About this file

This is an approved architectural and engineering plans document prepared by the California Department of General Services Division of the State Architect (DSA) for the Department of Motor Vehicles (DMV) HQ East Elevator Modernization project located at 2415 1st Avenue, Sacramento, California. The project comprises the modernization of eight elevators—six passenger elevators (Cars #1-6) and two freight elevators (Cars #7-8)—with Car #8 designated as an add alternate not included in the base project scope. The passenger elevators are rated at 4,000 pounds capacity, while the freight elevators are rated at 6,000 pounds capacity. Work includes replacement of existing elevator motors, controllers, and related electrical systems; installation of new LED lighting in elevator cars; modernization of call stations and car operating panels to meet current accessibility standards; and installation of new emergency communication systems. The plans were submitted for DSA plan check on October 28, 2025, with backcheck submittal on November 14, 2025, and received fire and panic approval on February 26, 2026. The project encompasses basement through penthouse levels with machine rooms located on the second floor for Cars #1-6 and on the penthouse level for Car #7, with service and construction scheduled to occur while the facility remains operational.

The plans specify compliance with the 2022 California Building Code, California Electrical Code, and California Fire Code, with detailed accessibility requirements for elevator car dimensions, control locations, signage, and communication systems. Work includes demolition of existing DC machines and replacement with new AC gearless machines, relocation of elevator controllers #3 and #4 to the main machine room, and replacement of existing elevator feeders and conduit where necessary. The project requires coordination with existing building systems, temporary wiring to maintain power during construction phases, and fire stopping of all conduit penetrations in fire-rated walls. Contract 25-318776 for Project 15501 requires a B License and Certificate of Reported Compliance (CRC) for any fleet vehicles subject to California Air Resources Board regulations. Sealed bids were to be received by July 22, 2026, at the DGS Office of Business and Acquisition Services, with project oversight provided by Clint Sierer (916-375-4352) and coordination with Architectural Elevator Consulting LLC.

View the file

Other files

File Type Posted
Project_Manual.pdf PDF
Bid_Package_Documents.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12-31-202512-31-2027

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

V3

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

01-29-2026

ISSUE DATE: JUNE 2, 2026

48" MIN. (FIELD VERIFY)

2022 CBC TABLE 11B-407.4.1

(E) EXCEPTION EXISTING ELEVATOR CAR

" M

IN

. (F

IE

LD

V

ER

IFY

C

BC

TA

BL

E

B-

7.4 .1

(E ) E

XC

EP

TIO

N

EX

IS

TIN

G

EL

EV

AT

OR

C

AR

DIM. (PER ELEVATOR TYPE)

2022 CBC TABLE

11B-407.4.1

" M

IN

C

BC

B-

8.2

.1

" M

IN

C

BC

B-

7.4

.6.

4.1 48

" M

AX

(A T T

.O . B

UT

TO

N)

C

BC

B-

8.2 .1

HOISTWAY SIGNAGE

(2022 CBC 11B-407.2.3)

M

IN

C

BC

B-

7.2

.2.

EMERGENCY

CONTROL

" M

AX

(A T T

.O . B

OT

TO

N)

C

BC

B-

8.2 .1

HALL SIGNALS

(2022 CBC 11B-407.2.1)

CALL BUTTONS

(2022 CBC 11B-407.2.1)

" M

IN

(A T B

.O . B

OT

TO

N)

C

BC

B-

8.2 .1

EMERGENCY

COMMUNICATION

SYSTEM

CAR POSITION INDICATOR

(2022 CBC 11B-407.4.8.1)

CAR CONTROLS

(2022 CBC 11B-407.2.1)

2 1 2 M

IN

2 1 2 M

IN

2 12 MIN

HOISTWAY SIGNAGE

(2022 CBC 11B-407.2.3.1)

" M

AX

(A T B

AS

EL

IN

E

OF

H

IG

HE

ST

RA

IS

ED

C

HA

RA

CT

ER

S)

C

BC

B-

3.4

.1

" M

IN

(A T B

AS

EL

IN

E

OF

LO

W

ES

T B

RA

IL

CE

LL

S)

C

BC

B-

3.4

.1

2"

WHITE ON BLACK

BACKGROUND

1 2" MI

N

LOCATES ABOVE

CAR CONTROL

PANEL OR DOOR

18 SQ FT MIN

NOTES:

1. ELEVATORS SHALL COMPLY WITH 11B-407 AND WITH ASME A17.1: THEY SHALL BE PASSENGER ELEVATORS AS CLASSIFIED BY ASME A17.1. ELEVATOR OPERATION SHALL BE AUTOMATIC.

2. COMBINED PASSENGER AND FREIGHT ELEVATORS: WHEN THE ONLY ELEVATORS PROVIDED FOR USE BY THE PUBLIC AND EMPLOYEES ARE COMBINATION PASSENGER AND FREIGHT ELEVATORS, THEY SHALL COMPLY WITH SECTION 11B-407 AND WITH ASME A17.1.

3. CALL BUTTONS & KEYPADS: SHALL BE LOCATED WITHIN ONE OF THE REACH RANGES SPECIFIED IN 11B-308 MEASURED TO THE CENTERLINE OF THE HIGHEST OPERABLE PART.

4. CALL BUTTONS: SHALL HAVE SQUARE SHOULDERS, BE 3/4 INCH MINIMUM IN THE SMALLEST DIMENSION AND SHALL BE RAISED 1/8" PLUS OR MINUS 1/32 INCH ABOVE THE SURROUNDING SURFACE. THE BUTTONS SHALL BE ACTIVATED BY A MECHANICAL MOTION THAT IS DETECTABLE.

5. CLEAR FLOOR SPACE: COMPLYING WITH 11B-305 SHALL BE PROVIDED AT CALL CONTROLS.

6. THE CALL BUTTON THAT DESIGNATES THE UP DIRECTION SHALL BE LOCATED ABOVE THE CALL BUTTON THAT DESIGNATES THE DOWN DIRECTION.

7. CALL BUTTONS: SHALL HAVE VISIBLE SIGNALS THAT WILL ACTIVATE WHEN EACH CALL IS REGISTERED AND WILL EXTINGUISH WHEN EACH CALL IS ANSWERED. CALL BUTTONS SHALL BE INTERNALLY ILLUMINATED WITH A WHITE LIGHT OVER THE ENTIRE SURFACE OF THE BUTTON.

8. A VISIBLE AND AUDIBLE SIGNAL: SHALL BE PROVIDED AT EACH HOISTWAY ENTRANCE TO INDICATE WHICH CAR IS ANSWERING A CALL AND THE CAR'S DIRECTION OF TRAVEL. WHERE IN-CAR SIGNALS ARE PROVIDED THEY SHALL VISIBLE FROM THE FLOOR AREA ADJACENT TO THE HALL CALL

BUTTONS.

9. VISIBLE SIGNALS: SHALL BE CENTERED AT 72 INCHES MINIMUM ABOVE THE FINISH FLOOR OR GROUND. THE VISIBLE SIGNAL ELEMENTS SHALL BE A MINIMUM 2 1/2 INCHES HIGH BY 2 1/2 INCHES WIDE. SIGNALS SHALL BE VISIBLE FROM THE FLOOR AREA ADJACENT TO THE HALL CALL BUTTON.

10. AUDIBLE SIGNALS: SHALL SOUND ONCE FOR THE UP DIRECTION AND TWICE FOR THE DOWN DIRECTION, OR SHALL HAVE VERBAL ANNUNCIATORS THAT INDICATE THE DIRECTION OF ELEVATOR CALL TRAVEL. AUDIBLE SIGNALS SHALL HAVE A FREQUENCY OF 1500 Hz MAXIMUM. VERBAL

ANNUNCIATORS SHALL HAVE A FREQUENCY OF 300 Hz MINIMUM AND 3,000 Hz MAXIMUM. THE AUDIBLE SIGNAL AND VERBAL ANNUNCIATORS SHALL BE 10 dB MINIMUM ABOVE AMBIENT, BUT SHALL NOT EXCEED 80 dB, MEASURED AT THE HALL CALL BUTTON.

11. FLOOR DESIGNATIONS: SHALL BE PROVIDED ON BOTH JAMBS OF ELEVATOR HOISTWAY ENTRANCES. FLOOR DESIGNATIONS SHALL BE PROVIDED IN BOTH RAISED CHARACTERS AND BRAILLE. RAISED CHARACTERS SHALL BE 2 INCHES HIGH. A RAISED STAR, PLACED TO THE LEFT OF THE

FLOOR DESIGNATION, SHALL BE PROVIDED ON BOTH JAMBS AT THE MAIN ENTRY LEVEL. THE OUTSIDE DIAMETER OF THE STAR SHALL BE 2 INCHES AND ALL POINTS SHALL BE OF EQUAL LENGTH. RAISED CHARACTERS, INCLUDING THE STAR, SHALL BE WHITE ON A BLACK BACKGROUND, BRAILLE COMPLYING WITH SECTION 11B-703.3 SHALL BE PLACED BELOW THE CORRESPONDING RAISED CHARACTERS AND THE STAR. THE BRAILLE TRANSLATION FOR THE STAR SHALL BE "MAIN". APPLIED PLATES ARE ACCEPTABLE IF THEY ARE PERMANENTLY FIXED TO THE JAMB.

12. ELEVATOR DOOR REQUIREMENTS: ELEVATOR DOORS SHALL BE THE HORIZONTAL SLIDING TYPE. CAR GATES SHALL BE PROHIBITED. ELEVATOR AND HOISTWAY DOORS SHALL OPEN AND CLOSE AUTOMATICALLY. EXCEPTION: EXISTING MANUALLY OPERATED HOISTWAY SWING DOORS SHALL BE PERMITTED PROVIDED THEY COMPLY WITH CLEAR DOOR WIDTH AND OPENING FORCE REQUIREMENTS AND THE CAR DOOR CLOSING IS NOT INITIATED UNTIL THE HOISTWAY DOOR IS CLOSED.

13. REOPENING DEVICE: ELEVATOR DOORS SHALL BE PROVIDED WITH A REOPENING DEVICE THAT SHALL STOP AND REOPEN A CAR DOOR AND HOISTWAY DOOR AUTOMATICALLY IF THE DOOR BECOMES OBSTRUCTED BY AN OBJECT OR PERSON. EXCEPTION: IN EXISTING ELEVATORS MANUALLY

OPERATED DOORS SHALL NOT BE REQUIRED TO COMPLY.

14. THE REOPENING DEVICE: SHALL BE ACTIVATED BY SENSING AN OBSTRUCTION PASSING THROUGH THE OPENING AT 5 INCHES NOMINAL AND 29 INCHES NOMINAL ABOVE THE FINISH FLOOR. THE REOPENING DEVICE SHALL NOT REQUIRE PHYSICAL CONTACT TO BE ACTIVATED, ALTHOUGH CONTACT SHALL BE PERMITTED BEFORE THE DOOR REVERSES. THE REOPENING DEVICE SHALL REMAIN EFFECTIVE TO 20 SECONDS MINIMUM.

15. DOOR AND SIGNAL TIMING: THE MINIMUM ACCEPTABLE TIME FROM NOTIFICATION THAT A CAR IS ANSWERING A CALL UNTIL THE DOORS OF THAT CAR START TO CLOSE SHALL BE CALCULATED FROM THE FOLLOWING EQUATION: T=D/(1.5 FT/S) OR T=D/(457 MM/S) = 5 SECONDS MINIMUM WHERE "T" EQUALS THE TOTAL TIME IN SECONDS AND "D" EQUALS THE DISTANCE FROM THE POINT IN THE LOBBY OR CORRIDOR 60 INCHES DIRECTLY IN FRONT OF THE FARTHEST CALL BUTTON CONTROLLING THAT CAR TO THE CENTERLINE OF ITS HOISTWAY DOOR. EXCEPTION: FOR CARS WITH IN-CAR LANTERNS, T SHALL BE PERMITTED TO BEGIN WHEN THE SIGNAL IS VISIBLE FROM THE POINT 60 IN INCHES DIRECTLY IN FRONT OF THE FARTHEST HALL CALL BUTTON AND THE AUDIBLE SIGNAL IS SOUNDED.

16. DOOR DELAY: ELEVATOR DOORS SHALL REMAIN FULLY OPEN IN RESPONSE TO A CAR CALL FOR 5 SECONDS MINIMUM.

17. DOOR WIDTH: SHALL COMPLY WITH TABLE 11B-407.4.1 DIAGRAMS. EXCEPTION: IN EXISTING ELEVATORS, A POWER-OPERATED CAR DOOR WITH A CLEAR WIDTH OF 32 INCHES MINIMUM SHALL BE PERMITTED.

18. CAR DIMENSIONS: INSIDE DIMENSIONS OF ELEVATOR CARS SHALL COMPLY WITH TABLE 11B-407.4.1. EXCEPTION: IN EXISTING BUILDINGS, WHERE EXISTING SHAFT CONFIGURATION PROHIBITS STRICT COMPLIANCE, EXISTING ELEVATOR CAR CONFIGURATIONS THAT PROVIDE A CLEAR FLOOR

AREA OF 18 SQUARE FEET MINIMUM AND ALSO PROVIDE AN INSIDE CLEAR DEPTH OF 54 INCHES MINIMUM AND A CLEAR WIDTH OF 48 INCHES MINIMUM SHALL BE PERMITTED.

19. FLOOR SURFACES: IN ELEVATOR CARS SHALL BE STABLE, FIRM AND SLIP RESISTANT, AND SHALL COMPLY WITH SECTIONS 11B-302 AND 11B-303.

20. PLATFORM TO HOISTWAY CLEARANCE: THE CLEARANCE BETWEEN THE CAR PLATFORM SILL AND THE EDGE OF ANY HOISTWAY LANDING SHALL BE 1 14 INCH MAXIMUM.

21. LEVELING: EACH CAR SHALL BE EQUIPPED WITH A SELF-LEVELING FEATURE THAT WILL AUTOMATICALLY BRING AND MAINTAIN THE CAR AT FLOOR LANDINGS WITHIN A TOLERANCE OF 1/2 INCH UNDER RATED LOADING TO ZERO LOADING CONDITIONS.

22. ILLUMINATION: THE LEVEL OF ILLUMINATION AT THE CAR CONTROLS, PLATFORM, CAR THRESHOLD AND CAR LANDING SILL SHALL BE 5 FOOT-CANDELS (54 LUX) MINIMUM.

23. ELEVATOR CAR CONTROLS: WHERE PROVIDED ELEVATOR CAR CONTROLS SHALL CONFORM WITH OPERABLE PARTS REQUIREMENTS. EXCEPTION: IN EXISTING ELEVATORS, WHERE A NEW CAR OPERATING PANEL IS PROVIDED, EXISTING CAR OPERATING PANELS MAY REMAIN OPERATIONAL

AND SHALL NOT BE REQUIRED TO COMPLY.

24. CONTROL LOCATION: CONTROLS SHALL BE LOCATED WITHIN ONE OF THE REQUIRED REACH RANGES. EXCEPTION: WHERE THE ELEVATOR PANEL SERVES MORE THAN 16 OPENINGS AND A PARALLEL APPROACH TO THE CONTROLS IS PROVIDED, BUTTONS WITH FLOOR DESIGNATIONS SHALL

BE PERMITTED TO BE 54 INCHES MAXIMUM ABOVE THE FINISH FLOOR; OR IN EXISTING ELEVATORS, CAR CONTROL BUTTONS WITH FLOOR DESIGNATIONS SHALL BE PERMITTED TO BE LOCATED 54 INCHES MAXIMUM ABOVE THE FINISH FLOOR WHERE A PARALLEL APPROACH IS PROVIDED

25. BUTTONS: BUTTONS SHALL HAVE SQUARE SHOULDERS, BE 3/4 INCH MINIMUM IN THEIR SMALLEST DIMENSION AND BE RAISED 1/8 INCH PLUS OR MINUS 1/32 INCH ABOVE THE SURROUNDING SURFACE. BUTTONS SHALL BE ARRANGED WITH NUMBERS IN ASCENDING ORDER. WHEN TWO OR

MORE COLUMNS OF BUTTONS ARE PROVIDED THEY SHALL READ FROM LEFT TO RIGHT. CAR CONTROL BUTTONS SHALL BE ILLUMINATED. CAR CONTROL BUTTONS SHALL BE ACTIVATED BY A MECHANICAL MOTION THAT IS DETECTABLE.

26. KEYPADS: CAR CONTROL KEYPADS SHALL BE IN A STANDARD TELEPHONE KEYPAD ARRANGEMENT.

27. EMERGENCY CONTROLS: BUTTONS SHALL HAVE THEIR CENTERLINES 35 INCHES MINIMUM ABOVE THE FINISH FLOOR. EMERGENCY CONTROLS, INCLUDING THE EMERGENCY ALARM, SHALL BE GROUPED AT THE BOTTOM OF THE PANEL.

28. DESIGNATIONS AND INDICATORS OF CAR CONTROLS: CONTROL BUTTONS SHALL BE IDENTIFIED BY RAISED CHARACTERS OR SYMBOLS, WHITE ON A BLACK BACKGROUND, COMPLYING WITH SECTION 11B-703.2 AND BRAILLE COMPLYING WITH SECTION 11B-703.3. RAISED CHARACTERS OR

SYMBOLS AND BRAILLE DESIGNATIONS SHALL BE PLACED IMMEDIATELY TO THE LEFT OF THE CONTROL BUTTON TO WHICH THE DESIGNATIONS APPLY. A MINIMUM CLEAR SPACE OF 38 INCH OR OTHER SUITABLE MEANS OF SEPARATION SHALL BE PROVIDED BETWEEN ROWS OF CONTROL

BUTTONS.

29. SYMBOLS: THE CONTROL BUTTON FOR THE EMERGENCY STOP, ALARM, DOOR OPEN, DOOR CLOSE, MAIN ENTRY FLOOR, AND PHONE, SHALL BE IDENTIFIED WITH RAISED SYMBOLS AND BRAILLE AS SHOWN IN TABLE 11B-407.4.7.1.3.

30. VISIBLE INDICATORS: BUTTONS WITH FLOOR DESIGNATIONS SHALL BE PROVIDED WITH VISIBLE INDICATORS TO SHOW THAT A CALL HAS BEEN REGISTERED. THE VISIBLE INDICATION SHALL EXTINGUISH WHEN THE CAR ARRIVES AT THE DESIGNATED FLOOR.

31. KEYPADS: KEYPADS SHALL BE IDENTIFIED BY VISUAL CHARACTERS COMPLYING WITH SECTION 11B-703.5 AND SHALL BE CENTERED ON THE CORRESPONDING KEYPAD BUTTON. THE NUMBER FIVE KEY SHALL HAVE A SINGLE RAISED DOT. THE DOT SHALL HAVE A BASE DIAMETER OF 0.118 INCH

MINIMUM TO 0.120 INCH MAXIMUM AND A HEIGHT OF 0.025 INCH MINIMUM TO 0.037 INCH MAXIMUM.

32. CAR POSITION INDICATORS: AUDIBLE AND VISIBLE CAR POSITION INDICATORS SHALL BE PROVIDED IN ELEVATOR CARS. CHARACTERS SHALL BE 1/2 INCH HIGH MINIMUM. INDICATORS SHALL BE LOCATED ABOVE THE CAR CONTROL PANEL OR ABOVE THE DOOR. AS THE CAR PASSES A FLOOR

AND WHEN A CAR STOPS AT A FLOOR SERVED BY THE ELEVATOR, THE CORRESPONDING CHARACTER SHALL ILLUMINATE.

33. AUDIBLE INDICATORS: THE SIGNAL SHALL BE AN AUTOMATIC VERBAL ANNUNCIATOR WHICH THE ANNOUNCES THE FLOOR AT WHICH THE CAR IS ABOUT TO STOP. THE VERBAL ANNUNCIATOR SHALL BE 10 dB MINIMUM ABOVE AMBIENT, BUT SHALL NOT EXCEED 80 dB, MEASURED AT THE

ANNUNCIATOR. THE VERBAL ANNUNCIATOR SHALL HAVE A FREQUENCY OF 300 Hz MINIMUM TO 3,000 Hz MAXIMUM. EXCEPTION: FOR ELEVATORS THAT HAVE A RATED SPEED OF 200 FEET PER MINUTE OR LESS, A NON-VERBAL AUDIBLE SIGNAL WITH A FREQUENCY OF 1500 Hz MAXIMUM WHICH SOUNDS AS THE CAR PASSES OR IS ABOUT TO STOP AT A FLOOR SERVED BY THE ELEVATOR SHALL BE PERMITTED.

34. EMERGENCY COMMUNICATIONS: RAISED SYMBOLS OR CHARACTERS, WHITE ON A BLACK BACKGROUND, AND BRAILLE SHALL BE PROVIDED ADJACENT TO THE DEVICE AND SHALL COMPLY WITH SECTIONS 11B-703.2 AND 11B-703.3. EMERGENCY TWO-WAY COMMUNICATION SYSTEMS BETWEEN

THE ELEVATOR CAR AND A POINT OUTSIDE THE HOISTWAY SHALL COMPLY WITH ASME A17.1.

35. SUPPORT RAIL: SUPPORT RAILS SHALL BE PROVIDED ON AT LEAST ONE WALL OF THE CAR. CLEARANCE BETWEEN SUPPORT RAILS AND ADJACENT SURFACES SHALL BE 1-1/2 INCHES MINIMUM. TOP OF SUPPORT RAILS SHALL BE 31 INCHES MINIMUM TO 33 INCHES MAXIMUM ABOVE THE FLOOR OF THE CAR. THE ENDS OF THE SUPPORT RAIL SHALL BE 6 INCHES MAXIMUM FROM ADJACENT WALLS. SUPPORT RAILS SHALL BE SMOOTH AND ANY SURFACE ADJACENT TO THEM SHALL BE FREE OF SHARP OR ABRASIVE ELEMENTS. ALLOWABLE STRESSES SHALL NOT BE EXCEEDED FOR MATERIALS USED WHEN A VERTICAL OR HORIZONTAL FORCE OF 250 POUNDS IS APPLIED AT ANY POINT ON THE SUPPORT RAIL, FASTENER, MOUNTING DEVICE, OR SUPPORTING STRUCTURE.

FLOOR DESIGNATIONS ON JAMBS OF

ELEVATOR HOISTWAY ENTRANCES

(2022 CBC FIGURE 11B-407.2.3.1)

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

G2-0

NONE

ACCESSIBILITY DETAILS

SCALE:

N/A

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J

CAR #1 CAR #2 CAR #3 CAR #4

CAR #6 CAR #5

CAR #8

CAR #7

FREIGHT

ONLY

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

CAR #6 CAR #5

TYP

TYP TYP TYP

CAR #8

CAR #7

FREIGHT ONLY

CAR #8

CAR #7

FREIGHT ONLY

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

CAR #6 CAR #5

TYP

TYP TYP TYP

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

A1-0

NONE

FLOOR PLAN - BASEMENT

LEVEL

SCALE:

N

SCALE:

A1-0 1/8"='-0"

C

B

C

G

GENERAL NOTESKEYNOTES

SCALE: 1/8"=1'-0"A1-0

G

SCALE: 1/8"=1'-0"A1-0

SCALE: 1/8"=1'-0"A1-0

SCALE: 1/8"=1'-0"A1-0

SCALE:

A1-0 1/8"='-0"

C

B

C

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

AS NOTED

LEGENDDEMOLITION KEYNOTES

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

12 6

J

H

G

F

E

D

C

B

A

151413121110 9 8 7 6 5 4 3 2 1

1514131110 9 8 7 5 4 3 2 1

J

H

G

F

E

D

C

B

A

CAR #1 CAR #2 CAR #3 CAR #4

CAR #6 CAR #5

CAR #8

CAR #7

FREIGHT

ONLY

FIRE

CONTROL

TYP

CAR #1 CAR #2 CAR #3 CAR #4

FIRE

CONTROL

TYP

TYP

TYP

CAR #6 CAR #5

TYP

TYP TYP TYP

CAR #8

CAR #7

FREIGHT ONLY

CAR #1 CAR #2 CAR #3 CAR #4

FIRE

CONTROL

TYP

TYP

TYP

CAR #8

CAR #7

FREIGHT ONLY

CAR #6 CAR #5

TYP

TYP TYP TYP

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

A2-0

NONE

FLOOR PLANS - LEVEL 1

GENERAL NOTES

SCALE:

N

A

B

C

G

H

KEYNOTES

SCALE:

A2-0 1/8"='-0"

SCALE: 1/8"=1'-0"A2-0

SCALE: 1/8"=1'-0"A2-0

SCALE: 1/8"=1'-0"A2-0

SCALE: 1/8"=1'-0"A2-0

SCALE:

A2-0 1/8"='-0"

A

B

87 10

C

G

H

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

AS NOTED

LEGENDDEMOLITION KEYNOTES

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

CAR #7

FREIGHT

ONLY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J

CAR #1 CAR #2 CAR #3 CAR #4

CAR #6 CAR #5

CAR #8

TYP

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

TYP

CAR #6 CAR #5

TYP

TYP TYP TYP

CAR #7

FREIGHT ONLY

CAR #8

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

TYP

CAR #7

FREIGHT ONLY

CAR #8

CAR #6 CAR #5

TYP

TYP TYP TYP

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

A3-0

NONE

FLOOR PLANS - LEVEL 2

GENERAL NOTES

SCALE:

N

A

B

C

G

H

KEYNOTES

SCALE:

A3-0 1/8"='-0"

SCALE: 1/8"=1'-0"A3-0

SCALE: 1/8"=1'-0"A3-0

SCALE: 1/8"=1'-0"A3-0

SCALE: 1/8"=1'-0"A3-0

SCALE:

A3-0 1/8"='-0"

A

B

87 10

C

G

H

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

ELEVATOR # 8 IS NOT IN THE BASE PROJECT SCOPE.

ELEVATOR # 8 IS AN ADD ALTERNATE.

AS NOTED

LEGENDDEMOLITION KEYNOTES

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J

CAR #7

FREIGHT

ONLY

CAR #1 CAR #2 CAR #3 CAR #4

CAR #6 CAR #5

TYP

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

TYP

CAR #6 CAR #5

TYP

TYP TYP TYP

CAR #7

FREIGHT ONLY

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

TYP

CAR #7

FREIGHT ONLY

CAR #6 CAR #5

TYP

TYP TYP TYP

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

A4-0

NONE

FLOOR PLANS - TYPICAL

LEVELS 3-6

GENERAL NOTESLEGEND

SCALE:

N

A

B

C

G

H

KEYNOTES DEMOLITION KEYNOTES

SCALE:

A4-0 1/8"='-0"

SCALE: 1/8"=1'-0"A4-0

SCALE: 1/8"=1'-0"A4-0

SCALE: 1/8"=1'-0"A4-0

SCALE: 1/8"=1'-0"A4-0

SCALE:

A4-0 1/8"='-0"

A

B

87 10

C

G

H

AS NOTED

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

FREIGHT

ONLY

A

B

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12 13 14

2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

J

CAR #1 CAR #2 CAR #3 CAR #4

CAR #6 CAR #5

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

CAR #6 CAR #5

TYP TYP TYP

CAR #7

FREIGHT ONLY

CAR #1 CAR #2 CAR #3 CAR #4

TYP

TYP

CAR #6 CAR #5

TYP TYP TYP

CAR #7

FREIGHT ONLY

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

10/28/25 DSA PLAN CHECK SUBMITTAL-

11/14/25 DSA BACKCHECK SUBMITTAL-

A5-0

NONE

FLOOR PLAN - PENTHOUSE

LEVEL

N

C

B

C

G

SCALE:

GENERAL NOTESKEYNOTES

SCALE: 1/8"=1'-0"A5-0

SCALE: 1/8"=1'-0"A5-0

SCALE: 1/8"=1'-0"A5-0

SCALE: 1/8"=1'-0"A5-0

C

B

87 10

SCALE:

A5-0 1/8"='-0"SCALE:

A5-0 1/8"='-0"

C

G

AS NOTED

LEGENDDEMOLITION KEYNOTES

12-31-2025

11/12/2025

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

LEGEND

O

THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS

INCLUDING BUT NOT LIMITED TO THE LATEST ADOPTED EDITIONS OF:

2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE

PART 1, TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR)

2022 CALIFORNIA BUILDING CODE (CBC)

PART 2, TITLE 24, CCR

BASED ON THE 2021 INTERNATIONAL BUILDING CODE (IBC)

2022 CALIFORNIA ELECTRICAL CODE (CEC)

PART 3, TITLE 24 CCR

BASED ON THE 2020 NATIONAL ELECTRICAL CODE (NEC)

2022 CALIFORNIA FIRE CODE (CFC)

PART 9, TITLE 24,

BASED ON THE 2021 INTERNATIONAL FIRE CODE (IFC)

APPLICABLE CODES

1. COPPER CONDUCTORS WITH THHN/THWN INSULATION, UON

POWER WIRE SPECIFICATIONS

EXISTING TO BE REMOVED AND SALVAGED

EXISTING TO BE DEMOLISHED

RELOCATED EQUIPMENT.

NEW PLANS-FINAL LOCATION OF

DEMO PLANS-EXISTING TO BE RELOCATED.

EXISTING TO REMAIN

(RS)

(D)

(RL)

(E)

GREEN

GREEN

WHITE

WHITE

BLUE

RED

RED

BLACK

BLACK

240V

240Y/120V

POWER WIRE COLOR CODE

SYSTEM

208Y/120V

480Y/277V

PHASE A

BLACK

YELLOW

PHASE B

RED

BROWN

PHASE C

BLUE

ORANGE

NEUTRAL

WHITE

GRAY

GROUND

GREEN

GREEN

(AIP)

ABANDON IN PLACE. (D) ABOVE GROUND CONDUITS

1"C-2#12, 1#12G

MULTIPLE RUNS OF RACEWAY AND CIRCUIT CONDUCTORS

U = # OF PARALLEL RUNS

V = CONDUIT SIZE

W = # OF PHASE/NEUTRAL CONDUCTORS IN EACH CONDUIT

(U)V"C-W#X, Y#Z X = PHASE/NEUTRAL CONDUCTOR SIZE

Y = #OF GROUND CONDUCTORS IN EACH CONDUIT

Z = GROUND CONDUCTOR SIZE

EXAMPLE: (2)3/4"C-2#12-1#12G INDICATES TWO 3/4"

CONDUITS EACH WITH 2#12 AND 1#12G CONDUCTORS

ELECTRICAL SYMBOLS COMMON

& CONNECTORS DOWN TO 3" BELOW GROUND LEVEL.

REMOVE AND (D) CONDUCTORS IN UG CONDUITS.

PLUG UG CONDUITS AND ABANDON IN PLACE.

SINGLE RUN OF RACEWAY AND CIRCUIT CONDUCTORS.

FIRST NUMBER IS RACEWAY SIZE.

THE FOLLOWING NUMBERS ARE THE CONDUCTOR

QUANTITIES AND SIZES.

EXISTING TO BE REMOVED AND REPLACED WITH NEW(RP)

A AMPERES

AC ALTERNATING CURRENT

AMPERES INTERRUPTING CAPACITY, SYMMETRICAL

AUTOMATIC TRANSFER SWITCH

AMERICAN WIRE GAUGE

CONDUIT, CONDUCTOR

AICS

ATS

AWG

C

CB CIRCUIT BREAKER

CL CONTINUOUS LOAD

CKT CIRCUIT

CNTL CONTROL

CO CONDUIT ONLY

DTL DETAIL

DWG DRAWING

E EXISTING

G, GND GROUND

GFCI GROUND-FAULT CIRCUIT INTERRUPTER

HP HORSEPOWER

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HZ HERTZ

JB JUNCTION BOX

KCMIL THOUSAND CIRCULAR MILS

KVA KILOVOLT-AMPERES

KW KILOWATT

LTG LIGHTING

MAX MAXIMUM

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MLO MAIN LUGS ONLY

MTD MOUNTED

N NEUTRAL

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NO. NUMBER

P POLE

PG&E PACIFIC GAS & ELECTRIC

PH, Ø PHASE

PVC POLYVINYL CHLORIDE

RECPT RECEPTACLE

REQ'D REQUIRED

SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT

SW SWITCH

TYP TYPICAL

UG UNDERGROUND

UON UNLESS OTHERWISE NOTED

V VOLT

VFD VARIABLE FREQUENCY DRIVE

W WATTS, WIRE

W/ WITH

WP WEATHERPROOF

XFMR TRANSFORMER

NTS NOT TO SCALE

ABOVE FINISHED FLOORAFF

ABOVE FINISHED GRADEAFG

FTL FEED THROUGH LUGS

IFS INTEGRATED FACILITIES SWITCHGEAR

ELECTRICAL ABBREVIATIONS

HCAI DEPARTMENT OF HEALTHCARE ACCESS AND INFORMATION

VA VOLT AMPERS

1. DEMOLITION DRAWINGS ARE BASED ON CASUAL FIELD OBSERVATION AND

EXISTING RECORD DOCUMENTS. REPORT DISCREPANCIES TO ARCHITECT

BEFORE DISTURBING EXISTING INSTALLATION.

2. DISCONNECT ELECTRICAL SYSTEMS IN WALLS, FLOORS, AND CEILINGS

SCHEDULED FOR REMOVAL.

3. PROVIDE TEMPORARY WIRING AND CONNECTIONS TO MAINTAIN EXISTING

SYSTEMS IN SERVICE DURING CONSTRUCTION.

4. REMOVE, RELOCATE, AND EXTEND EXISTING INSTALLATIONS TO

ACCOMMODATE NEW CONSTRUCTION. REPAIR ADJACENT CONSTRUCTION

AND FINISHES DAMAGED DURING DEMOLITION AND EXTENSION WORK. REMOVE

EXPOSED ABANDONED WIRE AND CABLE. PATCH SURFACES WHERE REMOVED

CABLES PASS THROUGH BUILDING FINISHES.

5. DISCONNECT ABANDONED CIRCUITS, OUTLETS AND REMOVE CIRCUIT,

DEVICES, WIRE AND CABLE. REMOVE ABANDONED BOXES, OUTLETS IF

RACEWAY, WIRE AND CABLE SERVICING THEM IS ABANDONED AND REMOVED.

PROVIDE BLANK COVER FOR ABANDONED BOXES WHICH ARE NOT REMOVED.

6. ENSURE ACCESS TO EXISTING BOXES, WIRING CONNECTIONS AND OTHER

INSTALLATIONS WHICH ARE TO REMAIN ACTIVE AND WHICH REQUIRE ACCESS.

MODIFY INSTALLATION OR PROVIDE ACCESS PANEL AS APPROPRIATE.

ELECTRICAL DEMOLITION NOTES

1. THE CONTRACTOR SHALL VISIT JOB SITE AND VERIFY CONDITIONS BEFORE

BIDDING.

2. THE FACILITY SHALL REMAIN IN OPERATION DURING ALL PHASES OF WORK.

WHERE SYSTEM SHUTDOWNS AND POWER OUTAGES ARE UNAVOIDABLE, SUCH

WORK SHALL BE SCHEDULED WITH THE FACILITY MANAGER AND SHALL OCCUR

AT SUCH TIMES AS TO CAUSE THE LEAST DISRUPTION OF NORMAL FACILITY

FUNCTIONS. INCLUDE ALL PREMIUM LABOR IN BID PROPOSAL TO COVER WORK

REQUIRED TO BE PERFORMED BEFORE OR AFTER "NORMAL" WORKING HOURS.

3. COORDINATE SEQUENCE OF WORK WITH OWNER. MAKE ALL NECESSARY

CONNECTIONS AS REQUIRED TO MAINTAIN POWER DURING THE STAGES OF

WORK.

4. EXISTING DEVICES SHOWN WERE TAKEN FROM EXISTING DRAWINGS (NOT "AS

BUILT" DRAWINGS) AND LIMITED SITE SURVEYS AND MAY NOT BE EXACTLY AS

SHOWN. CONTRACTOR SHALL VISIT JOB SITE AND VERIFY CONDITIONS PRIOR TO

BIDDING.

5. REFER TO THOSE DRAWINGS SHOWING OTHER WORK, AND COORDINATE

PLACEMENT OF WORK WITH THAT OF OTHER TRADES. REPORT ANY CONFLICT

TO ARCHITECT PRIOR TO INSTALLING WORK, ADJUST WORK AS DIRECTED BY

ARCHITECT.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING NEW FIRE

STOPPING OF ALL NEW OR EXISTING CONDUIT OR CABLE PENETRATIONS IN NEW

OR EXISTING FIRE RATED WALLS WITHIN THE LIMITS OF WORK. EXISTING AND

NEW WIRING UTILIZING AN EXISTING CONDUIT WITH EXISTING FIRE STOPPING

WITH NO VISUAL DAMAGE DOES NOT REQUIRE NEW FIRE STOPPING. IF

CONTRACTOR OBSERVES EXISTING PENETRATIONS IN RATED WALLS WITHOUT

FIRE STOPPING OR ARE OBVIOUSLY OUT OF COMPLIANCE WITHIN THE PROJECT

AREA, THEN THESE PENETRATIONS WILL NEED TO BE PROVIDED WITH FIRE

STOPPING ASSEMBLY PER LATEST CODE REQUIREMENT.

7. PROVIDE UPDATED TYPE WRITTEN PANEL INDEXES FOR ALL MODIFIED PANELS

ON THIS PROJECT.

ELECTRICAL NOTES SHEET DESCRIPTION

SHEET INDEX

E0-1 SYMBOLS, NOTES, SCHEDULES AND ABBREVIATIONS

E0-2

OVERALL & ENLARGED PLANS - 1ST FLOORE2-0

OVERALL & ENLARGED PLANS - BASEMENTE1-0

ONE LINE DIAGRAM & PANEL SCHEDULE

CLG. WALL SYMBOLS DESCRIPTIONFLOOR

ELECTRICAL SYMBOLS - PLANS

WALL MOUNTED LED LIGHT

SMOKE DETECTOR - PHOTOELECTRIC TYPE

HEAT DETECTOR

FIRE ALARM SYMBOLS - PLANS

OVERALL & ENLARGED PLANS - 2ND FLOORE3-0

X X DEFINED AS:

DUPLEX RECEPTACLE 18" AFF UON

G = GFCI

WP = WATERPROOF, PROVIDE WHILE IN USE COVER

S

ELEVATOR PIT DETAIL

SCALE: NONE

REFER TO DETAIL FOR THREADED

ROD CONNECTION TO STRUCTURAL

CEILING, TYPICAL.

TOTAL WEIGHTTRADE

(LBS/LINEAL FOOT)SIZE

TUBING (EMT)

ELECTRICAL METALLIC

NOTES:

1. SPACING BETWEEN HANGERS SHALL BE PER CEC REQUIREMENTS, NOT EXCEEDING 3 FEET OF EACH

RACEWAY TERMINATION, MAXIMUM OF 10 FEET BETWEEN SUPPORTS.

8" OR 14" DIA. ALL THREADED ROD.

2"

4"

1"

4"

2" 2"

UNISTRUT CONDUIT HANGER

#J1207 (3/4"), J1210 (1"), J1212

(1-1/4"), J1215 (1-1/2"), OR J1220 (2")

MAX.

DOUBLE NUTS

1.

ALTERNATE MOUNTING

LOCATION.

CONDUIT SUPPORT

NOTES:

SPACING BETWEEN SUPPORTS SHALL BE 10'-0" MAXIMUM.

2.

CONDUIT CLIP CADDY

K8, K12, K16, OR K20

TOTAL WEIGHTTRADE

(LBS/LINEAL FOOT)SIZE

TUBING (EMT)

ELECTRICAL METALLIC

3/4"

1"

1-1/4"

0.72

1.09

1.73

COMBINED WEIGHT OF CONDUITS BETWEEN SUPPORTS MAY NOT EXCEED 5 LBS/ LINEAR FOOT.

1/4" OR 3/8"

THREADED ROD

FOR 3/8" THREADED ROD REFER TO DETAIL FOR 3/8"

THREADED ROD TO CONC FILLED METAL DECK DETAIL

8" DIAMETER HILTI KBTZ

WITH 2" EMBEDMENT

INTO LOW FLUTE, ROD

COUPLING, AND

HANGER ROD.

1 5/8 x 1 5/8 x 12GA CHANNEL, 18" MINIMUM LENGTH.

CHANNEL NUT.

8" OR 14" DIAMETER THREADED

ROD, W/ LARGE FLAT WASHERS

AND DOUBLE NUTS.

150# MAX

(E) NORMAL WEIGHT CONCRETE ON

METAL DECK

150# MAX

2" MIN

THREADED ROD CONDUIT SUPPORT DETAIL

SCALE: NONE

CONDUIT TRAPEZE SUPPORT SYSTEM

SCALE: NONE

CONDUIT SUPPORT DETAIL

SCALE: NONE

THREADED ROD TO METAL DECK DETAIL

SCALE: NONE

TYPICAL - PROVIDE

DOUBLE NUTS AT END OF

ROD WITH MIN. OF 1 INCH

OF THREADED ROD

EXPOSED.

2" MIN

0.45

0.72

1.09

1.73

2.14

3.09

SINGLE POLE SWITCH- "x" = SEE INDEX BELOW S

SWITCH SUBSCRIPT INDEX:

BLANK = SINGLE POLE SWITCH

3 = THREE WAY SWITCH

PANELBOARDTOP VIEW

FRONT VIEW

ATTACH PANEL TO CHANNEL

WITH 5/8" SPRING NUTS, BOLT

AND FENDER WASHER.

1 5/8" STEEL CHANNEL

CONCRETE WALL

ATTACH CHANNEL TO CONCRETE

WALL WITH 3/8" WEDGE ANCHORS

AND LARGE FLAT WASHERS.

MINIMUM 4" EMBEDMENT.

SURFACE MOUNTED PANEL ON UNISTRUT

SCALE: NONE

OVERALL & ENLARGED PLANS - 3RD-6TH FLOORS -

TYPICALE4-0

OVERALL & ENLARGED PLANS - PENTHOUSE/ROOFE5-0

ENLARGED PLANS - PENTHOUSE/ROOFE5-1

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E0-1

NONE

SYMBOLS, NOTES,

SCHEDULES AND

ABBREVIATIONS

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

11-12-2025

1. REFER TO OVERALL FLOOR PLAN FOR PANELBOARD LOCATIONS.

EXISTING PANEL P1 AND ASSOCIATED CONDUIT/FEEDERS TO BE REPLACED. UTILIZE

EXISTING CONDUIT.

INSTALL NEW 125A/3P BREAKER IN THE SPACE INDICATED. REPLACE EXISTING

CONDUIT/FEEDERS ASSOCIATED WITH THE CIRCUIT, (1) 2" CONDUIT WITH (3) #1 AWG &

1 #6 AWG GROUND.

INSTALL NEW 100A/3P SPARE BREAKERS IN THE SPACE INDICATED.

SHEET NOTES

GENERAL NOTES

DMV BLDG. EAST - SINGLE LINE DIAGRAM

SCALE: NONE

1200A300A/3P

BASEMENT LEVEL

1200A 1200A

.0

V

#2 #4

MS1

#1

V

V

MS2 ( G - 12 - B )

BUSS TIE

CENTROVAC

# 1 + 2

( D - 13 - B )

O

4160 V4160 V

PDS3 ( H - 14 - B )

7/

V

4160 V4160 V

TO PDS4

( H - 14 - B )

TO PDS4

( H - 14 - B )

TO PDS4

( H - 14 - B )

TO PDS4

( H - 14 - B )

TO PDS4

( H - 14 - B )

TO PDS4

( H - 14 - B )

1ST FLOOR LEVEL

2ND FLOOR LEVEL

225A P4 ( C - 11 - 2 )

ESCALATOR

480V

3RD FLOOR LEVEL

4TH FLOOR LEVEL

5TH FLOOR LEVEL

6TH FLOOR LEVEL

PENTHOUSE LEVEL

P1

P3

FREIGHT ELEVATOR

AUTOMATIC TRANSFER

SWITCH

TO FREIGHT

ELEVATOR

TO ELB

EMERGENCY

POWER

MID CITY

SUBSTATION

SMUD RING

FEED # 2308

VOLTAGE DROP CALCULATION

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E0-2

NONE

ONE LINE DIAGRAM & PANEL

SCHEDULE

SCOPE OF WORK

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J

E1-0

OVERALL FLOOR PLAN - BASEMENT

SCALE: 1/16" = 1'-0"

NORTH

PLAN

E1-0

E1-0ELEV #4ELEV #3ELEV #2ELEV #1

ELEV #6 ELEV #5

ELEV #7

ELEV #8

B

ENLARGED FLOOR PLAN - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED FLOOR PLAN - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED FLOOR PLAN - CARS #7-8 (CAR 8, ALTERNATE)

SCALE: 1/8" = 1'-0"

A A A A

B

B

G,WP

3S 3S

3S

S

G,WP

G,WP

G,WP

(E)(E)

S

G,WP

(E)

G,WP

(E)

G,WP

(E)

(E)

(E)ELEV #1 ELEV #2 ELEV #3 ELEV #4

ELEV #6 ELEV #5

ELEV #7

ELEV #8

B

B B

B

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E1-0

NONE

OVERALL & ENLARGED

PLANS - BASEMENT

REPLACE (E) LIGHT FIXTURE. RECONNECT (N) FIXTURE TO (E) CIRCUIT AND LIGHTING

CONTROLS.

SEE DETAIL 1/E0-1 FOR INTERCONNECTION OF SWITCH WITH RECEPTACLE AND

LIGHTING.

EXTEND (E) LIGHTING CIRCUIT TO (N) LIGHT FIXTURE.

CONVENIENCE RECEPTACLES ARE ASSUMED TO BE EXISTING AND IN GOOD,

WORKING CONDITION. IF THERE IS ANY INDICATION OF DAMAGE, OR THEY ARE NOT

FUNCTIONAL, PROVIDE REPLACEMENT.

SHEET NOTES

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

A-1-1

B-1-1

A-2-1

B-2-1

C-1-1

D-1-1

C-2-1

D-2-1

A-3-1 A-4-1

B-3-1 B-4-1

A-5-1

B-5-1

C-3-1 C-4-1

D-3-1 D-4-1

C-5-1

D-5-1

B-7-1

A-7-1A-6-1

B-6-1

A-8-1

B-8-1

D-7-1

C-7-1C-6-1

D-6-1

C-8-1

D-8-1

E-1-1

F-1-1

E-2-1

F-2-1

G-1-1

H-1-1

G-2-1

H-2-1

J-1-1 J-2-1

E-3-1 E-4-1

F-3-1 F-4-1

E-5-1

F-5-1

G-3-1 G-4-1

H-3-1 H-4-1

G-5-1

H-5-1

F-7-1

E-7-1E-6-1 E-8-1

F-8-1

H-7-1

G-7-1 G-6-1

H-6-1

G-8-1

H-8-1

J-3-1 J-4-1 J-5-1 J-7-1J-6-1 J-8-1

B-10-1

A-10-1A-9-1

B-9-1

A-11-1

B-11-1

D-10-1

C-10-1C-9-1

D-9-1

C-11-1

D-11-1

A-12-1

B-12-1

A-13-1 A-14-1

B-13-1 B-14-1

C-12-1

D-12-1

C-13-1 C-14-1

D-13-1 D-14-1

A-15-1

B-15-1

C-15-1

D-15-1

F-10-1

E-10-1E-9-1 E-11-1

F-11-1

H-10-1

G-10-1G-9-1

H-9-1

G-11-1

H-11-1

E-13-1E-12-1

F-12-1

E-14-1

F-13-1 F-14-1

G-12-1

H-12-1

G-13-1 G-14-1

H-13-1 H-14-1

J-10-1J-9-1 J-11-1 J-12-1 J-13-1 J-14-1

E-15-1

F-15-1

G-15-1

H-15-1

J-15-1

STORAGE

12 6

J

H

G

F

E

D

C

B

A

151413121110 9 8 7 6 5 4 3 2 1

1514131110 9 8 7 5 4 3 2 1

J

H

G

F

E

D

C

B

A

Rev: 10/06/23

PH

SG

S

/3 6/

STT

/8

F.E.

STORAGE

STORAGE

529 Sq.Ft.

219 Sq.Ft.

205 Sq.Ft.

OVERALL FLOOR PLAN - 1ST FLOOR

SCALE: 1/16" = 1'-0"

NORTH

PLAN

E2-0

E2-0

E2-0ELEV #4ELEV #3ELEV #2ELEV #1

ELEV #6 ELEV #5

ELEV #7

ELEV #8

ENLARGED PLAN - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #7-8 (CAR 8, ALTERNATE)

SCALE: 1/8" = 1'-0"

C-4-1

B-8-1 B-9-1

G-10-1

ELEV #1 ELEV #2 ELEV #3 ELEV #4

ELEV #6 ELEV #5 ELEV #7

ELEV #8

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E2-0

NONE

OVERALL & ENLARGED

FLOOR PLANS - 1ST FLOOR

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J Rev: 01/21/2025

OVERALL FLOOR PLAN - 2ND FLOOR

SCALE: 1/16" = 1'-0"

NORTH

PLAN

E3-0

E3-0

E3-0

5,6 E3-0

ELEV #4ELEV #3ELEV #2ELEV #1

ELEV #6 ELEV #5

ELEV #7

ELEV #8

ENLARGED PLAN - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #7-8 (CAR 8, ALTERNATE)

SCALE: 1/8" = 1'-0"

ELEV #1 ELEV #2 ELEV #3 ELEV #4

ELEV #6 ELEV #5 ELEV #7

ELEV #8

ENLARGED PLAN - MACHINE ROOM - CAR #8 (ALTERNATE)

SCALE: 1/8" = 1'-0"

ENLARGED CEILING PLAN - MACHINE ROOM - CAR #8 (ALTERNATE)

SCALE: 1/8" = 1'-0"

(E) (E)

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E3-0

NONE

OVERALL & ENLARGED

FLOOR PLANS - 2ND FLOOR

EXISTING ELEVATOR MOTOR TO BE REPLACED WITH MOTOR OF SAME SIZE. REPLACE

MOTOR AND USE EXISTING CONDUIT AND FEEDERS.

FIRE ALARM DEVICES IN THIS SPACE ARE EXISTING TO REMAIN.

MACHINE ROOM LIGHTING IS EXISTING TO REMAIN. EXISTING LIGHTS MEET MINIMUM

FOOTCANDLE LEVEL CRITERIA.

SHEET NOTES

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

A

B

C

D

E

F

G

H

J

A

B

C

D

E

F

G

H

J

18/54

36/5436/14

OVERALL FLOOR PLAN - 3RD-6TH FLOOR - TYPICAL

SCALE: 1/16" = 1'-0"

NORTH

PLAN

E4-0

E4-0

E4-0ELEV #4ELEV #3ELEV #2ELEV #1

ELEV #6 ELEV #5

ELEV #7

ELEV #8

ENLARGED PLAN - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CAR #7

SCALE: 1/8" = 1'-0"

ELEV #1 ELEV #2 ELEV #3 ELEV #4

ELEV #6 ELEV #5 ELEV #7

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E4-0

NONE

OVERALL & ENLARGED

FLOOR PLANS - 3RD-6TH

FLOOR - TYPICAL

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

A

C

D

E

F

G

H

J

2 3 4 5 6 7 8 9 10 11 12 13 14

2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

E

F

G

H

J

OVERALL FLOOR PLAN - PENTHOUSE/ROOF

SCALE: 1/16" = 1'-0"

NORTH

PLAN

E5-0

E5-0

E5-0

1,2,3 E5-1

4,5 E5-1

6,7 E5-1

ENLARGED PLAN - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - CAR #7

SCALE: 1/8" = 1'-0"

ELEV #1 ELEV #2 ELEV #3 ELEV #4

ELEV #6 ELEV #5

ELEV #7

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E5-0

NONE

OVERALL & ENLARGED

PLANS - PENTHOUSE/ROOF

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

#1 #2

#1 #1 #2 #2 #3 #3 #4 #4

#1 #2 #3 #4

ENLARGED PLAN - MACHINE ROOM - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED CEILING PLAN - MACHINE ROOM - CARS #1-4

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - MACHINE ROOM - DEMO - CARS #1-4

SCALE: 1/8" = 1'-0"

#1 #2

#1 #1 #2 #2 #3 #3 #4 #4

#1 #2 #3 #4

#1 #2

#1 #1 #2 #2 #3 #3 #4 #4

#1 #2 #3 #4

(E) (E) (E) (E) (E)

(E)

(E)(E)

(E)

(E)

(E)(E)(E)

(E) (E)

(E) (E)

ENLARGED PLAN - MACHINE ROOM - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED CEILING PLAN - MACHINE ROOM - CARS #5-6

SCALE: 1/8" = 1'-0"

ENLARGED PLAN - MACHINE ROOM - CARS #7

SCALE: 1/8" = 1'-0"

ENLARGED CEILING PLAN - MACHINE ROOM - CARS #7

SCALE: 1/8" = 1'-0"

(E)

(E)

(E)

(E)

(E)

(E)

(E) (E)

(E) (E)

#3 #4

#3 #4

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

Clint Sierer 916 375-4352 Phone Clinton.Sierer@dgs.ca.gov

DMV HQ EAST ELEVATOR

MODERNIZATION

ELEVATION KEY PLAN

DMV HQ EAST

BASEMENT

1ST FLOOR

2ND FLOOR

3RD FLOOR

4TH FLOOR

5TH FLOOR

6TH FLOOR

PENTHOUSE

02/19/25 95% PLAN CHECK SUBMITTAL-

05/06/25 95% REFINED SCOPE CHECK SET-

05/29/25 95% REFINED SCOPE REVIEW-

DEPARTMENT OF MOTOR VEHICLES

DMV

Project Number: 000000000015501

08/22/25 FINAL 100% REVIEW-

E5-1

NONE

ENLARGED PLANS -

PENTHOUSE/ROOF

EXISTING PANEL P1 AND ASSOCIATED FEEDERS TO BE REPLACED.

EXISTING AC-DC CONVERTER TO BE DEMOLISHED. NEW MOTORS WILL BE FED

DIRECTLY FROM AC PANELS.

EXISTING ELEVATOR MOTOR TO BE REPLACED WITH MOTOR OF SAME SIZE. REPLACE

MOTOR AND USE EXISTING CONDUIT AND FEEDERS. VERIFY EXISTING

OVERCURRENT PROTECTION DEVICE IS MINIMUM 90 AMP, 3 POLE.

EXISTING WIREWAY TO BE DEMOLISHED. REPLACE WITH NEW CONDUIT AND

FEEDERS OF SAME SIZE.

FIRE ALARM DEVICES IN THIS SPACE ARE EXISTING TO REMAIN.

MACHINE ROOM LIGHTING IS EXISTING TO REMAIN. EXISTING LIGHTS MEET MINIMUM

FOOTCANDLE LEVEL CRITERIA.

ELEVATOR CONTROLLERS TO BE REPLACED. CONTROLLERS #3 AND #4 REPLACED

AND RELOCATED. PROVIDE NEW CONDUIT AND PULL NEW CONDUCTORS FOR ALL

CONTROLLERS.

CONTROLLER TO BE REPLACED WITH NEW, USE EXISTING CONDUIT AND

CONDUCTORS.

SHEET NOTES

(N) PANEL P1

(D) PANEL P1

10/28/25 DSA PLAN CHECK SUBMITTAL-

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

MAIN PASSENGER ELEVATORS

F100-DMV HEADQUARTERS -BUILDING EAST - 1St FLOOR ELEVATOR KEY

12 6

J

H

G

F

E

D

C

B

A

151413121110 9 8 7 6 5 4 3 2 1

1514131110 9 8 7 5 4 3 2 1

J

H

G

F

E

D

C

B

A

CAR #1

4,000 lbs

CAR #2

4,000 lbs

CAR #3

4,000 lbs

CAR #4

4,000 lbs

CAR #6

4,000 lbs

CAR #5

4,000 lbs

CAR #7

6,000 lbs.

CAR #8

6,000 lbs.

SVC/PASS.

ELEVATORS

FREIGHT

ELEVATORS

2415 1ST AVE.

SACRAMENTO, CA 95818

State of California

Department of General Services Real Estate Services Division

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

Architecture & Engineering Section

707 Third Street, Suite 4-105 West Sacramento, California 95605

DMV HQ EAST ELEVATOR

MODERNIZATION

VT-0

16" = 1'

1ST FLOOR PLAN

RJN

06/03/25

10/28/251 100%

2280 GRASS VALLEY HWY. #281

AUBURN, CA 95603

JACK ARNS: (916) 300-3456

BOB NICHOLSON (206) 227-0417

architectural elevator consulting, llc

WWW.ARCHITECTURALELEVATOR.COM

V2

OFFICE OF THE STATE FIRE MARSHAL

shall be available on the project site at all times.

2/26/2026

APPROVED FIRE AND PANIC ONLY

Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans

25-4219

DSA

D E P A R T M E N T O F G E N E R A L S E R V I C E S

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

DSA

DIVISION OF THE STATE ARCHITECT

APP: INC:

REVIEWED FOR

SS

APPROVED

DIV. OF THE STATE ARCHITECT

DATE:

FLS ACS

02-123762

03/12/2026

VT-1

MACHINE ROOM PLAN CARS 1-4

#1 #2 #3 #4

#1 #2 #3 #4

#1 #2 #3 #4

#1 #2 #3 #4

CAR #1

4,000 lbs

CAR #2

4,000 lbs

CAR #3

4,000 lbs

CAR #4

4,000 lbs

VT-1

HOISTWAY PLAN CARS 1-4

L

6 th

L

M.R. FLOOR

VT-1

SECTION CARS 1-4

(N) MAINLINE DISCONNECTS

WITH SHUNT TRIP

$ = EXISTING LIGHT SWITCH

= NEW PIT STOP SWITCH

(N) = NEW

(E) = EXISTING TO REMAIN

DRAWING KEY:

= EXISTING SMOKE DETECTOR

= EXISTING HEAT DETECTORHD

= EXISTING SPRINKLER

SD

= NEW DUPLEX G.F.I. OUTLETS

= NEW GUARDED LIGHTS

(N) ELEVATOR

CONTROLLER WITH

VF DRIVE

#4 #3

(N) ELEVATOR

CONTROLLER WITH

VF DRIVE

(N) ELEVATOR CONTROLLER

WITH VF DRIVE

REMOVE CONTROLLERS FOR CARS 3 AND

4 FROM CONTROLLER ROOM AND INSTALL

IN MAIN MACHINE ROOM.

AT END OF PROJECT REMOVE HALL CALL

STATIONS on floors 1, 3, 5, and 6. Install new stainless steel plate with fire exit signs.

AT END OF PROJECT REMOVE HALL CALL

STATIONS on floors 1, 3, 5, and 6. Install new stainless steel plate with fire exit signs.

LEDGES AT BACK

WALL TO REMAIN.

(N) 110 v. CAB LIGHT

DISCONNECTS

HD

SD

HD

SD

HD

SD

HD

SD

HD

SD

HD

SD

HD

SD

HD

SD

HDSD HDSD

(N) REMOVE EXISTING DC MACHINES

AND REPLACE WITH NEW AC

GEARLESS MACHINES

VT-1

PIT PLAN CARS 1-4 AT END OF PROJECT REMOVE HALL CALL

STATIONS on floors 1, 3, 5, and 6. Install new stainless steel plate with fire exit signs.

AT END OF PROJECT REMOVE HALL CALL

STATIONS on floors 1, 3, 5, and 6.

This is the start of the file's text. The full file is on GovTribe.