PKG00251559-instructions.pdf

PDF 76 KB Posted

Attached to
FY20 Saltonstall-Kennedy Competition
Opportunity number
NOAA-NMFS-FHQ-2020-2006111
Issued by

About this file

Application Instructions

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY20 Saltonstall-Kennedy Competition

TABLE OF CONTENTS

I. Funding Opportunity Description 4

A. Program Objective 4 B. Program Priorities 4 C. Program Authority 6

II. Award Information 6 A. Funding Availability 6 B. Project/Award Period 6 C. Type of Funding Instrument 6

III. Eligibility Information 7 A. Eligible Applicants 7 B. Cost Sharing or Matching Requirement 8 C. Other Criteria that Affect Eligibility 8

IV. Application and Submission Information 8 A. Address to Request Application Package 8 B. Content and Form of Application 9 C. Unique Entity Identifier and System for Award Management (SAM) 20 D. Submission Dates and Times 21 E. Intergovernmental Review 21 F. Funding Restrictions 22 G. Other Submission Requirements 22

V. Application Review Information 24 A. Evaluation Criteria 24 B. Review and Selection Process 27 C. Selection Factors 31 D. Anticipated Announcement and Award Dates 31

VI. Award Administration Information 32 A. Award Notices 32 B. Administrative and National Policy Requirements 33 C. Reporting 36

VII. Agency Contacts 36 VIII. Other Information 37

Federal Funding Opportunity Page 1 of 37

ANNOUNCEMENT OF FEDERAL FUNDING OPPORTUNITY

EXECUTIVE SUMMARY

Federal Agency Name(s): National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Department of Commerce

Funding Opportunity Title: FY20 Saltonstall-Kennedy Competition

Announcement Type: Initial

Funding Opportunity Number: NOAA-NMFS-FHQ-2020-2006111

Catalog of Federal Domestic Assistance (CFDA) Number: 11.427, Fisheries Dev and Utilization Research and Dev Grants and Coop Agreements Program

Dates: Dates: Pre-proposals must be received at http://www.Grants.gov under the competition link named “PRE PROPOSALS FY20 Saltonstall-Kennedy”, postmarked, or provided to a delivery service by 11:59 pm, Eastern Time, July 30, 2019, 60 days after the posting date of the Federal Funding Opportunity (FFO). Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable. Postmarked applications received more than 5 business days following the closing date will not be accepted. No facsimile or electronic mail applications will be accepted. Within 45 days of the pre-proposal due date, NOAA will inform the authorized representatives if the Saltonstall-Kennedy (S-K) Program encourages or does not encourage submission of a full proposal. It will be the responsibility of the authorized representative to forward notification to the Principal Investigator(s). Regardless of whether you are encouraged or not encouraged, all those who submit accepted pre-proposals and meet all requirements are eligible to submit full proposals.

Note: The Authorized Representative listed on the application will receive the response to the pre-proposal and full proposal should one be submitted. It will be the responsibility of the authorized representative to forward any notification to others within the project team, including the Principal Investigator.

Full Applications must be received by http://www.Grants.gov under the competition link named “FULL Proposals FY20 Saltonstall-Kennedy”, postmarked, or provided to a delivery service by 11:59 pm, Eastern Time, November 12, 2019, 165 days after the posting date of the FFO. Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable. Postmarked applications received more than 5 business days following the closing date will not be accepted. No facsimile or electronic mail applications will be accepted.

Federal Funding Opportunity Page 2 of 37

When developing your full application submission timeline, please keep in mind that you are encouraged to apply through the www.grants.gov website. This electronic submission system is relatively complex for first time users and involves several preliminary registrations to be completed before your application can be submitted. If you have already used the Grants.gov website, the required registrations may have already been completed. Please allow sufficient time for the application to be submitted electronically and for possible computer delays.

Validation or rejection of your application by Grants.gov may take up to 2 business days after submission. Please consider this process in developing your submission timeline. Applications not adhering to postmark or submission deadlines will be rejected and destroyed.

NOTE: Under this one solicitation there are two (2) competition links. Please be sure to submit your pre-proposals to the “PRE PROPOSALS FY20 Saltonstall-Kennedy” link within the dates specified in this FFO. Please be sure to submit your FULL Proposals to the “FULL Proposals FY20 Saltonstall-Kennedy” link prior to the date specified in this FFO.

Funding Opportunity Description: The Saltonstall-Kennedy Act established a fund (known as the S-K fund) used by the Secretary of Commerce to provide grants or cooperative agreements for fisheries research and development projects addressing aspects of U.S. fisheries, including, but not limited to, harvesting, processing, marketing, and associated business infrastructures (see section IV, F; Funding Restrictions). Under this authority, grants and cooperative agreements are made on a competitive basis (subject to availability of funding) to assist in carrying out projects to expand domestic and foreign markets related to U.S. commercial and recreational fisheries.

The term “fisheries” encompasses wild capture, marine aquaculture and recreational fishing. The objective of the S-K Research Program is to address the needs of the fisheries and fishing communities in optimizing economic benefits by building and maintaining sustainable fisheries and practices, dealing with the impacts of conservation and management measures, and increasing other opportunities to use existing infrastructure to support keeping working waterfronts viable. U.S. fisheries include any fishery, commercial or recreational, that is, or may be, engaged in by citizens or nationals of the United States or other eligible applicants. Proposals submitted to this competition must address at least one of the following priorities: Promotion, Development, and Marketing; Science or Technology that Promotes Sustainable U.S. Seafood Production and Harvesting. This Federal Funding Opportunity (FFO) includes information on application and criteria for research proposals requesting a maximum of $300,000 in Federal funding for up to a two-year period. Matching funds are not required, nor will they be considered during the evaluation process. Awards are anticipated to start no earlier than September 1, 2020.

Federal Funding Opportunity Page 3 of 37

FULL ANNOUNCEMENT TEXT

I. Funding Opportunity Description

A. Program Objective

The objectives of the S-K Grant Program and, therefore, the funding priorities, have changed over the years since the program began in 1980. The program has evolved as Federal fishery management laws and policies and research needs have evolved in response to changing circumstances.

The Magnuson-Stevens Act requires us to undertake efforts to prevent overfishing, rebuild overfished fisheries, insure conservation, minimize by-catch, protect essential fish habitats, and realize the full potential of U.S. fishery resources. It further requires that we take into account the importance of fishery resources to fishing communities; provide for the sustained participation of such communities; and, to the extent possible, minimize the adverse economic impacts of conservation and management measures on such communities.

The objective of the S-K Grant Program is to address the needs of fishing communities in optimizing economic benefits by building and maintaining sustainable fisheries and practices, dealing with the impacts of conservation and management measures, and increasing other opportunities to keep working waterfronts viable. NMFS seeks applications that demonstrate direct benefits to U.S. fishing industries and encourages proposals that involve fishing community participation. U.S. fisheries include any fishery, commercial or recreational, that is, or may be, engaged in by citizens or nationals of the United States or other eligible applicants.

Successful applications will be those aimed at helping fishing communities to resolve issues that affect their ability to fish; making full use of those species that are currently under Federal or state fishery management plans; and addressing the socioeconomic impacts of overfishing and overcapacity. The S-K Grant Competition is open to applicants from a variety of sectors, including individuals, industry, academia, and state and local governments. We encourage applications that involve collaboration between industry and the other sectors listed.

B. Program Priorities

Applications may address one or more of the two priorities listed below. However, a singular research priority that most closely reflects the objectives of your proposal must be identified and will be used by NMFS for review purposes. These priorities are aimed at

Federal Funding Opportunity Page 4 of 37 promoting and developing United States fisheries through advancing the economic vitality of the fishing industry and fishery working waterfront communities, rebuilding fish stocks, and maintaining and restoring healthy ocean and coastal ecosystems for the long-term benefit of the public.

Solicitation Priorities:

Priority #1 – Promotion, Development, and Marketing

Projects sought should:

- Promote better business practices to increase market demand for, and value-added of, U.S.

commercial and recreational fish species.

- Develop collaborative and improved regional, national, and global public relations and marketing opportunities that can position the U.S. seafood industry to increase domestic production and better compete in global markets.

- Include marketing strategies which involve participation of the seafood industry locally, regionally, or nationally.

Priority #2- Science or Technology that Promotes Sustainable U.S. Seafood Production and Harvesting

Projects sought should:

- Directly impact fisheries (to include commercial, recreational, wild capture, and aquaculture) through the development of science and technology based pilot projects that lead to the strengthening of existing, or the creation of new markets and opportunities in U.S.

fishing communities.

- Demonstrate a direct need or benefit to the fishing community that connects all segments of the fisheries supply chain from growing/harvesting to processing and marketing.

- Include, within the scope of the project, participation of the seafood industry and/or fishing community.

Federal Funding Opportunity Page 5 of 37

C. Program Authority

Authority for the Saltonstall-Kennedy Grant Program is provided under the Saltonstall- Kennedy Act, as amended (15 U.S.C. 713c-3).

II. Award Information

A. Funding Availability

Grant awards are dependent on the availability of Federal funding as provided in enacted Appropriations Acts. This Federal Funding Opportunity (FFO) is being released prior to final appropriations due to award process time frames. While the FY 2020 President's budget proposed $0 for this program, final Congressional direction has not been determined.

Applicants are not guaranteed any level of funding.

Project proposals requesting less than $25,000 or greater than $300,000 in federal funding, will not be accepted or reviewed. The number of awards made as a result of this solicitation will depend on the number of eligible applications received, the amount of funds requested for each project, the merit and ranking of the proposals, and the amount of funds made available to the S-K Program. There is no limit on the number of applications that can be submitted by the same applicant during this competitive solicitation; however, multiple applications submitted by the same applicant must clearly identify different projects, and each application will be rated individually in the competitive review process. If you have several projects that you are seeking funding for, submit a separate application for each project; do not consolidate several projects into one application.

B. Project/Award Period

We will award grants or cooperative agreements for a maximum period of two years (24 months), but shorter term project proposals are welcomed.

Applications beyond this 24 month duration will not be considered. The requested award start date must begin on the first day of the month and end on the last day of the month. The earliest start date for projects will be September 1, 2020, dependent upon availability of Federal funding as provided by Congress, acceptable completion of all NOAA/applicant negotiations including National Environmental Policy Act analysis and permit requirements, and the provision of other supporting documentation as requested. Applicants selected to receive funding may be asked to modify the project start date.

C. Type of Funding Instrument

Federal Funding Opportunity Page 6 of 37

The funding instrument (grant or cooperative agreement) will be determined by the NOAA Grants Office. A cooperative agreement will be used if the proposed project involves substantial Federal scientific or programmatic involvement. Substantial involvement means that, after award, NOAA scientific or program staff will assist, guide, coordinate, or participate in project activities in a partnership role; it is not to assume direction, prime responsibility, or a dominant role in the activities. The dominant role and prime responsibility resides with the award recipient for the project as a whole, although specific tasks and activities may be shared among the recipient and NOAA. The exact amount of funds, the scope of work, and terms and conditions of a successful award will be determined in pre-award negotiations, between the applicant’s Authorized Representative and NOAA/NMFS representatives.

III. Eligibility Information

A. Eligible Applicants

You are eligible to apply for a grant or a cooperative agreement under the Saltonstall- Kennedy Grant Program if:

1. You are a citizen or national of the United States;

2. You represent an entity that is a corporation, partnership, association, or other non- Federal entity, non-profit or otherwise (including Indian tribes), if such entity is a citizen of the United States within the meaning of section 2 of the Shipping Act, 1916, as amended (46 U.S.C. app. 802); or

3. You are a citizen of the Republic of the Marshall Islands, Republic of Palau, or the States of Micronesia.

We recognize the interest of the Secretaries of Commerce and Interior in defining appropriate fisheries policies and programs that meet the needs of the U.S. insular areas, so we encourage applications from individuals, government entities, and businesses in U.S.

insular areas. We support cultural and gender diversity in our programs and encourage women and minority individuals and groups to submit applications. We are also committed to broadening the participation of Minority Serving Institutions (MSIs), which include Historically Black Colleges and Universities, Hispanic Serving Institutions, and Tribal Colleges and Universities, in our grant programs. To find out more about MSIs go to http://www2.ed.gov/about/offices/list/ocr/edlite-minorityinst.html.

We encourage applications from members of the fishing community and applications that involve fishing community cooperation and participation. We will consider the extent of

Federal Funding Opportunity Page 7 of 37 fishing community involvement when evaluating the potential benefit of funding a proposal.

Eligible Applicants must submit a pre-proposal that meets the submission requirements listed in this FFO by the established due date. Full proposals will not be reviewed or evaluated if a pre-proposal was not received on time and ranked.

Non Eligible Applicants

You are not eligible to submit an application under this program if you are an employee of any Federal agency; a Regional Fishery Management Council (Council); or an employee of a Council. However, Council members who are not Federal employees can submit an application to the S-K Program.

B. Cost Sharing or Matching Requirement

No cost sharing or matching is required. The S-K Act, as amended, does not require that you share in the total cost of the project. Cost sharing is voluntary and will not increase the chances of your project being selected. If you choose to cost-share and if your application is selected for funding, you will be obligated to account for the amount of cost-share dollars reflected in the award documents, signed by the NOAA Grants Officer. This commitment of matching dollars becomes a binding offer. If project costs are shared, NMFS must provide at least 50 percent of total project costs.

C. Other Criteria that Affect Eligibility

Federal agencies and their personnel are not permitted to receive funding under this competition; however, Federal scientists can serve as uncompensated partners on proposals.

Should you wish to partner with a Federal agency, a written agreement detailing this participation must be provided. The agreement should describe any planning, scheduling, conducting, and analyzing of proposed project activities or work to be conducted by a Federal employee, and/or resources provided by the partnering agency, e.g. equipment or lab space.

IV. Application and Submission Information

A. Address to Request Application Package

For the full application, the standard application package, consisting of the standard forms, i.e., SF-424, SF-424A, SF-424B, SF-LLL, and the CD-511, is available at http://www.grants.gov.

Federal Funding Opportunity Page 8 of 37

If an applicant has problems with Grants.gov, contact the Grants.gov Customer Support at 1- 800-518-4726 or support@Grants.gov. If you do not have Internet access, a pre-proposal or full proposal application package may be received by contacting Clifford Cosgrove, S-K Program Manager, NOAA/NMFS (F/MB); 1315 East-West Highway, Room 14321, Silver Spring, MD 20910-3282, Phone: (301) 427-8736, or email: clifford.cosgrove@noaa.gov.

B. Content and Form of Application

Format requirements for both pre-proposals and full proposals: All application materials should be submitted in Adobe PDF or a common word processing format, and when printed out should meet all format requirements. All pages must be no less than single-spaced printed or typed, in at least 12-point font, and printable on 8.5-inch x 11-inch paper, with 1-inch margins. If these requirements are not followed, the pre-proposal or full proposal will be withdrawn without consideration.

Pre-proposals should be submitted through Grants.gov. The SF-424 must be filled out and signed as part of the grants.gov pre-proposal submittal. Do not submit or attach any additional attachments or documentation along with the SF-424 for the pre-proposal submission.

Pre-proposal Format

The pre-proposal process is intended to provide an indication to potential applicants of the technical merit and the relevancy of the proposed project to the S-K Research Program before preparing a full proposal. The intent is to reduce the burden of preparing full proposals that do not have a high probability for being funded. When drafting a pre-proposal, applicants should clearly convey how your proposed project meets the four evaluation criteria and the identified single priority area. Late or incomplete pre-proposals, as well as those that deviate from content or format requirements, will be withdrawn without consideration.

Federal employees are not allowed to assist in the preparation of pre-proposals. However, they may provide you with information on program goals, funding priorities, and pre-proposal application procedures. Because this is a competitive program, Federal employees will not provide assistance in conceptualizing, developing, or structuring pre-proposals.

The SF-424 form will serve as the cover page for the 2-page pre-proposal. Each pre-proposal may not exceed two pages, single-spaced, and may not include any other attachments or links embedded within the two page narrative.

Federal Funding Opportunity Page 9 of 37

Though the SF-424 form allows for additional attachments, do not use this function. Pre-proposals may only have an SF-424 form as a cover page, and a separate 2-page pre-proposal narrative. The pre-proposal narrative must be submitted using the format described above and must provide:

a. Name of organization, Title of project, and Principal Investigator(s), with email contact(s).

b. Priority: Applicants must identify the single priority that is most addressed by the pre-proposal. If more than one priority is addressed by the proposal, one priority must be identified as the primary. The primary priority will dictate the type of subject matter expert used to evaluate your pre-proposal. If one is not identified, a priority will be identified for you.

c. Background section that sets the stage for the work and identifies which one of the priorities in Section I.B the pre-proposal addresses directly.

d. Rationale of why the work should be conducted and how it is relevant to the S-K Research Program.

e. Clear statement of objectives and general methodology to be used.

f. Identification of required permits (i.e. ESA, MMPA) and permit numbers, if applicable.

g. Estimated budget amount (a detailed budget narrative is not required).

Information contained in the pre-proposal narrative needs to provide sufficient information for reviewers to evaluate the project based on the pre-proposal evaluation criteria (see Section V. A. Evaluation Criteria)

Full Application Format

A complete standard NOAA grant application package is required in accordance with the guidelines in this document. Applications that are not complete on the closing date of this announcement will not be reviewed. Your application must contain all required documents and forms; if these forms are not signed via the www.Grants.gov application process, they MUST be signed in ink. Paper applications without inked signatures on their forms will be

Federal Funding Opportunity Page 10 of 37 considered incomplete and will not be reviewed. The Authorized Representative MUST sign and date these forms in the space reserved for electronic signature. Signatures (electronic or ink) must match the name printed in the “Authorized Representative” section of the SF-424 Block 21. Another Authorized Representative may not sign on behalf of the individual noted in Block 21. An incomplete application or one that does not follow the format requirements will not be considered and will be withdrawn from the competition.

Each application must include (listed below are minimum requirements that must be included in the proposal submission. If any of these are not included the proposal will not be considered and will be withdrawn from the competition):

- An identified singular research priority that most closely reflects the objectives of your proposal. If more than one priority is addressed by the proposal, one priority must be identified as the primary. The primary priority will dictate the type of subject matter expert used to evaluate your proposal. If one is not identified, a priority will be identified for you.

- Federal application forms, including:

o SF-424, Application for Federal Assistance. Applicants must enter the NOAA assigned pre-proposal number in box 5b.

o SF-424A, Budget Information - Non-construction Programs must be completed.

Indicate any matching funds, if applicable.

o SF-424B, Assurances - Non-construction Programs must be completed for each submitted non-construction application.

o CD-511, Certification Regarding Lobbying.

o SF-LLL, Disclosure of Lobbying Activities (if applicable).

- Data Sharing Plan

- A Project Summary (described below, limit 2 pages).

- A Project Narrative (described below, limit 20 pages)

- A Budget Narrative (described below).

Federal Funding Opportunity Page 11 of 37

Each application should also include:

- NOAA NEPA Questionnaire (https://www.nepa.noaa.gov/docs/NOAA-Grants- Questionnaire-final.pdf). It is recommended that you pay attention to responding to Questions 1-19 and 20-37, the latter of which are specific to NMFS project submissions.

- Other Supporting Documentation and relevant attachments the applicant deems important to the overall understanding and evaluation of the proposed project [such as references, curricula vitae (not to exceed two pages each), letters of collaboration received from the relevant partners or communities involved in the project, etc. (combined into one PDF document)], which does not count against the 20-page limit for the Project Narrative.

Letters of support are not allowed to be submitted, and will not be accepted during the review process.

All pages must be no less than single-spaced printed or typed, in at least a 12–point font with one-inch margins on letter sized (8.5” x 11”) paper. Any PDF or other attachments that are included in an electronic application must meet the above format requirement when printed out. Failure to follow these requirements will result in the application being withdrawn from the competition.

If an applicant does not have Internet access or if Grants.gov is inaccessible, paper applications will be accepted. Paper applications must be submitted with completed, signed, inked signatures, with original forms in hard copy and an electronic copy of the entire application on a thumb drive, including scanned signed forms.

If the applicant has completed the entire application in Grants.gov but is unable to submit via Grants.gov, the application package should be provided via thumb drive along with printed and signed versions of forms SF-424, SF-424B, and CD-511. The Authorized Representative MUST sign and date these forms in the space reserved for electronic signature. Signatures (electronic or ink) must match the name printed in the “Authorized Representative” section of the SF-424 Block 21. Another Authorized Representative may not sign on behalf of the individual noted in Block 21. Paper applications should not be bound in any manner.

Content Requirements:

A. Project Summary

Federal Funding Opportunity Page 12 of 37

It is critical that the project summary accurately describe the project being proposed and convey all essential elements of the project for public dissemination.

Provide a summary of the proposed project (two page maximum). The summary must include:

- Abstract: A project abstract in plain language (limited to 200 words).

- Summary of potential commercial benefits to the fishing community of the research results (limited to 100 words).

Awardee’s abstract and summary of potential benefits will be used for reporting purposes and may be used on the NOAA S-K Research Program website along with the Principal Investigators contact email.

-In addition to the abstract and summary of potential benefits, each project summary should include a clear description of proposed activities including the species/resources to be addressed. It is critical the project summary accurately describes the project being proposed and conveys all essential elements of the project for public dissemination.

- Applicant Information: Applicant organization and name, title, and contact information of the Principal Investigator.

- Project Information: Project title, location, requested project period (start and end dates), Federal funding requested, and identification of the singular S-K research priority that most closely reflects the objectives of your proposal.

- Partners: Identification of collaborating partners, organizations, Co-Principal Investigators, titles and contact information.

B. Project Narrative

The project narrative comprises the research plan for the project. The narrative must be detailed enough for reviewers to make a clear connection between the proposed activities and the proposed benefit to the fishing community. The major part of the narrative should be devoted to a description and justification for the proposed project, including details of the

Federal Funding Opportunity Page 13 of 37 method to be used. It should include a timeline for major activities of the proposed project, and should indicate who will be responsible for which activities. There should be no ambiguity about who will perform particular parts of the project or the time at which these activities will take place. The project narrative may not exceed 20 pages. The tables and visual materials, including charts, graphs, maps, photographs and other pictorial presentations that you submit to document the project and the problem/opportunity you seek to address are included in the 20-page limit. The following do not count towards the 20-page limit: standard application forms, 2-page project summary (format requirements above), budget and justification, curricula vitae (CV) or resumes (resumes or curricula vitae, limited to two pages each), letters of collaboration, lists of permits, NEPA questionnaire, and data sharing plan.

The project narrative should closely follow the evaluation criteria outlined in this solicitation (see Section V. A. Evaluation Criteria) for the application to receive a consistent review against competing applications. The narrative should demonstrate your knowledge of, and convey the need for the project, and show how your proposal builds upon any past and current work in the subject area, as well as relevant work in related fields. The narrative should highlight any relationship to fishery management plans, or other fishery-related strategic planning or management documents, and if the project will yield environmentally compatible socioeconomic benefits to the fishing community, such as increased business opportunities, recreational opportunities, or decreased safety hazards. You should not assume that we already know the relative merits of the project you describe. You must describe your project as follows:

1. Project goals and objectives - Identify the one specific S-K Research Program priority (described in Section I. B. Program Priorities) to which the proposed project responds. The primary priority will dictate the type of subject matter expert used to evaluate your proposal.

Identify the problem/opportunity you intend to address and describe its significance to the fisheries resource and fishing community. Objectives should be simple and understandable;

as specific and quantitative as possible; clear as to the “what and when,” but should avoid the “how and why”; and attainable within the time, money and human resources available.

Projects should be accomplishment oriented and identify specific performance measurements. If you are applying to continue a project previously funded under the S-K Research Program, describe in detail your progress to date and explain why you need additional funding. If the proposal is for renewed support, include a description of the relation of the completed work to the proposed work. We will consider this information in evaluating your current application.

2. Project impacts - Describe the anticipated impacts of the project on the fisheries

Federal Funding Opportunity Page 14 of 37 resource and the fishing community in terms of increased product yield, or other measurable benefits. Identify the benefits that will be achieved as a result of this effort, both to the recipient, the industry and the general public as a whole. Describe how you/your organization (or others) will monitor progress and measure the project’s impacts.

3. Evaluation of project - Specify the criteria and procedures that you will use to monitor and evaluate the relative success or failure of a project in achieving its objectives.

4. Need for government financial assistance - Explain why you need NOAA financial assistance for the proposed work, and why other funding sources, if applicable, cannot fund all the proposed work. List all other sources of funding you have or are seeking for the project.

5. Federal, state, and local government activities and permits - It is your responsibility to obtain all necessary Federal, state, and local government permits and approvals where necessary for the proposed work to be conducted. You must note whether or not permits are required. If no permits are required, this section must indicate “no permits are required”. If permits are required, provide a list of all applicable permits that will be required to perform the proposed work and an indication of the status of any permits needed (e.g., not yet applied, permit application submitted/pending, permit granted, etc.) or a statement indicating that no permits are necessary. List any existing Federal, state, or local government programs or activities that this project would affect, including activities requiring: certification under state Coastal Zone Management Plans; Section 404 or Section 10 permits issued by the Corps of Engineers; exempted fishing permits, letters of authorization or other permits under Federal Fishery Management Plans (FMP); environmental impact statements to meet the requirements of the National Environmental Policy Act; scientific permits under the Endangered Species Act and/or the Marine Mammal Protection Act; or Magnuson-Stevens Act Essential Fish Habitat (EFH) consultation if the project may adversely affect areas identified as EFH. Describe the relationship between the project and these FMPs or activities, and list names and addresses of persons providing this information. You may obtain information on these activities from the NMFS Regions (see Section VII- Agency Contacts). This section does not count towards the 20-page limitation.

6. Statement of Work

a) What is the project design? What specific work, activities, procedures, statistical design, or analytical methods will you undertake? Describe methodologies or technical plans for activities to be conducted under the project. You should provide sufficiently detailed information on the proposed activities and potential environmental effects so that NOAA can

Federal Funding Opportunity Page 15 of 37 analyze the impacts of the project as required under the National Environmental Policy Act (see Section VI. B.2). The NEPA questionnaire does not count towards the 20 page limitation.

b) Who will be responsible for carrying out the various activities? Provide information about the specific responsibilities of other personnel funded through the proposal, including the technical and administrative points of contact, as appropriate.

c) What are the project milestones? Display timelines for major tasks, target milestones for important immediate and final products, and key project outcomes. This includes identifying all consultation and permitting requirements and their status (e.g., not applied for, pending, secured). Describe the timelines in increments (e.g., month 1, month 2), rather than by specific dates. Identify the individual(s) responsible for the various specific activities.

7. Project management - Describe how the project will be organized and managed.

Describe how the necessary experience, facilities, and administrative resources are in place to successfully meet the responsibilities associated with managing a federal financial assistance award. Proposals should demonstrate the applicant organization’s knowledge and experience in delivering the project requested in this application. The Principal Investigator may or may not be the applicant; however, if the applicant is not the Principal Investigator, there must be an explanation of the relationship between the applicant and Principal Investigator (e.g., the applicant may be responsible for managing the grant funds and the Principal Investigator will be responsible for completing the work).

Include the resume or curriculum vitae of the Principal Investigator(s) and any consultants and/or subcontractors, and indicate their level of involvement in the project. Include copies of any agreements between you and the participants describing the specific tasks to be performed. Agreement documents, and resumes/curricula vitae (2 page maximum for each), should be included in the “Supporting Documentation”. This information does not count toward the project narrative’s 20 page limitation.

8. Participation by persons or groups other than the applicant - Describe how any entities other than the applicant will participate in the project, and the nature (sub-award, sub-contract, volunteer, etc.) of their participation.

9. Outreach and Education - How will this project provide a focused and effective education and outreach strategy regarding the results of the funded proposal? This includes the degree to which the potential users of the results, (i.e. industry or state resource managers) have been involved in the planning of activity, will be involved in the execution

Federal Funding Opportunity Page 16 of 37 of the activity and/or are providing funds, and whether there is a plan to disseminate the results to user groups (including Regional Fishery Management Councils/Interstate Fisheries Management Commissions, etc.) and the public. Describe specific outreach goals and activities.

10. How will project results be disseminated? Describe any expected products of the project, such as a training manual, management plan, brochures, number of people trained, video, technique, or piece of equipment. Detail if/how products will be distributed to potential users (resource managers, researchers, other interested parties).

11. Data Sharing Plan up to 2 pages (not included in the 20-page limitation; can be submitted as an appendix).

(1.) Environmental data and information collected or created under NOAA grants or cooperative agreements must be made discoverable by and accessible to the general public, in a timely fashion (typically within two years), free of charge or at no more than the cost of reproduction, unless an exemption is granted by the NOAA Program. Data should be available in at least one machine-readable format, preferably a widely used or open-standard format, and should also be accompanied by machine-readable documentation (metadata), preferably based on widely used or international standards.

(2.) Proposals submitted in response to this Announcement must include a Data Sharing Plan of up to 2 pages describing how these requirements will be satisfied. The Data Sharing Plan should be aligned with the Data Management Guidance provided by NOAA in the Announcement. The contents of the Data Sharing Plan, and past performance regarding such plans, will be considered as part of proposal review. A typical plan should include descriptions of the types of environmental data and information expected to be created during the course of the project; the tentative date by which data will be shared; the standards to be used for data/metadata format and content; methods for providing data access; approximate total volume of data to be collected; and prior experience in making such data accessible. The costs of data preparation, accessibility, or archiving may be included in the proposal budget unless otherwise stated in the Guidance.

Accepted submission of data to the NOAA National Centers for Environmental Information (NCEI) is one way to satisfy data sharing requirements; however, NCEI is not obligated to accept all submissions and may charge a fee, particularly for large or unusual datasets.

(3.) NOAA may, at its own discretion, make publicly visible the Data Sharing Plan from funded proposals, or use information from the Data Sharing Plan to produce a formal

Federal Funding Opportunity Page 17 of 37 metadata record and include that metadata in a Catalog to indicate the pending availability of new data.

(4.) Proposal submitters are hereby advised that the final pre-publication manuscripts of scholarly articles produced entirely or primarily with NOAA funding will be required to be submitted to NOAA Institutional Repository after acceptance, and no later than upon publication. Such manuscripts shall be made publicly available by NOAA one year after publication by the journal.

C. Budget Narrative

Each application must include clear and concise budget information, both on the required Federal forms and as described here. In order for federal program officers to fully evaluate the appropriateness of proposed costs, a budget narrative must explain and justify all Federal and non-Federal costs by object class category, as listed on the SF-424A under Section B, Budget Categories. Provide detailed narrative descriptions of all costs, and explain each calculation for all budget categories. You are encouraged to include a budget table to further clarify the cost breakdown. If applicable, briefly describe the basis for estimating the value of the cost-sharing derived from in-kind contributions. All proposed costs must be reasonable, allowable, allocable, and necessary to the supported activity. Additional Budget Narrative Guidance may be found at http://www.ago.noaa.gov/grants/training.html.

The budget narrative must include the following:

a) Personnel costs, including salary and wages, should be broken out by named Principal Investigator (PI) and number of months requested per year, per PI, as a percentage of their normal salary rate. Support for each PI should be commensurate with their stated involvement, which may or may not correspond to their current position. Any unnamed personnel (graduate students, post-doctoral researchers, technicians) should be identified by their job title, and their personnel costs explained similar to PI personnel costs above. Fringe benefits should be identified separately from salary and wages; fringe benefit rates should be applied consistently, and should apply equally to both Federal and non-Federal (matching) funds, if applicable. Funds for salaries and fringe benefits may be requested only for those personnel who are directly involved in implementing the proposed project and whose salaries and fringe benefits are directly related to specific products or outcomes of the proposed project. All funds must be estimated to the nearest dollar; do not submit budgets containing cents.

b) Travel costs should be broken out by number of people traveling, destination and

Federal Funding Opportunity Page 18 of 37 purpose of travel, and projected costs per person. Projected travel costs should be inclusive of transport costs, lodging costs, and per diem expenses for all travelers, which are to be described in detail in the budget narrative. If travel details for a particular trip are unknown, explain the basis for estimating proposed costs. To qualify for support, attendance at meetings or conferences must enhance the investigator’s capability to perform the research or disseminate its results. Domestic travel is to be justified separately from foreign travel, since the latter may require additional clearances. You must adhere to the provisions of the "Fly America Act".

c) "Equipment" is non-expendable, tangible personal property with a per unit cost of $5,000 or more and a useful life of more than one year. Items that do not meet the equipment definition must be included under supplies. List each piece of equipment separately and reference the type/model to be purchased and its contribution to the achievement of the project goals. General use equipment must be used 100% for the proposed project if charged directly to the award; if the equipment will be used for multiple projects, only a portion of the expense that is commensurate with the actual use of the equipment during the project may be requested.

d) Supplies should be itemized to the level of detail known or may be based on established historical costs. Whenever possible, you should include the quantity/number of units and cost per unit to justify expenses listed in the supplies category.

e) Contractual costs should be itemized separately, according to standard budget categories that appear in the SF-424A; all types of contractual costs should be included in the Contractual line on the SF-424A and explained in detail in the budget narrative. You must indicate the basis for each contract cost estimate and specify the products or services to be obtained through all contracts.

f) Other costs should be listed by type of material or nature of expense (e.g. sub-award) and should be broken down by quantity/number of units and cost per unit, if applicable.

g) The budget may include an amount for indirect costs if the applicant has an approved indirect cost rate agreement with the Federal government. Indirect costs are essentially overhead costs for basic operational functions (e.g., lights, rent, water, and insurance) that are incurred for common or joint objectives and therefore cannot be identified specifically within a particular project. A copy of the current, approved negotiated indirect costs agreement with the Federal government must be included with the application.

If an applicant has not previously established an indirect cost rate with a Federal agency, Federal Funding Opportunity Page 19 of 37 they may choose to negotiate a rate with the Department of Commerce or use the de minimis indirect cost rate of 10% of MTDC (as allowable under 2 C.F.R. §200.414). The negotiation and approval of a rate is subject to the procedures required by NOAA and the Department of Commerce Standard Terms and Conditions Section B.06. The NOAA contact for indirect or facilities and administrative costs is:

Lamar Revis, Grants Officer NOAA Grants Management Division 1325 East West Highway 9th Floor Silver Spring, Maryland 20910 lamar.revis@noaa.gov

D. Supporting Documentation - This section should include the supporting documentation not included in the project narrative such as: qualifications of the primary project personnel (resumes or curricula vitae, limit two pages each); agreements with key partners; and letters of collaboration received from the relevant partners, or communities involved in the project.

Letters of support are not allowed to be submitted, and will not be accepted during the review process.

C. Unique Entity Identifier and System for Award Management (SAM)

To enable the use of a universal identifier and to enhance the quality of information available to the public as required by the Federal Funding Accountability and Transparency Act, 31 U.S.C. 6101 note, to the extent applicable, any proposal awarded in response to this announcement will be required to use the System for Award Management (SAM), which may be accessed online at https://www.sam.gov/SAM/. Applicants are also required to use the Dun and Bradstreet Universal Numbering System, as identified in OMB guidance published at 2 CFR Parts 25, which may be accessed at https://www.govinfo.gov/content/pkg/CFR-2018-title2-vol1/xml/CFR-2018-title2-vol1-part25.xml

Each applicant (unless the applicant is an individual or Federal awarding agency that is excepted from those requirements under 2 CFR 25.110(b) or (c), or has an exception approved by the Federal awarding agency under 2 CFR 25.110(d)) is required to: (i) be registered in SAM before submitting its application; (ii) provide a valid unique entity identifier in its application; and (iii) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award, application or plan under consideration by a Federal awarding agency. The Federal awarding agency may not make a Federal award to an applicant until the applicant has complied with all applicable

Federal Funding Opportunity Page 20 of 37 unique entity identifier and SAM requirements and, if an applicant has not fully complied with the requirements by the time the Federal awarding agency is ready to make a Federal award, the Federal awarding agency may determine that the applicant is not qualified to receive a Federal award and use that determination as a basis for making a Federal award to another applicant. Applicants should allow a minimum of five days to complete the SAM registration; registration is required only once, but must be renewed periodically.

D. Submission Dates and Times

Pre-proposals must be received at http://www.Grants.gov under the competition link named “PRE PROPOSALS FY20 Saltonstall-Kennedy”, postmarked, or provided to a delivery service by 11:59 pm, Eastern Time, 60 days after the posting date of the FFO. Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable. Postmarked applications received more than 5 business days following the closing date will not be accepted. No facsimile or electronic mail applications will be accepted. Within 45 days of the pre-proposal due date, NOAA will inform the Authorized Representative identified on the SF-424, based upon their pre-proposal, if the S-K Program encourages or does not encourage submission of a full proposal.

Eligible Applicants must submit a pre-proposal by the date specified in the DATES section.

Full proposals will not be reviewed or evaluated if a pre-proposal was not received and ranked.

Full Applications must be received by http://www.Grants.gov under the competition link named “FULL Proposals FY20 Saltonstall-Kennedy”, postmarked, or provided to a delivery service by 11:59 pm, Eastern Daylight Time, 165 days after the posting date of the FFO. Use of Grants.gov is preferred. If Grants.gov cannot reasonably be used, use of U.S. mail or another delivery service must be documented with a receipt; private metered postmarks are not acceptable. Postmarked applications received more than 5 business days following the closing date will not be accepted. No facsimile or electronic mail applications will be accepted.

NOTE: Under this one Federal Funding Opportunity there are two (2) competition links.

P…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.