DYERSVILLE MG RADIANT HEAT REPLACEMENT - PROJECT SUMMARY
This document set comprises architectural and engineering drawings for a radiant heating system replacement project managed by the Iowa Department of Transportation (Iowa DOT), Resources & Acquisitions Bureau, located at 14117 Highway 136 North, Dyersville, Iowa 52040. The project, designated BG-2D31-(012)-80-31, involves the complete removal of existing infrared radiant heating systems and installation of new gas-fired radiant heating equipment throughout a maintenance garage facility in Dubuque County, District 6. The scope encompasses demolition of six existing CRV burners, two vacuum pumps, associated piping, controls, and thermostats, with replacement of new radiant heat systems including multiple CRV-B8 and CRV-B10 burners, new vacuum pumps (VP-1 and VP-2), new control panels, thermostats, outside air PVC piping with bird screens, and flat sheet metal reflectors. The facility contains three operational areas: wash bay, storage bays, and mechanics bay, spanning approximately 240 feet in length and 80 feet in width.
The project includes provision of new 3/4-inch gas piping extensions, new electrical wiring from control panels to equipment, and painting of all rigid gas piping with Sherwin Williams Safety Yellow industrial enamel. Contractors are required to verify all existing wall penetrations for reuse and coordinate new burner, vacuum pump, thermostat, and control locations with existing infrastructure. System testing must verify proper vacuum levels of 2.5 to 3 inches water column at branch tube end vents for each zone, with photographic documentation required. The contractor bears responsibility for salvage rights coordination with the Iowa DOT Project Manager, removal and disposal of all construction debris, location verification of existing natural gas piping, and patching of unused openings to match adjacent surface materials and finishes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT MANUAL-DYERSVILLE RADIANT HEAT REPLACEMENT.pdf | ||
| 1347145-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING ON SITEREGIONAL PLAN
GARAGE
MAINT.
BLDG
4 5
DUBUQUE
OSCEOLALYON
DICKENSON
CRAWFORD
OBRIEN
CHEROKEE
SIOUX
EMMET
KOSSUTH
WINNEBAGO WORTH MITCHELL HOWARD
CLAY
MONONA
PLYMOUTH
BUENA VISTA POCAHONTAS
PALO ALTO
HUMBOLT WRIGHT FRANKLIN
FLOYD CHICKASAW
WINNESHIEK ALLAMAKEE
FAYETTE CLAYTON
BREMER
BUTLER
BLACK HAWK
CARROL
WOODBURY IDA SAC CALHOUN
HANCOCK CERRO GORDO
GREENE BOONE STORY MARSHALL
TAMA
GRUNDYHARDINHAMILTONWEBSTER
POWESHIEKJASPERPOLK
SCOTT
CLINTON
JACKSON
DUBUQUEDELAWAREBUCHANAN
JONES
CEDAR
LINN
BENTON
IOWA
JOHNSONHARRISON
POTTAWATTAMIE
MILLS
FREMONT
MADISON
DALLAS
GUTHRIEAUDUBON
SHELBY
CASS
ADAIR
UNIONADAMS
MONTGOMERY
PAGE TAYLOR RINGGOLD
WAREN MARION
LUCASCLARKE
DECATUR WAYNE
LEE
DES MOINES
LOUISA
MUSCATINE
WASHINGTONKEOKUKMAHASKA
HENRY
JEFFERSONWAPELLOMONROE
APPANOOSE DAVIS VAN BUREN
IOWA COUNTY AND DISTRICT KEY
PROJECT:
Resources & Acquisitions Bureau 800 Lincoln Way Ames, Iowa 50010
/1
/2
:0
:0
A
M
DYERSVILLE MG RADIANT HEAT REPLACEMENT
BG-2D31-(012)-80-31
14117 Hwy 136 N, Dyersville, IA 52040
INDEX OF DRAWINGS
NO SHEET NAME
A001 COVER
A101 DEMO PLAN
A102 NEW LAYOUT PLAN
STORAGE BAYS
WASH BAY
MECHANICS BAY
80' - 0"
240' - 0"
160' - 0"
8'
1A
20' 40'
8'
108'
40'
DROP
(6) EXIST. CRV B8 BURNERS
90° EL/TEE DROP
8'
1A
20' 40'
16'
108'
40'
4" O.A. THRU WALL -
LOWER ROOF
DROP
90° EL/TEE DROP
6'
4" O.A.
DROP
4" O.A.
12'
45'
1A (3)
VP-1
2A EXIST. CRV
A6 BURNER
EXISTING 4" O.A. CAP
CONTROL
PANEL A
#1A T.STAT
T
2 90° ELS DROP
2B EXIST. CRV
B6 BURNER
(NEW 1/24)
VP-2
EXISTING 4" O.A. CAP EXISTING 4" O.A. CAP
45'
4" O.A.
DROP
4" O.A. THRU WALL -
LOWER ROOF
1B (3)
NO WORK IN
OFFICE AREAS
EXISTING VACUUM PUMP TO BE REMOVED
EXISTING BURNER & FLOW TO BE REMOVED
EXISTING TAIL PIPE BRANCH TO BE REMOVED
EXISTING OUTSIDE AIR PVC PIPING TO BE REMOVED
EXISTING HEATER SYSTEM TO BE REMOVED
T EXISTING THERMOSTAT TO BE REMOVED
2B
CONTROL
PANEL B
#2B T.STAT
T
2A
CONTROL PANEL
T
#2A T.STAT
90° ELBOW OFFSET TO
45° ELBOW DROP
#1B T.STAT
T
EXISTING 4"- O.A. CAP
PVC PIPING W /
BIRDSCREEN- LOWER ROOF
( TYPICAL 2 )
EXISTING 4"- O.A. CAP
PVC PIPING W /
BIRDSCREEN- LOWER ROOF
( TYPICAL 2 )
SHEET
DATE:
x
S h e e t Io w a D
O T
R E
V
IS
IO
N
S
Resources & Acquisitions Bureau 800 Lincoln Way Ames, Iowa 50010
(515) 239-1299
COUNTY: DISTRICT:
PROJECT NUMBER:
/1
/2
:0
:0
A
M
D Y
E R
S V
IL
L E
M G
R A
D
IA
N T
H E
A T
R E
P L A
C E
M E
N T
D E
M O
P L A
N
H w y
N
D y e rs v ill e
IA
14 AUG 25
A101
BG-2D31-(012)-80-31
DUBUQUE 6
1/8" = 1'-0"
DEMO PLAN
N O
D
A T
E
B Y
D
E S
C R
IP
T
IO
N
DEMO NOTES:
1. THIS DRAWING DIAGRAMATICALLY REPRESENTS THE LAYOUT OF EXISTING CONDITIONS WITH MAJOR MECHANICAL AND ELECTRICAL COMPONENTS. THEY ARE NOT INTENDED TO SHOW ACCESSORIES OR INCIDENTALS COMMON TO EQUIPMENT INDICATED, THOUGH THESE ITEMS ARE TO BE REMOVED, ACCESSIBILITY TO DEMOLTION ITEMS SHALL NOT BE INFERRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFCATIONS OF BUILDING AND EXISTING
CONDITIONS PRIOR TO SUBMITTAL.
2. DEMOLTION OF SHALL INCLUDE ALL HANGERS, FITTINGS, DAMPERS, VALVES, ETC.
3. LIGHT LINES INDICATE EXISTING PIPING, EQUIPMENT, ETC. TO REMAIN. BOLD DASHED LINES INDICATE DEMOLTION
WORK, THIS PROJECT.
4. CONTRACTOR SHALL PATCH / REPAIR ALL UNUSED OPENINGS AND MODIFIED FINISH SURFACES. PATCH SHALL MATCH
MATERIALS, FINISH, AND TEXTURES OF ADJACENT SURFACES.
5. OWNER SHALL RETAIN FIRST SALVAGE RIGHTS TO REMOVED EQUIPMENT AND MATERIALS. UNLESS NOTED OTHERWISE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER AND TIMELY DISPOSAL OF ALL CONSTRUCTION DEBRIS INCLUDED BUT NOT LIMITED TO EQUIPMENT AND MATERIALS NOT CLAIMED BY OWNER. IA DOT PROJECT MANAGER SHALL DIRECT THE CONTRACTOR AS TO WHICH ITEMS WILL BE SALVAGED AND WHERE TO PLACE THEM ON
SITE.
6. CONTRACTOR TO LOCATE ALL EXISTING NATURAL GAS PIPING
DEMOLITION KEYNOTE LEGEND
KEY NOTE
BN-ED01 REMOVE RECEPTICLE AND ASSOCIATED WIRING BACK TO HEATER CONTROL PANEL
VP-ED02 REMOVE ELECTRICAL CONNECTION AND DISCONNECT WIRING BACK TO HEATER CONTROL PANEL
CP-ED03 DISCONNECT EXISTING HEATER CONTROL PANEL. SAVE CIRCIUT AND WIRING FOR NEW HEATER CONTROL PANEL
BN-MD01 REMOVE RADIANT HEAT BURNER, ASSOCIATED PIPING AND CONTROLS AS SHOWN. DISCONNECT / REMOVE OA
AND GAS PIPING AS SHOWN. SEENRE WORK PLANS FOR NEW CONNECTIONS
VP-MD02 REMOVE EXISTING VACUUM PUMP AND ASSOCIATED PIPING AND CONTROLS
CP-MD03 REMOVE EXISTING HEATER CONTROL PANEL AND ASSOCIATED CONTROL WIRING
STORAGE BAYS
WASH BAY
MECHANICS BAY
240' - 0"
160' - 0"
±10' B8
±15' ±25'
±10'
±110'
±25'
#1A (2) CRV B10
#1A (2) CRV B8
90° EL/TEE DROP
±15'
±25'
±10'
±30'
VP-1
CONTROL PANEL B
90° ELBOW
OFFSET TO 45°
EL DROP
VP-2
EXIST. HOLES W/ NEW 4" O.A.
NO WORK IN
OFFICE AREAS
NEW VACUUM PUMP
NEW BURNER & FLOW
NEW TAIL PIPE AND DAMPER COUPLINGS AT VACUUM PUMP INLET (4)
NEW PVC OUTSIDE AIR LINE
NEW HEATER SYSTEM
NEW FLAT SHEET METAL
T NEW THERMOSTAT
±30'
B8 B10 B10
±10' B8±15' ±25' ±30'
1B
B8 B10 B10
±30'
±110'
5'
±5' B8
B8
±35'
±15'±20'
±5'
80' - 0"
#1A T.STAT (NEW LOCATION)
NEW #1A T.STAT
T
DROP DROP
4" O.A. NEW 4" O.A. NEW
90° ELBOW
OFFSET TO 45°
EL DROP
(4) DAMPERS
CONTROL PANEL A
NEW #2A T.STAT
±5'
±15'
±35' ±20'
±5'
B8
B8
#2A (2) CRV
B8 80,000
#2B (2) CRV
B8 80,000
4" O.A. NEW
LENGTHS - COORDINATE
WITH LIGHTS, FLAT
SHEET ON BOTTOM OF
REFLECTOR AT RAIL
4" O.A. NEW
NEW 4" O.A. CAPS/PVC
PIPING (TYP. 2) GAP
W/BIRDSCREEN THRU
WALL AT LOWER ROOF
TUBE
ABOVE
RAILS
NEW #2B T.STAT
T
90° EL/TEE
DROP
#1A
#1B
EXISTING HOLE EXISTING HOLE
EXIST. HOLES W/ NEW 4" O.A.
EXISTING HOLE EXISTING HOLE
±5'
#1B (2) CRV B10
#1B (2) CRV B8
NEW 4" O.A. CAPS/PVC
PIPING (TYP. 2) GAP
W/BIRDSCREEN THRU
WALL AT LOWER ROOF
T
T
NEW #1B T.STAT
CONTROL PANEL
SHEET
DATE:
x
S h e e t Io w a D
O T
R E
V
IS
IO
N
S
Resources & Acquisitions Bureau 800 Lincoln Way Ames, Iowa 50010
(515) 239-1299
COUNTY: DISTRICT:
PROJECT NUMBER:
/1
/2
:0
:0
A
M
D Y
E R
S V
IL
L E
M G
R A
D
IA
N T
H E
A T
R E
P L A
C E
M E
N T
N E
W L
A Y
O U
T P
L A
N
H w y
N
D y e rs v ill e
IA
14 AUG 25
A102
BG-2D31-(012)-80-31
DUBUQUE 6
1/8" = 1'-0"
NEW LAYOUT PLAN
N O
D
A T
E
B Y
D
E S
C R
IP
T
IO
N
VACUUM PUMP SCHEDULE
MARK HP VOLTS PHASE FLA DRIVE DESIGN BASIS REMARKS
VP-1 3/4 120 1 6.6 A DIRECT CORAYVAC EP-201
VP-2 3/4 120 1 6.6 A DIRECT CORAYVAC EP-201
GAS FIRED HEATER SCHEDULE
MARK_ HEATING INPUT (MBH) GAS PRESSURE MIN./MAX. VOLTS_ PHASE_ FLA_ DESIGN BASIS_ REMARKS_
CRVB8 (2) @ #1A 80 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B8
CRVB10 (2) @ #1A 100 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B10
CRVB8 (2) @ #1B 80 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B8
CRVB8 (10) @ #1A 100 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B10
CRVB8 (2) @ #2A 80 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B8
CRVB8 (2) @ #2B 80 4.5 / 14 120 1 0.3 A CORAYVAC CRV-B8
ELECTRICAL / MECHANICAL KEYNOTE LEGEND
KEY NOTE
VP-1 PROVIDE WIRING FROM HEATER CONTROL PANEL 1 TO NEW VACUUM PUMP #1, PROVIDE SINGLE POLE 20 AMP DISCONNECT SWITCH
VP-2 PROVIDE WIRING FROM HEATER CONTROL PANEL 2 TO NEW VACUUM PUMP #2, PROVIDE SINGLE POLE 20 AMP DISCONNECT SWITCH
SYSTEM NOTES:
1. ALL DIMENSIONS ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD BY THE CONTRACTOR.
2. CONTRACTOR TO REMOVE ALL EXISTING INFRARED SYSTEMS AND ASSOCIATED TUBES / REFLECTORS / HANGERS / CONTROL PANELS / WIRING / THERMOSTATS / VACUUM PUMPS / ETC. AND DISPOSE OFF
CONSTRUCTION SITE.
3. CONTRACTOR SHALL INSTALL A COMPLETE NEW RADIANT HEAT SYSTEM THROUGHOUT. TO INCLUDE HANGERS AND CHANIS ETC. VERIFY EXISTING WALL PENETRATIONS FOR REUSE. PATCH OR REPAIR ANY HOLES
NOT FOR REUSE.
4. CONTRACTOR TO USE EXISTING OPENINGS IN WALL TO RUN NEW EQUIPMENT THROUGH, UNLESS NOTED OTHERWIDE.
5. ALL OUTSIDE AIR PIPING ARE 4" OR 6" IN DIAMETER AS NOTED, EQUIPPED VENT CAP WITH BIRD SCREENS, SEAL ALL WALL PENETRATIONS.
6. ALL PIPING ENTERING OR EXITING BUILDING SHALL BE EQUIPPED WITH BIRD SCREENS.
7. RADIANT HEATING REFLECTORS NOT SHOWN ON DRAWINGS FOR CLARITY, CONTRACTOR TO FURNISH AND INSTALL REFLECTORS ON NEW INSTALLATION.
8. ALL BURNER / VACUUM PUMP / THERMOSTAT / TUBE LOCATIONS ARE SAME AS EXISTING UNLESS OTHERWISE NOTED. CONTRACTOR TO COORDINATE.
9. PROVIDE NEW 3/4" GAS PIPING EXTENSIONS, UNLESS NOTED OTHERWISE.
10. INSTALL REFLECTOR TYPES AT OVERHEAD DOOR OPERATORS AND TRACK LOCATIONS IF NECESSARY TO PROTECT EXISTING EQUIPMENT.
11. PROVIDE NEW THERMOSTATS AT ALL LOCATIONS.
12. CONTRACTOR TO VERIFY ALL WIRING FOR RADIANT HEAT SYSTEM IS NOT ON SAME PANEL CIRCUITS AS OVERHEAD DOORS.
13. CONTRACTOR TO EXTEND GAS PIPING, CONDUITS AND POWER WIRING TO NEW BURNERS, CONTROL PANELS, THERMOSTATS, AND VACUUM PUMPS FOR COMPLETE SYSTEM INSTALLATION.
14. CONTRACTOR TO PAINT ALL EXISTING AND NEW RIGID GAS PIPING FROM GAS METER AND THROUGHOUT THE BUILDING WITH SHERWIN WILLIAMS, COLOR: SW4048 "SAFETY YELLOW". SYSTEM TYPE: ALKYD, SURFACE PREP, SSPC SP2/SP3. PAINT: 1 COAT PRIMER (KEM BOND HS), 2 COATS FINISH (INDUSTRIAL ENAMEL)
15. CONTRACTOR SHALL TEST SYSTEM FOR PROPER VACUUM AT BRANCH RADIANT TUBE END VENTS FOLLOWING INSTALLATION. MAKE ADJUSTMENTS AS NECESSARY TO PROVIDE 2 1/2" TO 3" WATER COLUMN FOR
EACH ZONE. PROVIDE PHOTO DOCUMENTATION OF EACH.
16. NEW BURNER LOCATIONS SHALL HAVE GAS / ELECTRIC / CONTOLS EXTENDED TO NEW LOCATIONS.
| Sheets |
| A001 - COVER |
| A101 - DEMO PLAN |
| A102 - NEW LAYOUT PLAN |