PIDP 2021 Project Information Form.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- 2021 Port Infrastructure Development Grants
- Opportunity number
- MA-PID-21-001
About this file
PIDP 2021 Project Information Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final FY21 PIDP NOFO for FR 03292021.pdf | ||
| PIDP 2021 Project Information form 03112021 pm.xlsx | XLSX spreadsheet | |
| PIDP 2021 Project Information Form 072021.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 2021 Port Infrastructure Development Program (PIDP) Project Information Form | |||
| Field Name | Response | Instructions | |
| Name of Lead Applicant | Enter the name of the Lead Applicant. This should be the same as the one used in the Grants.gov SF-424 submission, as well as the application project narrative. | Rural | |
| Project Name (Concise Title From SF-424) | Enter a concise descriptive title for the project. This should be the same as the title used in the Grants.gov SF-424 submission, as well as the application project narrative. | Urban | |
| Project Description | Describe the project in plain English terms that would generally be understood by the public, using no more than 100 words. For example, “The project will replace the existing bridge over the W river on Interstate X between the cities of Y and Z” or “The PIDP Grant will fund construction of an upgraded wharf at the Bay Street terminal." Please do not describe the project’s benefits, background, or alignment with the selection criteria in this field. | ||
| Is This a Planning Project? | Yes – If funding for this project is restricted to planning activities |
No – If construction acitivity is part of the proposed project Is This Project For a Coastal Port? Yes – If project is for a coastal port as defined in the NOFO No – If project is not for a coastal port Is This Project For a Great Lakes Port? Yes – If the project is for a Great Lakes port as defined in the NOFO No – If the project is not for a Great Lakes port
| Is this application for a Small Project at a Small Port? | A "Small Project at a Small Port" application determination is met if the average annual tonnage of cargo for the port during the three calendar years preceding the time of application is less than 8,000,000 short tons (as determined by U.S. Army Corps of Engineers data or data provided by an independent audit the findings of which are acceptable to the Department of Transportation), and if the application seeks less than $4.14 million in PIDP grant funding. |
| GIS Coordinates (X and Y Coordinates) | Enter the latitude and longitude (in decimals) of where project work will occur. If there are multiple project locations, please provide GIS coordinates for each location |
| Rural Project? | Indicate Rural if a majority of the project (by location of costs incurred) is in a Rural area (i.e., outside a 2010 Census-designated Urbanized Area (UA)). Consult the map in the link below: |
https://www.census.gov/geographies/reference-maps/2010/geo/2010-census-urban-areas.html (detailed PDF maps for every UA) https://www.census.gov/programs-surveys/geography/guidance/geo-areas/urban-rural/2010-urban-rural.html
| Project Zip Code | Identify the zip code where the project is located. For projects that are located in more than one zip code, identify the zip code where the project is principally located. |
| Community Development Zone? | Indicate if the project is located (entirely or partially) in Federally designated community development zones (i.e., an Empowerment or Opportunity Zone, Promise Zone, or Choice Neighborhood). |
| • Opportunity Zone | Indicate whether the project is in a qualified Opportunity Zone. Consult the map link below: |
https://www.transportation.gov/opportunity-zones/opportunity-zones-interactive-map
• Empowerment Zone Consult EZ Locator by street address at https://www.dol.gov/agencies/eta/wotc/resources Indicate whether the project is in a qualified Empowerment Zone. Provide the following data:
ID # Valid U.S. Street Address (No P.O. Boxes) ,City, State , Zip Code (5 digit), Best Matched Address, Match Score, Zone Status Zone Name, Map URL:
| • Promise Zone | Indicate whether the project is in a qualified Promise zone. Consult the latest list at https://www.hudexchange.info/programs/promise-zones/#designees |
| • Choice Neighborhood | Indicate whether the project is in a qualified Choice Neighborhoods zone. (https://www.hud.gov/program_offices/public_indian_housing/programs/ph/cn) |
| Anticipated Environmental Reviews (NEPA Status) | Indicate the anticipated NEPA level of review for the project (e.g., Categorical Exclusion, Environmental Assessment/ Finding of No Significant Impact, or Environmental Impact Statement/ Record of Decision, etc.) and describe the status of the review (e.g., not started, in progress, completed, etc.). |
| Same Project Previously Submitted? | Was the project submitted in a previous BUILD/TIGER/FASTLANE/INFRA round? If so, indicate to which year(s) it was submitted. Example: "TIGER (2016), INFRA (2020) and BUILD (2018)" |
| Applying for other discretionary grant programs in 2021 for the same work or related scopes of work? | Identify whether the applicant is also applying to other USDOT grant programs in 2021 (such as BUILD/TIGER/FASTLANE/INFRA). If so, is the application(s) seeking federal funding for the same proposed project or related scopes of work? |
| Applicant previously received BUILD/TIGER/FASTLANE/INFRA funding? | Identify whether the project has previously received BUILD/TIGER/FASTLANE/INFRA funding. |
| Port handled less than 10,000,000 short tons in 2017? | Indicate whether the port handled less than 10,000,000 short tons in 2017, as identified by the U.S. Army Corps of Engineers. |
| PIDP Grant Amount Requested | Enter the total amount of PIDP grant funds requested. |
| Total Future Eligible Project costs | Enter the total amount of future eligible project costs. This amount excludes previously incurred expenses (See Section C.2. of the NOFO) |
| Total Project Cost | Enter the total cost of the project. |
| Total Federal Funding | Enter the total amount of Federal funding from ALL Federal sources, including the amount of PIDP grant funding requested. |
| Total Non-Federal Funding | Enter the amount of funds committed to the project from non-Federal sources. |
| Non-Federal Ratio | Calculate the non-Federal percentage of the project cost by dividing the Total Non-Federal Funds by the Total Future Eligible Project Costs. Enter the result as a two-digit decimal (e.g. “.82” for 82%). |
| Will RRIF or TIFIA funds be used as part of the project financing? | Indicate whether RRIF or TIFIA funding will be used for the project. If so, indicate the amount of funds that will be used. |
Sheet2
| Select One |
| Yes |
| No |
| Select One |
| None |
| Avance technology-supported safety and design efficiency improvements |
| Bring facilities to a state of good repair and resiliency |
| Promote energy-efficient trade |
| Promote manufacturing |
| Agriculture or other exports |
| Support the safe flow of agricultural and food products |
None Advanced Technology-supported safety and design efficiency improvements Bring facilities to a state of good repair and resiliency Promote energy-efficient trade Promote manufacturing Agriculture or other exports Support the safe flow of agriculture and food products
File details come from the government source that posted it. Updated .