This document is an engineering drawing detail sheet prepared by Burns & McDonnell Engineering Company, Inc. for the Parker Substation 138kV High Bus Support Steel Structures project in Florida. The drawing underwent multiple revisions during the design development process, beginning with a 60% review in April 2026, followed by 90% reviews in May, July, and August 2026, with final issuance for construction approval in September 2026. The document was digitally signed and sealed by Bryan M. Surface on September 21, 2026, and is associated with GRU's procurement for manufacturing and delivery of new steel structures. The related contract opportunity indicates GRU intends to establish a 3-year agreement with the selected vendor for steel structures fabrication and delivery.
The engineering drawings and technical specifications establish the detailed requirements for the high bus support steel work at the Parker Substation. As a technical design document supporting the steel structures procurement, this file provides the manufacturing specifications and construction details necessary for vendors to prepare accurate bids and execute the work. The contract opportunity does not identify any specific set-asides, pricing terms, or funding sources in the materials provided. Additional details regarding contract value, payment terms, bonding requirements, and any small business or other preferential procurement designations would be found in the solicitation's formal bid documents and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Steel_Structures.pdf | ||
| PKSTLDTL11.pdf | ||
| PKSTLDTL10.pdf | ||
| PKSTLDTL9.pdf | ||
| PKSTLDTL8.pdf | ||
| PKSTLDTL7.pdf | ||
| PKSTLDTL6.pdf | ||
| PKSTLDTL5.pdf | ||
| PKSTLDTL3.pdf | ||
| PKSTLDTL2.pdf | ||
| PKSTLDTL1.pdf | ||
| 33_72_00_TND.pdf | ||
| 33_71_16_23_TND.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARKER SUBSTATION
138kV HIGH BUS SUPPORT STEEL DETAILSREV DATE DESCRIPTION
BURNS & MCDONNELL
ENGINEERING COMPANY, INC.
9400 WARD PARKWAY
KANSAS CITY, MO 64114
CHANGES AS INDICATED BY THE FOLLOWING
SEAL ASSUMES RESPONSIBILITY FOR THE
THE REGISTRANT OF THE NEWLY APPLIED
REVISION NUMBER: 0
04/15/26A ISSUED FOR 60% REVIEW
ISSUED FOR 90% REVIEWB 05/21/26
RE-ISSUED FOR 90% REVIEW07/17/26C
RE-ISSUED FOR 90% REVIEW08/28/26D
495 N Keller Rd, Suite 300, Maitland, FL 32751
THIS ITEM HAS BEEN DIGITALLY
SIGNED AND SEALED BY
BRYAN M. SURFACE ON THE DATE
ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT
ARE NOT CONSIDERED SIGNED AND
SEALED AND THE SIGNATURE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES.Brendan Murphy, PE#86559
E 09/21/26 ISSUED FOR CONSTRUCTION
Bryan Surface
09/21/2026