About this file
This is an approved fire and panic plan document issued by the Office of the State Fire Marshal for the California Department of Forestry and Fire Protection Ione Training Center in Ione, Amador County, California. The plan covers a modular classroom replacement project (Contract 25-289360, Project Number 000000000010124) and includes comprehensive construction documents consisting of cover sheets, existing conditions, demolition plans, surface improvements, utility plans with profiles, erosion control plans and details, and electrical site plans. The plans were approved on September 11, 2025, with an issue date of November 24, 2025, and are identified as plan set 25-2554. The work comprises labor, material, and services necessary for demolition of an existing septic tank with reconnection to municipal sewer, excavation for new utility connections, installation of electrical raceway, water connections, and related work. Sealed bids are due January 21, 2026, at 2:00 P.M. at 707 Third Street, West Sacramento, California 95605. A or B license is required to bid the project, and the Office of the State Fire Marshal must be available on the project site at all times during construction.
The approved plans are subject to field inspection and final approval, with the stipulation that approval does not authorize any omission or deviation from applicable regulations. Contractors bidding on the project must submit valid Certificates of Reported Compliance (CRCs) for any fleet vehicles subject to California Air Resources Board In-Use Off-Road Diesel-Fueled Fleet Regulations prior to contract execution. All contractors and subcontractors must comply with federal, state, and local health and safety mandates, with adherence to the most restrictive applicable requirement. One set of the approved plans has been issued and is available for bidder review.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Package_Documents.pdf | ||
| Project_Manual_1_of_2_Final.pdf | ||
| Project_Manual_2_of_2_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
08.28.2025
ISSUE DATE: NOVEMBER 24, 2025
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
25-2554
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
09/11/25
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
| 01-0001 C0.0 - COVER SHEET |
| 01-0002 C1.0 - EXISTING CONDITIONS |
| 01-0003 C2.0 - DEMOLITION PLAN |
| 01-0004 C2.1 - DEMOLITION PLAN |
| 01-0005 C3.0 - SURFACE IMPROVEMENTS |
| 01-0006 C4.0 - UTILITY PLAN |
| 01-0007 C4.1 - UTILITY PROFILE |
| 01-0008 C4.2 - UTILITY PROFILE |
| 01-0009 C4.3 - UTILITY PROFILE |
| 01-0010 C5.0 - EROSION CONTROL PLAN |
| 01-0011 C5.1 - EROSION CONTROL PLAN |
| 01-0012 C5.2 - EROSION CONTROL DETAILS |
| 01-0013 C6.0 - DETAILS |
| 01-0014 C6.1 - DETAILS |
| 01-0015 E001 - GENERAL NOTES, LEGEND, ABB AND INDEX |
| 01-0016 E101 - ELECTRICAL SITE PLAN |
| 01-0017 E601 - DETAILS |