Plans_adv.pdf

PDF 31 MB Posted

Attached to
Chickamauga and Chattanooga National Military Park
Solicitation number
693C73-21-B-000016
Issued by

About this file

This solicitation is seeking bids from certified Small Business Concerns for rehabilitation work at the Chickamauga and Chattanooga National Military Park. The project consists of rehabilitating approximately 2.00 miles of Glenn-Kelly Road, 0.82 miles of Battleline Road, and 0.33 miles of Poe Road, including parking areas and pull-offs, within the park. Work includes asphalt and concrete removal, grading, aggregate base installation, asphalt overlay, chip sealing, culverts, stone masonry walls, aggregate-topsoil course, signing, and pavement markings. The project will be split into multiple schedules with a total expected cost between $1,000,000 to $5,000,000. Bids are due on the date specified in the solicitation to be issued on or around June 29, 2021. The solicitation is being conducted by the Department of Transportation Federal Highway Administration for the Chickamauga and Chattanooga National Military Park project.

View the file

Other files

File Type Posted
Results of Bid Opening - NP-CHCH 500(1) 501(1).pdf PDF
FP14_Eng.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
NEPA CE.pdf PDF
VETS 4212 Form.pdf PDF
PAVEMENT REPORT NUMBER FY21-01.pdf PDF
IFB Solicitation - NP-CHCH 500(1) 501(1) ETC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Se.Av Sticky Note

NPS PMIS No. 234348, 234366, 234249 NPS Drwa No. 301/165365

STATE PROJECT

SHEET

NUMBER

GA

NP-CHCH 500(1),

A04

501(1 ), ETC.

SCHEDULE ROADWAY NAME (ROUTE NUMBER) STATION TO STATION LENGTH (MILE) AREA (SQFT) LANE MILE (MILE)

A Glenn-Kelly Road (Rte. 500) 0+40.00 to 71+00.00 1.34 - 1.34 A Tour Stop 7 Parking (Rte. 930) - 1501 0.03 A South Carolina Monument Parking (Rte. 932) - 1182 0.02 B Glenn-Kelly Road (Rte. 500) 71 +00 to 105+97.26 0.66 - 0.66 B South Post Gate Parking (Rte. 933) - 826 0.01 C Battleline Road (Rte. 501) 200+00.00 to 243+37.60 0.82 - 0.82 C Tour Stop 2 Parking (Rte. 934) - 638 0.01 D Poe Road (Rte. 502) 300+00.00 to 317+66.60 0.33 - 0.33 D Tour Stop 3 Parking (Rte. 935) - 777 0.01 E Glenn-Kelly Road (Rte. 500) 3+45.00 to 3+65.00 0.00 - 0.00

TOTAL= 3.15 4924.00 3.23

ti

:c u :c u g

:;; 0

!2 -fi

NO. DATE BY REVISIONS

U.S. DEPARTMENT DF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK

FEDERAL HIGHWAY ADMINISTRATION

OFFICE OF FEDERAL LANDS HIGHWAY

MILEAGE TABULATION

File details come from the government source that posted it. Updated .