This is a Project Manual and bidding document for Phase 15A Street Reconstruction issued by the City of The Colony, Texas in Denton County. The project involves the reconstruction of Chapman Street from Augusta Street to Curry Drive, the entire length of Independence Drive, and Bartlett Place from cul-de-sac to Clover Valley Drive. Work includes approximately 16,200 square yards of 6-inch thick reinforced concrete pavement, approximately 40,000 square feet of 4-inch thick reinforced concrete sidewalks, approximately 2,300 linear feet of 8-inch diameter sanitary sewer, 1,100 linear feet of 18-inch diameter sanitary sewer, 4,400 linear feet of 8-inch water line, mobilization, right-of-way preparation, traffic control, street lights, and related construction activities. A mandatory pre-bid conference is scheduled for 10:00 a.m. on Wednesday, October 28, 2026, at City Hall Council Chambers located at 6053 Main Street, The Colony, Texas. Formal bids must be submitted electronically through the Planetbids website (https://vendors.planetbids.com/portal/78679/portal-home) by 2:00 p.m. local time on Thursday, December 3, 2026, with results to be read at 2:00 p.m. the same day. The contract will be awarded to the lowest responsible bidder and must be executed within fifteen days of the Notice of Award. All work shall be completed within 400 calendar days, which includes 20 inclement weather days, with contract time commencing ten calendar days after the Notice to Proceed. Independence Drive is to be constructed last in the street sequencing.

The opinion of probable construction cost for the overall project is $4,980,000.00. Bidders must submit a bid bond in the amount of five percent of the bid amount and proof of insurance to Joseph Oerum (joerum@thecolonytx.gov) prior to bid opening; cashier checks are not acceptable for bid bonds. The City of The Colony is exempt from state sales tax on tangible personal property to be incorporated into the project, and bidders must separate material costs from labor and equipment costs on their bid forms. Upon City acceptance, contractors are required to provide a minimum two-year Maintenance Bond in the amount of fifty thousand dollars or ten percent of the contract amount, whichever is greater, but not to exceed one hundred percent of the contract amount. All work must comply with TxDOT and NCTCOG specifications, the City of The Colony's Addenda, and the North Central Texas Council of Governments Standard Specifications for Public Works Construction (Fifth Edition). The City of The Colony reserves the right to reject any or all bids, waive any informalities, and delete any portion of the project as necessary to stay within available funds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

PROPOSAL, CONTRACT, BOND FORMS,

AND SPECIFICATIONS

FOR

PROJECT NAME

BID #69-27-01 - PHASE 15A STREET RECONSTRUCTION

CITY OF THE COLONY

DENTON COUNTY, TEXAS

RICHARD BOYER, MAYOR

CITY COUNCIL

JUDY ENSWEILER ROBYN HOLTZ

BRIAN WADE DAN RAINEY

PERRY SCHRAG JOEL MARKS

TROY C. POWELL CITY MANAGER

TINA STEWART CITY SECRETARY

RON HARTLINE, P.E. DIRECTOR OF ENGINEERING

10/14/2026

TABLE OF CONTENTS

Page Section 1 - Bidding Documents 1-1

Invitation For Bids 1-2

Instructions To Bidders 1-3

Bid Form 1-13

Proposal/Bid Schedule/Summary 1-16

Non-Collusion Statement 1-54

State Reciprocal Requirement 1-55

Conflict of Interest Questionnaire 1-56

Certificate of Interested Parties 1-60

Bid Affidavit 1-61

HOUSE BILL 89 VERIFICATION 1-63

Section 2 - Contract Documents 1-64

Standard Form of Agreement (Contract) 1-65

Prevailing Wage Rates 1-71

Certificate Of Insurance 1-72

General Instructions For Bonds 1-73

Performance Bond 1-74

Payment Bond 1-76

Maintenance Bond 1-78

Section 3 - City of The Colony’s Supplementary Conditions 1-80 to the NCTCOG General Provisions

Section 4 - Special Provisions to Standard Specifications for 1-93

Construction and General Notes

Section 5 - Specific Technical Project Work Specifications for Construction 1-109

Appendix A - Standard Capital Improvement Project Sign Detail

Appendix B - Addendum to NCTCOG Standard Specifications for Public Works Construction

Appendix C – Addenda

Appendix D – Questions and Answers from Planetbids

For this project, the Standard Specifications for Public Works Construction -

North Central Texas, (Fifth Edition) as prepared by the North Central Texas

Council of Governments and the City of The Colony Standard Construction

Details shall govern all work to be done, together with any additional Special

Specifications or Specific Project Requirements included herein.

Bidding Documents

1-1

SECTION 1

BIDDING

DOCUMENTS

1-2

INVITATION FOR BIDS

BID NUMBER 69-27-01 - PHASE 15A STREET RECONSTRUCTION DATE: DECEMBER 3, 2026

Formal bids will be received through the Planetbids website located at https://vendors.planetbids.com/portal/78679/portal-home until 2:00 p.m., local time, Thursday, December 3, 2026.

There is no fee for registering or bidding on this project through Planetbids.

No paper copy bid will be acceptable.

PRE-BID AT 10:00 A.M., WEDNESDAY, OCTOBER 28, 2026, CITY HALL COUNCIL CHAMBERS

ROOM LOCATED AT 6053 MAIN STREET, THE COLONY, TEXAS.

ALTHOUGH NOT MANDATORY, BIDDERS ARE STRONGLY URGED TO ATTEND THIS

CONFERENCE. ANY MISUNDERSTANDINGS DUE TO NON-ATTENDANCE WILL NOT BE REASON

FOR LETTING A BIDDER OUT OF THE BID.

Results will be read at 2:00 p.m., Thursday, December 3, 2026.

The scope of work consists of the reconstruction of Chapman Street from Augusta Street to Curry Drive, the entire length of Independence Drive, and Bartlett Place from cul-de-sac to Clover Valley Dr. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 16,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approximately 40,000 SF of 4-inch thick reinforced concrete sidewalks, approximately 2,300 LF of 8-inch diameter sanitary sewer, 1,100 LF of 18-inch diameter sanitary sewer, 4,400 LF of 8-inch water line, and any other work deemed necessary by the City. All of the above shall be done in accordance with TxDOT and NCTCOG specifications with the City’s Addenda and as per instructions of the City Engineer. All construction sequencing and barricading will be done according to the City of

The Colony Standards. The opinion of probable construction cost for the overall project is $4,980,000.00.

Cashier checks are not allowed for bid bonds, as the check will be sent back to the vendor and the bid will not be accepted. The bidder must submit, prior to the bid opening time, proof of insurance and Bid Bond in the amount of five (5%) percent of the bid amount to Joseph Oerum (joerum@thecolonytx.gov). Originals must be submitted in the bid packet OR received by the Purchasing Manager before the bid opening.

Specifications, bid proposal forms, addendums and instructions to bidders may be downloaded from the

Planetbids website. No paper copy bid will be acceptable.

Any questions regarding the bid process, procedures, plans, or specifications shall be submitted through

Planetbids. All responses will be posted to Planetbids. Any addenda for this project will be posted on the

Planetbids website where prospective bidders may download them. All documents must be submitted with the bid package and “filled out completely” by the bidders. City of The Colony reserves the right to reject any or all bids, in whole or in part, to waive any informality in any bid, and to accept the bid which, in its discretion, is in the best interest of the City of The Colony.

Sincerely, Joseph Oerum Purchasing Manager, City of The Colony, 972-624-3145.

PUBLICATION DATES: Friday, October 16, 2026 and Friday, October 23, 2026 https://vendors.planetbids.com/portal/78679/portal-home

1-3

BIDDING AND CONTRACT DOCUMENTS

INSTRUCTIONS TO BIDDERS

1. Defined Terms.

Terms used in these Instructions to Bidders which are defined in the Standard Specifications for

Public Works Construction - North Central Texas, Fifth Edition, as prepared by the NCTCOG and the Supplementary Conditions of Agreement have the meanings assigned to them in these

General Conditions. The term "Bidder" means one who submits a Bid directly to Owner, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Successful Bidder" means the lowest, qualified, responsible Bidder to whom the Owner (on the basis of the Owner's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Notice to Bidders, Instructions to Bidders, the Bid Form, and the proposed Contract

Documents (including all Addenda issued prior to receipt of bids). Specific defined terms are:

Owner: Wherever the word "OWNER" is used in the specifications and Contract Documents, it shall be understood as referring to the City of The Colony, Texas.

Engineer: Wherever the word "ENGINEER" is used in the specifications and Contract

Documents, it shall be understood as referring to the City Engineer or his authorized representative, City of The Colony, 6053 Main Street, The Colony, Texas 75056.

Inspector: The authorized representative of the City of The Colony assigned to observe and inspect any or all parts of the work and the materials to be used therein.

2. Scope of Work.

The scope of work consists of the reconstruction of Chapman Street from Augusta Street to

Curry Drive, the entire length of Independence Drive, and Bartlett Place from cul-de-sac to

Clover Valley Dr. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 16,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approximately 40,000 SF of 4-inch thick reinforced concrete sidewalks, approximately 2,300 LF of 8-inch diameter sanitary sewer, 1,100 LF of 18-inch diameter sanitary sewer, 4,400 LF of 8-inch water line, and any other work deemed necessary by the City.

All of the above shall be done in accordance with TxDOT and NCTCOG specifications with the

City of the Colony’s Addenda and as per instructions of the City of The Colony City Engineer.

All construction sequencing and barricading will be done according to the City of The Colony

Standards. The opinion of probable construction cost for the overall project is $4,980,000.00.

3. Copies of Bidding Documents.

3.1 Complete sets of the Bidding Documents will be obtained by downloading from the PlanetBids website (https://vendors.planetbids.com/portal/78679/portal-home). The following general requirements pertain to the Bidding Documents:

A. No paper copy bid will be acceptable.

1-4

B. After award of the Contract, the successful Bidder will be furnished five (5) sets of

Contract Documents at no charge.

C. Bidding documents may be examined free of charge at the offices of the City

Engineer, City of The Colony, 6053 Main Street, The Colony, Texas, 75056.

3.2 Complete sets of Bidding Documents must be used in preparing Bids; the City of The Colony assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. No partial sets of plans, specifications or proposal forms will be issued.

3.3 The Owner, in making copies of Bidding Documents available on the above terms, does so only for the purpose of obtaining Bids on the Work and does not confer a license or grant for any other use.

4. Qualifications of Bidders.

The Bidder shall submit within five (5) days of the Owner's request such evidence as the Owner may require to establish his financial responsibility, experience and possession of such equipment as may be needed to prosecute the work in an expeditious, safe and satisfactory manner. The required information to be submitted shall consist of, but shall not necessarily be limited to, the following:

A. Current Project Experience.

A list of all projects presently under construction by the bidder including approximate cost and completion date shall be submitted upon request. Including any current contracts with the City of The Colony.

B. Past Project Experience.

The Bidder shall submit a list of comparable projects completed within the previous five years including approximate cost(s), quantities, and completion date(s). Include any past contracts with the City of The Colony.

C. Equipment.

The Bidder shall provide a list of equipment which will be used on this project.

The Bidder shall demonstrate that he has adequate equipment to complete this project, properly and expeditiously and shall state what additional equipment, if any, that he must rent/lease as may be required to complete this project.

D. Financial.

Each Bidder shall be prepared to submit upon request of the Owner a balanced financial statement with no evidence of threatening losses as evidenced by an audited certified financial statement (current within the last six (6) months of bid date). This information will be used to confirm that the Bidder has suitable financial status to meet obligations incidental to performing the work.

1-5

E. Technical Experience.

The Bidder shall demonstrate to the satisfaction of the Owner that he has the technical experience to properly complete this project.

F. Proof that the bidder maintains a permanent place of business.

5. Conflict of Interest.

City Charter states that no officer or employee of the City shall have a financial interest, direct or indirect, in any contract with the City, nor shall be financially interested, directly or indirectly, in the sale to the City of any land, or rights or interest in any land, materials, supplies or services.

This prohibition does not apply when the interest is represented by ownership of stock in a corporation involved, provided such stock ownership amounts to less than one percent (1%) of the corporation stock. Any violation of this prohibition will constitute malfeasance in office.

Any officer or employee of the City found guilty thereof should thereby forfeit his office or position. Any violation of this prohibition with the knowledge, expressed or implied, of the persons or corporations contracting with the City shall render the contract voidable by the City

Manager or the City Council. The Contractor represents that no employee or officer of the City has an interest in the Contractor.

6. Certificate of Interested Parties

Certificate of Interested Parties (Form 1295) must be provided per the Texas Legislature adoption of House Bill 1295 which added section 2252.908 of the Government Code. The law states that a government entity or state agency may not enter into certain contracts with a business entity unless the business entity submits a disclosure of interested parties to the government entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. The law applies only to a contract of a governmental entity or state agency that either 1) requires an action or vote by the governing body of the entity or agency before the contract may be signed or 2) has a value of at least $1 million. The disclosure requirement applies to a contract entered into on or after January 1, 2021. The completed form must be submitted on www.ethics.state.tx.us by the selected contractor prior to the City Council meeting to award the project.

7. Examination of Contract Documents and Sites.

7.1 Access to the sites shall be from the street and right-of-way at the respective intersections. It shall be the contractor’s total responsibility to provide necessary and adequate barricades in accordance with the City of The Colony requirements. Prospective Bidders shall respect all improvements. It is the responsibility of each Bidder before submitting a Bid, to: (a) examine the Contract Documents thoroughly, (b) visit the sites to become familiar with local conditions that may affect cost, progress, performance or furnishing of the Work, (c) consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the

Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and

(e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. Failure to http://www.ethics.state.tx.us/

1-6 make these examinations shall in no way relieve any Bidder from the responsibility of fulfilling all of the terms of the contract, without additional cost to the OWNER.

7.2 The location and depth of existing utilities shown on the plans are approximate and may not include all utilities within the site. All existing structures, improvements, and utilities shall be located and adequately protected, at the expense of the Contractor, from damage that might otherwise occur due to construction operations. Where construction comes in close proximity to existing structures or utilities, or if it becomes necessary to move services, poles, guy wires, pipelines, or other obstructions, it shall be the Contractor's responsibility to notify and cooperate with the utility or structure owner. It shall be the Contractor's total responsibility to verify locations and depths sufficiently in advance of construction such that necessary adjustments may be made to allow for the proper installation. The Contractor shall be liable for damage to any utilities resulting from the construction of this project.

7.3 Before submitting a Bid, each Bidder shall, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and underground facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of the Contract Documents.

7.4 On request in advance, Owner will provide each Bidder access to the site to conduct explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up and restore the sites to its former conditions upon completion of such explorations.

7.5 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract documents.

7.6 The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 7, that without exception the Bid is premised upon performing and furnishing the work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

8. Interpretations and addenda.

8.1 All bidders must register on the Planetbids website to receive addenda. All questions regarding interpretations or clarifications or any other aspect of the bid shall be posted on the

PLANETBIDS website located at https://vendors.planetbids.com/portal/78679/portal-home so that the answers to said questions will be immediately available to all bidders. All addenda will also be posted on Planetbids and the website will alert all registered bidders whenever an addendum is present. Only questions answered on the website or addressed by formal written

Addenda will be binding. Oral and other interpretations or clarifications will be without legal

1-7 effect. Questions received less than five days prior to the date for opening of Bids may not be answered. Each Bidder shall acknowledge on the bid proposal that all Addenda issued have been received.

8.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by the

Owner.

9. Contract Time.

9.1 The time for completion in calendar days should be included on the Bid Summary in the space provided. All work shall be complete within the calendar day count required by the Bid

Summary. The calendar day count shall commence ten (10) calendar days after the date of the

Notice to Proceed.

9.2 Prior to the issuance of the Notice to Proceed by the Owner, the Contractor shall submit a detailed Progress and Schedule bar chart to the Owner for approval.

9.3 Extension of the contract time shall be based on a Change Order or written amendment as specified in Item 108.8 of the General Provisions.

9.4 BIDDER agrees that all work awarded will be completed within 400 Calendar days, which includes 20 inclement weather days, for this project. The Contractor will submit written documentation to the Construction Inspector assigned by the City to document inclement weather days. Additional inclement weather calendar days will be added to the contract only if the 20 inclement weather days included in the bid have been approved. Contract time will commence to run as provided in the Contract Documents.

10. Substitute or "Or-Equal" Items.

The Contract, if awarded, will be on the basis of materials and equipment described in the

Drawings or specified in the Specifications without consideration of possible substitute or "or-equal" items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or "or-equal" item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the Effective Date of the Agreement. No substitutions should be considered during the bidding process.

11. Subcontractors, Suppliers, and Others.

11.1 If the Owner requests the identity of any Subcontractors, Suppliers, or other persons or organizations to be submitted to the Owner in advance of the specified date prior to the Effective

Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within seven (7) days after the request submit to the Owner a list of all such Subcontractors, Suppliers and other persons and organizations proposed for those portions of the Work for which such identification is requested. An experience statement shall accompany such list with pertinent information regarding similar projects and other evidence of qualification for each such

Subcontractor, supplier, person or organization if requested by the Owner. If the Owner, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other

1-8 person or organization, may, before the Notice of Award is given, request the apparent

Successful Bidder to submit an acceptable substitute in which case the apparent Successful

Bidder shall submit an acceptable substitute. Bidder's Bid price may be increased (or decreased) by the difference in cost occasioned by such substitution, and the Owner may consider such price adjustment in evaluating Bids and making the contract award.

If the apparent Successful Bidder declines to make any such substitution, the Owner may award the contract to the next lowest responsible Bidder that proposes to use acceptable

Subcontractors, Suppliers, other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder.

11.2 No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against which Contractor has reasonable objection.

12. Bid Proposal.

Formal electronic bid responses will be required on the Planetbids website at https://vendors.planetbids.com/portal/78679/portal-home. No paper copy bid responses will be acceptable. The blank spaces in the Bid Form shall be filled in for each item for which a quantity is given and the Bidder shall state the price for which he proposes to do each item of work. No substitutions, revisions, or omissions from the plans and/or specifications will be accepted unless authorized in writing by the Owner. The bidder must submit proof of insurance and a Bid Bond in the amount of five (5%) percent of the bid amount to Joseph Oerum

(joerum@thecolonytx.gov). Originals must be submitted online OR received by the Purchasing

Manager before the bid opening.

13. Provision Concerning Escalator Clauses.

Bids containing any condition, which provides for changes in the stated bid prices due to increase or decrease in the costs of materials, labor, or other items required for this project, may be rejected and returned to the Bidder without being considered.

14. Estimates of Quantities.

The quantities listed in the Bid Form will be considered as approximate and will be used for the comparison of bids. Payments will be made to the Contractor only for the actual quantities of work performed or materials furnished in accordance with the contract. The quantity of work to be done and the materials may be increased or decreased as provided for in the Contract

Documents.

15. Submission of Bids.

Bids should be submitted electronically through Planetbids at:

No paper copy bid will be accepted.

1-9

The bidder must submit proof of insurance and a Bid Bond in the amount of five (5%) percent of the bid amount to Joseph Oerum (joerum@thecolonytx.gov). Original electronic copies must be submitted online OR received by the Purchasing Manager before the bid opening.

Transaction Fees:

The City of The Colony uses Planetbids to distribute bids and proposals. Please disregard any reference to “Transaction Fees” made on the Planetbids website. THERE IS NO

TRANSACTION FEE FOR ANY VENDOR THAT IS AWARDED THIS BID.

16. Modification and Withdrawal of Bids.

16.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.

16.2 If, within twenty-four hours after the Bids are opened, any Bidder files a duly signed written notice with the Owner and promptly thereafter demonstrates to the reasonable satisfaction of

Owner that there was a material and substantial mistake in the preparation of the Bid, that

Bidder may withdraw his bid. Thereafter, that Bidder will be disqualified from further bidding on the work.

17. Rejection of Bids.

Bids may be rejected if they show alterations of form, additions not called for, conditional bids, incomplete bids, erasures or irregularities of any kind. The Owner reserves the right to waive any irregularities in the bids as received and to reject any and all bids without qualification(s).

More than one bid from an individual, firm or partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that a Bidder is interested in more than one such bid may cause the rejection of all bids in which said Bidder is interested. Bids in which prices are obviously unbalanced may be rejected.

18. Bids to Remain Subject to Acceptance.

All Bids will remain subject to acceptance for ninety (90) days after the day of the Bid opening, but the Owner may, in its sole discretion, release any Bid prior to that date.

19. Award of Contract.

19.1 The Owner reserves the right to reject any and all bids, to waive any and all informalities except for the time of submission of the Bid and to negotiate contract terms with the Successful Bidder.

The Owner also reserves the right to reject all nonconforming, non-responsive, unbalanced or conditional Bids. Also, the Owner reserves the right to reject the Bid of any Bidder if the Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or has doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of

1-10 the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

19.2 In evaluating Bids, the owner will consider the qualifications of the Bidders, whether or not the

Bids comply with the prescribed requirements, and such alternates, unit prices, completion time, and other data, as may be requested in the Bid form or prior to the Notice of Award.

19.3 The Owner may consider the qualifications and experience of any Subcontractors, Suppliers, or other persons or organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as requested by the Owner. The Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the

Notice of Award.

19.4 The Owner may conduct such investigations as the owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial stability of

Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to the Owner's satisfaction within the prescribed time.

19.5 If contract is to be awarded, it will be awarded to the lowest responsible Bidder whose evaluation by the Owner indicates to the Owner that the award will be in the best interests of the

Project. The Owner’s evaluation in determining “lowest responsible bidder” will include consideration of skill, judgement, and integrity necessary to the faithful performance of the contract, as well as sufficient financial resources and ability. The Owner will also consider performance by the Offeror under previous contracts with the City.

19.6 If the contract is to be awarded, the Owner will give the Successful Bidder a Notice of Award within ninety (90) days after the date of the Bid opening.

20. Execution of Agreement.

Within fifteen (15) days after written Notification of Award of the contract, the Successful

Bidder shall execute and furnish to the Owner three (3) original signed contracts, a Certificate of

Insurance, Payment, Performance, and Maintenance Bonds.

21. Affidavit of Bills Paid.

Prior to final acceptance of this project by the Owner, the Contractor shall execute an affidavit that all bills for labor, materials, and incidentals incurred in the project construction have been paid in full, and that there are no claims pending.

22. Bid Compliance.

Bid must comply with all Federal, State, County and local laws. Contractor shall not hire nor work any illegal alien.

1-11

23. Notice to Proceed.

Upon execution of the Contract, the Owner will issue a written Notice to Proceed to the

Contractor requesting that he proceed with the construction. The Contractor shall commence work within ten (10) calendar days after the date of Notice to Proceed.

24. Sales Tax.

The bidder shall not include or provide for sales tax on tangible personal property to be incorporated into the project. In order to be exempt from the sales tax on such tangible personal property, the contract shall separate and provide separate charges for materials to be incorporated into the project from charges for labor. The City will provide the Contractor with an exemption certificate for the materials. The contractor is expected to issue a resale certificate in lieu of paying a sales tax at the time of purchase. The bidder shall show the cost of materials to be incorporated into the contract (tangible personal property) in the space provided on the bid form. The successful bidders bid form will be used to develop a separated contract and will determine the extent of the tax exemption. Upon execution of the construction contract, the successful bidder shall provide a per item breakdown of: 1) materials incorporated into the project; and 2) labor, equipment, supervision and materials not incorporated into the project.

25. Silence of Specification.

The apparent silence of these specifications as to any detail or to the apparent omission from it of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement by Owner or their authorized representative.

26. Change Orders.

No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting contract. All change orders to the contract will be made in writing by the Owner.

27. Assignment.

The Successful Bidder shall not sell, assign, transfer or convey this contract, in whole or in part, without the prior written consent of Owner.

28. Venue.

This agreement will be governed and construed according to the laws of the State of Texas.

This agreement is performable in Denton County, Texas.

29. Maintenance Bond.

Upon City acceptance, any contractor doing work in The Colony is required to provide the city with a minimum Two (2) year Maintenance Bond. The maintenance bond shall be in the amount of fifty thousand dollars ($50,000.00) or ten (10%) percent of the amount of the

1-12 contract, whichever is greater, but not to exceed one hundred (100) percent of the contract amount.

1-13

BID FORM

PROJECT IDENTIFICATION: PHASE 15A STREET RECONSTRUCTION

in the City of The Colony

BID OF:

(NAME OF FIRM)

THIS BID IS SUBMITTED TO: City of The Colony (hereinafter called OWNER) c/o Purchasing Agent

6053 Main Street

The Colony, Texas 75056-1133

CITY OF THE COLONY BID NO.: 69-27-01 - PHASE 15A STREET RECONSTRUCTION

1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and

Instructions to Bidders. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and submit the Agreement with other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER's

Notice of Award.

3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:

a) BIDDER has examined copies of all the Bidding Documents and of the following

Addenda (receipt of all which is hereby acknowledged):

No: __________ __________ __________

Date: __________ __________ __________

Rec'd: __________ __________ __________

1-14

b) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.

c) BIDDER has studied carefully all reports and drawings of subsurface conditions contained in the contract documents and which have been used in preparation of the contract documents. CONTRACTOR may rely upon the accuracy of the technical data contained in such reports, but not upon non-technical data, interpretations or opinions contained therein or for the completeness thereof for CONTRACTOR's purposes.

Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to subsurface conditions at the sites.

BIDDER has studied carefully all drawings of the physical conditions in or relating to existing surface or subsurface structures on the sites, which are contained in the contract documents and which have been utilized in preparation of the contract documents.

CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings, but not for the completeness thereof for CONTRACTOR's purposes. Except as indicated in the immediately preceding sentence, CONTRACTOR shall have full responsibility with respect to physical conditions in or relating to such structures.

d) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies

(in addition to or to supplement those referred to in (c) above) which pertain to the subsurface or physical conditions at the sites or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents; and no additional examinations, investigations, explorations, tests reports or similar information or data are or will be required by BIDDER for such purposes.

e) BIDDER has correlated the results of all such observations, examinations, investigations, explorations, tests, reports and studies with the terms and conditions of the Contract Documents.

f) BIDDER has given ENGINEER written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by

ENGINEER is acceptable to BIDDER.

g) This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;

BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

h) It is understood and agreed that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids.

1-15

i) It is understood and agreed that the quantities of work to be done at unit prices and materials to be furnished may be increased or diminished as may be considered necessary in the opinion of the OWNER to complete the work fully as planned and contemplated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth, except as provided for in the Contract Documents.

4. It is understood and agreed that all work under this contract will be completed within the bid calendar days. Completion date will be established in the Notice to Proceed.

5. BIDDER will complete the Work for the following price(s):

1-16

PROPOSAL/UNIT PRICE BID SCHEDULE

PHASE 15A STREET RECONSTRUCTION

City of The Colony

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IA – Paving

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1 LS Construction Staking, work fully performed, complete in place per lump sum.

1 LS Barricades, Warning and Detour Signs, and Fences, designed and implemented for temporary traffic control during construction, work fully performed, complete in place per lump sum.

1 LS Joint Storm Water Pollution Prevention

Plan, implemented and maintained, including preparation of Notice of Intent and Notice of Termination, work fully performed, complete in place per lump sum.

4 EA Inlet Protection, furnish and install, work fully performed, complete in place per each.

3,268 SY Solid Sod, furnish and install including watering, topsoil and fertilizer, work fully performed, complete in place per square yard.

1 LS Mobilization and General Site

Preparation, work fully performed, complete in place per lump sum.

67,491 SF Sawcut and Remove Existing Concrete

Pavement and Flatwork, work fully performed, complete in place per square foot.

0 SF Street Repair for Utility Trench, work fully performed, complete in place per square foot.

2 EA Remove Existing Inlet (various sizes), work fully performed, complete in place per each.

8 EA Remove Existing Tree, only trees 12” and larger, work fully performed, complete in place per each.

173 LF Remove Retaining Wall, work fully performed, complete in place per linear foot.

1-17

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IA – Paving

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

800 CY Unclassified Street Excavation, work fully performed, complete in place per cubic yard.

190 CY Embankment, furnish and install, work fully performed, complete in place per cubic yard.

5,937 SY 6-inch Thick Type A, Grade 1 or 2 Flex

Base (Roadway), work fully performed;

complete in place per square yard.

5,553 SY 6-inch Thick, 4,000 psi Portland Cement

Reinforced Concrete Pavement, work fully performed, construct complete in place per square yard.

0 SY 6-inch Thick, 4,000 psi Portland Cement

Reinforced Concrete Driveway, work fully performed, construct complete in place per square yard.

416 SF 7-inch Thick, 4,000 psi Portland Cement

Reinforced Concrete Alley Approach and Alley Pavement, work fully performed, construct complete in place per square foot.

EA 4-Inch Thick, 4,000 psi Portland Cement

Concrete Barrier-Free Ramp (Modified

Type 5), work fully performed, construct complete in place per each.

Concrete Barrier-Free Ramp (Type 7), work fully performed, construct complete in place per each.

Type 7), work fully performed, construct complete in place per each.

19,469 SF 4-inch Thick, 4,000 psi Portland Cement

Concrete for Sidewalks, work fully performed, construct complete in place per square foot.

0 SF 5-inch Thick, 4,000 psi Portland Cement

Concrete for Trail, work fully performed, complete in place per square foot.

1-18

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IA – Paving

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

EA Sidewalk Steps Pedestrian Hand Rail, work fully performed, complete in place per each.

1 EA Street Overflow Flume at Sidewalk

Crossing, work fully performed, construct complete in place per each.

0 EA 10’ Curb Inlet, work fully performed, construct complete in place per each.

2 EA 15’ Curb Inlet, work fully performed, construct complete in place per each.

1 LS Remove and Reinstall Existing

Landscaping, work fully performed, complete in place per lump sum.

6 EA Remove and Reinstall Existing

Community Mailboxes, work fully performed, complete in place per each.

0 LS Remove, Salvage, and Reinstall Double

Swing Gate, work fully performed, complete in place per lump sum.

0 EA Remove, Salvage, and Reinstall Bollard, work fully performed, complete in place per each.

85 LF Remove and Replace Wood Privacy

Fence, work fully performed, complete in place per linear foot.

100 LF Tree Root Barrier, work fully performed, complete in place per linear foot.

0 LF Retaining Wall, work fully performed, complete in place per linear foot.

0 LF Decorative Retaining Wall, work fully performed, complete in place per linear foot.

1 LS Pavement Markings and Signage, work fully performed, complete in place per lump sum.

SUBTOTAL BID SUB-SECTION IA ITEMS 1 Thru 35 $ ______________

1-19

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IB – Water and Sanitary Sewer

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1,798 LF Trench Safety for Water Lines, furnish and install where required by OSHA

Standards that are in effect at the time of bidding, work fully performed, complete in place per linear foot.

5 EA Remove and Salvage Existing Water

Valve (various sizes), including

Excavation and Backfill, work fully performed, complete in place per each.

2 EA Remove and Salvage Existing Fire

Hydrant Assembly, including Excavation and Backfill, work fully performed, complete in place per each.

217 LF Remove Existing Water Lines (various sizes), including Excavation and Backfill, work fully performed, complete in place per linear foot.

1,590 LF Abandon Existing Water Lines (various sizes), including plugging, work fully performed, complete in place per linear foot.

0 LF 6-inch AWWA C900 PVC DR 18 (Class

150) Water Line (open cut), furnish and install, including Excavation, Embedment, Backfill, Fittings, Concrete Blocking &

Clean Up, work fully performed, complete in place per linear foot.

1,783 LF 8-inch AWWA C900 PVC DR 18 (Class

150) Water Line (open cut), furnish and install, including Excavation, Embedment, Backfill, Fittings, Concrete Blocking &

Clean Up, work fully performed, complete in place per linear foot.

15 LF 8-inch AWWA C900 PVC DR 18 (Class

150) Water Line (encased in 16’’ steel)

(open cut), furnish and install, including

Excavation, Fittings, Concrete Blocking &

Clean Up, work fully performed, complete in place per linear foot.

1-20

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IB – Water and Sanitary Sewer

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

4 EA 6-inch Gate Valve, including box and lid, furnish and install, work fully performed, complete in place per each.

9 EA 8-inch Gate Valve, including box and lid, furnish and install, work fully performed, complete in place per each.

0 EA Air Release Valve, including box and lid, furnish and install, work fully performed, complete in place per each.

0 EA Automatic Flush Valve Assembly, furnish and install, work fully performed, complete in place per each.

4 EA Fire Hydrant Assembly, including 6-inch lead line, 6-inch gate valve, and barrel extension, furnish and install, work fully performed, complete in place per each.

2 EA Connect to Existing 6-inch Water Line, work fully performed, complete in place per each.

2 EA Connect to Existing 8-inch Water Line, work fully performed, complete in place per each.

24 EA 1-inch Water Service Line (short service), Poly-SDR9, including saddle, corporation stop and fittings, furnish and install, work fully performed, complete in place per each.

27 EA 1-inch Water Service Line (long service) in 2-inch PVC Sleeve, Poly-SDR9, including saddle, corporation stop and fittings, furnish and install, work fully performed, complete in place per each.

51 EA Water Meter Box, furnish and install, work fully performed, complete in place per each.

1-21

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IB – Water and Sanitary Sewer

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1,206 LF Trench Safety for Sanitary Sewer Lines, furnish and install where required by

OSHA Standards that are in effect at the time of bidding, work fully performed, complete in place per linear foot.

1,212 LF Remove Existing Sanitary Sewer Lines

(various sizes), including Excavation and

Backfill, work fully performed, complete in place per linear foot.

3 EA Remove and Dispose Existing Sanitary

Sewer Manhole, including Excavation and

Backfill, work fully performed, complete in place per each.

1 EA Remove and Dispose Existing Sanitary

Sewer Main Cleanout, including

Excavation and Backfill, work fully performed, complete in place per each.

0 LF 6’’ PVC SDR 26 Sanitary Sewer (open cut), furnish and install, including

Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

122 LF 8’’ PVC SDR 26 Sanitary Sewer (open cut), furnish and install, including

Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

25 LF 8’’ PVC SDR 26 Sanitary Sewer

(encased in 16” steel) (open cut), furnish and install, including Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

1,039 LF 18’’ PVC SDR 35/PS46 Sanitary Sewer

(open cut), furnish and install, including

Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

1-22

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IB – Water and Sanitary Sewer

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

20 LF 18’’ PVC SDR 35/PS46 Sanitary Sewer

(encased in 30’’ steel) (open cut), furnish and install, including Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

1 EA 4-foot Diameter Standard Sanitary

Sewer Manhole (0 to 6-feet deep), including connection to all intersecting mains, furnish and install, work fully performed, complete in place per each.

5 EA 5-foot Diameter Standard Sanitary

Sewer Manhole (0 to 6-feet deep), including connection to all intersecting mains, furnish and install, work fully performed, complete in place per each.

20 VF Extra Depth for Standard Sanitary

Sewer Manhole (various sizes), furnish and install, work fully performed, complete in place per vertical foot.

645 LF 6-inch Sanitary Sewer Service Line with

4-inch wye (open cut), furnish and install, including Excavation, Embankment, and

Backfill and two 4-inch Cleanouts, work fully performed, complete in place per linear foot.

0 LF 4-inch Sanitary Sewer Service Line

(open cut), furnish and install, including

Excavation, Embankment, and Backfill, work fully performed, complete in place per linear foot.

0 EA Connect to Existing 6-inch Sanitary

Sewer, work fully performed, complete in place per each.

0 EA Connect to Existing 8-inch Sanitary

Sewer, work fully performed, complete in place per each.

1 EA Connect to Existing 18-inch Sanitary

Sewer, work fully performed, complete in place per each.

1-23

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IB – Water and Sanitary Sewer

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1 EA Connect to Existing Sanitary Sewer

Manhole, work fully performed, complete in place per each.

1,212 LF Pre-Construction Television Inspection, work fully performed, complete in place per linear foot.

1,206 LF Post-Construction Television Inspection, work fully performed, complete in place per linear foot.

SUBTOTAL BID SUB-SECTION IB ITEMS 1 Thru 38 $ ______________

1-24

SUBTOTAL BID SUB-SECTION IC ITEMS 1 Thru 4 $ ______________

TOTAL BASE BID (SUB-SECTIONS IA, IB, AND IC) $ _____________

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section I – Chapman Street

Sub-Section IC – Street Lights

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1 5 EA Remove Existing Street Light

Foundation, work fully performed, complete in place per each.

2 6 EA Street Light Foundation, furnish and install, work fully performed, complete in place per each.

3 567 LF 2-inch PVC Schedule 40 Conduit for

Street Lights (open cut), furnish and install, including Pull Rope, Excavation, Embedment and Backfill, work fully performed, complete in place per linear foot.

4 5 EA Electric Hand Hole, furnish and install, work fully performed, complete in place

1-25

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section II – Independence Drive

Sub-Section IIA – Paving

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

1 LS Construction Staking, work fully performed, complete in place per lump sum.

1 LS Barricades, Warning and Detour Signs, and Fences, designed and implemented for temporary traffic control during construction, work fully performed, complete in place per lump sum.

1 LS Joint Storm Water Pollution Prevention

Plan, implemented and maintained, including preparation of Notice of Intent and Notice of Termination, work fully performed, complete in place per lump sum.

0 EA Inlet Protection, furnish and install, work fully performed, complete in place per each.

2,544 SY Solid Sod, furnish and install including watering, topsoil and fertilizer, work fully performed, complete in place per square yard.

1 LS Mobilization and General Site

Preparation, work fully performed, complete in place per lump sum.

83,142 SF Sawcut and Remove Existing Concrete

Pavement and Flatwork, work fully performed, complete in place per square foot.

230 SF Street Repair for Utility Trench, work fully performed, complete in place per square foot.

0 EA Remove Existing Inlet (various sizes), work fully performed, complete in place per each.

5 EA Remove Existing Tree, only trees 12” and larger, work fully performed, complete in

1-26

BID #69-27-01-PHASE 15A STREET RECONSTRUCTION

Section II – Independence Drive

Sub-Section IIA – Paving

Item

No.

Quantity Unit Description and Price in Words Unit

Price

Total

Price

60 LF Remove Retaining Wall, work fully performed, complete in place per linear foot.

400 CY Unclassified Street Excavation, work fully performed, complete in place per cubic yard.

380 CY Embankment, furnish and install, work fully performed, complete in place per cubic yard.

7,218 SY 6-inch Thick Type A, Grade 1 or 2 Flex

Base (Roadway), work fully performed;

complete in place per square yard.

6,936 SY 6-inch Thick, 4,000 psi Portland Cement

Reinforced Concrete Pavement,…