Plans_and_Specs_133914__6_.pdf
PDF 7 MB Posted
- Attached to
- IFB No. 133914 CSLO Bldg. 872 Computer Room Air Conditioner (CRAC) System Replacement, Camp San Luis Obispo
- Solicitation number
- 0000040732
About this file
This is an equipment warranty schedule and as-built drawings document for Camp San Luis Obispo Building 872 Communications Renovation, Contract #18-333.2. The project involves the installation and configuration of power and cooling equipment within a data center environment. The power equipment includes four units: SY60K100F, PDPM100F6F-M, SYCFXR9, and PDPM144F, each with individual serial numbers and warranty identification numbers. The cooling equipment consists of four units: two ACRD600 units and two ACCD75234 units. All power equipment warranties commenced on August 26-28, 2019, with expiration dates of August 24-26, 2020. All cooling equipment warranties began on September 25, 2019, and expired on September 23, 2020. The as-built drawings, dated September 23, 2019, document the final configuration of the data center infrastructure, including rack distribution panels, a new 100 kilowatt UPS system configured for 60 kilowatts, relocated computer room air conditioning (CRAC) units, and comprehensive mechanical systems with specified piping sizes and isolation features.
The document includes detailed mechanical specifications for refrigerant lines, humidifier make-up water lines, and condensate drain lines, with all refrigerant lines equipped with vibration isolators and isolation valves at both ends of runs. The as-built drawings reference project number 18895 and were issued by the design firm as final record documents. No pricing terms, set-asides, incumbent information, or funding sources are identified in this technical documentation package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 133914_IFB_Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Camp SLO Building 872
Communications Renovation
Contract # 18-333.2
Equipment Warranty Schedule:
Power Product Serial Number Warranty ID Warranty Start Date End Date
SY60K100F QD1838240430 WN-23746024 8/26/2019 8/24/2020
PDPM100F6F-M QI1916340007 WN-24047252 8/28/2019 8/26/2020
SYCFXR9 QD1902140558 WN-23746349 8/27/2019 8/25/2020
PDPM144F QI1849340425 WN-23743643 8/27/2019 8/25/2020
Cooling Product Serial Number Warranty ID Warranty Start Date End Date
ACRD600 JK1809003685 WN-23744567 9/25/2019 9/23/2020
ACCD75234 F1940000117 WN-23744567 9/25/2019 9/23/2020
ACRD600 JK1810003433 WN-23746025 9/25/2019 9/23/2020
ACCD75234 F1940000121 WN-23746025 9/25/2019 9/23/2020
ISSUED FOR REV
Seal(s)
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
18895
DATE
PATH AND FILENAME: J:\18\18895\E\AS BUILT\E1.1.DWG PLOTSYLE TABLE: ---- PLOT DATE: September 23, 2019 TIME: 10:26 AM
A R C
H D
"x m m x m m ro u n d ed
RH MC
CAMP SLO
BUILDING 872, CAMP SAN LUIS OBISPO
HB
AS BUILTS
09-23-19
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
18895
DATE
PATH AND FILENAME: J:\18\18895\E\AS BUILT\E1.2.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM
A R
C H
D
"x m m x m m ro u n d ed
RH MC
CAMP SLO
BUILDING 872, CAMP SAN LUIS OBISPO
HB
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
18895
DATE
PATH AND FILENAME: J:\18\18895\E\AS BUILT\E2.1.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM
A R C
H D
"x m m x m m ro u n d ed
RH MC
CAMP SLO
BUILDING 872, CAMP SAN LUIS OBISPO
HB
AS BUILTS
09-23-19
Rack Distribution
Panel
‘A’ side
‘B’ side distribution from RPP B
RPP B AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2)
distribution from UPS
PDU
R/B 1
New PX 100 kW UPS (configured for 60 kW)
CRAC
(relocated)
Demo old UPS distribution
2 Post 2 Post
Perf tile
R/B 2
AP7811B (2)
R/B 4
R/B 3
2 Pos Rackt
AP7811B (2) AP7811B (2)
CRAC
AP8865 (2)
R/C 1 R/C 2
FM
R/D 1 R/D 2 R/D 3 R/D 4
Hot Aisle
R/D 5 R/D 6 R/D 7
R/C 5 R/C 6 R/C 7
AP8865 (2) AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2) AP8865 (2)
R D
R D
XR
U
PD
U
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
18895
DATE
PATH AND FILENAME: J:\18\18895\E\AS BUILT\E3.1.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM
A R
C H
D
"x m m x m m ro u n d ed
RH MC
CAMP SLO
BUILDING 872, CAMP SAN LUIS OBISPO
HB
Project Manager Drawn
Project Leader Checked
Client
Drawing Title
Check Scale (may be photo reduced)
Project No.
Drawing No.
Project
0 1inch 0 10mm
18895
DATE
PATH AND FILENAME: J:\18\18895\M\M2.1.DWG PLOTSYLE TABLE: ---- PLOT DATE: December 7, 2018 TIME: 2:43 PM
A R
C H
D
"x m m x m m ro u n d ed
RH MC
CAMP SLO
BUILDING 872, CAMP SAN LUIS OBISPO
HB
Rack Distribution
Panel
‘A’ side
‘B’ side distribution from RPP B
RPP B AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2)
distribution from UPS
PDU
R/B 1
New PX 100 kW UPS (configured for 60 kW)
CRAC
(relocated)
Demo old UPS distribution
2 Post 2 Post
Perf tile
R/B 2
AP7811B (2)
R/B 4
R/B 3
2 Pos Rackt
AP7811B (2) AP7811B (2)
CRAC
AP8865 (2)
R/C 1 R/C 2
FM
R/D 1 R/D 2 R/D 3 R/D 4
R/C 3
Hot Aisle
R/D 5 R/D 6 R/D 7
R/C 5 R/C 6 R/C 7
AP8865 (2) AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2) AP8865 (2)
R D
R D
XR
U
PD
U
Randy Line
CRAC-5
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Oval
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Line
Randy Oval
Randy Line
Randy Line
Randy Typewritten Text 1-1/8"
Randy Typewritten Text 7/8"
Randy Typewritten Text 1"
Randy Typewritten Text 7/8"
Randy Typewritten Text 1/2"
Randy Typewritten Text 7/8"
Randy Typewritten Text 1/2"
Randy Typewritten Text 3/4"
Randy Typewritten Text 1/2"
Randy Typewritten Text 1-1/8"
Randy Typewritten Text 7/8"
Randy Typewritten Text 3/4"
Randy Typewritten Text 3/4"
Randy Typewritten Text 1"
Randy Typewritten Text Blue Lines Are Humidifier Make-Up Water Lines
Randy Typewritten Text Red Lines Are Refrigerant Lines
Randy Typewritten Text Purple Lines Are Condensate Drain Lines
Randy Typewritten Text Refrigerant Lines Have Vibrations Isolators & Isolation Valves At Both Ends Of The Runs
Randy Typewritten Text Humidifier Make-Up Water Lines Have Isolation Valves At Each Unit
File details come from the government source that posted it. Updated .