Plan_Sheets_1-9.pdf

PDF 2 MB Posted

Attached to
El Pelar Drive - Pedestrian Ramps and Concrete Repair, Sanada Way - Storm Drain
Solicitation number
CT224-32
Issued by
Boise County, Idaho

About this file

These plan sheets are engineering documents prepared by the Ada County Highway District (ACHD) for two related infrastructure improvement projects: El Pelar Drive Pedestrian Ramps (Project Number 5500.740.2023.34) and 3555 N Sanada Way Storm Drain (Project Number 224001.07). The projects involve installing pedestrian infrastructure improvements including curb and gutter, sidewalks, pedestrian ramps, and storm drain infrastructure in Ada County, Idaho. The plan set includes detailed design drawings spanning multiple sheets covering vicinity maps, utility locations, grading plans, construction signage, typical pedestrian routing, and specific engineering details like catch basin specifications and alignment tables.

The project documents indicate these are public infrastructure improvements that will require precise civil engineering work, including specific technical specifications for drainage infrastructure, pedestrian access improvements, and roadway modifications. The plan sheets provide comprehensive technical details including elevation profiles, geometric design specifications, construction phasing information, and traffic control/pedestrian routing plans. While specific budget details are not prominently displayed, the documents suggest these are publicly funded infrastructure projects aimed at improving accessibility and drainage in specific sections of Ada County, with engineering work to be performed according to Idaho Transportation Department standards and Ada County Highway District specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Matthew W. Degen

Digitally signed by Matthew W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen Date: 2023.06.22 08:30:58-06'00'

W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:31:16-06'00'

W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:31:34-06'00'

W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:31:57-06'00'

Sheet No. D e s c r i p t i o n

I N D E X O F S H E E T S

0%

Matthew W. Degen

Digitally signed by Matthew W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen Date: 2023.11.08 08:25:59-07'00'

W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:26:18-07'00'

D E T A I L T I T L E

Revisions: S I G N A T U R E S

DETOUR

AHEAD

WORK

ROAD

MPH

OUT

BRIDGEROAD CLOSEDDETOUR DETOURSANADA WAY

AHEAD

DETOUR

ROAD WORK

END

FEET

Revisions: S I G N A T U R E S

A description of project

For Information Call ACHD at 387-6290 Contractor: Completion Date: (year/season)

Project Sponsored By

City Logo Here

Matthew W. Degen

Digitally signed by Matthew W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:26:38-07'00'

Revisions: S I G N A T U R E S

X STREET

Matthew W. Degen

Digitally signed by Matthew W. Degen

DN: C=US,

E=mdegen@achdidaho.org, O=ACHD, CN=Matthew W.

Degen

08:27:01-07'00'

File details come from the government source that posted it. Updated .