Plan-11x17 Color.pdf

PDF 1 MB Posted

Attached to
Lyndon B. Johnson Job Corps Center Structural Repairs Federal contract opportunity
Solicitation number
1282A720Q0115
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Lyndon B. Johnson Job Corps Center Structural Repairs, newest first.
File Type Posted
beta.SAM.gov.pdf PDF
1282A720Q0115.pdf PDF
Specification-All.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

LBJ BUILDING 50 REPAIR

From Franklin, NC, Proceed on Old Murphy Road, then onto Wayah Rd for approx. 3.2 miles to the center.

LBJ JC Center 3170 Wayah Road, Franklin, NC 28734

W

KN

AA

CK

D

RA

W

IN

G1

.D W

G;

NORTH CAROLINA

MACON COUNTY

WASHINGTON OFFICE

LYNDON B. JOHNSON JOB CORP CCC

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET

2 COLUMN REPAIR OF WAREHOUSE DOORS

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/1 0/2

0 0 9:

W

KN

AA

CK

C

:\U

SE

RS

\W

KN

AA

CK

\D

OC

UM

EN

TS

\P

RO

JE

CT

S\ 1-

A-

TS

T\

JC

L

BJ

W

AR

EH

OU

SE

\C

ON

TR

AC

T

FO

LD

ER

\L

BJ

W

AR

EH

OU

SE

C

OL

UM

N.

DW

G;

WO

Civilian Conservation Corps

BUILDING 50

REPAIR

LBJ Center

Column Repair of Warehouse Doors

6/10/2020

W Knaack, PE

W. Knaack PE

X.XXX

S-01 2 2scale: 3/16" = 1'

FULL VIEW OF DAMAGE

scale: 3/16" = 1' ABUTMENTS scale: 3/16" = 1'

VIEW OF DAMAGE

scale: NTS

DAMAGED BLOCKS TO BE REPLACED

scale: NTS

BLOCK DAMAGE INSIDE

Add bracing to support lintel above door.

Replace Blocks

Bracing under the brick veneer during replacement of the CMU's.

General Notes:

Replace only half of the CMU's at a time. The remaing half will help keep the column supported.

If the contractor chooses to replace them all at the same time, they will need to submit a plan to the FS for review.

All removed materials will be disposed off site.

The contractor will submit brick veneer color choices for FS approval prior to ordering.

The contractor will submit the CMU product data and grout product data for approval prior to ordering.

The contractor will coordinate the work no less than 7 days before work commences.

Any trim, hardware, or other items removed for the repair will need to be replaced with the existing materials or new materials to pre work conditions.

All work to follow the 2018 IBC.

Contractor will need to confirm the work and quantities.

CMU's and Brick Veneer to be replaced.

Contractor to remove additional courses to inspect the block partially revealed in the photo.

Contractor may add additional connections to support column.

Area of work

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

Drawing1-COVERSHEET
Sheets and Views
COVERSHEET
OLE1
LBJ Warehouse Column-PLOT
Sheets and Views
PLOT

File details come from the government source that posted it. Updated .