PineBrook_Plans.pdf
PDF 2 MB Posted
- Solicitation number
- 2115206
- Issued by
- Hamilton County, New York
About this file
This document appears to be a set of plans and specifications for the Pine Brook Bridge replacement project, which is being administered by the Hamilton County Highway Department and the Town of Arietta, New York. The project involves the replacement of the existing bridge over Pine Brook on North Point Road, including the construction of new abutments, steel girders, a glulam timber deck, and bridge railing. Key details include the use of PZC-13 steel sheet piling for the abutments, W18x55 steel girders spaced at 4'-8" centers, a 6 3/4" glulam timber deck, and a two-rail box beam bridge railing. The plans indicate the project is scheduled for completion in October 2024.
The plans provide detailed specifications for the materials, construction, and installation of the various bridge components. Pricing appears to be a lump sum bid, with no indication of set-asides or incumbent contractors. The project is funded by the local agencies, but the specific funding sources and amounts are not detailed in the provided documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PineBrook_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SITE PLAN
3 0F
S P .d g n
SP-1
SCALE: DATE: SHEET NO.
AS SHOWN
Andrew S. Bell, P.E.
A S BELL ENGINEERING, PC
THE WRITTEN AUTHORITY OF A.S.BELL ENGINEERING PC.
PETITION AND MAY NOT BE REVISED OR REUSED BY ANYONE WITHOUT
PLANS AND SPECIFICATIONS WILL BE SUBJECT OF A COPYRIGHT
NEGOTIATIONS BETWEEN THE OWNER AND A.S.BELL ENGINEERING, PC.
THE SUBJECT PROJECT ONLY AS A RESULT OF CONTRACTUAL
THE PLANS AND SPECIFICATIONS HEREIN ARE INTENDED FOR
BELL ENGINEERING
E
XCELSIOR
L
IC
EN
SE
D
PRO
FESSIONAL ENGINEER
STATE OF NEW Y
OR
K
ANDREW S. BEL
055448
AND/OR IN THE SPECIFICATION.
DESCRIBE THE FULL EXTENT OF THE ALTERATIONON THE DRAWING
ARE MADE, THE PROFESSIONAL ENGINEER MUST SIGN, SEAL, DATE AND
OF A LICENSED PROFESSIONAL ENGINEER. WHERE SUCH ALTERATIONS
THE ACCOMPANYING SPECIFICATION, UNLESS IT IS UNDER THE DIRECTION
ANY PERSON FROM ALTERING ANYTHING ON THIS DRAWING AND/OR
THE EDUCATION LAW OF THE STATE OF NEW YORK PROHIBITS
B
(518) 452-2838 DRAWING NO.
asbellengineering@gmail.com
5895 JOHNSTON ROAD
SLINGERLANDS, NY 12159
LAKE PLEASANT, NEW YORK, 12108
P.O. BOX 56, STATE ROUTE 8
HAMILTON COUNTY HIGHWAY DEPARTMENT
TOWN OF ARIETTA
PINE BROOK BRIDGE
14OCTOBER 2024
COORDINATE TABLE
CONTROL PT
#3
#1
NORTH
4930.69
EAST
4728.20
5000.00 5000.00
4974.365022.04
5012.04 4998.09
STA 1+67.814
STA 1+96.564
CL BRGS W.
CL BRGS E.
#2 5032.56 4858.99
4923.154833.05
4932.92 4928.34
CENTER CURVE 1
CURVE 2
R=200'
R=100'
W18x55
C x
.9
N
SCALE: 1/8" = 1'-0"
L & ROADWAY
C BRIDGE
BM Nail=100.00'
POINT #2
CONTROL
" C he rry
BM Nail=102.00'
STA 1+93.564
OUTLINE OF 22' x 80' TEMPORARY BRIDE
2+10 2+20 2+302+001+901+801+70
1+40
1+3
'R
1+2
1+1
1+
0+9
0+8
0+7
+5
STA 1+25.303
PCC
+6
1+50
1+60- PT 2+40
H A
R
O U
ROUTE 30
TO NYS
M
IN
T
Y
W
Y BEARINGS
C WEST
BEARINGS
C EAST
POINT #3
CONTROL
o rt h o in t a d
"P e ro k
E:
.99N:
.56
.00N:
.00
SIGNAL
TEMP
FLOW
PLAN AND ELEVATION
4 0F
PE-1
OPERATING
INVENTORY
HS-38
HS-27
69T
49T
LOAD RATING - ASD
BRIDGE PLAN
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = 1'-0"
TWO-RAIL BRIDGE RAIL
RAIL, (TYP)
BOX BEAM GUIDE
BEAM TRANSITION, (TYP)
BRIDGE RAIL TO BOX
SEE DWG AB-1
ABUTMENTS (TYP)
PZC13 SHEET PILE
BRIDGE ELEVATION
2'-0"
.8
.5
.053398'/'
SLOPE=
EL 100.625
EL102.00
EARTHWORK
5 0F
EW-1
EARTHWORK
SCALE: 1/8" = 1'-0"
18'-0"' CHAN
2+10 2+20 2+30 2+50
2+001+901+801+70
1+40
1+3
1+2
1+1
1+
0+9
0+8
0+7
+5
STA 1+25.303
PCC
+6
1+50
1+60- PT 2+40
rt h o t d e ro k e B ro k"
.99N:
.56
.00N:
.00
SIGNAL
TEMP
& FILL
BRIDGE
REMOVE
REMOVED
TO BE
BRIDGE
EXISTING
HEAVY STONE FILL
GEOTEXTILE AND
REGRADE AREA ADD
REMOVE FILL
NEW ROAD
OLD EDGE OF ROAD
ROADWAY AS NECESSARY
PLACE FILL ALONG
6 OFAB-1
ABUTMENT SHEETING PLAN
NOTES:
INCLUDED IN THE SQUARE FOOT PRICE BID FOR THE SHEETING.
CLAMPS, TURNBUCKLES, AND THIER INSTALLATION SHALL BE
COST OF ALL MC18x42.7 CAPS, W6x25 WALES, SOLDIER PILES,CABLES,3.
BENDS IN ALIGNMENT.
WING WALL PILES. CHANNEL CAPS TO BE MITERED AND WELDED AT
SHEETS TO BE CAPPED WITH MC18x42.7 CHANNELS WELDED TO THE
BE THIRTY (30') FEET DRIVEN TO ELEVATION SHOWN. WING WALL
SHEET PILING LENGTHS FOR CORNER PILES AND WING WALLS SHALL2.
ARE FORTY (40') FEET.
ESTIMATED SHEET PLE LENGTHS FOR ABUTMENTS
BRIDGE SEAT CHANNEL CAPS AND ASSOCIATED HARDWARE.
PRACTICAL REFUSAL AND CUT TO PROPER ELEVATION TO ACCEPT
ASTM A-328 PZC13 SHEETS. ABUTMENT SHEETS TO BE DRIVEN TO
ALL SHEET PILING SHAL BE HOT ROLLED WITH FORGED INTERLOCKS, 1.
SCALE: 3/4" = 1'-0"
HIGH @ 12" O.C.
CONNECTORS, 6"
3/4" DIA. SHEAR
4"±
MC18 x 42.7 CAP
BRIDGE SEAT
WALE DETAIL @
SHEET PILING, (PZC 13)
PERMANENT STEEL
W6x25 OR BENT PLANE
5"x5"x 1/2" (TYP)
WALE
ELEV: 98.21(W)
ELEV: 96.84(E)
ELEV: 94.0 (W)
ELEV: 92.8 (E)
ELEV: 98.16 (W) ±
ELEV: 96.80 (E) ±
SCALE: 3/4" = 1'-0"
SHEET PILING, (PZC 13)
PERMANENT STEEL
W6x25
@ WING END
WALE DETAIL
WALE
SEE PLAN
ELEV: 98.0 (W)
ELEV: 96.0 (E)
C IMPROVEMENTL
SCALE: 1/4"=1'-0"
Z
G
11'-ƒ
L
E
7/ 8"
1'-
7ƒ
PZC13
ALL
SHEETS
C BRGS ENDL
TURNBUCKLE (TYP)
1" GALVANIZED
WELDED TO SHEETS
W6x25 WALES FULLY
BEAM WELDED TO PILES
W6x25 15'-0"LG. TIE
WIRE ROPE (TYP)
5/8" GALVANIZED
LONG (TYP)
SHOLDIER PILE 15'-0"
HP12x53 OR W12x65
(TYP)
15'-0" MIN
C BRGS BEGINL
WIRE ROPE (TYP)
5/8" GALVANIZED
BEAM WELDED TO PILES
W6x25 15'-0"LG. TIE
LONG (TYP)
SHOLDIER PILE 15'-0"
HP12x53 OR W12x65
TURNBUCKLE (TYP)
1" GALVANIZED
15'-0"
CORNER (TYP)
45°PILEPRO
@ 2'-3 7/8" = 11'-7•"
5 PZC13 WING WALL SHEETS
@ 2'-3 7/8" = 11'-7•"
5 PZC13 WING WALL SHEETS
.6
EL. 102.7
EL. 102.2
EL. 100.0
EL. 100.2
EAST ABUTMENT
7 OFAB-2
REFERENCE NOTE
TYPICAL GIRDER ELEVATION AT ABUTMENT DETAIL
EAST ABUTMENT REINFORCING
MD-1
AB-3
SCALE: 1/2" = 1'-0"
EAST ABUTMENT PLAN
ON DWG MD-1)
(SEE DETAIL "D"
BASE PLATE, (TYP)
6" x 6" x 3/4"
C OF BEAM
"A"
L BRIDGE
OF C
AND SECTION B-B ON DWG. AB-3)
(REFER TO DETAIL ON DWG MD-1
STEEL GIRDER PEDISTAL DETAIL
TO OUTSIDE OF DECK 25'-0"
BETWEEN DECK AND CONCRETE
AFTER DECK INSTALLATION
APPLY 1" PREMOULDED STRIP
ABUTMENT SHEET PILES
(T
"A" G1 G2 G3 G4 G5 G6
1'-5‡"
1'-0"
.4
2'-1‚" 5 GIRDER SP. @ 4'-8" = 24'-0„" 2'-1…"
28'-2ƒ"
12'- 5„
24' -10
C OF BRGS,
EAST ABUTMENT ELEVATION
SECTION "A"-"A"
G1 G3G2
4"
C OF BRIDGE
C L
8ƒ"
SEE AB-3
BEAM ENCASEMENT
MC18x42.7 CAP
(TYP BOTH SIDES)
DRIVEN TO REFUSAL
PILES (PZC-13) TO BE
ABUTMENT STEEL SHEET
APPLY 1" PREMOULDED JOINT FILLER
G4
G5
G6
ELEV:97.80
ELEV:98.16
ELEV: 100.73
ELEV: 99.64
ELEV: 100.00
ELEV: 100.37
T/O CAP
ELEV:96.80
28'-2 3/4"
REINFORCING
EAST ABUTMENT
8 OFAB-3
(LOWER POUR) REINFORCEMENT PLAN
EAST ABUTMENT - BRIDGE SEAT,
& 2 BACK)
(2 FRONT
(8)-5E5
BACK
G3G1 G2 G4 G5 G6L BRIDGE
(1)-5E3
(1)-5E2
(1)-5E1
(1)-5E4
FRONT
EACH BAY), (TYP.)
SPACES. (4 IN
STIRRUPS @ EQ.
(12)-5E1 BOTT.
28'-2 3/4" (REF)
SECTION B-B
6"
(REF)
F
WATERSTOP
TYPE "D"
SCALE: 1" = 1'-0"
AT 2'-0" ON CENTER
STUD SHEAR CONNECTORS
@ 12"
STIRRUPS
5E TOP
5E BOTTOM
STEEL GIRDER
W18 x 55
BEAMS)
(BETWEEN
5E
THRU WEB OF GIRDER
1 1/2" DIA. DRILLED HOLE
5E FULL LENGTH THRU
DWG MD-1
SUPPORT DETAIL
STEEL BEAM
SEE TEMPORARY
MC18 x 42.7
PILING, (PZC 13)
PERMANENT STEEL SHEET
5 EQ 5E1,2,3,4
2" COV. (TYP)
END OF W18 x 55 GIRDER
BACK FACE
LC OF BRG'S.
OR BENT PLANE
SHEET CUT-OFF
SURFACES
ASPHALT WEARING
TIMBER DECK
6 3/4" GLULAM
ELEV: 98.13 WEST ±
ELEV: 96.76 EAST ±
SEE ELEVATION
V
IE
G3G1 G2 G4 G5 G6L BRIDGE
POUR REINFORCEMENT PLAN
EAST ABUTMENT - BACK WALL
5E11 BAR
(5) TOP
BEAM FRONT
(1)-5E8 BEYOND
LENGTH BACK
(3)-5E10 FULL
(1)-5E19
(1)-5E18
(1)-5E14
(1)-5E15
(1)-5E16
(1)-5E17
(1)-5E9 BEYOND
1'-5‡"1'-0"
1'-5‡" 1'-0"
TOP
(1)-5E12
BEAMS FRONT
(3)-5E7
THROUGH WEB
(FULL LENGTH
(2)-5E7
28'-2 3/4"(REF)
EAST ABUTMENT REINFORCEMENT ELEVATION
G1 G2 G3 G4
"B"
G5 G6
ELEV: 96.80
ELEV: 97.80
ELEV: 99.64
ELEV: 100.37
ELEV: 100.73
ELEV: 100.00
ELEV: 98.16
WEST ABUTMENT
REFERENCE NOTE DWG. NO.
9 OFAB-4
AB-5
TYPICAL GIRDER ELEVATION AT ABUTMENT DETAIL
WEST ABUTMENT REINFORCING
C OF BEAM,
L BRIDGE
C OF
TO OUTSIDE OF DECK 25'-0"
BETWEEN DECK AND CONCRETE
APPLY 1" PREMOULDED STRIP
(T
.4
G3 G2 G1G4G5G6
WEST ABUTMENT PLAN
2'-1‚"2'-1…"
24'
-10
5 GIRDER SP. @ 4'-8" = 24'-0„"
"A" "A"
AND SECTION B-B ON DWG. AB-3)
(REFER TO DETAIL ON DWG MD-1
STEEL GIRDER PEDISTAL DETAIL
ON DWG MD-1)
(SEE DETAIL "D"
BASE PLATE, (TYP)
ABUTMENT SHEET PILES
C OF BRGS,
WEST ABUTMENT ELEVATION
SECTION "A"-"A"
G1G3 G2
C L
SEE AB-5
BEAM ENCASEMENT
APPLY 1" PREMOULDED JOINT FILLER
28'-3"
G4
G5
G6
ELEV:101.01
ELEV:101.74
ELEV:101.37
ELEV:102.10
ELEV:99.53
ELEV: 99.17
ELEV: 98.17
DESIGNED BY: ANDREW S. BELL, P.E. NYSPE NO. 055448
BRIDGE REPLACEMENT PROJECT
A. S. Bell Engineering, PC
HAMILTON COUNTY DEPARTMENT OF PUBLIC WORKS
(518) 452-2838
Slingerlands, NY 12159
5895 Johnston Road
TOWN OF ARIETTA, NEW YORK 12139
OVER PINE BROOK STREAM
NORTH POINT ROAD - CR3
OCTOBER 2024
TRACY J. ELDRIDGE, COUNTY HIGHWAY SUPERINTENDENT
REINFORCING
NORTH (W) ABUTMENT
10 OFAB-5
G3 G1G2G4G5G6 L BRIDGE
5E11 BAR
(5) TOP
(1)-5E8 BEYOND
LENGTH BACK
(3)-5E10 FULL
(1)-5E9 BEYOND
1'-5‡"1'-0"
1'-5‡" 1'-0"
BEAMS FRONT
(3)-5E7
THROUGH WEB
(FULL LENGTH
(2)-5E7
REINFORCEMENT PLAN
WEST ABUTMENT - BACK WALL POUR
WEST ABUTMENT REINFORCEMENT ELEVATION
G1G2G3G4
2'-1…"24'-0„"2'-1‚"
8ƒ" L
G5G6
ELEV: 98.17
ELEV: 99.17
101.01
ELEV: 101.74
EL 102.10
EL 101.37
EL 99.53
(LOWER POUR) REINFORCEMENT PLAN
WEST ABUTMENT - BRIDGE SEAT,
& 2 BACK)
(2 FRONT
(8)-5E5
G3 G1G2G4G5G6 L BRIDGE
SECTION B-B
WATERSTOP
TYPE "D"
AT 2'-0" ON CENTER
STUD SHEAR CONNECTORS
@ 12"
5E TOP
5E BOTTOM
STEEL GIRDER
BEAMS)
5E
THRU WEB OF GIRDER
1 1/2" DIA. DRILLED HOLE
5E FULL LENGTH THRU
DWG MD-1
SUPPORT DETAIL
STEEL BEAM
SEE TEMPORARY
MC18 x 42.7
PILING, (PZC 13)
PERMANENT STEEL SHEET
5 EQ 5E1,2,3,4
2" COV. (TYP)
END OF W18 x 55 GIRDER
BACK FACE
LC OF BRG'S.
OR BENT PLANE
SHEET CUT-OFF
ELEV: 98.13 WEST ±
ELEV: 96.76 EAST ±
SEE ELEVATION
FRAMING PLAN AND DETAILS
11 OF
STEEL NOTES:
MAY BE ASTM A-36 OR EQUIVALENT.
3. CONNECTION AND MISCELLANEOUS PLATES
(A992), GRADE 50 OR EQUIVALENT.
AND OUTRIGGERS SHALL BE ASTM A-572
2. BEAMS, DIAPHRAGMS, BRIDGE RAIL POSTS
GALVANIZED AFTER FABRICATION.
1. ALL COMPONENTS TO BE HOT-DIPPED
FP-1
DIAPHRAGM / GIRDER CONNECTIONS
DETAIL "D" BEARING PLATE
5 GIRDER SPACES AT 4'-8" = 23'-4"
24'-10" (ACTUAL DECK WIDTH)
25'-1"
C12x20.7C12x20.7
SCALE: 1/2"= 1'=0"
BRIDGE SECTION "A"-"A"
LC ROADWAY
@ 5'-6" (TYP)
W6 x 25 SPACED
CLEARANCE
BOLTS
GALVANIZING FOR 3/4" DIA.
13/16" DIA. HOLES AFTER
1 1/2 "
WEB OF W18 BEAM
(TYP), BOLTED TO
W10 x 26, 15" LG.
C12x20.7 C12x20.7
24'-1" ROADWAY (F-F OF RAIL)
DWG. MD-1)
(SEE DETAILS ON
CONN. PLATE (TYP)
4" x 1/2" FULL DEPTH
SURFACE AT CENTER
2 1/2" ASPHALT WEARING
COURSE
1" INITIAL
MEMBRANE
WATERPROOFING
SURFACE AT EDGE
1 1/2" ASPHALT WEARING
GIRDERS
BRIDGE RAIL (TYP)
2 RAIL BOX BEAM
C12x20.7
BOLTS (TYP)
3/4" DIA. A325
BRIDGE RAIL POST DETAIL
SCALE: 1" = 1'=0"
WEB OF W18 BEAM
(TYP), BOLTED TO
W10 x 26, 15" LG.
C12 x 20.7
1" GAP
1 1/2" (TYP)
ON DWG. MD-1)
(SEE DETAILS
PLATE (TYP),
CONNECTION
4" x 1/2"
W6 x 25
(REF.)
6 3/8"
3/16" TUBE
6" x 6" x
FLAT WASHER AND LOCK WASHER (TYP)
BOLT), 7 1/2" LONG WITH HEX NUT,
SQUARE NECK BOLT, (A307) (CARRIAGE
3/4" DIA. GALV. STEEL ROUND HEAD
4 @ 3"
1•"
C OF BEARINGS
FRAMING PLAN
SCALE: 1/4" = 1'-0"
(ALL MATERIAL HOT DIPPED GALVANIZED)
DIAPHRAGM LOCATION
12'-10 1/2 "
(SEE DWG. MD-1)
DETAIL "D", (TYP)
12'-10 1/2 "
DIAPHRAGM LOCATION
4 SPACES AT 5'-6" = 22'-0"
25'-9" C/C BEARINGS
C BRIDGE & ROADWAY
CONN. PLATE
7" x 1/2"
DIAPHRAGM
C12x20.7
IR
13.64°
SKEW
MISCELLANEOUS DETAILS
12 OF
STEEL NOTES:
GALVANIZED AFTER FABRICATION.
1. ALL STEEL COMPONENTS TO BE HOT-DIPPED
INTERMEDIATE DIAPHRAGM
SCALE: 1 1/2"= 1'=0"
LEVEL
PLATE (TYP)
PLATE
CONNECTION PLATE
FASCIA GIRDER
IG
IT
5/16"
3"
DIAPHRAGM CONNECTION DETAIL
1" SNIPE
3/4" DIA. BOLTS
GALVANIZING FOR
13/16" DIA. AFTER
PLATE (TYP)
CONNECTION PLATE
INTERIOR GIRDER
PLATE
1 1/2" (TYP)
56" (4'-8") GIRDER SPACING
1"
4•"
4•"
BASE PLATE
x 26'-3" LG., (TYP)
W 18 x 55 GIRDER
STIFFNER (TYP)
2" x 1/4" BEARING
C OF L
WELDED TO THE BASE PLATE
THREADED INTO AND TACK
RODS TO BE FULLY
SUPPORT RODS. SUPPORT
THREADED HOLES FOR
0ƒ"(TYP)
0ƒ" 7•"
3" (TYP)
1•" (TYP)
76.4°
13.6°
BEARING PLATE
SCALE: 6"= 1'=0"
DETAIL 'D'
SCALE: 1 1/2" = 1'-0"
AT ABUTMENT DETAIL
TYPICAL GIRDER PEDESTAL
4 TOTAL, (2 PER SIDE)
SUPPORT ROD, (A449)
1" DIA. FULLY THREADED
A FLAT WASHER (TYP)
HEAVY HEX NUT WITH
FLAT WASHER (TYP)
HEX NUT WITH
DOUBLE HEAVY
3"
STIFFENER
BEARING
ON DWG. AB-2)
(REFER TO SECTION B-B
BACKWALL REINFORCEMENT
GALVANIZING IN WEB FOR
1 1/2" DIA. HOLES AFTER 10‚"
1'-4‚"
(GALVANIZED AFTER FABRICATION)
WELDED TO THE BASE PLATE
THREADED INTO AND TACK
SUPPORT RODS TO BE FULLY
HOLES FOR SUPPORT RODS.
BASE PLATE WITH THREADED
6" x 6" x 3/4" (MIN) THICK
ROD HOLE (TYP)
(MIN.) SUPPORT
C OF 1" DIA.L
1/2" (TYP)
13 OFTD-1
AND DETAILS
TIMBER DECK PLAN
NOTES:
W/0.60 PCF RETENTION
3. TIMBER TREATMENT "PENTA"
GLULAM PER AITC-117-98
2. TIMBER SHALL BE SOUTHERN YELLOW PINE
1. DESIGN LIVE LOAD HS-25
SPACING PLAN VIEW
4'-0" INTERIOR PANEL ATTACHMENT
BRACKET, (REF)
1" FOR ANGLE
C OF GIRDER
4'-0" PANEL WIDTH
6"2'-0"
6" 2'-0"
OUTLINE OF
BOLT (TYP)
DOME HEAD
FOR 5/8" DIA
11/16" DIA HOLE
DETAIL 'B'
DETAIL 'C'
LC OF BEARINGS
GIRDERS (TYP)
OUTLINE OF W18 x 55
SPACING PLAN VIEW
END PANEL ATTACHMENT
ABOVE FOR LOCATIONS)
(REFER TO DECK PLAN
ANCHOR ROD BETWEEN GIRDERS,
THRU DECK FOR 3/4" DIA.
DRILL & CHEMICAL GROUT
x 1 1/2" DEEP & 1" DIA.
2 1/2" DIA. COUNTERSINK
3'-10•"
13.6°
DECK / BEAM CONNECTION DETAIL
SEE DETAIL - 'A'
STEEL ANGLE BRACKET,
BOLT (TYP)
DOME HEAD
WITH 5/8" DIA.
11/16" DIA. HOLE
BEAM)
(TO MISS
1" (REF),
4 3/4 " (REF)
DECK / CONCRETE CONNECTION DETAIL
CHEMICALLY ANCHORHED INTO ABUTMENT
NUT, FLAT WASHER & LOCK WASHER
ANCHOR ROD, 1'-1" LG. WITH HEX
3/4" DIA GALVANIZED
INTO ABUTMENT (TYP)
6" (MIN.) EMBEDDMENT
THRU, (TYP)
DRILL & CHEMICAL GROUT
x 1 1/2" DEEP AND 1" DIA
2 1/2" DIA CONTERSINK
GLULAM DECK PANEL PLAN
SCALE: 1/4" = 1'-0"
27'-9" (ALONG BEAM)
4'-0"
5 PANELS @ 4'-0" = 20'-0"
.1
IR
SEE DETAIL "C"
TYPICAL END PANEL
3'-10•"3'-10•"
SEE DETAIL "B"
TYPICAL DECK PANEL
1'-2„"
BRIDGE RAILING
14 OFBR-1
Transition Tube
HEAVY POST DETAIL
r ie s
Pavement
{‚ 2
‚ 2
ˆ
Splice Tube
(Typ.)
SPLICE TUBE DETAIL
ELEVATION PLAN
NOTE:
The cost of the Extra Long Post with Soil Plate to be included in the cost of the transition item.
fill plates (bottom) and in
7•"
2-Š" \ bolts, nuts and lock washers
(1 near side of web, 1 far side of conform to ANSI B and nuts shall web) (Typ.) Bolts
18.2.1 and ANSI B
18.2.2, and washers shall conform to
ANSI B 18.22.1.
washers (1 top, 1 bottom) and 1 lock washer (Galvanized). (Typical) long bolts w/nut, 2 standard
(top and bottom) for ƒ" \ x 7•"
‡" \ hole in Box Beam Guide Rail
15/16" x 7" slot in
PAY LIMIT FOR DOUBLE BOX STEEL BRIDGE RAILING
TRANSITION OF RAIL MOUNTING HEIGHTS
6 SPACES @ 2'-0" = 12'-0" 6 SPACES @ 3'-0" = 18'-0"
DETAILS SEE BD-RL4E)
HEAVY POSTS (FOR
SHOULDER BREAK LINE
TRANSITION POSTS (SEE BD-RL4E)
3'- 0"
9'-
1'-
S3 x 5.7 POSTS (SEE CURRENT HIGHWAY STANDARD SHEETS)
THE TRANSITION ITEM.
IN THE PRICE BID FOR
THE FLARED SECTION
INCLUDE THE COST FOR
FOR THE TRANSITION ITEM.
BE INCLUDED IN THE PRICE BID
THE COST OF THIS POST TO4
6'-0" STANDARD HIGHWAY SPACING
PAY LIMIT FOR BEAM GUIDE RAIL
IN HIGHWAY ESTIMATE
FOR EXPANSION JOINT, SEE SPLICE "B", BD-RL4E
FOR FIXED JOINT, SEE SPLICE "A", BD-RL4E
FOR FIXED JOINT, SEE SPLICE "D", BD-RL4E
FOR EXPANSION JOINT, SEE SPLICE "C", BD-RL4E
4'-0" HEAVY POSTS
SEE DETAIL "A"
FOR JOINT, SEE SPLICE "E" ON BD-RL5E
< OF SLICE
ON STRUCTURE
< OF FIRST POST
< OF POST
IN LOWER RAIL
< OF TURNBACK SPLICE7•"
9•" 2'-3"
1'-5•"
"BOX BEAM GUIDE RAIL"
SEE HIGHWAY STANDARD SHEET TITLED
FOR SHELF ANGLE AND POST DETAILS,
END OF THE TUBE.
GROUND SURFACE AT THE
9" MEASURED ABOVE THE
FOR THE TRANSITION ITEM.
INCLUDED IN THE PRICE BID
THE COST OF THIS POST TO BE
RAILING TRANSITION TO HIGHWAY BOX BEAM GUIDE RAIL
ELEVATION
PLAN
< OF POST
PAY LIMIT FOR TRANSITION - BRIDGE RAILING OR CONCRETE BARRIER TO BOX BEAM GUIDE RAIL = 32'-0"
WITH SOIL PLATE
TYPICAL EXTRA LONG POST
be flush (Typ.)
Tops of tubes to lock washer (Typ.)
nut, plain washer and ƒ" \ carriage bolt transition item.
included in the cost of the
Posts with Soil Plates to be
The cost of the Extra Long
Transition Tubes Not Shown
Permissable to cut along this line for driving (Typical on all
Guide Rail Posts)
TS6 x 6" x 3/16"
Extra Long Post
W6 x 9 x 7'-0" lg
Soil Plate
8" x 1/4" x 2'-0"
Tube x 6" long (Typ.)
Post Spacer 8" x 6" x 1/4"
Tube x 6" long (Typ.)
Post Spacer 8" x 6" x 1/4"
W6 x 9 x 7'-0" lg.
W6 x 8.5 or
Soil Plate
8" x 1/4" x 2'-0"
2 @ 10
Box Beam Rail
6" x 6" x 3/16"
25°
4" x 3/8" x 9•" lg.
5" x 5" x 5/16" tube (top & bot.)
Box Beam. See "ELEVATION OF TRANSITION".
9" measurement at the end of the
This angle is determined by the
Fill Plates
Š
Š 2
B-UIVb 3•
3•
251'- 1•
1'-1•"
B-UIVb
45°
B-UlVb
Steel back-up
}bar to remain. ‚"
LOWER TRANSITION GUIDE RAIL
SPLICE DETAIL AT TURN BACK IN
SPLICE TUBE
WELD DETAIL FOR
Pay limit for
Steel Bridge
Railing (Two Rail)
< OF SPLICE
FE
4'-0"
1 1/4"
TO BE FLUSH (TYP)
TOPS OF TUBES
FLAT WASHER & LOCK WASHER
CARRIAGE BOLT, HEX NUT,
3/4" DIA x 7 1/2" LG.
REFERENCE SURFACE
TUBE 6" LG. (TYP)
8" x 6" x 1/4" GALV.
GALV. BOX BEAM
SECTION "E"-"E"
PLATE)
LG. WITH SOIL
(W6 x 9 x 7'-0"
HEAVY POST
1 FAR SIDE OF WEB) (TYP)
(1 NEAR SIDE OF WEB, &
NUTS & FLAT WASHERS
(ASTM A307) WITH HEX
STD. HEX HEAD BOLTS
TWO 1/2" DIA. x 1 1/2" LG. FOR BOLT
TOP & BOTTOM
7/16" DIA. HOLE
HEX NUT & FLAT WASHER (TYP)
HEAD BOLT (ASTM A307) WITH
3/8" DIA. x 7" MIN. LENGTH HEX
NUT & FLAT WASHER (TYP)
HEAD BOLT (ASTM A307) WITH
1/2" DIA. x 1 1/2" LONG STD. HEX
IN POST (TYP)
5/8" DIA. HOLES
SURFACE
REFERENCE
3"3"
5"
S3 x 5.7 x 7'-0" LG.
TRANSITION POST
ANGLE (TYP)
x 4 1/2" LG. SHELF
L5" x 3 1/2" x 3/8"
SECTION "F"-"F"
TUBE (TYP)
& LOCK WASHER (TYP)
(ASTM A307 WITH HEX NUT
3/4" DIA. CARRIAGE BOLTS
BRIDGE RAILING DETAIL
POST
W6x25
1 1/2"
RAIL TUBE
VIEW "G"-"G"
LOCK WASHER (TYP)
WITH HEX NUT &
BOLTS (ASTM A307
3/4" DIA. CARRIAGE
RAIL TUBE
VIEW "H"-"H"
POST
W6 x 25
BRIDGE RAILING DETAIL
2 0F
GN-1
NUMBER
DRAWING
DESCRIPTION
INDEX OF DRAWINGS
NUMBER
SHEET
GENERAL NOTES WITH INDEX
BR-1
TD-1
FP-1
AB-5
AB-4
AB-3
AB-2
AB-1
EW-1
PE-1
SP-1
GN-1
TS-1
ESTIMATE OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QUANTITY
BRIDGE RAILING DETAILS
TIMER DECK PLAN & DETAILS
MISCELLANEOUS DETAILS
FRAMING PLAN & DETAILS
WEST (W) ABUTMENT REINFORCING
WEST (W) ABUTMENT PLAN & ELEVATION
EAST (E) ABUTMENT REINFORCING
EAST (E) ABUTMENT PLAN & ELEVATION
EARTH WORK
GENERAL NOTES & INDEX
TITLE SHEET
202.12 REMOVAL AND DISPOSAL OF SUPERSTRUCTURE LS NEC
206.01 STRUCTURE EXCAVATION LS NEC
634.01 SURVEY AND STAKEOUT LS NEC
699.06 MOBILIZATION, DEMOBILIZATION AND MISCELLANEOUS LS NEC
203.21 SELECT STRUCTURE FILL LS NEC
202.19 REMOVAL AND DISPOSAL OF SUBSTRUCTURE LS NEC
203.03 EMBANKMENT IN PLACE LS NEC
610.0203 ESTABLISHING TURF LS NEC
553.02 COFFERDAMS (TYPE 2) EA 2
16606.80 TRANSITION BRIDGE RAIL TO BOX BEAM LF 128
203.02 UNCLASSIFIED EXCAVATION LS NEC
620.03 MEDIUM STONE FILLING CY 10
555.0105 CLASS A CONCRETE FOR STRUCTURES CY 14
556.0202 EPOXY COATED BAR REINFORCEMENT LB 900
619.01 BASIC WORK ZONE TRAFFIC CONTROL (SIGNS) LS NEC
AND NOT GUARANTEED
QUANTITIES SHOWN ARE APPROXIMATE
NOTE: THIS PROJECT IS LUMP SUM BID
403.138902 ASPHALT CONCRETE BINDER COURSE - TYPE 3 TON 2
568.10 TWO RAIL STEEL BRIDGE RAIL LF 52
552.11 PERMANENT STEEL SHEETING (PZC-13) SF 4000
304.12 SUBBASE COURSE- TYPE 2 CY 37
403.178202 ASPHALT CONCRETE TOP COURSE - TYPE 6F2 TON 3
EA 4 606.120101 BOX BEAM GUIDE RAIL END PIECES
LS NEC 564.0501 STRUCTURAL STEEL (APPROX. 15,630#)
SF 630 594.10 GLUE-LAMINATED TIMBER DECK
LS NEC 564.201 GALVANIZING STRUCTURAL STEEL (APPROX. 9700#)
DESIGN SPECIFICATIONS: NEW YORK STATE DEPARTMENT OF TRANSPORTATION
(NYSDOT) STANDARDS SPECIFICATIONS FOR HIGHWAY BRIDGES WITH ALL PROVISIONS
MATERIALS AND CONSTRUCTION SPECIFICATIONS: STANDARD SPECIFICATIONS,
FOR DESIGN PURPOSES ALL CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE
STRENGTH OF 3 K.S.I. UNLESS OTHERWISE NOTED.
ALL CONCRETE REINFORCING BARS SHALL COMPLY WITH ASTM A-615 GRADE 60
IT WILL BE THE CONTRACTOR'S OBLIGATION AND RESPONSIBILITY TO USE METHODS
AND EQUIPMENT WHICH WILL INSURE THE SATISFACTORY COMPLETION OF THE
REQUIRED WORK WITH A MINIMUM OF DELAY.
BRIDGE MAINTENANCE NOTE
THE CONTRACTOR IS ADVISED THAT ADDITIONAL NOTES WILL BE FOUND ON
SUBSEQUENT SHEETS OF THE CONTRACT PLANS AND SUCH NOTES, WHILE PERTAINING
TO THE SPECIFIC DRAWINGS THEY ARE PLACED ON, ALSO SUPPLEMENT THE GENERAL
NOTES LISTED HEREIN.
THE INSTALLATION OF SELECT STRUCTURE FILL, ITEM 203.21, AS SHOWN ON THE
STRUCTURAL PLANS, SHALL BE COMPLETED IMMEDIATELY FOLLOWING THE COMPLETION
OF THE CURING PERIOD FOR THE ABUTMENTS OR WALLS.
SHALL BE COMPACTED TO 95 PERCENT OF STANDARD PROCTOR MAXIMUM DENSITY AS
DEFINED UNDER SUBSECTION 203-3.12 - COMPACTION.
ALL EXPOSED EDGES OF CONCRETE ARE TO BE CHAMFERED 1-INCH UNLESS OTHERWISE
NOTED.
LIVE LOAD: HS 25.
IN THE EVENT THE CONTRACTOR DAMAGES AN EXISTING UTILITY SERVICE CAUSING AN
COMPANY BEFORE COMMENCING WORK TO RESTORE SERVICE AND MAY NOT CEASE HIS
WORK OPERATION UNTIL SERVICE IS RESTORED.
INTERRUPTION IN SAID SERVICE, HE SHALL IMMEDIATELY NOTIFY THE UTILITY
ALL DAMAGE, DIRECT OR INDIRECT, OF WHATEVER NATURE RESULTING FROM THE
PERFORMANCE OF THIS WORK, OR RESULTING TO THE WORK DURING IT'S PROGRESS
FROM WHATEVER CAUSE, SHALL BE BORNE AND SUSTAINED BY THE CONTRACTOR.
THE COST OF FURNISHING, INSTALLING, MAINTAINING, REMOVING AND DISPOSING OF ALL
PLATFORMS, NETS, SCREENS AND OTHER PROTECTIVE DEVICES SHALL BE INCLUDED IN
THE CONTRACTOR SHALL BE REQUIRED TO PROTECT HIS WORKERS AT ALL TIMES IN
CONFORMANCE WITH APPLICABLE OSHA REGULATIONS.
SELECT STRUCTURE FILL, ITEM 203.21, AND SUBBASE MATERIAL, ITEM 304.03
DOCUMENTS.
AND MATERIALS WHICH HE IS REQUIRED TO FURNISH IN ACCORDANCE WITH THE CONTRACT
CONTRACTOR BECAUSE OF THE CONTRACTOR'S FAILURE TO INCLUDE IN HIS BID ALL ITEMS
TO BE DONE UNDER THIS CONTRACT. NO EXTRA COMPENSATION WILL BE ALLOWED TO THE
THE FIELD CONDITIONS AND TO JUDGE FOR HIMSELF THE EXTENT AND NATURE OF THE WORK
THE CONTRACTOR IS TO VISIT THE SITE BEFORE BIDDING, TO FAMILIARIZE HIMSELF WITH
SUBSTRUCTURE NOTES
GENERAL NOTES
PAYMENT LINE. SHEETING OR OTHER MEANS SHALL NOT BE USED TO SEPARATE
THE TWO MATERIALS.
(EPOXY COATED). ALL ELEVATIONS SHOWN ON PLANS ARE BASED ON LOCAL DATUM.
THE LUMP SUM PRICE BID FOR THE VARIOUS ITEMS OF THE CONTRACT.
SUPERSTRUCTURE NOTES
OF THE CONTRACTOR AS DIRECTED BY THE ENGINEER. NO TREE REMOVAL IS SCHEDULED.
ANY DAMAGE CAUSED TO THIS NATURAL GROWTH SHALL BE RESTORED AT THE EXPENSE
WITHIN AND OUTSIDE THE LIMITS OF CONSTRUCTION AND NOT SCHEDULED FOR REMOVAL.
CARE SHALL BE TAKEN TO RETAIN NATURAL GROWTH AND PREVENT DAMAGE TO TREES
IN EFFECT AS OF JANUARY 2024.
THE BEAMS FOR THIS BRIDGE REQUIRE CAMBER.
THE STRUCTURAL STEEL FOR THIS BRIDGE SHALL BE HOT DIPPED GALVANIZED.
CONSTRUCTION AND MATERIALS, NYSDOT OFFICE OF ENGINEERING, DATED MAY 1,
2024 WITH CURRENT ADDITIONS AND MODIFICATIONS.
EMPLOYED, THE WORK SHALL BE SUSPENDED UNTIL ADEQUATE PROTECTION IS PROVIDED.
IF THE ENGINEER DETERMINES THAT ADEQUATE PROTECTIVE DEVICES ARE NOT BEING
NETS, SCREENS OR OTHER PROTECTIVE DEVICES SHALL BE USED TO CATCH THE MATERIAL.
DROP WASTE CONCRETE, DEBRIS OR OTHER MATERIAL BELOW THE BRIDGE. PLATFORMS,
DURING CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL NOT BE ALLOWED TO
QUANTITIES. THE CONTRACTOR SHALL PERFORM THE WORK IN ACCORDANCE WITH FIELD CONDITIONS.
TIME. ACTUAL FIELD CONDITIONS MAY REQUIRE MODIFICATIONS TO CONSTRUCTION DETAILS AND WORK
HAVE BEEN PREPARED BASED ON FIELD INSPECTION AND OTHER INFORMATION AVAILABLE AT THE
BE ACCURATELY DETERMINED PRIOR TO COMMENCEMENT OF WORK. THESE CONTRACT DOCUMENTS
RECONSTRUCTION PROJECTS, THE EXACT EXTENT OF RECONSTRUCTION WORK CANNOT ALWAYS
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FACT THAT, DUE TO THE NATURE OF
SHALL BE REMOVED AND THE AREA RESTORED AT THE COMPLETION OF THE WORK.
AND MAINTAIN WATER RIGHTS TO SUSTAIN FISH LIFE. THESE TEMPORARY MEASURES
FROM A STREAM, HE SHALL CONSTRUCT AN INTAKE OR TEMPORARY DAM TO PROTECT
POLLUTED WITH SAND, SILT, CEMENT, OIL, OR OTHER IMPURITIES. IF HE USES WATER
PURPOSES OR OTHER SIMILAR OPERATIONS WHICH COULD CAUSE THIS WATER TO BECOME
IMMEDIATELY FLOWING INTO A STREAM, ANY WATER WHICH HAS BEEN USED FOR WASH
BE PROHIBITED. HE SHALL NOT RETURN DIRECTLY TO A LAKE, OR TO A DITCH
THE MANIPULATION OF EQUIPMENT AND/OR MATERIALS IN OR NEAR SUCH STREAM SHALL
TO ANY STREAM FROM POLLUTION BY DEBRIS, SEDIMENT OR OTHER FOREIGN MATERIAL.
SATISFACTION OF THE ENGINEER TO PREVENT OR REDUCE TO A MINIMUM ANY DAMAGE
STREAM CONSERVATION: THE CONTRACTOR SHALL CONDUCT HIS OPERATIONS TO THE
SHALL BE INCLUDED IN THE LUMP SUM BID PRICE FOR THE COFFERDAM ITEM.
COST OF DEWATERING THE ENTIRE EXCAVATION, REGARDLESS OF THE SOURCE OF WATER,
WHERE A COFFERDAM IS USED COMPLETELY OR PARTIALLY AROUND AN EXCAVATION, THE
THE COUNTY.
OF COMPLIANCE OR NON-COMPLIANCE OF THE SPECIFICATION TO THE CONTRACTOR AND
REPORT DESCRIBING THE TESTS PERFORMED, THE RESULTS OF SUCH TESTS, AND A STATEMENT
ASTM, AND NYSDOT STANDARDS. THE TESTING LABORATORY SHALL SUBMIT A WRITTEN
APPROVED IN ADVANCE BY THE COUNTY. TESTING SHALL CONFORM TO THE APPLICABLE
TESTING OF MATERIALS SHALL BE PERFORMED BY AN INDEPENDENT TESTING LABORATORY
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF TESTING ALL MATERIALS.
ESTABLISHMENT), OF THE STANDARD SPECIFICATIONS
TOPSOILED, FERTILIZED, SEEDED AND MULCHED AS SPECIFIED UNDER SECTION 610 (TURF
ALL DISTURBED UNPAVED AREAS WITHIN THE DESIGNATED WORK LIMITS SHALL BE GRADED,
ADDITIONS AND MODIFICATIONS.
OF THE STANDARD SPECIFICATIONS DATED MAY 1, 2008 INCLUDING CURRENT
REQUIREMENTS OF SECTION 107, LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC,
PROTECTION OF THE PUBLIC: THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE
SHALL BE PLACED SIMULTANEOUSLY, IN CONTACT, ON BOTH SIDES OF THE VERTICAL
EMBANKMENT IN PLACE, ITEM 203.03 AND SELECT STRUCTURE FILL, ITEM 203.21,
OF THE NEW YORK STATE STEEL CONSTRUCTION MANUAL (SCM).
ALL PHASES OF ERECTION AND CONSTRUCTION, AS PROVIDED FOR IN PARAGRAPH 204.2
THE CONTRACTOR SHALL PROVIDE FOR THE STABILITY OF STRUCTURAL STEEL DURING
GENERAL NOTES
SHALL BE INCLUDED IN THE LUMP SUM PRICE BID FOR THE PROJECT.
INDICATED BY ITEM NUMBER. THE COST OF WORK FOR WHICH NO PAYMENT IS INDICATED
SPECIFICATIONS OR UNDER THE HEADING GENERAL NOTES UNLESS PAYMENT IS SPECIFICALLY
NO PAYMENT WILL BE MADE FOR WORK CALLED FOR BY NOTES ON THE PLANS, IN THE
SEEDED IN A MANNER APPROVED BY THE ENGINEER.
SATISFACTION OF THE ENGINEER. ALL THE DISTURBED AREAS SHALL BE GRADED AND
PERFORMED UNDER THIS CONTRACT, SHALL BE RESTORED AS SPECIFIED AND TO THE
SHOULDER AREAS DISTURBED BY THE CONTRACTOR AS PART OF THE WORK TO BE
BID FOR THE CONTRACT.
UNAUTHORIZED ENTRY. THE COST OF THIS WORK IS TO BE INCLUDED IN THE LUMP SUM PRICE
REGULATIONS, TO THE SATISFACTION OF THE ENGINEER, TO PROTECT THE PUBLIC AND PREVENT
ALL WORK AREAS AT THE STRUCTURE SHALL BE COMPLETELY FENCED, CONFORMING WITH OSHA
SHALL BE INCLUDED IN THE LUMP SUM BID.
OF, THE COST OF SUPPLYING A DISPOSAL AREA AND TRANSPORTATION TO THAT DISPOSAL AREA
WHENEVER ITEMS IN THE CONTRACT REQUIRE MATERIALS TO BE REMOVED AND DISPOSED
EXPENSE OF THE CONTRACTOR
SHALL BE REPAIRED OR REPLACED IN A MANNER SATISFACTORY TO THE ENGINEER AT THE
IN PLACE OR WHICH ARE TO REMAIN THE PROPERTY OF THE COUNTY, THE DAMAGED MATERIALS
NOT BE DAMAGED. IF THE CONTRACTOR DAMAGES ANY MATERIALS WHICH ARE TO REMAIN
ARE TO REMAIN IN PLACE, OR WHICH ARE TO REMAIN THE PROPERTY OF THE COUNTY, WILL
THE CONTRACTOR SHALL PERFORM ALL WORK WITH CARE SO THAT ANY MATERIALS WHICH
BASELINE DIMENSIONS AND BENCH MARK DATA.
THE PROPOSED ROADWAY AND BRIDGE ARE SHOWN IN THESE PLANS COMPLETE WITH
SURVEY AND STAKEOUT: THE CONTRACTOR IS RESPONSIBLE ALL SURVEY AND STAKEOUT.
STANDARD SPECIFICATIONS. NO PAYMENT WILL BE MADE FOR INDIVIDUAL ITEMS.
NUMBERS ARE FOR REFERENCE ONLY TO THE MAY 1, 2024 MATERIAL AND CONSTRUCTION
THIS PROJECT SHALL BE BID BASED ON A SINGLE LUMP SUM PRICE. ALL NYSDOT ITEM
DESCRIBED IN THE CURRENT EDITION OF THE "ASSHTO MANUAL FOR BRIDGE MAINTENANCE".
BY THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS AND
THIS BRIDGE IS TO BE MAINTAINED IN ACCORDANCE WITH THE GUIDELINES ESTABLISHED
WITH ITEM 203.21 - SELECT STRUCTURE FILL. NO SEPARATE PAYMENT TO BE MADE.
THE COST OF WATER USED FOR COMPACTION OF SELECT FILL ITEMS SHALL BE IN ACCORDANCE
ISSUED FOR THE PROJECT.
THIS PERMIT. DE-WATERING SHALL BE IN ACCORDANCE WITH THE ENVIRONMENTAL PERMITS
PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO UNDERSTAND THE CONDITIONS OF
COPY OF THE ARTICLE 15 PROTECTION OF WATERS PERMIT, ISSUED BY NYSDEC FOR THIS
POTENTIAL TO IMPACT WATER QUALITY, THE CONTRACTOR SHALL PROMINENTLY DISPLAY A
PRIOR TO THE INSTALLATION OF COFFERDAMS, OR THE BEGINNING OF ANY WORK WITH THE
EXISTING SUPERSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.12.
EXISTING SUBSTRUCTURE SHALL BE REMOVED UNDER ITEM 202.19.
OR EQUIVALENT UNLESS OTHERWISE NOTED.
ALL STRUCTURAL STEEL FOR THIS STRUCTURE SHALL BE ASTM A572 GRADE 50
EXISTING BEAMS TO BECOME THE PROPERTY OF THE CONTRACTOR.
SHEETING NOTES
BELOW THE STREAM BED INTO GLACIAL TILL. SEE NOTES ON AB-1
THE ABUTMENT SHALL BE DRIVEN TO PRACTICAL REFUSAL ESTIMATED TO BE 40 FEET
MATERIAL CONFORMS TO THE REQUIREMENTS OF THE STEEL SPECIFIED. SHEETING FOR
STATEMENT BY A QUALIFIED MILL REPRESENTATIVE TO THE EFFECT THAT THE SUBJECT
COPIES OF PHYSICAL AND CHEMICAL TEST RESULTS WHICH SHALL INCLUDE A SWORN
STEEL MAY BE USED. THE CONTRACTOR SHALL FURNISH TO THE ENGINEER, CERTIFIED
SHALL NOT HAVE A SECTION MODULUS LESS THAN THAT SHOWN ON THE PLANS. STOCK
REQUIREMENTS OF ASTM A36 UNLESS OTHERWISE INDICATED ON THE PLANS. THE SHEETING
THE PLANS. WALING AND BRACING SHALL BE NEW AND UNUSED CONFORMING TO THE
CONFORMING TO THE REQUIREMENTS OF ASTM A328M UNLESS OTHERWISE INDICATED ON
STEEL SHEET PILING FOR THE ABUTMENTS AND WINGWALLS SHALL BE NEW AND UNUSED
File details come from the government source that posted it. Updated .