Plans_17301.pdf

PDF 2 MB Posted

Attached to
751/17301. BDW; Presque Isle SH Dock Repair & Fuel Sys Mods
Solicitation number
RFQ - 171 - 240000000288
Issued by
Presque Isle County, Michigan

About this file

This document contains construction drawings for the Presque Isle State Harbor Dock Repair and Fuel System Modifications project in Presque Isle County, Michigan. The project is overseen by the State of Michigan Department of Technology, Management and Budget, State Facilities Administration, Design and Construction Division. The key aspects of the project include demolition and modifications to the existing fuel system and structural repairs to the dock. The bid attachments must be uploaded to the SIGMA VSS system, and bidders should contact the specified individuals with any questions or issues. Approved emailed bids may be accepted on a case-by-case basis prior to the 2:00 p.m. deadline.

The project requires the installation of a new fuel dispenser, including a backlit LCD display, flow control valves, and a payment terminal. Existing piping and equipment are to be reused where possible, with any required replacements to be coordinated with the engineer. A test and balance of the fuel system is required to verify the dispenser flow rates. The dock structural repairs include abutment repairs and other modifications as detailed in the drawings. Bidders should review the general electrical and mechanical notes for additional requirements and coordination considerations.

View the file

Other files

File Type Posted
Advertisement_17301.pdf PDF
Specifications_17301.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

HE

C

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

AP

PR

O

VE

D B

Y:

(866) 454-3923 | WWW.C2AE.COM

W E

RE

C

YC

LE

BL

AC

K W

HI

TE

TH

E

BA

R

BE

LO

W S

HO

W

S G

RA

YS

C

AL

E

FR

O M

W

HI

TE

T

O S

O

LID

TH

E

BA

R

BE

LO

W S

HO

W

S

PR

IM

AR

Y C

O

LO

RS

PROJ. #:

ISSUANCES

DESCRIPTION DATE

PHASE

COPYRIGHT© C2AE

NOT TO BE REPRODUCED OR DISTRIBUTED

WITHOUT PRIOR WRITTEN CONSENT

ALL RIGHTS RESERVED

11/

/2

8:

A

M S:

\2

8\

D

TM

B_

Pr es qu eI sl \D ra w in gs

\D S_

Pr es qu e

Is le

\S he et s\

Ti tle

Sh ee t.d w g

TI

TL

E

SH

EE

T

C

RO

N K, E

RI

K

TI

TL

E

SH

EE

T

PR

ES

Q

UE

IS

LE

S

TA

TE

H

AR

BO

R D

O C

K

RE

PA

IR

A

ND

FU

EL

S

YS

TE

M

M O

D

IFI

C

AT

IO

NS

PR

ES

Q

UE

IS

LE

C O

UN

TY

, M I

18-0112

100% PHASE 500

100% PHASE 500 11/22/23

G.1.1

CONSTRUCTION DRAWINGS

FOR

DTMB FILE NO. 751/17031.BDW

INDEX NO. 53270

PRESQUE ISLE STATE HARBOR

DOCK REPAIR AND FUEL SYSTEM MODIFICATIONS

PRESQUE ISLE COUNTY, MICHIGAN

(SEAL)

U.S.-23 HURON

LAKE

GRAND

CR638

LAKE

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINSTRATION

DESIGN AND CONSTRUCTION DIVISION

ADAM P. LACH, RA, DIRECTOR

TUEBOR

U

S

QU E

R C I

U

PISR

C

SNIEN

M

IS

KAB

E

RUPL SBUI

ANEO

E I

MLA

P

AM

C

M

MUUN

C

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

AP

PR

O

VE

D B

Y:

(866) 454-3923 | WWW.C2AE.COM

W E

RE

C

YC

LE

BL

AC

K W

HI

TE

TH

E

BA

R

BE

LO

W S

HO

W

S G

RA

YS

C

AL

E

FR

O M

W

HI

TE

T

O S

O

LID

TH

E

BA

R

BE

LO

W S

HO

W

S

PR

IM

AR

Y C

O

LO

RS

PROJ. #:

ISSUANCES

DESCRIPTION DATE

PHASE

COPYRIGHT© C2AE

NOT TO BE REPRODUCED OR DISTRIBUTED

WITHOUT PRIOR WRITTEN CONSENT

ALL RIGHTS RESERVED

R

E

S

G

D

FU

EL

S Y

ST

EM

D

EM

O

LI

TI

O

N P

LA

N

PR

ES

Q

UE

IS

LE

S

TA

TE

H

AR

BO

R

DO

C K

RE

PA

IR

A

ND

FU

EL

S

YS

TE

M M

O D

IFI

C

AT

IO

NS

PR

ES

Q

UE

IS

LE

C O

UN

TY

, M I

18-0112

C1.1

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINSTRATION

DESIGN AND CONSTRUCTION DIVISION

ADAM P. LACH, RA, DIRECTOR

SR

C I

UC M

KAB

E

IP C

Feet 0 30 60

R

E

S

PG

PD

C

HE

C

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

AP

PR

O

VE

D B

Y:

(866) 454-3923 | WWW.C2AE.COM

W E

RE

C

YC

LE

BL

AC

K W

HI

TE

TH

E

BA

R

BE

LO

W S

HO

W

S G

RA

YS

C

AL

E

FR

O M

W

HI

TE

T

O S

O

LID

TH

E

BA

R

BE

LO

W S

HO

W

S

PR

IM

AR

Y C

O

LO

RS

PROJ. #:

ISSUANCES

DESCRIPTION DATE

PHASE

COPYRIGHT© C2AE

NOT TO BE REPRODUCED OR DISTRIBUTED

WITHOUT PRIOR WRITTEN CONSENT

ALL RIGHTS RESERVED

GENERAL ELECTRICAL NOTES

A. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE LATEST

ACCEPTED EDITION OF THE NATIONAL ELECTRICAL CODE (NEC) AND ALL

STATE AND LOCAL CODES.

B. AREAS ADJACENT TO THE PROJECT WORK AREA WITHIN THE FACILITY

ARE TO REMAIN OPERATIONAL DURING NORMAL HOURS OF FACILITY

OPERATION. COORDINATE ALL REQUIRED SYSTEM SHUTDOWNS WITH

THE OWNER TO MINIMIZE DISRUPTION OF STAFF WITHIN THE FACILITY.

C. WORK MAY BE REQUIRED TO BE PERFORMED DURING OFF HOURS TO

AVOID INTERFERING WITH THE OPERATION OF THE FACILITY. SEE

PHASING OR CONSTRUCTION SEQUENCING INFORMATION ON THE

DRAWINGS AND/OR IN THE SPECIFICATIONS.

D. COORDINATE THE INSTALLATION OF ALL EQUIPMENT REQUIRING

ELECTRICAL CONNECTIONS WITH CIVIL AND MECHANICAL PLANS,

SPECIFICATIONS AND EQUIPMENT DRAWINGS. PROVIDE ALL

NECESSARY EQUIPMENT POWER AND CONTROL CONNECTIONS NOT

PROVIDED BY OTHERS WHETHER INDICATED ON THE DRAWINGS OR

NOT.

E. UNLESS OTHERWISE NOTED, ALL SINGLE PHASE BRANCH CIRCUITS FOR

LIGHTING AND POWER SHALL BE 2#12 AND 1#12G IN ¾” CONDUIT.

F. ALL LOW VOLTAGE ELECTRICAL POWER AND CONTROL CONDUCTORS

SHALL BE STRANDED COPPER.

G. INSTALL AN INSULATED, GREEN, GROUNDING CONDUCTOR IN ALL

FEEDER AND BRANCH CIRCUIT RACEWAYS.

H. SPLICE CABLES OR CONDUCTORS IN OUTLET BOXES, DEVICE BOXES,

PULL BOXES OR JUNCTION BOXES. DO NOT SPLICE CABLES OR

CONDUCTORS IN CONDUIT BODIES.

I. FINAL CONNECTIONS TO ITEMS SUBJECT TO VIBRATION SHALL BE MADE

WITH FLEXIBLE METAL CONDUIT OR LIQUID TIGHT FLEXIBLE METAL

CONDUIT. FLEXIBLE METAL CONDUIT AND LIQUID TIGHT FLEXIBLE

METAL CONDUIT SHALL NOT BE USED AS A GROUNDING CONDUCTOR.

PROVIDE A SEPARATE GREEN GROUNDING CONDUCTOR.

J. IN THE EVENT OF CONFLICTS BETWEEN THE REQUIREMENTS OF THE

DRAWINGS AND SPECIFICATIONS OR WITHIN THE DRAWINGS OR

SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL BE

ASSUMED TO BE CORRECT. REFER UNCERTAINTIES IN REQUIREMENTS

TO THE ENGINEER FOR CLARIFICATION.

K. THE ELECTRICAL DIAGRAM INFORMATION HAS BEEN TAKEN FROM

THE EXISTING FACILITY RECORD DRAWINGS AND HAS NOT BEEN

COMPLETELY FIELD VERIFIED FOR ACCURACY. THE ELECTRICAL

CONNECTIONS SHOWN ARE EXISTING TO REMAIN UNLESS

OTHERWISE NOTED.

L. REFER TO SPECIFICATION SECTION 01030 FOR PROJECT

ALTERNATES.

M. FOR NEW CONNECTIONS, MATCH EXISTING CONDUIT AND

CONDUCTOR SIZES.

N. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH NEC

ARTICLE 514. ALL ABOVE GRADE CONDUIT SHALL BE THREADED

RIGID STEEL. UNDERGROUND CONDUIT MAY BE PVC SUBJECT TO

THE REQUIREMENTS OF NEC 514.8. FURNISH AND INSTALL

CONDUIT SEAL FITTINGS AS REQUIRED BY NEC 514.

FUEL DISPENSER SPECIFICATION

A. PROVIDE WAYNE SELECT GEN2 DISPENSER OR EQUAL.

B. BACKLIT LCD DISPLAYS, WITH PROGRAMMABLE GALLON OR LITERS.

DISPLAY VISIBLE FOR 10 MINUTES AFTER POWER LOSS. DISPLAY

INDICATES PRICE AND TOTALIZER. DISPLAY ADJUSTABLE FOR SERVICE

ACCESS.

C. STANDARD FLOW CONTROL VALVE UP TO , TWO STAGE 24 VDC VALVE

PER HOSE TO ALLOW SEPARATE PROGRAMMABLE FLOW RATE FOR

EACH HOSE ON DISPENSER.

D. UL LISTED COMPONENTS. SOLID STATE RELAYS,

E. PAYMENT TERMINAL: ONBOARD RETAIL TERMINAL FOR CONNECTION TO

POS SYSTEM. WVGA COLOR TOUCH SCREEN, SECURE PIN PAD WITH

METAL KEYS, SECURE HYBRID CHIP READER AND RECEIPT PRINTER.

F. MIN 1" RUBBERIZED FLEXIBLE FUEL HOSE 20' LENGTH (FIELD

VERIFY EXISTING HOSE LENGTH AND MATCH), RATED FOR

OUTDOOR USE AND USE ON HOSE REEL.

GENERAL MECHANICAL NOTES

A. AREAS ADJACENT TO THE PROJECT WORK AREA WITHIN THE FACILITY

ARE TO REMAIN OPERATIONAL DURING NORMAL HOURS OF FACILITY

OPERATION. COORDINATE ALL REQUIRED SYSTEM SHUTDOWNS WITH

THE OWNER .

B. REVISE EXISTING PIPE CONNECTIONS INSIDE TRANSITION BOX ON

DOCK. DO NOT ADD CONNECTIONS OUTSIDE OF TRANSITION BOX.

C. COORDINATE THE INSTALLATION OF ALL EQUIPMENT WITH CIVIL AND

ELECTRICAL PROVIDE ALL NECESSARY EQUIPMENT , ANCILLARIES AND

CONTROLS FOR FULLY FUNCTIONING SYSTEM WHETHER INDICATED ON

THE DRAWINGS OR NOT.

D. REUSE EXISTING EQUIPMENT/PIPING AS INDICATED. IF FIELD

INSPECTION REVEALS DAMAGE OR CONDITION WARRANTING

REPLACEMENT NOTIFY ENGINEER.

E. IN THE EVENT OF CONFLICTS BETWEEN THE REQUIREMENTS OF THE

DRAWINGS AND SPECIFICATIONS OR WITHIN THE DRAWINGS OR

SPECIFICATIONS, THE MORE STRINGENT REQUIREMENT SHALL BE

ASSUMED TO BE CORRECT. REFER UNCERTAINTIES IN REQUIREMENTS

TO THE ENGINEER FOR CLARIFICATION.

F. THE INFORMATION SHOWN HAS BEEN TAKEN FROM THE EXISTING

FACILITY RECORD DRAWINGS AND HAS NOT BEEN COMPLETELY FIELD

VERIFIED FOR ACCURACY. FIELD VERIFY EXISTING CONDITIONS.

G. REFER TO SPECIFICATION SECTION 231113 FOR FUEL PIPING. INTENT IS

TO MATCH EXISTING FUEL PIPING SYSTEM EXISTING ON DOCK. FIELD

VERIFY ATP TRIPLE WALL PIPE SYSTEM IN USE.

H. FOR NEW CONNECTIONS, MATCH EXISTING CONDUIT AND CONDUCTOR

SIZES.

I. ALL MECHANICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH

STATE/LOCAL/FEDERAL ORDINANCES, CODES, AND LAWS. FOR

PURPOSE OF THIS DESIGN, THE CODES FOR STATE OF MICHIGAN WERE

USED AS BASIS. ADHERE TO ALL EPA REGULATIONS.

J. A TEST AND BALANCE OF FUEL SYSTEM AT COMPLETED TO VERIFY

DISPENSER FLOW RATES IS REQUIRED AS PART OF THIS WORK.

Feet 0 30 60

FU

EL

S Y

ST

EM

P

RO

PO

SE

D P

LA

N

PR

ES

Q

UE

IS

LE

S

TA

TE

H

AR

BO

R

DO

C K

RE

PA

IR

A

ND

FU

EL

S

YS

TE

M M

O

DI

FIC

AT

IO

NS

PR

ES

Q

UE

IS

LE

C O

UN

TY

, M I

18-0112

C1.2

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINSTRATION

DESIGN AND CONSTRUCTION DIVISION

ADAM P. LACH, RA, DIRECTOR

SR

C I

UC M

KAB

IP C

C

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

AP

PR

O

VE

D B

Y:

(866) 454-3923 | WWW.C2AE.COM

W E

RE

C

YC

LE

BL

AC

K W

HI

TE

TH

E

BA

R

BE

LO

W S

HO

W

S G

RA

YS

C

AL

E

FR

O M

W

HI

TE

T

O S

O

LID

TH

E

BA

R

BE

LO

W S

HO

W

S

PR

IM

AR

Y C

O

LO

RS

PROJ. #:

ISSUANCES

DESCRIPTION DATE

PHASE

COPYRIGHT© C2AE

NOT TO BE REPRODUCED OR DISTRIBUTED

WITHOUT PRIOR WRITTEN CONSENT

ALL RIGHTS RESERVED

11/

/2

8:

A

M S:

\2

8\

D

TM

B_

Pr es qu eI sl \D ra w in gs

\D S_

Pr es qu e

Is le

\S he et s\

EX

IS

TI

N

G S

TR

UC

TU

RE

D

ET

AI

LS

.d w g

S1 .1

C

RO

N K, E

RI

K

D O

C K

S

TR

U C

TU

RA

L R

EP

A

IR

PR

ES

Q

UE

IS

LE

S

TA

TE

H

AR

BO

R D

O C

K

RE

PA

IR

A

ND

FU

EL

S

YS

TE

M

M O

D

IFI

C

AT

IO

NS

PR

ES

Q

UE

IS

LE

C O

UN

TY

, M I

18-0112

S1.1

DEMOLITION PLAN

ENLARGED ABUTMENT REPAIR DETAIL

REPAIR PLAN

2" = 1'-0"

2" = 1'-0"

3" = 1'-0"

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINSTRATION

DESIGN AND CONSTRUCTION DIVISION

ADAM P. LACH, RA, DIRECTOR

SR

C I

UC M

KAB

IP C

Sheets and Views
G.1.1 Title Sheet
C1.1 Fuel System Demolition Plan
C1.2 Fuel System Proposed Plan
S1.1 Dock Structural Repair

File details come from the government source that posted it. Updated .