PLA Special Notice - 25R0002.pdf
PDF 129 KB Posted
- Attached to
- PLA Special Notice FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222
- Solicitation number
- Not on record
About this file
This is a Project Labor Agreement (PLA) Special Notice from the U.S. Army Corps of Engineers Seattle District soliciting industry comments on potential PLA use for a large-scale construction project at Joint Base Lewis McChord, Washington. The project involves converting two existing barrack buildings (Buildings 3221-3222) into operational facilities for 3-tier command levels, with an estimated construction cost between $25 million and $100 million. Planned work includes extensive demolition and renovation, such as hazardous material abatement, 75% exterior envelope removal, 90% mechanical-electrical system replacement, new exterior envelope installation, and new mechanical-electrical systems.
The Corps is seeking construction industry feedback through a detailed survey on PLA implementation, requesting information about local labor market conditions, previous similar projects, potential challenges, and perspectives on how a PLA might advance federal procurement efficiency. The document emphasizes this is a market research effort only, not a formal solicitation, and encourages contractors to provide comprehensive insights about local construction projects, labor availability, scheduling requirements, and potential PLA benefits or drawbacks. Responses will help the government make informed acquisition decisions for this military facility renovation project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Subject: FY25 Joint Base Lewis McChord Multi Domain Task Force Buildings 3221-3222, Washington.
NAICS Code: 236220 – Commercial and Institutional Building Construction.
Product Service Code: Y1AZ-Construction of Other Administrative Facilities and Service Buildings.
THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A
REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID.
THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS
AVAILABLE AT THIS TIME.
This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers Seattle District is soliciting comments from the construction community addressing the potential use of PLA for large scale construction projects (exceeding $35 million) within Joint Base Lewis McChord, Washington.
DESCRIPTION OF WORK:
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
The definitive removal / demolition work items for each building will require:
a) Hazardous material / debris abatement and removal mostly within the crawl space
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc,
c) Removal at ~ 90% removal of building mechanical – electrical systems
d) Removal of the existing roof EPDM system (but not the roof framing structure)
The definitive repair / new work items for each building will require:
e) New exterior envelope
f) New building mechanical – electrical systems
g) New roof TPO system
Other considerations for site work coordination
h) New utility connections (mostly by other entities)
i) Shared construction boundaries with adjacent current and future projects
MAGNITUDE:
In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $25,000,000 and $100,000,000.
FACTORS TO BE CONSIDERED:
Some of the factors that may be considered regarding PLA use are:
1. The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades.
2. There is a shortage of skilled labor in the region in which the construction project will be sited.
3. Completion of the project will require an extended period of time.
4. PLAs have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project.
5. A PLA will promote the agency’s long term program interests, such as facilitating the training of a skilled workforce to meet the agency’s future construction needs.
6. Any other factors that the agency decides are appropriate.
FEDERAL ACQUISITION REGUATIONS (FAR) 22.502 DEFINITIONS:
Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U. S.C. 158(f).
FAR 22.503 – POLICY:
a. PLA are a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of PLAs in connection with large-scale construction projects.
b. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a PLA with one or more labor organizations if the agency decides that the use of PLAs will:
1. Advance the Federal Governments interest in achieving economy and efficiency in
Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and;
2. Be consistent with law. (Refer also to FAR 52.222-33 Notice of Requirement for PLA and FAR 52.222-34 PLA).
INDUSTRY COMMENTS:
The construction community is invited to comment on the use of PLAs using the following questions:
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
Please provide a list of recent (2-5 years) construction projects in the local labor market of the project under consideration. The information gathered in this exercise should include the following information:
a) Project Name and Location
b) Detailed Project Description
c) Initial Cost Estimate vs. Actual Final Cost
d) Was the project completed on time?
e) Number of craft trades present on the project
f) Was a PLA used?
g) Were there any challenges experienced during the project?
THIS IS NOT A SOLICITATION FOR PROPOSALS AND DOES NOT CONSTITUTE
ANY COMMITMENT BY THE GOVERNMENT. Responses to this PLA market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitations announcements separately from responses to this market survey.
| THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME. |
| DESCRIPTION OF WORK: |
| General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade ... |
| The definitive removal / demolition work items for each building will require: |
| a) Hazardous material / debris abatement and removal mostly within the crawl space |
| b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc, |
| c) Removal at ~ 90% removal of building mechanical – electrical systems |
| d) Removal of the existing roof EPDM system (but not the roof framing structure) |
| The definitive repair / new work items for each building will require: |
| e) New exterior envelope |
| f) New building mechanical – electrical systems |
| g) New roof TPO system |
| Other considerations for site work coordination |
| h) New utility connections (mostly by other entities) |
| i) Shared construction boundaries with adjacent current and future projects |
| MAGNITUDE: |
| FACTORS TO BE CONSIDERED: |
| FEDERAL ACQUISITION REGUATIONS (FAR) 22.502 DEFINITIONS: |
| FAR 22.503 – POLICY: |
| INDUSTRY COMMENTS: |
| THIS IS NOT A SOLICITATION FOR PROPOSALS AND DOES NOT CONSTITUTE |
File details come from the government source that posted it. Updated .