Plan-11x17 Color.pdf
PDF 1 MB Posted
- Attached to
- Lyndon B. Johnson Job Corps Center Structural Repairs Federal contract opportunity
- Solicitation number
- 1282A720Q0115
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| beta.SAM.gov.pdf | ||
| 1282A720Q0115.pdf | ||
| Specification-All.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
LBJ BUILDING 50 REPAIR
From Franklin, NC, Proceed on Old Murphy Road, then onto Wayah Rd for approx. 3.2 miles to the center.
LBJ JC Center 3170 Wayah Road, Franklin, NC 28734
W
KN
AA
CK
D
RA
W
IN
G1
.D W
G;
NORTH CAROLINA
MACON COUNTY
WASHINGTON OFFICE
LYNDON B. JOHNSON JOB CORP CCC
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET
2 COLUMN REPAIR OF WAREHOUSE DOORS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/1 0/2
0 0 9:
W
KN
AA
CK
C
:\U
SE
RS
\W
KN
AA
CK
\D
OC
UM
EN
TS
\P
RO
JE
CT
S\ 1-
A-
TS
T\
JC
L
BJ
W
AR
EH
OU
SE
\C
ON
TR
AC
T
FO
LD
ER
\L
BJ
W
AR
EH
OU
SE
C
OL
UM
N.
DW
G;
WO
Civilian Conservation Corps
BUILDING 50
REPAIR
LBJ Center
Column Repair of Warehouse Doors
6/10/2020
W Knaack, PE
W. Knaack PE
X.XXX
S-01 2 2scale: 3/16" = 1'
FULL VIEW OF DAMAGE
scale: 3/16" = 1' ABUTMENTS scale: 3/16" = 1'
VIEW OF DAMAGE
scale: NTS
DAMAGED BLOCKS TO BE REPLACED
scale: NTS
BLOCK DAMAGE INSIDE
Add bracing to support lintel above door.
Replace Blocks
Bracing under the brick veneer during replacement of the CMU's.
General Notes:
Replace only half of the CMU's at a time. The remaing half will help keep the column supported.
If the contractor chooses to replace them all at the same time, they will need to submit a plan to the FS for review.
All removed materials will be disposed off site.
The contractor will submit brick veneer color choices for FS approval prior to ordering.
The contractor will submit the CMU product data and grout product data for approval prior to ordering.
The contractor will coordinate the work no less than 7 days before work commences.
Any trim, hardware, or other items removed for the repair will need to be replaced with the existing materials or new materials to pre work conditions.
All work to follow the 2018 IBC.
Contractor will need to confirm the work and quantities.
CMU's and Brick Veneer to be replaced.
Contractor to remove additional courses to inspect the block partially revealed in the photo.
Contractor may add additional connections to support column.
Area of work
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Drawing1-COVERSHEET |
| Sheets and Views |
| COVERSHEET |
| OLE1 |
| LBJ Warehouse Column-PLOT |
| Sheets and Views |
| PLOT |
File details come from the government source that posted it. Updated .