Photo Bulk Oxygen Tank Syracuse VAMC.pdf
PDF 180 KB Posted
- Solicitation number
- 36C24222Q0799
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24222Q0799_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 1-3, 2021
OXYGEN BULK SUPPLY SYSTEM
Medical Gas and Vacuum Systems Inspection/Testing
VA Medical Center
Syracuse, NY
SCHEMATIC PER CURRENT NFPA 99 FACILITY'S GAS SUPPLY SOURCE
SYSTEM INFORMATION INSPECTION CHECK LIST Pass/Fail
Location System complies with above schematic per NFPA 99 Fail
Facility area(s) served Enclosure (min 6' height) non-combustible, proper ventilation & 2 Lockable
Entries/Exists
Fail
Bulk Supplier/Equipment Owner Containers permanently anchored & cylinders adequately secured Pass
National Board Number (Primary)
National Board Number (Reserve)
Primary Liquid Level 220 "H2O Top & bottom fill, hose purge, & vent valves present Pass
Primary Pressure 170 psi Proper fill circuit (inlet, strainer, check valve, purge valve, supports) Pass
Intermediate Regulator Pressure 55 psi Gas specific connects, header valves & pigtails w/checks @ header Pass
Reserve Liquid Level 82 "H2O 2 reliefs & 2 rupture disks w/ 3 direction valves each container Pass
Reserve Pressure 160 psi Piped w/brazed copper, brass, or stainless & no flex connects/fittings wear & leaks Pass
Reserve Regulator Pressure 100 psi Reserve automatically feeds if primary cannot feed w/ reserve & primary checks Pass
Final Line Pressure (1) N/A psi Reserve economizer which feeds upstream final regulators Pass
Final Line Pressure (2) N/A psi Drainage prevented towards (buildings, drains, etc.) & from hazards Pass
Source Valve Pressure 55 psi Labeling: pipeline, source/main valves & "Oxygen-No Smoking, No Open Flames" Pass
Main Valve Pressure 55 psi Vaporizer adequately sized & isolation valves for service w/o supply interruption Pass
Emergency Supply (3' clearance) or (IBER) w/2 checks, secured, & labeled Fail
Pass
Distances with "*" do not apply if a 2 hr fire rated wall interrupts the line of sight between un-insulated portions of the bulk & the exposure
Pass
1' - all structures (Type I & II), * 50' - wood framed Type III, IV, or V building types, * 50' - Public assembly or nearest non-ambulatory patient, * 5' - Property lines & overhead electrical wiring, 10' building openings, * 10' - public sidewalks & parked vehicles, * 15' - Hazardous piping materials & below ground flammable liquid tanks, * 25' -
0-1000 gal flammable liquids/liquefied gas, below ground flammable liquid fill or vent, 0-25,000 scf flammable gases, or slow burning solids, * 50' - >1000 gal flammable liquids/liquefied gas, >25,000 scf flammable gases, or rapidly burning solids, 3' - combustible surfaces (asphalt & expansion joint filler) where liquid oxygen may fall, 8' -
Sewer or drain openings to delivery connects, reliefs, mobile supply equipment, & liquid withdrawal connects, Walls may not form a 3-4 sided court
Bulk Pad
Entire facility
Air Products/Syracuse VA
Noncombustible pad w/3' maintenance clearance, accessible for delivery & pad adequately sized for vehicles
Indicator/Switch
Indicator/Switch
Primary Contents
Reserve Contents
Low Switch
Reserve Pressure
Switch
Reserve Low
Reserve
Alarm Switch
Reserve in Use
Economizer psi
Container Reserve
Container
Primary
Header
Either
Vaporizer
EOSC
V
Line Pressure
Regulators
Gauge
Demand Check
Ball Valve
Vent Piped Outside
Relief Valve
Pressure Regulator
Pressure Switch
Check Valve (Flow in direction of point)
High-Pressure Valve
Source
Valve
Main
Valve
(Check or
Ball valve)
>3 Cylinders
& 1 avg days supply
File details come from the government source that posted it. Updated .