Pinsetter Maintenance Performance Work Statement.pdf

PDF 247 KB Posted

Attached to
Cavalier AFS Pinsetter Maintenance Services Federal contract opportunity
Solicitation number
FA4659-20-Q-B001
Issued by
Department of the Air Force Air Mobility Command

View the file

Other files for this federal contract opportunity

Other files attached to Cavalier AFS Pinsetter Maintenance Services, newest first.
File Type Posted
Wage Determination 2015-5385.pdf PDF
FA4659-20-Q-B001 CAFS Bowling Pinsetter Maintenance.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Pinsetter Maintenance Services at Cavalier Air Force Station, North Dakota

1. GENERAL: Work required is to provide labor necessary to perform preventive and corrective maintenance on four (4) AMF bowling pinsetters, lanes, and ball returns at Cavalier

Air Force Station (CAFS), North Dakota. Contractor will complete Lockout Tag Out (LO/TO) training and will utilize LO/TO procedures when working on the pinsetters.

2. PREVENTIVE MANTENANCE: The contractor will perform preventive maintenance

(PM) in accordance with the requirements listed in the manufacturer’s Service and Parts manual, except that the frequency for PM will be monthly instead of weekly. PM time will be coordinated with 10 SWS Services. PM will include required lubrication, component inspection and replacement of parts that periodically wear out during regular use and are considered normal wear and tear: such as, but not limited to, drive belts, mechanical feed trays, and pinsetters.

Broken or defective components that do not routinely require replacement must be identified to

Services. The Director of Services will be responsible for ordering all parts. Repairs will be started within five (5) working days upon receipt of requested parts. The contractor will be required to condition, and oil the lanes once per week during the 14 week bowling league season and once per month during non-league months. Additionally lanes will be stripped once every two weeks during league season and once per quarter during the remainder of the year. The contractor will perform lane certification requirements and turn in all paperwork to the Services

Director on an annual basis.

3. CORRECTIVE MAINTENANCE: Upon notification of machine failure by the Services office, the contractor shall respond to provide teardown and a list of required replacement parts, within two (2) working days (Monday through Friday), to Services personnel. The Director of

Services will be responsible for the ordering of parts. Repairs will be started within five (5) working days upon receipt of requested parts.

4. PARTS AND MATERIALS: The government will be responsible for ordering all parts and materials.

5. SPECIAL EVENTS: Contractor will be at the bowling alley for a minimum of 14 league bowling nights and three (3) special events (turkey bowl, league roll-offs, midnight bowl, etc.)

for approximately three (3) hours, or until the scheduled event is over, to insure the proper functioning of all pinsetters and ball returns. Dates and times will be coordinated with the

Director of Services prior to the start of the Leagues and within 14 days prior to the scheduled special events. Dates and times will be subject to change with as much prior notice as possible.

6. TRAINING: Contractor must possess or complete a certified AMF maintenance course within the first year of the contract.