This is an equipment warranty schedule and as-built drawings document for Camp San Luis Obispo Building 872 Communications Renovation, Contract #18-333.2. The project involves the installation and configuration of power and cooling equipment within a data center environment. The power equipment includes four units: SY60K100F, PDPM100F6F-M, SYCFXR9, and PDPM144F, each with individual serial numbers and warranty identification numbers. The cooling equipment consists of four units: two ACRD600 units and two ACCD75234 units. All power equipment warranties commenced on August 26-28, 2019, with expiration dates of August 24-26, 2020. All cooling equipment warranties began on September 25, 2019, and expired on September 23, 2020. The as-built drawings, dated September 23, 2019, document the final configuration of the data center infrastructure, including rack distribution panels, a new 100 kilowatt UPS system configured for 60 kilowatts, relocated computer room air conditioning (CRAC) units, and comprehensive mechanical systems with specified piping sizes and isolation features.

The document includes detailed mechanical specifications for refrigerant lines, humidifier make-up water lines, and condensate drain lines, with all refrigerant lines equipped with vibration isolators and isolation valves at both ends of runs. The as-built drawings reference project number 18895 and were issued by the design firm as final record documents. No pricing terms, set-asides, incumbent information, or funding sources are identified in this technical documentation package.

View the file

Other files

File Type Posted
133914_IFB_Packet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Camp SLO Building 872

Communications Renovation

Contract # 18-333.2

Equipment Warranty Schedule:

Power Product Serial Number Warranty ID Warranty Start Date End Date

SY60K100F QD1838240430 WN-23746024 8/26/2019 8/24/2020

PDPM100F6F-M QI1916340007 WN-24047252 8/28/2019 8/26/2020

SYCFXR9 QD1902140558 WN-23746349 8/27/2019 8/25/2020

PDPM144F QI1849340425 WN-23743643 8/27/2019 8/25/2020

Cooling Product Serial Number Warranty ID Warranty Start Date End Date

ACRD600 JK1809003685 WN-23744567 9/25/2019 9/23/2020

ACCD75234 F1940000117 WN-23744567 9/25/2019 9/23/2020

ACRD600 JK1810003433 WN-23746025 9/25/2019 9/23/2020

ACCD75234 F1940000121 WN-23746025 9/25/2019 9/23/2020

ISSUED FOR REV

Seal(s)

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

18895

DATE

PATH AND FILENAME: J:\18\18895\E\AS BUILT\E1.1.DWG PLOTSYLE TABLE: ---- PLOT DATE: September 23, 2019 TIME: 10:26 AM

A R C

H D

"x m m x m m ro u n d ed

RH MC

CAMP SLO

BUILDING 872, CAMP SAN LUIS OBISPO

HB

AS BUILTS

09-23-19

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

18895

DATE

PATH AND FILENAME: J:\18\18895\E\AS BUILT\E1.2.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM

A R

C H

D

"x m m x m m ro u n d ed

RH MC

CAMP SLO

BUILDING 872, CAMP SAN LUIS OBISPO

HB

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

18895

DATE

PATH AND FILENAME: J:\18\18895\E\AS BUILT\E2.1.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM

A R C

H D

"x m m x m m ro u n d ed

RH MC

CAMP SLO

BUILDING 872, CAMP SAN LUIS OBISPO

HB

AS BUILTS

09-23-19

Rack Distribution

Panel

‘A’ side

‘B’ side distribution from RPP B

RPP B AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2)

distribution from UPS

PDU

R/B 1

New PX 100 kW UPS (configured for 60 kW)

CRAC

(relocated)

Demo old UPS distribution

2 Post 2 Post

Perf tile

R/B 2

AP7811B (2)

R/B 4

R/B 3

2 Pos Rackt

AP7811B (2) AP7811B (2)

CRAC

AP8865 (2)

R/C 1 R/C 2

FM

R/D 1 R/D 2 R/D 3 R/D 4

Hot Aisle

R/D 5 R/D 6 R/D 7

R/C 5 R/C 6 R/C 7

AP8865 (2) AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2) AP8865 (2)

R D

R D

XR

U

PD

U

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

18895

DATE

PATH AND FILENAME: J:\18\18895\E\AS BUILT\E3.1.DWG PLOTSYLE TABLE: Standard.ctb PLOT DATE: September 23, 2019 TIME: 10:26 AM

A R

C H

D

"x m m x m m ro u n d ed

RH MC

CAMP SLO

BUILDING 872, CAMP SAN LUIS OBISPO

HB

Project Manager Drawn

Project Leader Checked

Client

Drawing Title

Check Scale (may be photo reduced)

Project No.

Drawing No.

Project

0 1inch 0 10mm

18895

DATE

PATH AND FILENAME: J:\18\18895\M\M2.1.DWG PLOTSYLE TABLE: ---- PLOT DATE: December 7, 2018 TIME: 2:43 PM

A R

C H

D

"x m m x m m ro u n d ed

RH MC

CAMP SLO

BUILDING 872, CAMP SAN LUIS OBISPO

HB

Rack Distribution

Panel

‘A’ side

‘B’ side distribution from RPP B

RPP B AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2)

distribution from UPS

PDU

R/B 1

New PX 100 kW UPS (configured for 60 kW)

CRAC

(relocated)

Demo old UPS distribution

2 Post 2 Post

Perf tile

R/B 2

AP7811B (2)

R/B 4

R/B 3

2 Pos Rackt

AP7811B (2) AP7811B (2)

CRAC

AP8865 (2)

R/C 1 R/C 2

FM

R/D 1 R/D 2 R/D 3 R/D 4

R/C 3

Hot Aisle

R/D 5 R/D 6 R/D 7

R/C 5 R/C 6 R/C 7

AP8865 (2) AP8865 (2) AP8861 (2) AP8861 (2) AP8861 (2) AP8865 (2) AP8865 (2)

R D

R D

XR

U

PD

U

Randy Line

CRAC-5

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Oval

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Line

Randy Oval

Randy Line

Randy Line

Randy Typewritten Text 1-1/8"

Randy Typewritten Text 7/8"

Randy Typewritten Text 1"

Randy Typewritten Text 7/8"

Randy Typewritten Text 1/2"

Randy Typewritten Text 7/8"

Randy Typewritten Text 1/2"

Randy Typewritten Text 3/4"

Randy Typewritten Text 1/2"

Randy Typewritten Text 1-1/8"

Randy Typewritten Text 7/8"

Randy Typewritten Text 3/4"

Randy Typewritten Text 3/4"

Randy Typewritten Text 1"

Randy Typewritten Text Blue Lines Are Humidifier Make-Up Water Lines

Randy Typewritten Text Red Lines Are Refrigerant Lines

Randy Typewritten Text Purple Lines Are Condensate Drain Lines

Randy Typewritten Text Refrigerant Lines Have Vibrations Isolators & Isolation Valves At Both Ends Of The Runs

Randy Typewritten Text Humidifier Make-Up Water Lines Have Isolation Valves At Each Unit