Plans_adv.pdf
PDF 31 MB Posted
- Solicitation number
- 693C73-21-B-000016
About this file
This solicitation is seeking bids from certified Small Business Concerns for rehabilitation work at the Chickamauga and Chattanooga National Military Park. The project consists of rehabilitating approximately 2.00 miles of Glenn-Kelly Road, 0.82 miles of Battleline Road, and 0.33 miles of Poe Road, including parking areas and pull-offs, within the park. Work includes asphalt and concrete removal, grading, aggregate base installation, asphalt overlay, chip sealing, culverts, stone masonry walls, aggregate-topsoil course, signing, and pavement markings. The project will be split into multiple schedules with a total expected cost between $1,000,000 to $5,000,000. Bids are due on the date specified in the solicitation to be issued on or around June 29, 2021. The solicitation is being conducted by the Department of Transportation Federal Highway Administration for the Chickamauga and Chattanooga National Military Park project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-CHCH 500(1) 501(1).pdf | ||
| FP14_Eng.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| NEPA CE.pdf | ||
| VETS 4212 Form.pdf | ||
| PAVEMENT REPORT NUMBER FY21-01.pdf | ||
| IFB Solicitation - NP-CHCH 500(1) 501(1) ETC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Se.Av Sticky Note
NPS PMIS No. 234348, 234366, 234249 NPS Drwa No. 301/165365
STATE PROJECT
SHEET
NUMBER
GA
NP-CHCH 500(1),
A04
501(1 ), ETC.
SCHEDULE ROADWAY NAME (ROUTE NUMBER) STATION TO STATION LENGTH (MILE) AREA (SQFT) LANE MILE (MILE)
A Glenn-Kelly Road (Rte. 500) 0+40.00 to 71+00.00 1.34 - 1.34 A Tour Stop 7 Parking (Rte. 930) - 1501 0.03 A South Carolina Monument Parking (Rte. 932) - 1182 0.02 B Glenn-Kelly Road (Rte. 500) 71 +00 to 105+97.26 0.66 - 0.66 B South Post Gate Parking (Rte. 933) - 826 0.01 C Battleline Road (Rte. 501) 200+00.00 to 243+37.60 0.82 - 0.82 C Tour Stop 2 Parking (Rte. 934) - 638 0.01 D Poe Road (Rte. 502) 300+00.00 to 317+66.60 0.33 - 0.33 D Tour Stop 3 Parking (Rte. 935) - 777 0.01 E Glenn-Kelly Road (Rte. 500) 3+45.00 to 3+65.00 0.00 - 0.00
TOTAL= 3.15 4924.00 3.23
ti
:c u :c u g
:;; 0
!2 -fi
NO. DATE BY REVISIONS
U.S. DEPARTMENT DF TRANSPORTATION CHICKAMAUGA AND CHATTANOOGA NATIONAL MILITARY PARK
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
MILEAGE TABULATION
File details come from the government source that posted it. Updated .