This document includes a statement of work for the provision of temporary modular office space at the Philadelphia International Airport. The Federal Aviation Administration requires approximately 6,500 square feet of modular space for additional employees being added to its existing air traffic control tower and terminal radar approach control facility. The scope of work entails installing modular units in an existing parking lot, including associated site work, foundations, utilities connections, and finishes. Interested vendors were requested to submit capability statements by April 5, 2022 to assist the agency with acquisition planning for the potential future solicitation of this requirement. The pre-solicitation notice did not constitute a request for proposal.

View the file

Other files

File Type Posted
PHL TRAILER PACKAGE - DRAFT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Philadelphia (PHL) Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) Facility Philadelphia, Pennsylvania

Temporary Modular Office Space

Summary of Work

TABLE OF CONTENTS PAGE

1Project Summary………………………………………………………..2
2Civil/Site……………………………………………………………………2
3Architectural/Interiors……………………………………..……………......3
4Mechanical and Plumbing …………..………………………………..……4
5Electrical …………..………………………………..…………..….……...4
6Fire Protection ………….………………………………..…………..….…4

Reviewed by: Annette McKinney, AJW-2E11C, NY Terminal Design Engineer

1. Project Summary The Federal Aviation Administration (FAA) currently owns and operates an ATCT and TRACON Facility at Philadelphia International Airport. The FAA is looking to purchase approximately 6,500 SF of modular space that is needed for employees being added to work at the existing facility. Modular buildings shall consist of offices, break areas, restrooms, classrooms, and open areas, plus a separate 320 sf building for a gym. Scope of work includes the modular units in an existing parking lot, installation of foundations, associated utilities, ADA/ABA compliant access ramps and miscellaneous associated site work. The modular units are expected to be occupied for a period of 5 to 7 years while a permanent addition to the facility is designed and constructed. The modular units may be trailers connected together and configured to meet the proposed layout or other modular building construction.

2. Civil/Site Description of Work Demolition Removal of 4 trees, small concrete pad, curb and sidewalk removal (approximately 200 lf), remove portions of asphalt paving to install new underground utilities, and removal of one light post and light post foundation.

Utilities Electric - Install new underground concrete ductbank to from modular buildings to the existing facility for electric, fire alarm, telecommunications and fiber optics.

Sanitary Sewer – Install new underground sanitary sewer piping to connect to existing sanitary lift station.

Plumbing –tap into existing water supply and install new water piping underground to new modular facility for domestic water and fire suppression.

Foundations Install 30” concrete reinforced with rebar sonotube type pier foundations, quantity as needed.

Concrete/Paving Install concrete pad for incoming electric service panels.

Install concrete sidewalk and cub along new modular buildings.

Patch/pave areas of asphalt disturbed during construction.

Install jersey barriers for traffic control at the modular buildings.

3. Architectural Layout may vary but shall include quantity of private offices, shared offices, break room, conference room, classrooms, study rooms, open areas, restrooms and gym space as shown below.

Access Provide ABA compliant access ramps, landings and entrances.

Furniture Provide furnishings for the spaces described above.

Finishes Provide room finishes including carpet tile, vinyl tile, acoustical ceilings, walk-off mats at entrances, standard manufacture wallboards.

Hardware Exterior doors shall have cypher locksets, interior doors shall have keyed locksets.

4. Mechanical and Plumbing Restrooms Provide 4 restrooms with exhaust fans in locations to accommodate facility users.

Air Handling Units Provide mechanical units and thermostats to adequately modulate the temperature throughout the modular facility.

5. Electrical Power Install feeder panels and electrical distribution throughout modular facilities including power and data outlets throughout.

Lighting Provide interior and exterior lighting fixtures.

Lightning protection Install lightning protection system.

Cable Trays Provide cable trays to be used by FAA for distribution of phone and data throughout the modular facility.

6. Fire Protection Fire Suppression An automatic fire suppression sprinkler system shall be installed throughout the buildings.

Fire Alarm System Install addressable fire detection and notification speaker/strobe devices throughout the modular buildings. Connect to existing facility fire alarm control panel.