This plan set document pertains to the construction of a new South Shower Building at Austin Hawes Campground in Barkhamsted, Connecticut, administered by the Connecticut Department of Energy and Environmental Protection. The project involves the complete demolition of an existing single-story wood-framed restroom and shower facility and its replacement with a new 1,391-square-foot Type 5B non-combustible masonry and timber-framed structure. The new building will accommodate eight toilet/shower rooms (including two ADA-accessible units), one ADA-accessible toilet room, shared utility sinks, a janitorial space, and mechanical systems. The project is designed to accommodate an occupant load of approximately 10 persons and is scheduled for construction in 2027. The design documents include architectural, structural, civil, mechanical, electrical, and plumbing drawings prepared by TLB Architecture, LLC; Cartier Structural Design; Nathan L. Jacobson & Associates, Inc.; and Innovative Engineering Services, LLC, with issuance for permit dated July 10, 2026.

The design complies with the 2022 Connecticut State Building Code, 2021 International Building Code, and applicable standards for accessibility (2017 ICC/ANSI A117.1). Construction specifications address site conditions including soil bearing capacity of 3,000 pounds per square foot, erosion and sediment control requirements per 2024 Connecticut Guidelines, and site demolition and grading plans. The project includes reinforced concrete foundations and slabs, reinforced concrete masonry unit walls with bond beams and lintels, metal-plate-connected prefabricated roof trusses, standing seam metal roofing, and comprehensive mechanical, electrical, and plumbing systems. Special inspection is required for cast-in-place concrete, soil bearing capacity, and reinforced masonry. Contractor design responsibilities include roof truss shop drawings, sheeting and bracing design, and construction sequencing. The design incorporates sustainable features including ground glass pozzolans in concrete to reduce Portland cement content by not less than thirty percent.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIST OF DRAWINGS

DESCRIPTIONDWG NO. SHEET NO.

NED LAMONT, GOVERNOR

STATE OF CONNECTICUT

DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION

EMMA CIMINO

ARCHITECT:

JULY 10, 2026

AUSTIN HAWES CAMP SHOWER

SOUTH SHOWER BUILDING

AUSTIN HAWES CAMPGROUND

LOCATION OF PROJECT

MASSACHUSETTS

198 W RIVER RD,

BARKHAMSTED, CT

M/E/P ENGINEER:

COMMISSIONER

TLB ARCHITECTURE, LLC.

92 WEST MAIN STREET

CHESTER, CT 06412

PROJECT NO. DEPA00013203702S

INNOVATIVE ENGINEERING SERVICES, LLC.

33 NORTH PLAINS INDUSTRIAL ROAD

WALLINGFORD, CT 06492

CIVIL ENGINEER & SURVEY:

NATHAN L. JACOBSON &

ASSOCIATES, INC.

86 MAIN STREET

CHESTER, CT 06412

R H

O D

E

IS

L A

N D

N E

W Y

O R

K

GENERAL & CODE INFORMATION

SOUTH BATHHOUSE TOPOGRAPHIC SURVEY

STRUCTURAL NOTES

FOUNDATION PLAN

ROOF FRAMING PLAN

STRUCTURAL BUILDING SECTIONS

ROOF PLAN

EXTERIOR BUILDING ELEVATIONS

BUILDING SECTIONS

ENALRGED PARTIAL FLOOR PLANS

INTERIOR ELEVATIONS

INTERIOR ELEVATIONS

REFLECTED CEILING PLAN

WALL SECTIONS

DOOR AND FINISH SCHEDULES & DETAILS

DETAILS

DETAILS

DETAILS

SHOWER BUILDING PLUMBING FLOOR PLAN

PLUMBING NOTES, LEGENDS, AND SCHEDULES

PLUMBING DETAILS

G-01

C-01

S-00

S-01

S-02

S-03

A-01

A-03

A-05

A-06

A-07

A-08

A-09

A-10

A-11

SHOWER BUILDING FLOOR PLAN

A-12

A-13

A-14

A-15

P1.1

P2.1

P2.2

PLUMBING DETAILS

MECHANICAL FLOOR PLAN

MECHANICAL NOTES,SCHEDULES AND DETAILS

SHOWER BUILDING ELECTRICAL FLOOR PLANS

ELECTRICAL NOTES, LEGEND, DETAILS & SCHEDULES

SITE UTILITY PLAN

ROOF DETAILS A-04

P2.3

M1.1

M2.1

E1.1

E2.1

SU1.1

SOUTH BATHHOUSE SITE DEMOLITION PLAN

SOUTH BATHHOUSE SITE GRADING, UTILITY AND EROSION & SEDIMENT CONTROL PLAN

EROSION & SEDIMENT CONTROL NOTES AND DETAILS

SITE DETAILS

SITE DETAILS

DESIGN NOTES

C-02

C-03

C-04

C-05

C-06

C-07

STRUCTURAL ENGINEER:

CARTIER STRUCTURAL DESIGN

54 BENJAMIN ROAD

PRESTON, CT 06365

SHOWER BUILDING JOINT/SLAB FLOOR PLAN A-02

STRUCTURAL DETAILS

STRUCTURAL DETAILS

S-04

S-05

AD-01DEMO PLAN AND NOTES

ELECTRICAL CONDUIT AERIAL - SOUTH A-00

C

RE: 'E' DWGS. & INT.

ELEVATIONS, TYP

TYP. INTERIOR DOOR/

ROOM SIDE

LIGHT SWITCH4

6"

1'-0" CLR at PUSH SIDE 2'-0" CLR. at PULL SIDE

CL

CL

HAND DRYER

6"

/4

1'

6" 2' - 0" 6"

L

COMPACTED EARTH

RIGID INSULATION

BATT INSULATION

EARTH

CONCRETE

PLYWOOD

SOLID WOOD BLOCKING

DISCONT. WD BLOCKING

FINISH WOOD

GYPSUM BOARD

INSULATED CMU

24" MIN.

MIN.

1'-0"

CLR OPEN'G

32" MIN.

6" TYP. U.O.N.

RE: DOOR SCHED.

and DETAILS

THESE DIMENSIONS

SHALL BE MAINTAINED

AT ALL DOORS,

UNLESS SPECIFICALLY

NOTED OTHERWISE IN

THE DRAWINGS

MFR

PRE-MANF

PRE-FAB

CONCRETE MASONRY UNITCMU MTL

FLOOR DRAINFD

STRUCT

w/

GALVANIZEDGALV

GREASE DUCTGD

WD

WNDW

WWF

GAUGE

FINISHED FLOOR ELEVATION

FINISH

FIRE CODE

FIRE DEPT. CONNECTION

FOUNDATION

FOOTING

FLOOR

FACE OF

FL/FLR

GA

FTG

FNDTN

F.O.

FFEL

FC

FIN

FDC

TYP

UON

VEST

VIF

U/S

SUSP

TLT

T.O.

T&G

PT

FIBERGLASS

EQUAL

EXPANSION

EXTERIOR

ELEVATION

EXISTING

FIRE ALARM

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

EXT

FBRGLS

FEC

FE

FA

EQ

EXP

EXIST

ELEV

RM

RWL

ST

SCHED.

SPEC.

REQ'D

REINF

PTD

DRINKING FOUNTAIN

DOOR

DOWN

CARPET

DISTANCE

EACH

ETHYLENE PROPYLENE

DIENE MONOMER

DRAWINGS

DETAIL

DR

DWGS

EPDM

EA

DTL

DF

DIST

CPT

DN

POLY

PROV

PRE-FIN

M.R.

PLYWD

OC

NIC

HR

BOARDBD

BITUMINOUS

CEILING

CHAIN LINK

BUILDING

CLEAR

CONTINUOUS

CONCRETE

CLOSET

COORDINATE

CLG

COORD

CONT

CONC

CLOS

BIT

BLDG

CL

CLR L.C.C.

LT

MIN

MAX

INSUL

HRDWR

JTS

K.S.

ACOUSTICAL

ABOVE FINISH FLOOR

APPROXIMATE

ALUMINUM

ANIMAL WATER SYSTEM

BY OWNER

BARRIER

ALUM

AWS

B.O.

BARR

APPROX

ACOUST

AFF

GWB

HDG

HARDBD

HCA

HM

GYP

METAL

STRUCTURE

WITH

WELDED WIRE FABRIC

WOOD

WINDOW

TYPICAL

VERIFY IN FIELD

UNLESS OTHERWISE NOTED

VESTIBULE

UNDERSIDE

TONGUE and GROOVE

SUSPENDED

TOILET

TOP OF

PRESERVATIVE TREATED

ROOM

RAINWATER LEADER

SPECIFICATIONS

STORAGE

SCHEDULE

REINFORCEMENT

REQUIRED

PAINTED

POLYETHYLENE

PRE-FINISHED

PREFABRICATED

PRE-MANUFACTURED

PROVIDE

MOISTURE RESISTANT

NOT IN CONTRACT

PLYWOOD

ON CENTER

HOUR

LEAD COATED COPPER

MANUFACTURER

MAXIMUM

MINIMUM

LIGHT

INSULATION

HARDWARE

JOINTS

KICK SPACE

GYPSUM WALL BOARD

HANDICAPPED ACCESSIBLE

HARDBOARD

HOLLOW METAL

HOT-DIPPED GALVANIZED

GYPSUM

FIRE ALARM HORN and STROBEFAHS

S.STL STAINLESS STEEL

NHP NON-HUMAN PRIMATE

MTD MOUNTED

BIO-SAFETY CABINETBSC

FIRE ALARM PULL STATIONFAPS

GL GLASS

FULLY TEMPEREDFT

FIRE SEPARATION DISTANCEFSD

U.

O

.N

A D

A

M

X

1' -5

M

A X

TY

P.

U O

N

1' -4

M

A X

R E F L S

UR

F

FIRE HORN

& LIGHT

LIGHT

SWITCH

MOP

HOLDER

URINAL

MIRROR

RECEPTACLE

GRAB BARS

OF WALL

18"

2'-0" min.

FR. FACE

MAX.

12" min.

CL

GRAB BAR

REAR WALL

H.C. STALL

M

IN

M A X

LAVATORY

1"

42" min.

39"-41"

M

IN

GRAB BAR

SIDE WALL

H.C. STALL

1'-7"

M in

M

A X H .C

DRINKING

FOUNTAIN

M A X

SOAP DISH

9"

-4 1"

40"

54" min.

M

IN

X

M

X

M

X

M

X

MIN. MAX.

URINAL

PARTITION

M

IN

. 6

M

A X

COAT

HOOK

A D

A M

A X

CONTROLS

1' - 3" 1' - 3"

CLEAR

1' - 3" 1' - 3"

CLEAR

WALL

1'

2' - 0"

3' - 6"

1/

TOILET TISSUE DISPENSER

MOUNTING AREA.

PROVIDE MOCKUP FOR

INSPECTOR APPROVAL.

SOAP

DISPENSER

" 4

1' -6

E N T R

Y S

ID

E

SHOWER &

CONTROLS

VERT. & HORIZ.

GRAB BARS

ADA SHOWER STALL

(SIDE VIEW AT CONTROLS

WALL)

ADA SHOWER STALL

(VIEW LOOKING AT BACK

WALL)

SHOWER & CONTROLS

VERT. & HORIZ.

GRAB BARS

ADA COMPLIANT

SHOWER SEAT

M

IN48" MIN

9"

TRANSITION

REAR WALL

FLUSH

S E A T W

A L L

C O

N T R

O L W

A L L

ADA SHOWER

STALL

(PLAN VIEW)

11_

2" DIA. GRAB

BARS

SOAP DISH

M

X

M

X

M

X

M

X

M

X

M

X

4" MAX9 1/8"

15"-16"

22"-23"

1' - 6"

MAX

2 1/2"

3' - 0"

1/

M

A X

M

A X

M

A X

15"

MAX.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

THE CONTRACTOR SHALL BE LICENSED IN THE STATE OF CONNECTICUT, AND FULLY INSURED AS REQUIRED

BY APPLICABLE LAWS.

COMPLY WITH ALL APPLICABLE CODES, LAWS AND STATUTES APPLICABLE FOR NEW CONSTRUCTION AND

FOR THE LEGAL DISPOSAL OF ALL MATERIALS FOR THE BUILDING AND THE SITE.

THE CONTRACTOR SHALL COMPLY WITH ALL OF THE CT STATE BUILDING CODE CHAPTER 33,

"SAFEGUARDS DURING CONSTRUCTION.

ALL REQUIRED AND NECESSARY PERMITS SHALL BE SECURED FROM ALL FEDERAL, STATE AND MUNICIPAL AGENCIES HAVING JURISDICTION, AT THE COST AND EXPENSE OF THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACTOR SHALL OBTAIN APPROVAL OF ALL COMPLETED WORK AS

REQUIRED BY ALL AGENCIES HAVING JURISDICTION.

PRIOR TO COMMENCEMENT OF WORK AT THE SITE, WHERE POSSIBLE AND THROUGHOUT THE COURSE OF THE WORK, THE CONTRACTOR SHALL INSPECT AND VERIFY THE LOCATION AND CONDITION OF EVERY ITEM AFFECTED BY THE WORK UNDER THIS CONTRACT AND REPORT DISCREPANCIES TO THE ARCHITECT

BEFORE THE COMMENCEMENT OF WORK.

CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ALL EXISTING UTILITIES. RECORD LOCATION OF AND PROTECT ALL UTILITIES ENCOUNTERED AS A RESULT OF WORK UNDER THIS CONTRACT. IF DAMAGED, MAKE

LIKE NEW AT NO ADDITIONAL COST TO OWNER.

COORDINATE THE WORK TO BE PERFORMED UNDER THIS CONTRACT WITH ALL ELECTRICAL, MECHANICAL, AND ROOM FINISHES.

VERIFY EXACT LAYOUT COMPATIBILITY WITH REQUIRED SETBACKS BEFORE BEGINNING WORK.

CONTRACTOR RESPONSIBLE FOR STAKING AND LAYOUT OF THE WORK.

DO NOT SCALE MEASURE ANY DRAWINGS. VERIFY THE FIGURES, DIMENSIONS AND DESIGN INTENTION SHOWN ON THE DRAWINGS BEFORE BEGINNING LAYOUT OF THE WORK. REPORT ANY ERRORS OR DISCREPANCIES

TO THE ARCHITECT.

DIMENSIONS ON THE DRAWINGS ARE TO FACE OF FINISHES UNLESS NOTED OTHERWISE.

STRICTLY ADHERE TO MANUFACTURER'S WRITTEN INSTRUCTIONS.

ALL MATERIALS REMOVED/REPLACED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO

PROPERLY DISPOSE OF. THE CONTRACTOR SHALL CLEAN AREAS INSIDE THE AREAS AFFECTED BY THE WORK AND ALL EXTERIOR WORK AND LANDSCAPING SHALL BE RESTORED TO ITS PRE-CONSTRUCTION STATUS. INTERIOR AND EXTERIOR SURFACES OF THE WINDOWS SHALL BE CLEANED PRIOR TO FINAL

PAYMENT BEING RELEASED.

SIGNS WILL BE POSTED ALONG THE ROUTES WHERE DUMPSTER CARTS WILL BE USED WARNING PERSONNEL

AND OTHER OCCUPANTS TO BE CAREFUL, AS ROOF DEBRIS IS BEING TORN OFF AND DISPOSED

PROPERLY.

APPLICABLE CODES:APPLICABLE CODES:

2022 CONNECTICUT STATE BUILDING CODE

2021 INTERNATIONAL BUILDING CODE (IBC)

2021 INTERNATIONAL PLUMBING CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 INTERNATIONAL ENERGY CONSERVATION CODE

2020 NATIONAL ELECTRIC CODE (NFPA 70)

2017 ICC/ANSI A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

2022 CONNECTICUT STATE FIRE PREVENTION CODE

2022 CONNECTICUT STATE FIRE SAFETY CODE

2021 NFPA 1 FIRE CODE

OTHER INFORMATION

BUILDING OWNER STATE OF CONNECTICUT

PROJECT ADDRESS 173 SCOTLAND ROAD, BALTIC, CT 06330

BUILDING CODE INFORMATION:BUILDING CODE INFORMATION:

USE GROUP CLASSIFICATION: SECTION 303.1.1 GROUP B BUSINESS

(SMALL BUILDINGS AND TENANT SPACES)

CONSTRUCTION TYPE: TYPE 5B

(NON-COMBUSTIBLE - TABLE 601& 602 CSBC)

BUILDING HEIGHT LIMITS:BUILDING HEIGHT LIMITS:

ALLOWABLE BUILDING HEIGHT: (TABLE 503) 2 STORIES, 40'-0"

ACTUAL BUILDING HEIGHT: 1 STORY, 19'-0"

ALLOWABLE BUILDING AREA (TABLE 503): 9,000 SF

ACTUAL BUILDING AREA: 1,391 SF

OCCUPANT LOAD (CSBC/IBC SECTION 1004):OCCUPANT LOAD (CSBC/IBC SECTION 1004): BUSINESS AREAS 150 GROSS SF / OCCUPANTS

TOTAL OCCUPANCY = 1,391 SF/ 100 SF

= 10 OCCUPANTS

CAPACITY OF EGRESS COMPONENT (CSBC/IBC TABLE 1005):CAPACITY OF EGRESS COMPONENT (CSBC/IBC TABLE 1005):

CORRIDORS: 0.2" WIDTH/PERSON

44" SERVING > 50p 36" SERVING 50p OR LESS

DOORS: 0.2" WIDTH/PERSON

MINIMUM NUMBER OF EXITS REQUIRED 10 (CSBC 1014)

HANDICAPPED ACCESS YES, ALL SPACES

MAX TRAVEL DISTANCE TO EXITS 200 FT REQUIRED (CSBC 1015.1)

PLUMBING FIXTURE COUNTSPLUMBING FIXTURE COUNTS

PLUMBING FIXTURE COUNTS WERE DETERMINED BY THE DEPARTMENT OF ENERGY AND ENVIRONMENTAL

PROTECTION BASED ON HISTORICAL WATER CONSUMPTION DATA FOR THE CAMPGROUND.

INTERIOR ELEVATIONS

BUILDING SECTION

EXTERIOR ELEVATIONS

DETAIL NUMBER

ROOM NAME & NUMBER

DOOR NUMBER

REVISION MARK

WALL TYPE

COLUMN GRID LINES

REFERENCE POINT

WALL SECTION

WINDOW TYPE

XX.X

1A

1B

1C

XX.X

XX.X

XX.X

XX.X

X

X

X

XX

X

1D

VB001

ENTRY/PPE

FIRE EXTINGUISHER

FE

7"

ROOM SIGNAGE, TYP.

RE: SPEC FOR SPECIFIC

REQUIREMENTS (SIZE,

SYMBOLS, TEXT, ETC.)

18"x18" MIN. CLEAR

FLOOR SPACE

ELEVATION PLAN

CJ

EQ

EQ

AUDIO/VISUAL UNIT

C.L. UNIT

15'-7 5/8" CALL FOR AID SIGNS at

TOILET/SHOWER ROOMS2"

DELEGATED DESIGN::DELEGATED DESIGN::

SECTION: DESCRIPTION::

061753 “SHOP-FABRICATED WOOD TRUSSES” – INCLUDES METAL PLATE-CONNECTED

TRUSSES, FABRICATED WITH DIMENSIONAL LUMBER AND DELIVERED TO THE SITE

AS ASSEMBLED TRUSS MEMBERS FOR ROOF CONSTRUCTION.

315000 “SHEETING AND BRACING” – INCLUDES DESIGN OF MEANS AND METHODS OF

SHEETING AND BRACING, NECESSARY TO PROVIDE SAFE EXCAVATIONS.

92 WEST MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title

R E V I S I O N S

TLB ARCHITECTURE, LLC

DEPA00013203702S

GENERAL & CODE

INFORMATION

G-01

JAS

MPF

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

AUSTIN HAWES CAMPGROUND 198 W RIVER RD,

BARKHAMSTED, CT

1/4" = 1'-0"10 TYPICAL DEVICE LOCATIONS

15 MATERIALS LEGEND

1/2" = 1'-0"8 OFFSET AND HCA CLEARANCES

13 TYPICAL ABBREVIATIONS

1/4" = 1'-0"11 TYPICAL MOUNTING HEIGHTS

1/2" = 1'-0"7 TYPICAL HCA SHOWER STALL

9 PROJECT GENERAL NOTES 5 BUILDING CODE INFORMATION

16 SYMBOLS LEGEND

1/2" = 1'-0"2 ROOM SIGNAGE MOUNTING

1 DELEGATED DESIGN

mark date description

JULY 10, 2026

CT. GRID

020 20 40

SCALE: 1"=20'

GRAPHIC SCALE

51015

86 MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

1"=20'

C-01

CB

BCC

SOUTH - SHOWER BUILDING

TOPOGRAPHIC SURVEY

12860001SP

NOTES:

FEB. 12, 2025

1. THIS SURVEY WAS PREPARED PURSUANT TO THE

REGULATIONS OF CONNECTICUT STATE AGENCIES

SECTIONS 20-300B-1 THROUGH 20-300B-20 AS A CLASS

T-2 TOPOGRAPHIC SURVEY (VERTICAL ACCURACY

CLASS V-2).

2. UNDERGROUND OR OVERHEAD ENCROACHMENTS,

STRUCTURES, AND SYSTEMS WERE NOT

INVESTIGATED AS A PART OF THIS SURVEY, EXCEPT AS

SHOWN OR NOTED HEREON.

3. STONE WALLS AND/OR FENCES MAY DEVIATE

SLIGHTLY FROM PRINCIPAL COURSES SHOWN.

4. PERIPHERAL PROPERTY LINES OF ADJACENT OWNERS

ARE SHOWN FOR GENERAL INFORMATIONAL

PURPOSES ONLY AND ARE NOT TO BE CONSTRUED AS

BEING ACCURATELY LOCATED OR SHOWN HEREON.

5. HORIZONTAL DATUM IS NAD83. VERTICAL DATUM IS

NAVD88.

6. PARCELS MAY BE SUBJECT TO SUCH RIGHTS AND

EASEMENTS AS APPEAR OF RECORD OR ARE

APPARENT BY USAGE. THIS SURVEY REFLECTS

ENCUMBRANCES NOTICED AND DISCOVERED BY THE

SURVEYOR IN THE NORMAL COURSE OF WORK AND

DOES NOT NECESSARILY SHOW EVERY POSSIBLE

CONDITION AFFECTING THE PROPERTY. EASEMENTS,

SERVITUDES, LOCAL ORDINANCES, ZONING AND

OTHER LEGAL ENCUMBRANCES MAY EXIST WHICH ARE

NOT REFLECTED HEREON. CONSULT A TITLE

ATTORNEY TO DISCOVER ALL LEGAL ENCUMBRANCES,

IF ANY, ATTACHED TO THIS PROPERTY.

7. UNDERGROUND UTILITIES SHOWN ARE BASED ON

INFORMATION PROVIDED BY OTHERS AND SHOULD BE

CONSIDERED APPROXIMATE AND INCOMPLETE.

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1S

P.

dw g, /2 /2

8:

:5

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio

n) .p c3

SCALE: 1"=20'

GRAPHIC SCALE

51015

86 MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

1"=20'

C-02

CB

BCC

SOUTH - SHOWER BUILDING

SITE DEMOLITION PLAN

12860001SP

FEB. 12, 2025

NOTES:

1. In General, Lower Case Text Identifies Existing Features/Conditions.

2. IN GENERAL, UPPER CASE TEXT IDENTIFIES

PROPOSED FEATURES/CONDITIONS UNLESS

OTHERWISE SPECIFIED.

3. FOR LOCATION OF UNDERGROUND ELECTRIC,

TELEPHONE, GAS, CABLE TV AND OTHER FACILITIES

OF PUBLIC UTILITY COMPANIES, INQUIRE OF "CALL

BEFORE YOU DIG, INC." AT 1-800-922-4455.

CT. GRID

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1S

P- N

O R

TH

S O

U

TH

.d w g, /2 /2

9:

:1

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

SCALE: 1"=20'

GRAPHIC SCALE

51015

86 MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

1"=20'

C-03

CB

BCC

SOUTH - SHOWER BUILDING

SITE GRADING, UTILITY AND

EROSION & SEDIMENT CONTROL PLAN

12860001SP DEPA00013203702S

FEB. 12, 2025

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

NOTES:

1. In General, Lower Case Text Identifies Existing Features/Conditions.

2. IN GENERAL, UPPER CASE TEXT IDENTIFIES

PROPOSED FEATURES/CONDITIONS UNLESS

OTHERWISE SPECIFIED.

3. FOR LOCATION OF UNDERGROUND ELECTRIC,

TELEPHONE, GAS, CABLE TV AND OTHER FACILITIES

OF PUBLIC UTILITY COMPANIES, INQUIRE OF "CALL

BEFORE YOU DIG, INC." AT 1-800-922-4455.

CT. GRID

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1S

P.

dw g, /2 /2

8:

:4

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

PROJECT NARRATIVE:

THE SUBJECT PROJECT INCLUDES CONSTRUCTION OF THE SOUTH SHOWER BUILDING.

ADDRESS OF PROPOSED USE:

198 WEST RIVER ROAD

BARKHAMSTED, CONNECTICUT 06063

ADDRESS OF OWNER'S AGENT AND PROPERTY OWNER:

STATE OF CONNECTICUT

DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION

79 ELM STREET

HARTFORD, CONNECTICUT 06106

CONSTRUCTION SCHEDULING:

IT IS PROPOSED TO PERFORM CONSTRUCTION IN 2027. IN GENERAL, THE SEQUENCE FOR CONSTRUCTION AND SITE STABILIZATION

MAY BE AS FOLLOWS:

1. INSTALL CONSTRUCTION ENTRANCES, CONSTRUCTION FENCING AND SEDIMENT AND EROSION CONTROLS.

2. REMOVE TREES, STUMPS AND CONDUCT SITE DEMOLITION.

3. STRIP AND STOCKPILE TOPSOIL.

4. CONSTRUCT BUILDING FOUNDATIONS AND EXTEND WATER AND POWER.

5. CONSTRUCT SUBSURFACE SEWAGE DISPOSAL SYSTEMS

6. ROUGH GRADE SITE.

7. CONSTRUCT BUILDINGS.

8. INSTALL CONCRETE AND BITUMINOUS WALKS.

9. BACKFILL, PLACE TOPSOIL.

10. REMOVE CONSTRUCTION ENTRANCES AND CONSTRUCTION FENCING.

11. FINE GRADE, FERTILIZE, SEED AND MULCH ALL DISTURBED AREAS.

12. REMOVE REMAINING SEDIMENT AND EROSION CONTROL MEASURES ONCE VEGETATION HAS BECOME ESTABLISHED.

THE CONTRACTOR SELECTED TO CONSTRUCT THIS PROJECT WILL BE RESPONSIBLE FOR IMPLEMENTATION OF SEDIMENT AND EROSION CONTROL MEASURES ON THIS SITE. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR WILL PROVIDE THE STATE OF CONNECTICUT DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION WITH THE NAME, ADDRESS AND TELEPHONE NUMBER OF THE RESPONSIBLE PERSON. SHOULD ANY PROBLEMS OCCUR, THEN THE OWNER'S AGENT SHOULD BE

CONTACTED.

CONTINGENCY PLAN

A MINIMUM OF TWO WEEKS PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE THE OWNER'S AGENT WITH THE NAMES AND TELEPHONE NUMBERS OF THE RESPONSIBLE PERSONS TO BE CONTACTED IN THE EVENT OF AN EROSION

AND/OR SEDIMENT CONTROL PROBLEM.

THE CONTRACTOR SHALL AT ALL TIMES KEEP SUFFICIENT ADDITIONAL SEDIMENTATION CONTROL FENCE AND/OR HAY BALES ON THE PROJECT SITE TO CONTROL UNFORESEEN EROSION AND/OR SEDIMENT PROBLEMS. IN THE EVENT OF A PROBLEM THE CONTRACTOR SHALL PROMPTLY STABILIZE THE PROBLEM AND CONTAIN ANY SEDIMENT AND THEN NOTIFY THE OWNER'S AGENT.

EROSION AND SEDIMENT CONTROL

THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF THE EROSION AND SEDIMENT CONTROL PLAN FOR THE

PROJECT.

THE MINIMUM STANDARDS FOR ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE THOSE OUTLINED IN THE "2024 CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT CONTROL", LATEST REVISION. ALTERNATIVE MEASURES, METHODS, MEANS AND TECHNIQUES MAY BE ALLOWED WITH THE PRIOR APPROVAL OF THE OWNER'S AGENT.

GENERAL GUIDELINES:

5. NO CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN AREAS DESIGNATED AS INLAND WETLANDS, WATERCOURSES OR

FLOODPLAINS, DESIGNATED UPLAND REVIEW ZONES OR WITHIN STREAM CHANNEL ENCROACHMENT LINES WITHOUT ALL

REQUIRED APPROVALS AND/OR PERMITS.

6. TEMPORARY EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED PRIOR TO THE START OF CONSTRUCTION.

7. ALL EROSION AND SEDIMENT CONTROLS SHALL BE MAINTAINED CONTINUOUSLY AND SHALL NOT BE REMOVED UNTIL ALL

DISTURBED AREAS HAVE BEEN STABILIZED.

8. THE CONTRACTOR SHALL LIMIT THE DISTURBANCE OF LAND TO THOSE AREAS SHOWN ON THE DRAWINGS AND SHALL TAKE REASONABLE CARE TO PROTECT AND PRESERVE EXISTING VEGETATION WITHIN THE LIMITS OF DISTURBANCE WHERE

FEASIBLE.

9. WHERE PRACTICABLE, THE CONTRACTOR SHALL PLAN HIS CONSTRUCTION OPERATIONS SO AS TO LIMIT THE AREAS OF EXPOSED SOIL TO AREAS ACTIVELY UNDER CONSTRUCTION. THE CONTRACTOR SHALL TAKE REASONABLE CARE TO LIMIT THE PERIOD OF EXPOSURE OF DISTURBED AREAS. THE INSTALLATION OF PERMANENT VEGETATIVE MEASURES SHALL BE

ACCOMPLISHED AS SOON AS IS PRACTICABLE.

10. ADEQUATE PROVISIONS SHALL BE TAKEN TO PROTECT ALL EXPOSED CUT AND FILL SLOPES FROM SURFACE WATER FLOW

DAMAGE.

11. ALL MATERIAL FROM CLEARING AND GRUBBING OPERATIONS SHALL BE DISPOSED OF IN A LAWFUL MANNER.

12. WATER FROM DEWATERING OPERATIONS SHALL NOT BE DISCHARGED DIRECTLY TO ANY WETLAND OR WATERCOURSE.

SUCH WATER SHALL BE DISCHARGED TO AN APPROVED SEDIMENT BASIN AND/OR FILTER DEVICE OR TO A STORM DRAINAGE SYSTEM ONLY WHEN APPROVED. NO WATER FROM DEWATERING OPERATIONS SHALL BE DISCHARGED INTO A SANITARY

SEWER SYSTEM.

13. THE STORAGE, WASHING, FUELING AND MAINTENANCE OF EQUIPMENT AND VEHICLES SHALL TAKE PLACE IN DESIGNATED AREAS ONLY. IN THE EVENT OF A CONTAMINANT SPILL THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION OIL AND CHEMICAL SPILL RESPONSE DIVISION (860-424-3338) AND THE OWNER'S

AGENT.

PRESERVE AND CONSERVE SOIL

TOPSOILING

MATERIALS

SITE INVESTIGATIONS SHALL BE MADE TO DETERMINE IF THERE IS A SUFFICIENT QUANTITY OF TOPSOIL OF GOOD QUALITY ON THE SITE TO JUSTIFY STRIPPING. HIGH QUALITY TOPSOIL SHALL BE FRIABLE AND LOAMY (LOAM, SANDY LOAM, SILT LOAM, SANDY CLAY LOAM, CLAY LOAM). OTHER SOIL TYPES WITH HIGH ORGANIC CONTENT MAY BE FOUND SUITABLE AFTER TESTING. IT SHALL BE FREE OF DEBRIS, TRASH, STUMPS, ROCKS, ROOTS AND NOXIOUS WEEDS. IT SHALL GIVE EVIDENCE OF BEING ABLE TO SUPPORT HEALTHY VEGETATION. IT SHALL CONTAIN NO SUBSTANCE THAT IS POTENTIALLY TOXIC TO PLANT

GROWTH.

ALL TOPSOIL SHALL BE TESTED BY A RECOGNIZED LABORATORY TO DETERMINE THE PROPER APPLICATION RATES OF LIME

AND FERTILIZER.

INSTALLATION REQUIREMENTS

1. STRIPPING OF TOPSOIL SHALL BE CONFINED TO THE IMMEDIATE CONSTRUCTION AREA. THE DEPTH OF REMOVAL MAY VARY DEPENDING ON THE SITE CONDITIONS. ALL SEDIMENT CONTROLS SHALL BE IN PLACE PRIOR TO BEGINNING STRIPPING

OPERATIONS.

2. TOPSOIL SHALL BE STOCKPILED IN SUCH A MANNER THAT NATURAL SURFACE WATER FLOW IS NOT OBSTRUCTED AND NO

OFF-SITE SEDIMENT DAMAGE SHALL RESULT.

3. SIDE SLOPES OF STOCKPILES SHALL NOT BE STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL.

4. A SEDIMENT BARRIER SHALL SURROUND ALL TOPSOIL STOCKPILES.

5. TEMPORARY SEEDING OF STOCKPILES SHALL BE COMPLETED WITHIN 30 DAYS OF THE FORMATION OF THE STOCKPILE, IN

ACCORDANCE WITH THE TEMPORARY VEGETATIVE COVER REQUIREMENTS.

6. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE

DRAWINGS.

7. WHERE THE pH OF THE SUBSOIL IS 6.0 OR LESS, GROUND AGRICULTURAL LIMESTONE SHALL BE SPREAD IN ACCORDANCE WITH THE SOIL TEST TO A pH OF 6.0 TO 6.5 OR THE VEGETATIVE ESTABLISHMENT PRACTICE BEING USED.

8. AFTER THE AREAS TO BE TOPSOILED HAVE BEEN BROUGHT TO GRADE, AND IMMEDIATELY PRIOR TO SPREADING THE TOPSOIL, THE SUBGRADE SHALL BE LOOSENED BY DISCING OR SCARIFYING OR TRACKING TO A DEPTH OF AT LEAST 4

INCHES TO ENSURE BONDING OF THE TOPSOIL AND SUBSOIL.

9. TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR IN A CONDITION THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. THE TOPSOIL SHALL BE UNIFORMLY DISTRIBUTED TO A MINIMUM COMPACTED DEPTH OF 4 INCHES, UNLESS OTHERWISE NOTED.

ANY IRREGULARITIES IN THE SURFACE RESULTING FROM TOPSOILING OR OTHER OPERATIONS SHALL BE CORRECTED IN

ORDER TO PREVENT THE FORMATION OF DEPRESSIONS OR WATER POCKETS.

10. TOPSOIL SHALL BE COMPACTED ENOUGH TO ENSURE GOOD CONTACT WITH THE UNDERLYING SOIL AND TO OBTAIN A UNIFORM FIRM SEEDBED FOR THE ESTABLISHMENT OF A DURABLE TURF. UNDUE COMPACTION IS TO BE AVOIDED AS IT

INCREASES RUNOFF VELOCITY AND VOLUME, AND PREVENTS SEED GERMINATION.

11. IMMEDIATELY FOLLOWING TOPSOIL APPLICATION, PROTECT THE TOPSOIL FROM EROSION BY EITHER SODDING, SEEDING

AND/OR MULCHING.

LAND GRADING

1. ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES SHALL BE PROTECTED DURING CLEARING AND CONSTRUCTION IN

ACCORDANCE WITH THE APPROVED SEDIMENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY STABILIZED.

2. AREAS TO BE FILLED SHALL BE CLEARED, GRUBBED AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS OR

OTHER OBJECTIONABLE MATERIAL.

3. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER

RELATED PROBLEMS.

4. FILL MATERIAL SHALL BE FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS AND OTHER OBJECTIONABLE

MATERIALS.

5. FROZEN MATERIAL OR SOFT, MUCKY OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO FILLS.

6. FILL SHALL NOT BE PLACED ON A FROZEN FOUNDATION.

7. TOPSOILING SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE REQUIREMENTS FOR TOPSOILING.

8. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOWING FINISHED GRADING.

DUST CONTROL

INSTALLATION REQUIREMENTS

WATER

1. THE EXPOSED SOIL SURFACE SHALL BE MOISTENED PERIODICALLY WITH ADEQUATE QUANTITIES OF WATER TO CONTROL

DUST.

STONE

1. COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. IN AREAS ADJACENT TO WATERWAYS USE CHEMICALLY

STABLE AGGREGATE.

MAINTENANCE

1. WHEN TEMPORARY DUST CONTROL MEASURES ARE USED, REPETITIVE TREATMENT SHALL BE APPLIED AS NEEDED TO

ACCOMPLISH CONTROL.

VEGETATIVE SOIL COVER

TEMPORARY SEEDING

INSTALLATION REQUIREMENTS

SITE PREPARATION

1. GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, MULCH

APPLICATION AND MULCH ANCHORING. ALL GRADING SHOULD BE DONE IN ACCORDANCE WITH THE REQUIREMENTS FOR

LAND GRADING.

2. INSTALL NEEDED EROSION CONTROL MEASURES SUCH AS DIVERSIONS, GRADE STABILIZATION STRUCTURES, SEDIMENT

BASINS AND GRASSED WATERWAYS.

SEEDBED PREPARATION

1. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TEST RECOMMENDATIONS SUCH AS THOSE OFFERED BY THE UNIVERSITY OF CONNECTICUT SOIL TESTING LABORATORY. SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL COOPERATIVE EXTENSION SERVICE OFFICE. IF SOIL TESTING IS NOT FEASIBLE ON SMALL OR VARIABLE SITES, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE OR 7.5 POUNDS PER 1,000 SQUARE FEET OF 10-10-10 OR EQUIVALENT. APPLY LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS MAGNESIUM OXIDE) AS

FOLLOWS:

SOIL TEXTURE TONS/ACRE LBS/1,000 SQUARE FEET

CLAY, CLAY LOAM, AND HIGH ORGANIC SOIL 3 135

SANDY LOAM, LOAM, SILT LOAM 2 90

LOAMY SAND, SAND 1 45

REFER TO COUNTY SOIL SURVEY REPORT FOR SOIL TEXTURES AT THE SITE.

SEEDING

1. ANNUAL RYE GRASS 40 LBS/ACRE, 1 LB/1000 SF

2. WHERE THE SOIL HAS BEEN COMPACTED BY CONSTRUCTION OPERATIONS, LOOSEN SOIL TO A DEPTH OF 2 INCHES BEFORE

APPLYING FERTILIZER LIME AND SEED.

3. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR HYDROSEEDER.

HYDROSEEDINGS WHICH INCLUDE MULCH, MAY BE LEFT ON SOIL SURFACE. SEEDING RATES MUST BE INCREASED BY 10

PERCENT WHEN HYDROSEEDING.

4. SPRING SEEDINGS USUALLY GIVE THE BEST RESULTS, SPRING SEEDINGS OF ALL SEED LEGUMES IS RECOMMENDED.

HOWEVER, LATE SUMMER SEEDINGS PRIOR TO SEPTEMBER 1 CAN BE MADE. WHEN CROWN VETCH IS SEEDED IN LATE SUMMER AT LEAST 35 PERCENT OF THE SEED SHOULD BE HARD SEED (UNSCARIFIED), THE RECOMMENDED SEEDING DATES

ARE:

MARCH 15 THROUGH JUNE 15

AUGUST 15 THROUGH OCTOBER 15

PERMANENT SEEDING

INSTALLATION REQUIREMENTS

1. GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, MULCH APPLICATION AND ANCHORING, AND MAINTENANCE. ALL GRADING SHOULD BE BE DONE IN ACCORDANCE

WITH THE REQUIREMENTS FOR LAND GRADING.

SEEDBED PREPARATION

1. APPLY LIMESTONE AND FERTILIZER ACCORDING TO SOIL TESTS SUCH AS THOSE OFFERED BY THE UNIVERSITY OF CONNECTICUT SOIL TESTING LABORATORY. SOIL SAMPLE MAILERS ARE AVAILABLE FROM THE LOCAL COOPERATIVE EXTENSION SERVICE OFFICE. IF SOIL TESTING IS NOT FEASIBLE ON SMALL OR VARIABLE SITES, OR WHERE TIMING IS CRITICAL, FERTILIZER MAY BE APPLIED AT THE RATE OF 300 POUNDS PER ACRE OR 7.5 POUNDS PER 1,000 SQUARE FEET USING 10-10-10 OR EQUIVALENT. IN ADDITION, 300 POUNDS OF 38-0-0 PER ACRE OR EQUIVALENT OF SLOW RELEASE NITROGEN MAY BE USED FOR TOPDRESSING. APPLY GROUND LIMESTONE (EQUIVALENT TO 50 PERCENT CALCIUM PLUS

MAGNESIUM OXIDE) AS FOLLOWS:

SOIL TEXTURE TONS/ACRE LBS/1,000 SQUARE FEET

CLAY, CLAY LOAM, AND HIGH ORGANIC SOIL 3 135

SANDY LOAM, LOAM, SILT LOAM 2 90

LOAMY SAND, SAND 1 45

REFER TO COUNTY SOIL SURVEY REPORT FOR SOIL TEXTURES AT THE SITE.

2. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF 4 INCHES WITH A DISC, SPRING TOOTH HARROW OR OTHER SUITABLE EQUIPMENT. THE FINAL HARROWING OR DISCING OPERATION SHALL BE ON THE GENERAL CONTOUR. CONTINUE TILLAGE UNTIL A REASONABLY UNIFORM, FINE SEEDBED IS PREPARED. ALL BUT CLAY OR SILTY SOILS

AND COARSE SANDS SHOULD BE ROLLED TO FIRM THE SEEDBED WHEREVER FEASIBLE.

3. REMOVE FROM THE SURFACE ALL STONES ONE INCH OR LARGER IN ANY DIMENSION UNLESS OTHERWISE SPECIFIED.

REMOVE ALL OTHER DEBRIS SUCH AS WIRE, CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS OR OTHER

UNSUITABLE MATERIAL.

4. INSPECT SEEDBED JUST BEFORE SEEDING. IF TRAFFIC HAS LEFT THE SOIL COMPACTED, THE AREA MUST BE RETILLED AND

FIRMED AS ABOVE.

SEEDING DATES

1. SPRING SEEDINGS USUALLY GIVE THE BEST RESULTS. SPRING SEEDINGS OF ALL SEED MIXES WITH LEGUMES IS RECOMMENDED, HOWEVER LATE SUMMER SEEDINGS PRIOR TO SEPTEMBER 15 CAN BE MADE. WHEN CROWN VETCH IS SEEDED IN LATE SUMMER AT LEAST 35 PERCENT OF THE SEED SHOULD BE HARD SEED (UNSCARIFIED). THE RECOMMENDED

SEEDING DATES ARE:

MARCH 15 THROUGH JUNE 15

SEPTEMBER 1 THROUGH OCTOBER 15

2. WITH THE EXCEPTION OF CROWN VETCH, THE FINAL SEEDING DATE MAY BE EXTENDED 15 DAYS IN THE COASTAL TOWNS OF

NEW LONDON, MIDDLESEX, NEW HAVEN AND FAIRFIELD COUNTIES.

SEEDING

1. SEE SPECIFICATIONS FOR SEED MIX AT 70 LBS. / ACRE.

2. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER TYPE SEEDER OR HYDROSEEDER. NORMAL SEEDING DEPTH IS FROM 1/4 TO 1/2 INCH. HYDROSEEDINGS WHICH ARE MULCHED MAY BE LEFT ON SOIL SURFACE.

3. WHERE FEASIBLE, EXCEPT WHERE EITHER A CULTIPACKER TYPE SEEDER OR HYDROSEEDER IS USED, THE SEEDBED SHOULD BE FIRMED FOLLOWING SEEDING OPERATIONS WITH A ROLLER, OR LIGHT DRAG. SEEDING OPERATIONS SHOULD BE

ON THE CONTOUR.

4. FROST CRACK SEEDING MUST BE DONE IN LATE WINTER OR EARLY SPRING. SUITABLE WEATHER CONDITIONS ARE FREEZING NIGHTS AND THAWING DAYS WITH LITTLE OR NO SNOW COVER. SEEDING RATES MUST BE INCREASED 10 PERCENT WHEN

USING THIS METHOD.

5. HYDRAULIC APPLICATION (HYDROSEEDING), IS A SUITABLE METHOD FOR USE ON CRITICAL AREAS. WHEN HYDROSEEDING, A SEEDBED IS PREPARED IN THE CONVENTIONAL WAY OR BY HAND RAKING TO LOOSEN AND SMOOTH THE SOIL AND TO REMOVE SURFACE STONES LARGER THAN ONE INCH IN DIAMETER. SLOPES MUST BE NO STEEPER THAN 2 TO 1 (2 FEET HORIZONTALLY TO ONE FOOT VERTICALLY). LIME AND FERTILIZER MAY BE APPLIED SIMULTANEOUSLY WITH THE SEED. THE USE OF FIBER MULCH ON CRITICAL AREAS IS NOT RECOMMENDED (UNLESS IT IS USED TO HOLD STRAW OR HAY). FIBER MULCH DOES NOT PROVIDE ADEQUATE SEEDBED PROTECTION. BETTER PROTECTION IS GAINED BY USING STRAW MULCH AND HOLDING IT WITH ADHESIVE MATERIALS OR 500 POUNDS PER ACRE OF WOOD FIBER MULCH. SEEDING RATES MUST BE

INCREASED BY 10 PERCENT WHEN HYDROSEEDING.

6. APPLY MULCH ACCORDING TO THE TEMPORARY MULCHING MEASURE.

7. IF SEEDING CANNOT BE DONE WITHIN THE SEEDING DATES, USE THE TEMPORARY MULCHING MEASURE TO PROTECT THE

SITE AND DELAY SEEDING UNTIL THE NEXT RECOMMENDED SEEDING PERIOD.

MAINTENANCE

1. LIME ACCORDING TO A SOIL TEST OR AT A MINIMUM OF EVERY FIVE YEARS USING A RATE OF TWO TONS PER ACRE (100

POUNDS PER 1,000 SQUARE FEET).

2. WHERE GRASSES PREDOMINATE, FERTILIZE ACCORDING TO A SOIL TEST OR BROADCAST BIENNIALLY, 300 POUNDS OF

10-10-10 OR EQUIVALENT PER ACRE (7.5 POUNDS PER 1,000 SQUARE FEET).

3. WHERE LEGUMES PREDOMINATE, FERTILIZE ACCORDING TO A SOIL TEST OR BROADCAST EVERY THREE YEARS 300 POUNDS

OF 0-20-20 PER ACRE OR EQUIVALENT (7.5 POUNDS PER 1,000 SQUARE FEET).

NON-LIVING SOIL PROTECTION

MULCH FOR SEED

MATERIALS

1. SELECT MULCH MATERIALS BASED ON SITE CONDITIONS, AVAILABILITY OF MATERIALS AND LABOR AND EQUIPMENT. OTHER

MATERIALS MAY BE USED ONLY WITH THE PERMISSION OF THE APPROVING AUTHORITY.

INSTALLATION REQUIREMENTS

ORGANIC MULCHES

1. ORGANIC MULCHES MAY BE USED IN ANY AREA WHERE MULCH IS REQUIRED, SUBJECT TO THE RESTRICTIONS NOTED BELOW:

RATES

MULCHES PER ACRE PER 1,000 SQUARE FEET

STRAW 1 1/2 - 2 TONS 35-45 LBS

APPLICATION

1. MULCH MATERIALS SHALL BE SPREAD UNIFORMLY, BY HAND OR MACHINE. WHEN SPREADING STRAW OR HAY MULCH BY HAND, DIVIDE THE AREA TO BE MULCHED INTO APPROXIMATELY 1,000 SQUARE FOOT SECTIONS AND PLACE 35-45 POUNDS

(1 BALE) OF STRAW OR HAY IN EACH SECTION TO ENSURE UNIFORM DISTRIBUTION.

ANCHORING

1. HAY OR STRAW MULCHES MUST BE ANCHORED IMMEDIATELY AFTER APPLICATION TO PREVENT WINDBLOWING. HAY OR STRAW MULCH MAY BE ANCHORED BY TRACKING WITH CONSTRUCTION EQUIPMENT, BUT NOT BY USING NETTING.

MAINTENANCE

1. ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAINSTORMS, TO CHECK FOR RILL EROSION.

WHERE EROSION IS OBSERVED, ADDITIONAL MULCH SHOULD BE APPLIED. NETS SHALL BE INSPECTED AFTER RAINSTORMS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, REINSTALL NET AS NECESSARY AFTER REPAIRING DAMAGE TO THE SLOPE. INSPECTIONS SHALL TAKE PLACE UNTIL GRASSES ARE FIRMLY ESTABLISHED. GRASSES SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED WHICH IS MATURE ENOUGH TO CONTROL SOIL EROSION AND TO SURVIVE SEVERE WEATHER CONDITIONS. WHERE MULCH IS USED IN CONJUNCTION WITH ORNAMENTAL PLANTINGS, INSPECT PERIODICALLY THROUGHOUT THE YEAR TO DETERMINE IF MULCH IS MAINTAINING COVERAGE OF THE

SOIL SURFACE, REPAIR AS NEEDED.

SEDIMENT IMPOUNDMENTS, BARRIERS, AND FILTERS

HAY BALE BARRIER

INSTALLATION REQUIREMENTS

SHEET FLOW APPLICATIONS

1. BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE ON THE CONTOUR, WITH THE ENDS OF ADJACENT BALES TIGHTLY

ABUTTING ONE ANOTHER.

2. ALL BALES SHALL BE EITHER WIRE-BOUND OR STRING TIED. BALES SHALL BE INSTALLED SO THAT BINDINGS ARE ORIENTED AROUND THE SIDES RATHER THAN ALONG THE TOPS AND BOTTOMS OF THE BALES TO PREVENT DETERIORATION OF THE

BINDINGS.

3. A TRENCH SHALL BE EXCAVATED THE WIDTH OF A BALE AND THE LENGTH OF THE PROPOSED BARRIER TO A MINIMUM DEPTH OF 4 INCHES. AFTER THE BALES ARE STAKED AND CHINKED, THE EXCAVATED SOIL SHALL BE BACKFILLED AGAINST THE BARRIER. BACKFILL SOIL SHALL CONFORM TO THE GROUND LEVEL ON THE DOWNHILL SIDE AND SHALL BE BUILT UP TO 4 INCHES AGAINST THE UPHILL SIDE OF THE BARRIER. BALES SHOULD BE PLACED 10 FEET AWAY FROM THE TOE OF SLOPES

UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR DIRECTED.

4. EACH BALE SHALL BE SECURELY ANCHORED BY AT LEAST TWO STAKES DRIVEN THROUGH THE BALE. THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE TO FORCE THE BALES TOGETHER. STAKES SHALL BE

DRIVEN DEEP ENOUGH INTO THE GROUND TO SECURELY ANCHOR THE BALES.

5. THE GAPS BETWEEN BALES SHALL BE CHINKED (FILLED BY WEDGING) STRAW BETWEEN THEM TO PREVENT WATER FROM

FLOWING BETWEEN THE BALES.

CHANNEL FLOW APPLICATIONS

1. BALES SHALL BE PLACED IN A SINGLE ROW, LENGTHWISE, ORIENTED PERPENDICULAR TO THE CONTOUR, WITH ENDS OF

ADJACENT BALES TIGHTLY ABUTTING ONE ANOTHER.

2. THE REMAINING STEPS FOR INSTALLING A BALE BARRIER FOR SHEET FLOW APPLICATIONS APPLY HERE, WITH THE

FOLLOWING ADDITION:

3. THE BARRIER SHALL BE EXTENDED TO SUCH A LENGTH THAT THE BOTTOMS OF THE END BALES ARE HIGHER IN ELEVATION THAN THE TOP OF THE LOWEST MIDDLE BALE TO ASSURE THAT SEDIMENT LADEN RUNOFF WILL FLOW EITHER THROUGH OR

OVER THE BARRIER BUT NOT AROUND IT.

MAINTENANCE

1. INSPECTION SHALL BE MADE AFTER EACH STORM EVENT AND PERIODICALLY DURING PROLONGED RAIN EVENTS AND REPAIR

OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED.

2. ACCUMULATED SEDIMENT BEHIND THE BALES SHALL BE REMOVED WHEN IT REACHES 1/2 OF THE ORIGINAL HEIGHT OF THE

BALES.

GEOTEXTILE SILT FENCE

MATERIALS

1. GEOTEXTILE. GEOTEXTILE SHALL BE A PERVIOUS SHEET OF PROPYLENE, NYLON, POLYESTER OR ETHYLENE FILAMENTS AND SHALL BE CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE FOLLOWING REQUIREMENTS:

PHYSICAL PROPERTY REQUIREMENTS

FILTERING EFFICIENCY 75% (MIN)

TENSILE STRENGTH AT 20% (MAX) ELONGATION -

EXTRA STRENGTH 50 LBS./LIN. IN. (MIN)

STANDARD STRENGTH 30 LBS./LIN. IN. (MIN)

FLOW RATE 12 GAL./SF/MIN. (MIN.)

2. STAKES FOR GEOTEXTILE SILT FENCES SHALL BE 1" x 1" WOOD WITH A MINIMUM LENGTH OF 5 FEET.

3. WIRE FENCE REINFORCEMENT FOR GEOTEXTILE SILT FENCES USING STANDARD STRENGTH MATERIAL SHALL BE A MINIMUM OF 42 INCHES IN HEIGHT, A MINIMUM OF 14 GAUGE AND SHALL HAVE A MAXIMUM MESH SPACING OF 6 INCHES.

INSTALLATION REQUIREMENTS

1. THE HEIGHT OF THE BARRIER SHALL NOT EXCEED 36 INCHES. (HIGHER BARRIERS MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE). THE SEDIMENTATION CONTROL FENCE SHALL BE PLACED 10 FEET

AWAY FROM THE TOE OF SLOPES UNLESS OTHERWISE SHOWN ON THE DRAWINGS OR DIRECTED.

2. WHEN JOINTS ARE NECESSARY, GEOTEXTILE ROLL ENDS SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM 6" OVERLAP AND SECURELY SEALED IN CONFORMANCE WITH THE MANUFACTURERS RECOMMENDATIONS.

3. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART AND DRIVEN SECURELY INTO THE GROUND A MINIMUM DEPTH OF 12

INCHES.

4. WHEN STANDARD STRENGTH GEOTEXTILE IS USED, A WIRE MESH SUPPORT FENCE SHALL BE FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS USING HEAVY DUTY WIRE STAPLES AT LEAST 1 INCH LONG, TIE WIRES OR HOG RINGS. THE WIRE SHALL EXTEND INTO A TRENCH A MINIMUM OF 2 INCHES AND SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE

ORIGINAL GROUND SURFACE.

5. THE STANDARD STRENGTH GEOTEXTILE SHALL BE STAPLED, WIRED OR TIED TO THE WIRE FENCE, AND 8 INCHES OF THE

GEOTEXTILE SHALL BE EXTENDED INTO THE TRENCH.

6. WHEN EXTRA STRENGTH GEOTEXTILE OR BURLAP AND CLOSER POST SPACING ARE USED, THE WIRE MESH SUPPORT FENCE

MAY BE ELIMINATED.

7. THE TRENCH SHALL BE BACKFILLED AND THE SOIL COMPACTED OVER THE GEOTEXTILE.

MAINTENANCE

1. INSPECTION SHALL BE MADE AFTER EACH STORM EVENT AND PERIODICALLY DURING PROLONGED RAINFALL. REPAIR OR

REPLACEMENT SHALL BE MADE AS REQUIRED.

2. ACCUMULATED SEDIMENT BEHIND THE FENCE SHALL BE REMOVED WHEN IT REACHES 1/2 OF THE HEIGHT OF THE BARRIER.

86 MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

AS SHOWN

C-04

CB

BCC

12860001ES

NOV. 21, 2025

SOUTH - SHOWER BUILDING

EROSION & SEDIMENT CONTROL

NOTES AND DETAILS

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1E

S-

SO

U

TH

.d w g, /2 /2

9:

:0

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

86 MAIN STREET

CHESTER, CT

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

AS SHOWN

C-05

CB

BCC

SOUTH - SHOWER BUILDING

SITE DETAILS

12860001DT

NOV. 21, 2025

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1D

T-

SO

U

TH

.d w g, /2 /2

8:

:3

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

AS SHOWN

C-06

CB

BCC

SOUTH - SHOWER BUILDING

SITE DETAILS

12860001DT

NOV. 21, 2025

BUILDING

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1D

T-

SO

U

TH

.d w g, /2 /2

8:

:5

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

STATE OF CONNECTICUT

DEPARTMENT OF ADMINISTRATIVE SERVICES

CAD no.

drawing prepared by project no.

project drawing no.

approved by drawn by scale date drawing title descriptiondatemark

R E V I S I O N S

NATHAN L. JACOBSON & ASSOCIATES, INC.

NONE

C-07

CB

BCC

SOUTH - SHOWER BUILDING

DESIGN NOTES

12860001DT

NOV. 21, 2025

DEPA00013203702S

AUSTIN HAWES CAMPGROUND 198 W RIVER RD.

BARKHAMPSTED, CT

AUSTIN HAWES CAMP SHOWER

BUILDING - SOUTH

07/10/26 ISSUED FOR PERMIT

I:\ C iv il

3D \1

1\

_P ro du ct io n

D ra w in gs \1

1D

T-

SO

U

TH

.d w g, /2 /2

8:

:3

AM

, A ut oC

AD

P

D F

(G en er al

D oc um en ta tio n)

GENERAL STRUCTURAL NOTES

1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE CONNECTICUT STATE BUILDING CODE AND ITS

APPLICABLE REFERENCED STANDARDS.

2. THE CONTRACTOR SHALL COORDINATE ALL DIMENSIONS AND ELEVATIONS WITH THE ARCHITECTURAL DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND

ENGINEER OF RECORD.

3. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROVIDE FOR A SAFE AND EFFICIENT METHOD

OF SHORING AND/OR BRACING THE STRUCTURE DURING CONSTRUCTION.

4. ALL WORK SHALL BE CONTINUOUSLY MONITORED AND INSPECTED BY AN INDEPENDENT TESTING AGENCY REFER TO SPECIAL INSPECTION NOTES ON THIS SHEET. SUBMIT ALL TEST AND INSPECTION REPORTS TO A/E

FOR REVIEW.

5. SUBMIT SHOP DRAWINGS FOR APPROVAL - FOR ALL TRADES INDICATED HEREIN - PRIOR TO PROCEEDING WITH

FABRICATION AND/OR CONSTRUCTION.

6. IN ANY CASE OF CONFLICT BETWEEN THE NOTES AND DETAILS THE MOST RIGID REQUIREMENTS SHALL GOVERN. CONTRACTOR SHALL MAKE NO DEVIATION FROM CONTRACT DOCUMENTS WITHOUT WRITTEN

APPROVAL OF THE ENGINEER.

7. JOB SAFETY AND CONSTRUCTION PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR.

8. ALL COSTS OF INVESTIGATION AND/OR REDESIGN, DUE TO CONTRACTOR LACK OF CONFORMANCE WITH THE

PROJECT DOCUMENTS, SHALL BE AT THE CONTRACTOR'S EXPENSE.

9. TYPICAL DETAILS APPLY REPETITIVELY ON THE PROJECT. CONTRACTOR SHALL COORDINATE THE GENERAL

REQUIREMENTS OF TYPICAL DETAILS WITH PROJECT CONDITIONS, PLANS, SPECIFICATIONS, AND SECTIONS.

FOUNDATIONS

1. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING "CALL BEFORE YOU DIG" AS WELL AS ALL APPROPRIATE AGENCIES AND MUNICIPALITIES TO AVOID DAMAGE TO UNDERGROUND UTILITIES PRIOR TO

THE START OF ANY SITE WORK.

2. A GEOTECHNICAL INVESTIGATION WAS NOT PERFORMED FOR THE SITE. FOUNDATIONS WERE DESIGNED BASED ON PRESUMPTIVE LOAD-BEARING VALUES OF SOILS LISTED IN TABLE 1806.2 OF THE BUILDING CODE.

SOILS ARE ASSUMED TO BE SAND, SILTY SAND, CLAYEY SAND, SILTY GRAVEL, AND/OR CLAYEY GRAVEL WITH A

BEARING CAPACITY OF 3,000 PSF.

3. FOOTINGS SHALL BE STEPPED AT A MAXIMUM SLOPE OF 2 HORIZONTAL TO 1 VERTICAL, UNLESS NOTED

OTHERWISE - SEE TYPICAL DETAILS.

4. REMOVE ALL TOPSOIL, EXISTING FILLS, ORGANIC MATERIALS, FROST DISTURBED SOILS, AND UNSUITABLE

MATERIAL PRIOR TO PLACING NEW FOOTINGS.

5. DURING BACKFILL OPERATIONS OF ALL FOUNDATION WALLS, THE FILL ON EITHER SIDE OF THE WALL SHALL NOT EXCEED A 2'-0" DIFFERENTIAL, UNLESS THE WALL IS DESIGNED FOR RETAINING ACTION.

6. IN NO CASE SHALL BULLDOZERS OR OTHER HEAVY EQUIPMENT BE PERMITTED CLOSER THAN 5 FEET FROM ANY FOUNDATION WALL. IF IT IS NECESSARY TO OPERATE SUCH EQUIPMENT CLOSER THAN 5 FEET TO THE WALL, THE CONTRACTOR SHALL BE THE SOLE RESPONSIBLE PARTY AND AT THEIR OWN EXPENSE SHALL PROVIDE ADEQUATE SUPPORTS OR BRACE THE WALL TO WITHSTAND THE ADDITIONAL LOADS SUPERIMPOSED

FROM SUCH EQUIPMENT.

7. CONTRACTOR SHALL BE RESPONSIBLE TO ADEQUATELY PROTECT ALL EXCAVATION SLOPES. WHERE NECESSARY, SHEETING AND SHORING OF EXCAVATION SHALL BE PROVIDED WITH ALL REQUIRED TIEBACKS

AND BRACING.

8. METHODS EMPLOYED IN ALL SHEETING AND SHORING SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER

LICENSED IN THE STATE OF CONNECTICUT.

9. SOIL COMPACTION SHALL BE CONTROLLED BY A QUALIFIED TESTING LABORATORY AS PART OF SPECIAL INSPECTIONS. TAKE A MINIMUM OF ONE FIELD DENSITY TEST FOR EACH LAYER LOCATION OF TEST SHALL BE

DETERMINED BY THE TESTING AGENCY.

10. MATERIAL FOR COMPACTED GRANULAR FILL SHALL CONSIST OF INORGANIC SOIL FREE OF CLAY, LOAM, ICE AND SNOW, TREE STUMPS, ROOTS, AND OTHER ORGANIC MATTER; GRADED TO THE FOLLOWING LIMITS:

SIEVE SIZE %PASSING (BY WEIGHT)

4-INCHES 100

NO. 10 30-100

NO. 40 10-90

NO. 200 0-12

REINFORCED CONCRETE

1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318 AND 301 REQUIREMENTS. THIS SHALL INCLUDE PROPORTIONING OF CONCRETE MIX, CONCRETE TESTING, PLACEMENT OF CONCRETE, AND CURING

PROCEDURES.

2. CONCRETE REINFORCING DETAILING SHALL BE IN ACCORDANCE WITH ACI-315 UNLESS OTHERWISE NOTED ON

THE DRAWINGS.

3. ALL COLD WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 306. THE GC SHALL BE RESPONSIBLE FOR SUBMITTING A COLD WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO

CONSTRUCTION.

4. ALL HOT WEATHER CONCRETING SHALL CONFORM TO THE REQUIREMENTS OF ACI 305. THE GC SHALL BE RESPONSIBLE FOR SUBMITTING A HOT WEATHER CONCRETING PROCEDURE FOR REVIEW PRIOR TO

CONSTRUCTION.

5. CONCRETE SHALL HAVE 28-DAY COMPRESSIVE STRENGTH, AIR ENTRAINMENT, W/CM RATIO, AND MAX

AGGREGATE SIZE PER THE CONCRETE MIX DESIGN PROPERTIES TABLE.

6. THE CONCRETE MIX SHALL INCLUDE GROUND GLASS POZZOLANS (GGP) CONFORMING TO ASTM C1866 TO THE MAXIMUM EXTENT FEASIBLE TO REDUCE THE TOTAL AMOUNT OF PORTLAND CEMENT, WHICH WOULD

OTHERWISE BE USED, BY NOT LESS THAN 30 PERCENT.

7. UNLESS NOTED OTHERWISE, PROVIDED MINIMUM REINFORCING COVER PER TABLE - THIS SHEET.

8. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60 UNLESS REQUIRED TO BE WELDED AS

SHOWN ON PLANS. ALL REINFORCING BARS REQUIRED TO BE WELDED SHALL CONFORM TO ASTM A706, GRADE 50.

9. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. SUPPORT WIRE FABRIC WITH CHAIRS OR LIFTS, DURING

CONCRETE PLACEMENT TO ENSURE PROPER POSITION IN SLAB.

10. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE PLACING CONCRETE. IF REQUIRED, ADDITIONAL BARS OR STIRRUPS SHALL BE PROVIDED BY THE CONTRACTOR TO FURNISH SUPPORT FOR ALL

BARS.

11. ALL REINFORCING BARS SHALL BE LAPPED USING THE TENSION SPLICE LENGTHS IN THE LAP SPLICE SCHEDULE

UNLESS OTHERWISE NOTED ON THE PLANS.

12. THE CONTRACTOR SHALL SUBMIT THE INFORMATION LISTED BELOW TO THE ENGINEER FOR APPROVAL.

CONRACTOR SHALL ALLOW FOR A TWO WEEK REVIEW PERIOD BY THE DESIGN TEAM.

1. PRODUCT DATA FOR EACH PRODUCT TYPE.

2. DESIGN MIXTURES FOR EACH CONCRETE MIXTURE.

3. STEEL REINFORCEMENT SHOP DRAWINGS.

4. CONSTRUCTION JOINT LAYOUT AND DETAILS.

5. SEQUENCE OF POURS.

13. VERTICAL WALL CONSTRUCTION JOINTS SHALL BE LOCATED TO PROVIDE A 60 FOOT MAXIMUM LENGTH OF CONCRETE PLACEMENT. JOINTS SHALL BE LOCATED AT LEAST 8'-0" FROM ANY COLUMN LINE OR WALL OPENING.

14. THE CONTRACTOR SHALL PROVIDE THE REINFORCING STEEL ERECTOR WITH A SET OF APPROVED SHOP

DRAWINGS FOR FIELD USE.

15. ALL ADJOINING SURFACES NOT CAST MONOLITHICALLY SHALL BE ROUGHENED TO 1/4 INCH AMPLITUDE FOR THE ENTIRE INTERSECTING SURFACE ACCORDING TO ACI RECOMMENDATIONS AND APPLY A BONDING AGENT AS

REQUIRED.

16. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND LOCATIONS OF ALL OPENINGS, PIPE SLEEVES, CURBS, ETC

AS REQUIRED BY OTHER TRADES BEFORE CONCRETE IS PLACED.

17. CONTRACTOR SHALL COORDINATE LOCATION OF FLOOR DRAINS, CURBS, CONCRETE PADS AND FLOOR

DEPRESSIONS, ETC WITH THE ARCHITECTURAL AND MECHANICAL DRAWINGS.

18. CONTRACTOR SHALL COORDINATE LOCATION ON INSERTS, WELDED PLATES AND OTHER ITEMS TO BE

EMBEDDED IN CONCRETE WITH ARCHITECTURAL AND MECHANICAL DRAWINGS.

19. MOIST CURE THE CONCRETE IN ACCORDANCE WITH ACI 308 FOR NOT LESSS THAN SEVEN DAYS WITH THE

FOLLOWING MATERIALS:

1. WATER.

2. CONTINUOUS WATER-FOG SPRAY.

3. ABSORPTIVE COVER, WATER SATURATED, AND KEPT CONTINUOUSLY WET.

20. FOUNDATIONS SHALL BE PROTECTED FROM FROST THROUGHOUT PHASED CONSTRUCTION IN ACCORDANCE WITH ASCE 32-01 WITH A MINIMUM OF 1 INCH THICK LAYER INSULATION HAVING A NOMINAL RESISTIVITY OF 5 R/IN.

21. ALL CONCRETE WORK, REINFORCING, PLACEMENT, AND FORMWORK SHALL BE INSPECTED BY AN INDEPENDENT

TESTING AGENCY RETAINED BY THE OWNER.

22. TESTING OF COMPOSITE SAMPLES OF FRESH CONCRETE SHALL BE PERFORMED FOR A MINIMUM OF ONE SAMPLE OF EACH DAY'S POUR OF EACH CONCRETE MIXTURE FOR THE FIRST 25 CUBIC YARDS PLACED AND A SAMPLE SET FOR EVERY 50 CUBIC YARDS PLACED SUBSEQUENTLY. TESTING SHALL INCLUDE THE FOLLOWING:

1. SLUMP IN ACCORDANCE WITH ASTM C143 AT POINT OF PLACEMENT.

2. AIR CONTENT IN ACCORDANCE WITH ASTM C231 AT POINT OF PLACEMENT.

3. CONCRETE TEMPERATURE IN ACCORDANCE WITH ASTM C1064. PERFORM ONE TEST HOURLY WHEN ARE

TEMPERATURE IS 40 DEGREES F AND BELOW OR 80 DEG F AND ABOVE AND, AND ONE TEST FOR EACH

COMPOSITE SAMPLE.

4. UNIT WEIGHT IN ACCORDANCE WITH ASTM C567.

23. COMPRESSION TEST SPECIMENS IN ACCORDANCE WITH ASTM C31

1. CAST AND LABORATORY CURE TWO SETS OF TWO STANDARD CYLINDER SPECIMENTS FOR EACH

COMPOSITE SAMPLE.

2. CAST AND FIELD CURE TWO SETS OF TWO STANDARD CYLINDER SPECIMENTS FOR EACH COMPOSITE

SAMPLE.

24. COMPRESSION-STRENGTH TESTS IN ACCORDNACE WITH ASTM C39

1. TEST ONE SET OF TWO LABORATORY-CURED SPECIMENS AT 7 DAYS AND 28 DAYS.

2. TEST ONE SET OF TWO FIELD-CURED SPECIMENS AT 7 DAYS AND 28 DAYS.

F3

F2

EXPOSURE

CLASS

MAXIMUM

w/CM

MINIMUM

fc' PSI

0.40 5000

F2

0.45 4500

0.45 4500

NW

NW

CONCRETE

NW

SLAB ON GRADE

FOUNDATION WALLS

ITEM

FOOTINGS AND PIER

AIR CONTENT

6% +/- 1.5%

6% +/- 1.5%

CONCRETE MIX DESIGN PROPERTIES

MAX AGGREGATE

SIZE

3/8"

3/4"

3/4"

6% +/- 1.5%

ALL 3ALL

CONCRETE EXPOSURE REINFORCING BAR SIZE SPECIFIED COVER, INMEMBER

CAST AGAINST AND

PERMANENTLY IN

CONTACT WITH GROUND

No. 6 THROUGH No.18 BARS 2EXPOSED TO WEATHER

OR IN CONTACT WITH

GROUND

ALL

SLABS,

JOISTS, AND

WALLS

No. 5 BAR, W31 OR D31

WIRE, AND SMALLER 1-1/2

No. 14 AND No. 18

BARS

NOT EXPOSED TO

WEATHER OR IN

CONTACT WITH GROUND BEAMS, COLUMNS,

PEDESTALS, AND

TENSION TIES

PRIMARY REINFORCEMENT,

STIRRUPS, TIES, SPIRALS, AND

HOOPS

No. 11 BAR AND

SMALLER

1-1/2

3/4

1-1/2

MINIMUM CONCRETE COVER FOR REINFORCING

BAR SIZE

#3

TOP (IN)

#4

#5

#6

#7

#8

#9

#10

#11

REBAR LAP SPLICE

SCHEDULE

OTHER

(IN)

SPECIAL INSPECTION

SPECIAL INSPECTION IS REQUIRED, PER CHAPTER 17 OF THE STATE OF CONNECTICUT BUILDING CODE, FOR THE

FOLLOWING ITEMS:

1. CAST-IN-PLACE CONCRETE

2. SOIL BEARING CAPACITY (SEE FOUNDATIONS NOTE 2)

3. REINFORCED MASONRY

THE OWNER SHALL RETAIN AND PAY FOR AN INDEPENDENT THIRD PARTY INSPECTION AGENCY TO OVERSEE THE

SPECIAL INSPECTION PROCESS. REFER TO THE SPECIAL INSPECTION FORM.

CONTRACTOR'S DESIGN RESPONSIBILITY

1. THE LISTED BELOW PROJECT ITEMS ASSOCIATED WITH FABRICATION, ERECTION AND CONTRACTORS MEANS AND METHODS AND REQUIRING STRUCTURAL DESIGN ARE THE RESPONSIBILITY OF THE CONTRACTOR.

2. THE CONTRACTOR SHALL RETAIN THE SERVICES OF STRUCTURAL PROFESSIONAL ENGINEER REGISTERED IN

THE STATE OF CONNECTICUT TO PERFORM THE DESIGN OF THE ITEMS, MARKED AS ( * ).

3. CALCULATIONS FOR ITEMS MARKED AS ( * ) SHALL BE SUBMITTED FOR REVIEW AND APPROVAL TO THE ENGINEER OF RECORD, OTHERWISE THE ITEMS SHALL BE SUBMITTED FOR THE OWNERS RECORD:

A: CONCRETE REINFORCEMENT SHOP DRAWINGS

B: MASONRY PRODUCT SUBMITTALS & REBAR SHOP DRAWINGS

C: PRE-ENGINEERED WOOD ROOF TRUSS DRAWINGS ( * )

D: PRE-ENGINEERED TIMBER ROOF TRUSS DRAWINGS ( * )

REINFORCED MASONRY

1. WALLS INDICATED ON STRUCTURAL DRAWINGS ARE FOR REFERENCE ONLY. SEE ARCHITECTURAL DRAWINGS

FOR TYPE, LOCATION, THICKNESS AND COMPOSITION OF MASONRY WALLS.

2. MATERIALS:

A. HOLLOW CONCRETE MASONRY UNITS (NORMAL WEIGHT UNITS): ASTM C 90 W/ UNIT COMPRESSIVE

STRENGTH OF 1,500 PSI MIN.

B. INSULATED CONCRETE MASONRY UNITS: ASTM C578, TYPE I W/ UNIT COMPRESSIVE STRENGTH OF 2,150

PSI MIN.

C. MORTAR : (TYPE S) ASTM C 270, TYPE S FOR ALL ABOVE GRADE APPLICATIONS.

D. GROUT: ASTM C 476 (COMPRESSIVE STRENGTH AT 28 DAYS = 2000 PSI)

E. DEFORMED STEEL REINFORCING BARS: ASTM A615 GRADE 60.

3. MASONRY WALL REINFORCING: SEE TYPICAL DETAILS.

4. BAR POSITIONERS FOR VERTICAL WALL BARS SHALL BE 9 GAUGE, GALVANIZED WIRE. PROVIDE POSITIONERS

FOR ALL REINFORCED CELLS.

5. ALL VERTICAL WALL REINFORCING SHALL BE CONTINUOUS FOR THE FULL HEIGHT OF MASONRY WALLS, INCLUDING THROUGH CONTINUOUS MASONRY BOND BEAMS UNLESS OTHERWISE INDICATED.

6. CELLS CONTAINING REINFORCING BARS AND ALL CELLS BELOW GRADE SHALL BE GROUTED SOLID USING LOW

LIFT GROUTING PROCEDURES. MAXIMUM GROUT POUR HEIGHT SHALL BE 4 FEET.

7. PROVIDE BOND BEAMS AND LINTELS FOR ALL OPENINGS IN MASONRY WALLS. SEE DETAILS.

8. ALL BOLTS OR ANCHORS SHALL BE SOLIDLY EMBEDDED IN GROUT. IF A BOND BEAM IS NOT LOCATED AT BOLT

OR ANCHOR ELEVATION, PROVIDE LATH AND FILL CELL LOCALLY TO PROVIDE SUBSTRATE FOR BOLT OR

ANCHOR. GROUT CELL ABOVE ALL MASONRY ANCHORS.

9. HOLLOW UNITS SHALL BE LAID WITH FULL MORTAR COVERAGE ON HORIZONTAL AND VERTICAL FACE SHELLS, PROVIDE FULL BEDDING FOR WEBS AT REINFORCED CORES AND IN THE STARTING COURSE ON FOOTINGS AND

SOLID FOUNDATION WALLS.

10. MORTAR PROTRUSIONS EXTENDING INTO CELLS OR CAVITIES TO BE REINFORCED AND/OR GROUTED SHALL BE

REMOVED.

11. FOR LOCATION AND THICKNESS OF CMU WALLS, SEE ARCH DRAWINGS.

12. ELASTOMERIC JOINT SEALANTS FOR VERTICAL…