDARY PERMITTEE.
WHEN THE PLAN IS AMENDED, THE PRIMARY PERMITTEE MUST NOTIFY AND PROVIDE A COPY OF THE AMENDMENT TO ALL AFFECTED SECONDARY PERMITTEES WITHIN THIS SEVEN (7) DAY PERIOD. THE SECONDARY PERMITTEE(S) MUST IMPLEMENT ANY NEW PLAN REQUIREMENTS AFFECTING THEIR SITE(S) WITHIN 48-HOURS OF NOTIFICATION BY THE PRIMARY PERMITTEE. NOTWITHSTANDING THE FOREGOING, THE PRIMARY OR TERTIARY PERMITTEE REMAINS RESPONSIBLE FOR INSURING THAT THE PLAN, AS APPROPRIATE, MEETS THE
REQUIREMENTS OF THIS PERMIT.
PROPER OPERATION AND MAINTENANCE:
THE PERMITTEE SHALL AT ALL TIMES PROPERLY OPERATE AND MAINTAIN ALL FACILITIES AND SYSTEMS OF TREATMENT AND CONTROL (AND RELATED APPURTENANCES) WHICH ARE INSTALLED OR USED BY THE PERMITTEE TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THIS PERMIT AND WITH THE REQUIRED PLANS.
PROPER OPERATION AND MAINTENANCE ALSO INCLUDES ADEQUATE LABORATORY CONTROLS AND
APPROPRIATE QUALITY ASSURANCE PROCEDURES. PROPER OPERATION AND MAINTENANCE REQUIRES THE OPERATION OF BACKUP OR AUXILIARY FACILITIES OR SIMILAR SYSTEMS, INSTALLED BY AN PERMITTEE ONLY
WHEN NECESSARY TO ACHIEVE COMPLIANCE WITH THE CONDITIONS OF THE PERMIT.
EROSION AND SEDIMENT CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION AND SEDIMENT CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT
SOURCE.
REFER TO THE DETAILS CONTAINED WITHIN THIS PLAN SET FOR ADDITIONAL MAINTENANCE INSTRUCTION.
NON-STORM WATER DISCHARGES:
NON-STORM WATER DISCHARGES (DISCHARGES FROM FIRE FIGHTING ACTIVITIES, FIRE HYDRANT FLUSHING, POTABLE WATER SOURCES INCLUDING WATER LINE FLUSHING, IRRIGATION DRAINAGE, AIR CONDITIONING CONDENSATE, SPRINGS, UNCONTAMINATED GROUNDWATER, AND FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS OR POLLUTANTS) THAT ARE COMBINED WITH STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY SHALL BE DISCHARGED TO THE PROPOSED STORM DRAINAGE SYSTEM AND ROUTED THROUGH THE EROSION AND SEDIMENTATION CONTROLS IDENTIFIED WITHIN THIS PLAN. NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF THIS IS NOT
POSSIBLE.
WASTE MATERIALS AND DISPOSAL:
ALL WASTE MATERIALS SHALL BE COLLECTED AND STORED IN A SECURELY LIDDED METAL DUMPSTER OR OTHER APPROPRIATE WASTE MANAGEMENT FACILITY PERMISSIBLE UNDER GAR PERMIT NO. 100001. WASTE MANAGEMENT FACILITIES SHALL MEET ALL SOLID WASTE MANAGEMENT REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE SHALL BE DEPOSITED IN THE WASTE MANAGEMENT FACILITIES. WASTE MANAGEMENT FACILITIES SHALL BE EMPTIED A MINIMUM OF ONCE PER WEEK OR MORE OFTEN IF NECESSARY AND TRASH SHALL BE HAULED AS REQUIRED BY LOCAL REGULATIONS. NO CONSTRUCTION WASTE SHALL BE
BURIED ON-SITE.
ALL PERSONNEL SHALL BE INSTRUCTED ON PROPER PROCEDURES FOR WASTE DISPOSAL. A NOTICE STATING THESE PRACTICES SHALL BE POSTED AT THE JOB SITE AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR
SEEING THAT THESE PROCEDURES ARE FOLLOWED.
LOCATE WASTE COLLECTION AREAS AWAY FROM STREETS, GUTTERS, WATERCOURSES AND STORM DRAINS.
WASTE COLLECTION AREAS, SUCH AS DUMPSTERS, ARE OFTEN BEST LOCATED NEAR CONSTRUCTION SITE
ENTRANCES TO MINIMIZE TRAFFIC ON DISTURBED SOILS.
HAZARDOUS WASTES:
ALL HAZARDOUS WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER AS REQUIRED BY LOCAL, STATE, AND/OR FEDERAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. THE JOB SITE SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED, SHALL INSTRUCT SITE PERSONNEL IN THESE PRACTICES. MATERIAL SAFETY DATA SHEETS (MSDS'S) FOR EACH SUBSTANCE WITH HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE SHALL BE OBTAINED AND USED FOR THE PROPER MANAGEMENT OF POTENTIAL WASTES THAT MAY RESULT FROM THESE PRODUCTS. AN MSDS SHALL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH PRODUCT IS STORED AND/OR USED AND ANOTHER COPY OF EACH MSDS SHALL BE MAINTAINED IN THE EROSION SEDIMENTATION AND POLLUTION CONTROL PLAN (ESPCP) FILE AT THE JOB SITE CONSTRUCTION TRAILER OFFICE. EACH EMPLOYEE WHO HANDLES A SUBSTANCE WITH HAZARDOUS PROPERTIES WILL BE INSTRUCTED ON THE USE OF MSDS SHEETS AND THE SPECIFIC INFORMATION IN THE APPLICABLE MSDS FOR THE PRODUCT HE/SHE IS USING, PARTICULARLY REGARDING SPILL
CONTROL TECHNIQUES.
THE CONTRACTOR WILL IMPLEMENT THE SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN FOUND WITHIN THIS ESPCP AND WILL TRAIN ALL PERSONNEL IN THE PROPER CLEANUP AND HANDLING OF SPILLED MATERIALS. NO SPILLED HAZARDOUS MATERIALS OR HAZARDOUS WASTES SHALL BE ALLOWED TO COME IN CONTACT WITH STORM WATER DISCHARGES. IF SUCH CONTACT OCCURS, THE STORM WATER DISCHARGE SHALL BE CONTAINED ON SITE UNTIL APPROPRIATE MEASURES IN COMPLIANCE WITH STATE AND FEDERAL REGULATIONS ARE TAKEN TO DISPOSE OF SUCH CONTAMINATED STORM WATER. IT SHALL BE THE RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO PROPERLY TRAIN ALL PERSONNEL IN THE USE OF THE
SPCC PLAN.
NOTHING IN THIS PERMIT SHALL BE CONSTRUED TO PRECLUDE THE INSTITUTION OF ANY LEGAL ACTION OR RELIEVE THE PERMITTEE FROM ANY RESPONSIBILITIES, LIABILITIES, OR PENALTIES TO WHICH THE PERMITTEE IS OR MAY BE SUBJECT UNDER THE GEORGIA HAZARDOUS WASTE MANAGEMENT ACT, O.C.G.A. § 12-8-60, ET SEQ.
OR UNDER CHAPTER 14 OF TITLE 12 OF THE OFFICIAL CODE OF GEORGIA ANNOTATED; NOR IS THE OPERATOR RELIEVED FROM ANY RESPONSIBILITIES, LIABILITIES OR PENALTIES TO WHICH THE PERMITTEE IS OR MAY BE
SUBJECT UNDER SECTION 311 OF THE CLEAN WATER ACT OR SECTION 106 OF COMPREHENSIVE
ENVIRONMENTAL RESPONSE COMPENSATION AND LIABILITY ACT.
SANITARY WASTES:
ALL PERMITTEES SHALL ENSURE THAT THIS PLAN IS IN COMPLIANCE WITH APPLICABLE STATE AND/OR LOCAL
WASTE DISPOSAL, SANITARY SEWER, OR SEPTIC SYSTEM REGULATIONS.
A MINIMUM OF ONE PORTABLE SANITARY UNIT SHALL BE PROVIDED FOR EVERY TEN (10) WORKERS ON THE SITE.
ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME PER WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN COMPLETE COMPLIANCE WITH THE LOCAL STATE REGULATIONS.
ALL SANITARY WASTE UNITS SHALL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE UNIT CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT OF BMP'S SHALL BE IMPLEMENTED AS NECESSARY, SUCH AS GRAVEL BAGS OR SPECIFICALLY DESIGNED PLASTIC SKID CONTAINERS AROUND THE BASE, TO PREVENT WASTE FROM CONTRIBUTING TO STORM WATER DISCHARGES. THE LOCATION OF SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION CONTROL PLAN GRADING PHASE BY THE
CONTRACTOR ONCE THE LOCATIONS HAVE BEEN DETERMINED.
OFFSITE VEHICLE TRACKING / DUST CONTROL:
OFF-SITE VEHICLE TRACKING OF DIRT, SOILS, AND SEDIMENTS AND THE GENERATION OF DUST SHALL BE MINIMIZED OR ELIMINATED TO THE MAXIMUM EXTENT PRACTICAL. A STABILIZED CONSTRUCTION EXIT (CO) SHALL BE PROVIDED TO REDUCE VEHICLE TRACKING OF SEDIMENT. SEE ESPCP PLAN AND DETAIL SHEETS FOR THE CONSTRUCTION EXIT LOCATIONS AND DETAIL. THE PAVED STREET ADJACENT TO THE CONSTRUCTION EXIT SHALL BE INSPECTED DAILY BY A REPRESENTATIVE OF THE SITE CONTRACTOR FOR TRACKING OF MUD, DIRT, OR ROCK. DUMP TRUCKS HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED WITH A TARPAULIN. DUST CONTROL (DU) SHALL BE APPLIED AS NECESSARY TO PREVENT SURFACE AND AIR MOVEMENT
OF DUST.
INVENTORY FOR POLLUTION PREVENTION PLAN
THE FOLLOWING MATERIALS ARE EXPECTED TO BE ONSITE DURING CONSTRUCTION: CONCRETE PRODUCTS, ASPHALT, PETROLEUM BASED FUELS AND LUBRICANTS FOR EQUIPMENT, TAR, METAL BUILDING MATERIALS, LUMBER, SHEET ROCK, FLOOR COVERINGS, ELECTRICAL WIRE AND FIXTURES, PAINTS/STAINS/FINISHING TREATMENTS, PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CLEANING SOLVENTS, PESTICIDES, FERTILIZERS, HERBICIDES, CRUSHED STONE, PLASTIC AND METAL PIPES.
SPILL PREVENTION
PRACTICES SUCH AS GOOD HOUSEKEEPING, PROPER HANDLING OF HAZARDOUS PRODUCTS AND PROPER SPILL CONTROL PRACTICES WILL BE FOLLOWED TO REDUCE THE RISK OF SPILLS AND SPILLS FROM DISCHARGING
INTO STORM WATER RUNOFF.
GOOD HOUSEKEEPING
QUANTITIES OF PRODUCTS STORED ONSITE WILL BE LIMITED TO THE AMOUNT NEEDED FOR THE JOB.
A. PRODUCTS AND MATERIALS WILL BE STORED IN A NEAT, ORDERLY MANNER IN APPROPRIATE CONTAINERS
PROTECTED FROM RAINFALL, WHERE POSSIBLE.
B. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH MANUFACTURER LABELS LEGIBLE AND
VISIBLE.
C. PRODUCT MIXING, PRODUCT DISPOSAL, AND DISPOSAL OF PRODUCT CONTAINERS WILL BE ACCORDING TO
THE MANUFACTURER'S RECOMMENDATIONS.
D. THE CONTRACTOR WILL INSPECT SUCH MATERIALS TO ENSURE PROPER USE, STORAGE AND DISPOSAL.
EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN GENERAL NOTES
(IN CONFORMANCE WITH STATE OF GEORGIA GENERAL NPDES PERMIT NO. GAR 100001)
PRODUCT SPECIFIC PRACTICES
PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS WILL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORM WATER DRAINAGE INLETS.
IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT LINER TO
PREVENT/MINIMIZE SITE CONTAINMENT. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND DISPOSAL AS REQUIRED BY
LOCAL AND STATE REGULATIONS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED INTO THE STORM WATER COLLECTION SYSTEM.
EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS, AND PRODUCT CONTAINERS WILL BE DISPOSED
ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.
CONCRETE/MASONRY - NO CONCRETE TRUCKS WILL BE ALLOWED TO WASH OUT OR DISCHARGE SURPLUS CONCRETE OR DRUM WASH WATER ON SITE. THE CONCRETE PROVIDER HAS RESPONSIBILITY TO ENSURE APPROPRIATE TRAINING HAS BEEN PROVIDED TO THEIR TRUCK DRIVERS, AND MUST PROVIDE APPROPRIATE DETAILS AND RESOURCES TO ENABLE THEM TO COMPLETE A DELIVERY WITHOUT CAUSING POLLUTION. CHUTES, BARRELS, WHEELBARROWS AND OTHER EQUIPMENT MUST BE RINSED IN THE SITE WASH-DOWN AREA. SWEEP OR SHOVEL ANY SPILLS THAT OCCUR AND ALLOW RESIDUE TO SET BEFORE REMOVING. THE HARDENED RESIDUE MAY THEN BE PLACED IN A DESIGNATED CONCRETE/MASONRY RECYCLING BIN ON SITE. DO NOT WASH CONCRETE/MASONRY INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS. TRUCKS SHOULD NOT
TRACK ANY CONCRETE OR MUD AND SEDIMENT OFF SITE.
FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS, THE CROP ESTABLISHMENT GUIDELINES, OR THE SPECIFICATIONS
CONTAINED WITHIN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA.
SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC) PLAN:
A. LOCAL, STATE, AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP SHALL BE CLEARLY
POSTED AND PROCEDURES SHALL BE MADE AVAILABLE TO SITE PERSONNEL.
B. MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP SHALL BE KEPT IN THE MATERIAL STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST, AND PROPERLY LABELED PLASTIC AND
METAL WASTE CONTAINERS.
C. SPILL PREVENTION PRACTICES AND PROCEDURES SHALL BE REVIEWED AFTER A SPILL AND ADJUSTED AS
NECESSARY TO PREVENT FUTURE SPILLS.
D. ALL SPILLS WILL BE CLEANED IMMEDIATELY UPON DISCOVERY. ALL SPILLS SHALL BE REPORTED AS
REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS.
E. THE DISCHARGE OF HAZARDOUS SUBSTANCES OR OIL IN THE STORM WATER DISCHARGE(S) FROM A SITE
SHALL BE PREVENTED.
F. WHERE A RELEASE CONTAINING A HAZARDOUS SUBSTANCE IN AN AMOUNT EQUAL TO OR IN EXCESS OF A REPORTING QUANTITY ESTABLISHED UNDER EITHER GEORGIA'S OIL OR HAZARDOUS MATERIAL SPILLS OR RELEASES ACT (O.C.G.A. SEC. 12-14-2, ET SEQ.), 40 CFR 117, OR 40 CFR 302 OCCURS DURING A 24-HOUR PERIOD, THE PERMITTEE IS REQUIRED TO NOTIFY EPD AT (404) 656-4863 OR (800) 241-4113 AND THE NATIONAL RESPONSE CENTER (NRC) AT (800) 424-8802 IN ACCORDANCE WITH THE REQUIREMENTS OF GEORGIA'S OIL OR HAZARDOUS MATERIAL SPILLS OR RELEASES ACT (O.C.G.A. SEC. 12-14-2, ET SEQ.), 40 CFR
117, AND 40 CFR 302 AS SOON AS HE HAS KNOWLEDGE OF THE DISCHARGE.
G. FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER) OR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) SHALL BE CONTACTED WITHIN 24 HOURS AT
(800) 424-8802.
H. FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE GEORGIA EPD SHALL BE
CONTACTED WITHIN 24 HOURS AT (404) 656-4863 OR (800) 241-4113.
I. FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL SHALL BE CLEANED AND
LOCAL AGENCIES SHALL BE CONTACTED AS REQUIRED.
J. GENERAL NPDES PERMIT NO. GAR 100002 DOES NOT AUTHORIZE THE DISCHARGE OF HAZARDOUS
SUBSTANCES OR OIL RESULTING FROM AN ON-SITE SPILL.
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN 1,320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS. THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND COUNTERMEASURES PLAN PREPARED BY A LICENSED PROFESSIONAL.
DESIGN PROFESSIONAL:
MATTHEW FELTS, P.E.
LEVEL II CERTIFICATION
No.: 0000087020
EXPIRES : 05/01/2025
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
:9901 :1245081.2270 :2205213.9837 :883.02
33" PINE
13\18"MAG
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
FAYETTE COUNTY
TPID# 0517 029
N/F
LEGENDS ON REDWINE
GREENSPACE
PB. 42 PG. 45
TPID# 0517 3019
ASPHALT
DRIVE
ASPHALT
DRIVE
SP
EE
D
BU
MP
TENNIS
COURT
RULES
28" OAK
17/10/8" HW
9" PINE
9" PINE
11" PINE
11" PINE
11" PINE
13" PINE
10" PINE
18" PINE
12" PINE
6" PINE
8" PINE
6" PINE
6" PINE
9" PINE
12" PINE
6" PINE
6" PINE
8"RCP
8"RCP
8"RCP
EXISTING 8" PVC MAIN PER
COUNTY MARK-UPS.
TPF
O
R
TPF
OR
TP
F
OR
TPF
OR
TPF OR TPF OR
TPF
O
R
2:1
1%
1%
3:
3:
878.12 878.36
881.32 881.82
878.62
878.69878.90
877.43
877.43
877.00
877.00
877.82
877.39
877.27
877.20
881.95
876.80
NYLO 1
FES 1
2"
R C
P
877.20
877.30
876.50
876.10
874.73
874.50
877.30
883 882
881 880
879 878
876.05
ELEVATIO
N
EL
EV
AT
IO
N
STATION
STORM LINE 1 PROFILE
HORZ. SCALE 1"= 20'
VERT. SCALE 1"= 4'
0+50 1+00
F
ES
TO
P:
.0
5'
IE
IN
.7 3'
(N
YL
O
12" RCP
94LF @ 0.50%
N
YL
O
TO
P:
.5 0'
IE
O
U T
5.
FE
S 1)
PROPOSED
GRADE
EXISTING
GRADE
SHEET KEYNOTES
GENERAL SHEET NOTES
SHEET LEGEND
FI
LE
P
AT
H
\A C
P3
SE
R
VE
R \R
ES
O
U R
C
ES
\P R
O
JE
C
TS
\F Y2
2\
4\
.C
AD
_B
IM
\0 4.
.C
AD
\C
G
PL
O
TT
ED
B
Y:
T
H O
M
PS
O N
, S
YD
N
EY
D
AT
E:
0/ 2/
1 2
D
SHEET NUMBER
SUBMITTED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
DATE:
SHEET TITLE
DRAWING ISSUE
SEAL
CLIENT INFORMATION
3500 Parkway Lane Suite 500
Peachtree Corners Georgia 30092
ORIGINAL SHEET SIZE:
22" X 34"
PROJECT NAME
3 4 5
C
B
A
100% PERMIT SUBMITTAL
04/07/2023
PROJECT #
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
1220214
KIWANIS PARK
PICKLEBALL
COURTS
980 REDWINE RD,
FAYETTEVILLE, GA
30215
Copyright © 2022 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .