Pinpoint IIR Statement of Work.pdf

PDF 98 KB Posted

Attached to
PinPoint 2R System Upgrade
Solicitation number
FA441725Q0223
Issued by

About this file

This Statement of Work (SOW) details the upgrade of a Pinpoint II system to a Pinpoint IIR with prober for the Department of the Air Force Special Operations Command. The contractor is required to install a comprehensive set of components including a new chassis with dual output power supply, UUT power supply, motherboard, CPU, hard drive, memory, card cage, TestVue software, Windows 11, schematic generation package, full system accessory kit, and a vectorless test card. Key installation requirements include using certified technicians, following manufacturer specifications, performing an operator's check after installation, and providing written documentation of repairs and warranties. The upgrade includes a one-year manufacturer's warranty and will utilize existing cards and original bezels.

View the file

Other files

File Type Posted
Parts List - PinPoint 2R System Upgrade.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

Pinpoint II upgrade to a Pinpoint IIR with prober

1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, equipment, supplies, technical data, and labor necessary to install, test, and quote the Pinpoint IIR upgrades. All work shall be completed to industrial specifications and all OSHA regulations. The contractor shall accomplish all tasks to meet the requirements of the Statement of Work (SOW).

1.1. Contractor will install the following items: A New Chassis with Dual Output 0-20VDC @ 10A Variable Power Supply, UUT Power Supply: +/-5V, +/- 12V, +3.3V, Power Sense Board, Mother Board, CPU, Hard Drive (SDD), Memory, Phantom Card Set, 14 Slot Card Cage and Cover with quiet cooling design, Latest TestVue software, Library update, etc., Windows 11 (or desired version to be specified at time of order), Schematic Generation Package (Net List Generator and Schematic Viewer), Full system Accessory Kit (Test Clips, probes, leads etc), Vectorless Test Card (includes: VI - ASA, Shorts locator and LCR ), One year manufacturer's warranty on upgraded items, Uses existing cards and original bezels.

1.2. The contractor shall provide all parts, equipment, tools, and certified technicians to install all non-operational components outlined in paragraph 1.1.

1.3. The contractor shall provide and install all approved parts IAW the manufacturers' technical specifications.

1.4. The contractor shall perform an operator's check after the installation is complete. This is to ensure that the equipment is functioning IAW manufacturers' specifications as well as utilizing technical data and approved procedures.

2. DELIVERABLES.

2.1. Parts and Repair Documentation. The contractor shall provide to the customer written documentation, which identifies all repairs completed, and any applicable warranties provided.

File details come from the government source that posted it. Updated .