Seattle District

RFP No. W912DW22R0003

Construct Consolidated Total Force Integration (TFI) Flight Base Operations

Facility at Fairchild Air Force Base, Spokane, WA, Design-Build Construction Solicitation Phase 1 of 2

This is an Unrestricted Procurement

November 2021

This page intentionally left blank.

TABLE OF CONTENTS – PHASE 1

REQUEST FOR PROPOSAL W912DW21R0031

Construct Consolidated (TFI) Flight Base Operations Facility

Fairchild AFB, Spokane, WA

DIVISION 00 - PROPOSAL REQUIREMENTS, CONTRACT FORMS AND CONDITIONS

Sections

00 11 00

00 20 00

00 21 00

00 22 10

SF 1442

Caution to Offerors

Instructions, Conditions and Notices to Offerors

Phase 1of 2 Phase Design-Build Selection Procedure & Attachments

00 22 20 Phase 2 of 2 Phase Design-Build Selection Procedures and Basis of Award For planning purposes; to be added by amendment

00 45 00

00 72 00

00 73 00

Representations and Certifications

Contract Clauses For planning purposes; subject to change by amendment

Special Contract Requirements Wage Determinations For planning purposes; subject to additions in Phase 2

DIVISION 01 - GENERAL REQUIREMENTS - (For planning purposes; to be added in Phase 2)

Appendices: To be added in Phase 2

RETURN THE FOLLOWING WITH YOUR PHASE ONE (1) PROPOSAL:

• SF 1442

• Phase 1 Technical Proposal - including Proposal Data Sheet and all other submission requirements identified in Section 00 22 10 Phase 1 of 2 Phase Design-Build Selection Procedures

• Corporate Certificate

End of Table of Contents

Construct Consolidated Total Force Integration (TFI) Base Operations Facility, Fairchild Air Force Base, Spokane, WA

This is a Full and Open Competition (Unrestricted) Tw o-Phase Procurement.

Funds are not currently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available from w hich payment for contract purposes can be made.

CCL for this project is $36,300,000.00

The 1442 correctly reflects the offer guarantee is required. It is NOT Required for Phase 1 but, it IS required for Phase 2.

DEBBIE A KNICKERBOCKER 206-764-6804

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Nov-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________522 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

206-764-6817FAX:TEL: TEL: FAX:

W912DW22R0003 43

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912DW22R0003

00 20 00

!!! CAUTION TO OFFERORS !!!

1. BUSINESS HOURS: For the Seattle District Corps of Engineers are from 7:30 A.M. to 4:00 P.M., Monday through Friday.

2. AVAILABILITY OF FUNDS: Funds are not currently available for this acquisition. No contract award will be made until appropriated funds are made available from which payment for contract purposes can be made.

BEFORE SIGNING AND SUBMITTING YOUR OFFER,PLEASE TAKE NOTE OF

THE FOLLOWING, AS FAILURE TO PERFORM ANY ONE OF THESE ACTIONS

MAY CAUSE YOUR OFFER TO BE REJECTED

3. AMENDMENTS: Have you acknowledged receipt of ALL amendments? Contractors are required to review the solicitation and its amendments on beta.SAM.gov. If in doubt as to the number of amendments issued, please contact the representative listed on the Information Page.

4. AMENDED SECTIONS: If any of the amendments furnished amended sections, then the amended sections must be used in submitting your offer.

5. SYSTEM FOR AWARD MANAGEMENT: Contractors are required, before receipt of contract award, to ensure that their firm is registered in the government web site entitled System for Award Management (SAM) and that all information required is current and up to date.

Refer to: https//:www.beta.SAM.gov

6. FAR 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011): Whenever practicable, when not using electronic commerce methods to submit information or data to the Government, please submit paper documents, such as offers, letters, or reports, which are printed or copied double-sided on paper containing at least 30 percent postconsumer fiber.

7. ATTENTION: Due to COVID security restrictions, Refer to Section 00 21 00, Paragraph 1.10 for Proposal Submittal information.

CORPORATE CERTIFICATE

IF THE CONTRACTOR IS A CORPORATION OR PARTNERSHIP, THE APPLICABLE PORTION OF

THE FORM LISTED BELOW MUST BE COMPLETED. IN THE ALTERNATIVE, OTHER EVIDENCE

MUST BE SUBMITTED TO SUBSTANTIATE THE AUTHORITY OF THE PERSON SIGNING THE

CONTRACT. IF A CORPORATION, THE SAME OFFICER SHALL NOT EXECUTE BOTH THE

CONTRACT AND THE CERTIFICATE.

CORPORATE CERTIFICATE

I,____________________________________ , certify that I am the______________________ Secretary of the Corporation named as Contractor herein; that __________________________, who signed this contract on behalf of the Contractor was then of said corporation; that said contract was duly signed for and on behalf of said corporation by authority of its governing body and is within the scope of its corporate powers.

___________________________________ (CORPORATE)

(Secretary) SEAL

AUTHORITY TO BIND PARTNERSHIP

This is to certify that the names and signatures of all partners are listed below and that the person signing the contract has authority actually to bind the partnership pursuant to its partnership agreements.

Each of the partners individually has full authority to enter into and execute contractual instruments on behalf of said partnership with the United States of America, except as follows: (state "none" or describe limitations, if any).

This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.

(Names and Signatures of all Partners)

NAME SIGNATURE

SECTION 00 21 00

INSTRUCTIONS, CONDITIONS AND NOTICES TO

OFFERORS

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 CONTRACT COST CEILING LIMITATION FOR DESIGN AND CONSTRUCTION

COSTS

1.3 GOVERNMENT SECURITY REQUIREMENTS

1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.5 OFFEROR'S QUESTIONS AND COMMENTS

1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.7 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.8 PRE-PROPOSAL CONFERENCE

1.9 ACCURACY IN PROPOSALS

1.10 PROPOSAL SUBMITTALS

1.11 PROPOSAL FORMAT

1.12 JOINT VENTURE PROPOSAL REQUIREMENTS

1.13 SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING THE

UTILIZATION OF SMALL BUSINESS CONCERNS

1.14 SOLICITATION INSTRUCTIONS - PROVISIONS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

The U.S. Army Corps of Engineers (USACE), Seattle District (NWS) intends to procure services for design and construction services for a Consolidated Total Force Integration (TFI) Flight Base Operations Facility not to exceed 5,784 SM. This permanent facility will consolidate the functional elements of an active duty (AD) Operations Group, Operations Squadron (with its integral Base Operations Element), Aircraft Flight Equipment (AFE), and an Air National Guard (ANG) Air Refueling Squadron Operations Group, Operations Support Flight, Sensitive Compartmented Information Facility (SCIF), Joint Worldwide Intelligent Communications System (JWICS), weather equipment infrastructure, and a Flight Kitchen in support of an additional 12 Primary Aircraft Authorization (PAA) and the associated new squadron while maximizing Total Force Integration (TFI) efficiencies. The facility will include reinforced concrete foundation, concrete floor slab, structural steel frame, standing seam metal roof and exterior. Project will include fire suppression and alarm systems, all utilities and building systems, pavements, communications, site improvements, and associated support facilities to provide a complete and usable facility. Building systems include but are not limited to HVAC, plumbing, mechanical, fire protection, electrical, and communication systems. Support facilities include but are not limited to land clearing, paving, fencing, general site improvements, utility connections, site lighting, parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, access roads/paving, and signage.

Project shall provide new parking (3,948 SM), demolish building B1 (2,026 SM) and parking lot (3,138 SM), and provide integrated access to flight line as part of this facilities' site work. Anti- Terrorism/Force Protection (AT/FP) and physical measures for the design will include minimum standoff distances from roads, parking areas and vehicle unloading areas. Department of Defense principles for high performance energy and sustainable building measures are required in the design and construction of the project in accordance with federal laws and Executive Orders. The building will require third party certification of High Performance and Sustainable Building Guiding Principles Compliance (HPSBGPC) using either US Green Building Council (USGBC) or Green Building Initiative (GBI).

1.2. CONTRACT COST CEILING LIMITATION FOR DESIGN AND

CONSTRUCTION COSTS

The design and construction costs will be subject to the funds available for this project. The ceiling limitation to design and construct this project is at $36,300,000.00, in which the project may not be awarded over that amount. Offerors are notified that they are under no obligation to approach this ceiling. However, the Government may not be able to make an award if the dollar amount set for this project is exceeded.

1.3. GOVERNMENT SECURITY REQUIREMENTS

Solicitation responses will ONLY be received electronically. Please refer to Paragraph

1.10 for Submittal information.

Be advised regarding any Site Visit during Phase 2 Solicitation: Effective August 25, 2021, Federal employees, contractors, and visitors who enter a Federal facility or site must follow facility signage and requirements, and agency safety protocols, regarding vaccination and testing documentation. Contractors and visitors attempting to gain entry at GSA owned or leased facilities secured by Federal Protective Service (FPS) must complete the Certification of Vaccination form available at https://www.saferfederalworkforce.gov/downloads/CertificationVaccinationPRAv7.pdf and show the form upon entry. Contractors and visitors who are not fully vaccinated or who decline to disclose their vaccination status must also be prepared to show proof of a negative COVID-19 test from within the previous three days, in accordance with Safer Federal Workforce Task Force requirements and agency requirements, as applicable.

1.4. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities website at:

www.beta.SAM.gov under RFP number W912DW22R0003.

It shall be the Contractor' s responsibility to check the websites for any amendments.

The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

A list of interested vendors (potential offerors and subcontractors) is available on the federal business opportunities web site (registration required) with the solicitation announcement.

1.5. OFFEROR'S QUESTIONS AND COMMENTS

1.5.1. Administrative questions and/or comments relative to these documents should be submitted via e-mail:

Contract Specialist U.S. Army Corps of Engineers, Seattle District ATTN: Debbie Knickerbocker Phone: 206-764-6804 Email: Debbie.a.knickerbocker@usace.army.mil

Contracting Officer U.S. Army Corps of Engineers, Seattle District ATTN: Susan Newby Phone: 206-764-6754 Email: Susan.f.newby@usace.army.mil https://www.saferfederalworkforce.gov/downloads/CertificationVaccinationPRAv7.pdf http://www.beta.sam.gov/ mailto:Debbie.a.knickerbocker@usace.army.mil mailto:Susan.f.newby@usace.army.mil

Note: All questions and/or comments should reach the above referenced Contracting Office no later than three (3) business days before proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.

1.5.2. Bidder Inquiry

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W912DW22R0003

The Bidder Inquiry Key is: WY626W-9KDJC8

The Bidder Inquiry System will be unavailable for new inquiries three (3) business days prior to proposal due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago).

The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

1.6. SMALL BUSINESS SIZE STANDARD/NAICS CODE

See Section 00 45 00, FAR 52.219-1 for the small business size standard/NAICS Code.

1.7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.8. PRE-PROPOSAL CONFERENCE

The Government intends to hold a pre-proposal conference during Phase 2 (two) at the http://www.projnet.org/projnet project site.

1.9. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.10. PROPOSAL SUBMITTALS

In strict compliance with guidance relating to the current situation with COVID-19 and social distancing, the ONLY authorized transmission method for proposals in response to this solicitation is electronically via SAFE online submission. NO OTHER

TRANSMISSION METHODS (E-MAIL, FACSIMILE, REGULAR MAIL, HAND

CARRIED, ETC.) WILL BE ACCEPTED.

The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Please allow time for possible system issues. Offerors shall electronically transmit their proposals using the following link:

https://safe.apps.mil/

Please send proposals using the link above to Contract Specialist Debbie Knickerbocker at debbie.a.knickerbocker@usace.army.mil AND to Contracting Officer Susan Newby at Susan.F.Newby@usace.army.mil.

1.10.1 Instructions for Submitting Electronic Proposals

In an effort to reduce paperwork and cost, all proposals shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. Submit no more than five (5) PDF files. Total file size cannot exceed 8GB. Files may be compressed and/or combined into ZIP files using compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

1.10.2 Request for Upload Code

Email Contract Specialist Debbie Knickerbocker at debbie.a.knickerbocker@usace.army.mil AND Contracting Officer Susan Newby at Susan.F.Newby@usace.army.mil no later than five (5) working days prior to the proposal due date to receive a request code. Please allow time for any possible system issues.

Include “W912DW22R0003 SAFE Proposal Drop-Off Request …” in the subject. Include the name and email address of the sender, and the name of the offeror in the body of the email.

The request code will allow a one-time file upload via the SAFE site. Offerors that fail to email for request a code five (5) working days before proposal submission date may not be able to receive a request code in time to upload their submission.

You will receive an email from NoReplyTo@mail.mil with the subject line similar to "[DoD SAFE] W912DW21RTEST Proposal Drop-off Invite". The body of the email will contain a hyperlink, with the drop-off key embedded, for your use in uploading your proposal. The body of the email may also contain additional instructions from the Contracting Specialist in a note beneath the hyperlink. The drop-off key will be valid for 10 calendar days.

1.10.3 Instructions for Upload of Proposal

Follow the hyperlink in the email. This will take you to the DoD SAFE drop off page. The page will be pre-populated with the Name and email you provided, the name and email of the recipient, and the note with additional instructions from the Contracting Specialist.

Add Contract Specialist Debbie Knickerbocker at debbie.a.knickerbocker@usace.army.mil and Contracting Officer Susan Newby at Susan.F.Newby@usace.army.mil as recipients.

The Proposer must enter the e-mail address for both the Contracting Officer and Specialist.

The Proposer can enter an additional e-mail address if desired. After entering the e-mail address, click the ADD button to add the person(s) e-mail to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group e-mail accounts.

Accept the default checkbox settings. Add the files that contain your offer. Files for upload will be listed beneath the “Click to Add Files or Drag Them Here” button. Enter a description for each file. Ensure your proposal is complete and all files are listed; this is a one-time drop-off key. Click on “Drop-off Files” when all files are listed.

When the upload is complete, DoD SAFE will present a screen listing the files uploaded and transmit an email to the recipient(s) to inform them that your proposal has been uploaded.

1.10.4 Receipt of Submissions

The Government will consider proposal submission timely if it is completely uploaded into the SAFE website and the acknowledgement email sent by the date and time proposals are due. It is the Offeror’s responsibility to allow sufficient time for upload. It can take several minutes or even hours in some cases.

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided. It is the responsibility of the firm to confirm the Government’s mailto:Susan.F.Newby@usace.army.mil receipt of the proposal prior to the due date.

See Box 13 of the Standard Form 1442 for the time and date your proposal is due.

I.11. PROPOSAL FORMAT

File format. Proposals shall be submitted in PDF format, suitable for reading using Adobe Acrobat in a Windows 10 operating system. PDF files may be combined and compressed using compression utility software such as WinZip or PKZip.

File Organization. Volumes I and II shall be submitted in different files. Each Volume shall be organized as specified below. PDFs shall be indexed and bookmarked to facilitate navigation.

File Names shall clearly state the RFP Number, Volume Number and Offeror Name. If applicable, file names may include the Tab, Example Project Number, and similar relevant information.

Formatting. Pagination shall be in 8 ½” x 11” format, using at least ½” margins and 10 point or larger font size.

The prime or joint venture’s name, address, a signature of the official that can bind the firm and a telephone number shall appear in the lower left corner of the title page of any document/volume to be evaluated.

Volume number, section and date submitted shall appear in the bottom right corner of each page (along with the revision number for the amended page, if necessary).

1.12. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond (in Phase 2) unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.13. SUBCONTRACTING PLAN/ SUBCONTRACTING GOALS REGARDING

THE UTILIZATION OF SMALL BUSINESS CONCERNS

(a) Application. This clause applies to Offerors, considered Large Business, submitting proposals under NAICS Code 236220.

(b) Federal Acquisition Regulations (FAR) and Department of Defense Federal Acquisition Regulations (DFARs). Attention is directed to the following FAR and DFARS clauses contained in section 00 72 00 of this solicitation:

52.219-8, Utilization of Small Business Concerns

52.219-9, Small Business Subcontracting Plan (Alternate II) (applies only to Large Business)

52.219-16, Liquidated Damages- Small Business Subcontracting Plan (applies only to Large Business)

252.226-7001, Utilization of lndian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns

(c) Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

Large business Prime Offerors may achieve the small business participations goals through subcontracting to small businesses.

Small business Prime Offerors may achieve small business participation goals through their own performance/participation as a Prime and also through subcontracting to other small businesses.

The District has provided the following draft Seattle District Small Business goals as a reference to model the offeror's targeted objectives. Once submitted in the proposal, the Plan is a commitment.

The proposal must identify the extent to which Small Businesses (SBs), Small Disadvantaged Businesses (SDBs), Woman-Owned SBs (WOSB), Historically Underutilized Business Zone (HUBZone) SBs, Veteran Owned SBs (VOSBs), and/or Service-Disabled Veteran Owned SBs (SDVOSBs) would be utilized in the performance of this contract opportunity (as small business Prime Offerors and/or small business Subcontractors).

Seattle District Goals:

Small Business 41% Small Disadvantaged Business 14% Woman Owned Small Business 7% HUBZone Small Business 2.5% Veteran Owned Small Business 2.5% Service-Disabled Veteran-Owned Small Business 4%

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-1 Alt I Instructions to Offerors--Competitive Acquisition (Jan 2017) -

Alternate I

OCT 1997

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

252.236-7006 Cost Limitation JAN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

PLEASE NOTE: Bid guarantee is only required for Phase 2.

52.228-11 INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021) (DEVIATION 2020-O0016)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee, a performance bond, or a payment bond –

(1) Pledge of assets; and

(2) Standard Form 28, Affidavit of Individual Surety, except that the words “being duly sworn, depose and say” on the Standard Form 28 are replaced with the word “affirm” and the Standard Form 28 is not required to be sworn and notarized in block 12.

(b) Pledges of assets from each person acting as an individual surety shall be in the form of—

(1) Evidence of an escrow account containing cash, certificates of deposit, commercial or Government securities, or other assets described in FAR 28.203-2 (except see 28.203-2(b)(2) with respect to Government securities held in book entry form); and/or

(2) A recorded lien on real estate. The offeror will be required to provide—

(i) A mortgagee title insurance policy, in an insurance amount equal to the amount of the lien, or other evidence of title that is consistent with the requirements of Section 2 of the United States Department of Justice Title Standards at https://www.justice.gov/enrd/page/file/922431/download. This title evidence must show fee simple title vested in the surety along with any concurrent owners; whether any real estate taxes are due and payable; and any recorded encumbrances against the property, including the lien filed in favor of the Government as required by FAR 28.203- 3(d);

(ii) Evidence of the amount due under any encumbrance shown in the evidence of title;

(iii) A copy of the current real estate tax assessment of the property or a current appraisal dated no earlier than 6 months prior to the date of the bond, prepared by a professional appraiser who certifies that the appraisal has been conducted in accordance with the generally accepted appraisal standards as reflected in the Uniform Standards of Professional Appraisal Practice, as promulgated by the Appraisal Foundation.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, Seattle District ATTN: Roger D. Williams, Chief of Contracting 4735 East Marginal Way South, Bldg 1202 Seattle, WA 98134-2388

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- To be determined at Phase Two (2) of the Solicitation

(c) Participants will meet at-- To be determined at Phase Two (2) of the Solicitation

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov http://www.acg.osd.mil/dpap/dars/

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

It is the advantage of the offeror to to read the entire solicitation.

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media: electronic mail (see instructions in submitting price proposals for Phase 2).

SECTION 00 22 10 - PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURE

AND ATTACHMENTS

1.0 OVERVIEW

2.0 GENERAL INSTRUCTIONS

3.0 PHASE 1 – TAB A / STANDARD FORM 1442 AND PROPOSAL DATA SHEET

4.0 PHASE 1 - PROPOSAL AND RELATED EVALUATION FACTORS

5.0 TAB B - FACTOR 1 - SPECIALIZED EXPERIENCE

5.1 SUBMISSION REQUIREMENTS

5.2 EVALUATION CRITERIA

6.0 TAB C – FACTOR 2 – PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS

6.2 EVALUATION CRITERIA

7.0 PHASE 1 OVERALL RATING

7.1 PHASE 1 EVALUATION PROCEDURES

7.2 SOURCE SELECTION EVALUATION BOARD (SSEB)

7.3 EVALUATION

PHASE ONE - SECTION 00 22 10 PHASE ONE ATTACHMENTS

1. PROPOSAL DATA SHEETS

2. SPECIALIZED CONSTRUCTION EXPERIENCE

3. SPECIALIZED DESIGN EXPERIENCE

4. SUBCONTRACTOR LETTER OF COMMITMENT (if applicable)

5. PAST PERFORMANCE CUSTOMER SATISFACTION SURVEY

1.0 OVERVIEW

1.1. This solicitation is for the design and construction of a facility and associated features located at Fairchild AFB, Spokane, WA The facility must meet Department of Defense (DOD) criteria, Executive Orders and other applicable laws, regulations, and industry standards. In Phase 1 of the 2-phase design-build selection procedure, interested firms or joint venture entities (referred to as "Offerors") submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will short-list up to five (5) (unless the Contracting Officer determines that a larger competitive range is in the best interest of the government) of the Phase 1 Offerors to compete for the design-build contract in Phase 2.

1.2. Phase 2 shall be issued via Amendment. In Phase 2, the successful Offerors will submit proposals including pricing information in accordance with specified instructions. Unless the Contracting Officer decides discussion are necessary, it is the intent of the Government to make an award based on initial offers, so initial proposals should contain the Offeror's best terms.

1.3. ORDER OF PRECEDENCE - Design/Build Contract

• The contract includes the standard contract clauses and schedules current at the time of contract award. It entails (1) the solicitation in its entirety, including all drawings, cuts, and illustrations and any amendments, and (2) the successful offeror's accepted proposal. The contract constitutes and defines the entire agreement between the Contractor and the Government. No documentation shall be omitted which in any way bears upon the terms of that agreement.

• b. In the event of conflict or inconsistency between any of the provisions of this contract, including the Request for Proposal, Contractor's proposal, or contract deliverable, precedence shall be given in the following order:

1. Betterments: Any portions of the accepted proposal, or any subsequent design or other submittal, which both conform to and exceed the provisions of the Request for Proposal.

"Betterment" is defined as any product, component, or system, which exceeds the minimum requirements stated in the Request for Proposal.

2. The provisions of the solicitation, including drawings and attachments.

3. All other provisions of the accepted proposal including RFP Standard Form SF 1442 and

Schedule.

4. Any design products including, but not limited to, plans, specifications, engineering studies and analyses, shop drawings, equipment installation drawings, etc. These are "deliverables" under the contract and must conform to or exceed all provisions of the contract, in order of precedence herein.

2.0 GENERAL INSTRUCTIONS

Firms formally organized as design-build entities, design firms and construction contractors that have associated specifically for this project, consortia of firms or any other interested parties may submit proposals. Associations may be as joint ventures or comprised of key team subcontractors. To qualify for Phase 2, the Offeror must have professional architects and engineers, registered in the appropriate technical disciplines, and the requirements specified in Contract Clause 52.236-25, "Requirements for Registration of Designers", must be met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.

Submit the Phase 1 proposal electronically. PHASE 1 DOES NOT INVOLVE PRICING SUBMISSION.

3.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET

Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section).

4.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS

TABS B and C are described as follows:

Note: PHASE 2 Evaluation Factors will be provided via amendment.

5.0 TAB B- FACTOR 1 - SPECIALIZED EXPERIENCE

5.1 SUBMISSION REQUIREMENTS

The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) must each demonstrate recent, relevant experience on similar projects, using Construction – Specialized Experience form (Attachment 2), and Designer – Specialized Experience Form (Attachment 3) at the end of the section. Offerors may rely on contracts performed for state, local, or corporate and private entities if the cited projects are similar in scope, magnitude, and complexity as those described in 5.1.1.2. Offerors may submit relevant projects in which the participating firms were a part of a joint venture. Offerors submitting as a joint venture may submit relevant past joint venture projects as well as relevant projects from each of the joint venture firms. Offerors may submit projects from key subcontractors reflecting relevant design or construction experience performed by that key subcontractor. However, each included firm (i.e.

subcontracor, sister-company etc.) must submit a signed Letter of Commitment. Each firm shall provide information that demonstrates the experience relevant to its role on this project. Submit projects that are 100% constructed and turned over no longer than six (6) years preceding the date that proposals are due.

Offeror will note the date of completion in proposal materials. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Design firms may list prime contractors they have worked with for government, private or commercial customers. The offeror shall select the design firm(s) and indicate its selected Designer of Record in the proposal. If projects were design-build, identify them as such. With exception of the discussion of teaming experience and LEED/Third Party sustainability experience specified in paragraph 5.1.2, the offeror shall submit no more than six projects to demonstrate capability.

5.1.1. Submit project matrix, corresponding to the submitted projects with up to six (6) project matrix examples, to demonstrate relevant construction and design experience. "Relevant" is defined as projects similar to the project in this solicitation in scope, magnitude, and complexity and have a logical connection to the requirements of this RFP.

5.1.2. The Government will consider extent of recent experience, degree of relationship of such experience to this project and demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy (see definition of relevancy in paragraph 5.1.1.) to this project include, but are not limited to the Number, size, type of work, complexity, location, and the firm's role and extent of work self-performed (breaking out all work and simply "pouring the sidewalks" on a cited project are examples of less relevant experience).

5.1.3. Three (3) types of experience areas that are considered relevant include: 1) Construction of

Location Factor Number Description Relative Importance

Tab B Factor 1 Specialized Experience 1st (Most Important Factor)

Tab C Factor 2 Past Performance 2nd (Slightly less important than Factor 1) similarly- sized facility by contract value of $30 million or greater; 2) Construction of facilities with similar features and functions; and 3) Military Construction (MILCON). Projects must include at least one of the three experience criteria to be considered relevant. Proposals must demonstrate, at a minimum, all three relevant experience areas through submitted projects. Additional consideration will be given to projects that can demonstrate all three relevant experience areas or additional relevant experience beyond the minimum requirement. Only relevant projects 100% completed and turned over within the past six (6) years from the date proposals are due shall be submitted.

PROJECT EXPERIENCE MATRIX

PROJECT TITLE

IN

D

IC

A

TE

E

XP

ER

IE

N

C E

IS

C O

N

ST

R U

C

TI

O N

, D

ES

IG

N

, O R

B

TH

SI

M

IL

A

R

LY

-S

IZ

ED

F

A C

IL

IT

IE

S

B Y

C O

N

TR

A C

T

VA

LU

E

EQ

U

IV

A

LE

N

T

TY

PE

S

O F

FA

C

IL

IT

IE

S

M

IL

IT

A

R Y

C O

N

ST

R U

C

TI

N

(M

IL

C

O N

PROJECT A

PROJECT B

Etc …

5.1.1.1. For Construction Experience: In addition to the requirements in 5.1.1., above, the offeror must submit only those projects for which the offeror or Key Subcontractor was the Prime Contractor or Key Subcontractor performing the construction portion of the contract. Offerors should explain how the information provided is relevant to the proposed acquisition, and the projects selected should clearly demonstrate the construction capabilities of the offeror. In addition, the offeror must clearly identify to which, if any, of the three (3) especially relevant experience area(s) each project example pertains (e.g., Project A may qualify and be listed for construction of similarly-sized facility by contract value and military construction, while Project B may qualify and be listed only for construction of similarly sized facility by contract value, etc.).

5.1.1.2. For Design Experience: In addition to the requirements in 5.1.1., above, the offeror must submit only those projects for which the Designer was the Designer of Record. Offerors must explain how the information provided is relevant to the proposed acquisition, and the projects selected should clearly demonstrate the design capabilities of the offeror. In addition, the offeror must clearly identify to which, if any, of the three (3) especially relevant experience area(s) each project example pertains (e.g., Project A may qualify and be listed for Design of similarly-sized facility by contract value and Military Construction (MILCON), while Project B may qualify and be listed only for Design of similarly sized facility by contract value, etc.).

5.1.1.3. Teaming, LEED, & Design-Build Experience: The offeror must describe any previous teaming experience within the proposed organization, if not described in the project list. Describe team members' experience on LEED projects and/or projects with Third Party Sustainable certification, if not included on the project list. Offeror may describe design-build experience on other type projects. The above information is limited to projects that are 100% constructed and turned over within the past six (6) years preceding the date proposals are due.

5.1.1.4. Definitions for Factor 1

1. Scope means containing many of the elements of work and of physical size of a vertical construction two-story building with corporate, administrative, or headquarters functions, consisting of a minimum of 40,000 square feet.

1. Complexity means new construction with varied elements of work or sequencing of the work required for a two-story corporate facility/administrative/headquarters facility and any construction of a Sensitive Compartmented Information Facility (SCIF).

2. Similar means not necessarily identical but showing a resemblance in qualities or characteristics of the proposed project, such as, for example, a two-story corporate facility/administrative/headquarters facility and any construction of a SCIF.

3. Recent means completion within six (6) years preceding the proposal due date stated in the Solicitation.

4. Magnitude means a total project contract value close to $30,000,000.00.

5. Prime Contractor is defined as the firm that signs on the Standard Form (SF) 1442.

5.2 EVALUATION CRITERIA

5.2.1. The Government will evaluate the extent that proposals demonstrate recent and relevant experience of the prime contractor and designer of record in design, construction, or design-build in accordance with their role on this project. If the design will be accomplished in- house, rather than by subcontract, then the design element of specialized experience will still be evaluated. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. Military Construction (MILCON) project experience will be rated more favorably than project experience not within military installations.

5.2.2. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), including CPARS, reviewing other DOD or Government appraisal systems, or interviewing owners or references. The Government may check any or all cited references to verify supplied information.

5.2.3. To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive additional credit for Specialized Experience for the relevant experience of key personnel proposed for this project.

5.2.4. The Government may give additional consideration to previous design-build experience, even if the experience is on different type projects. Similarly, the Government may give additional consideration to recent teaming experience among the team members, even if on different type design and/or construction projects than this project. Most consideration will be given to most relevant experience.

5.2.5. Additional consideration may be given if either the constructor or the design firm(s) demonstrate experience in sustainable design.

6.0 TAB C- FACTOR 2 - PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS

6.1.1. In accordance with FAR 42.1503, past performance will be evaluated using the Past Performance Information Retrieval System (PPIRS) for the prime contractor and its Designer of Record firm. If any firm has multiple functions or divisions, limit the DUNS number to the division or unit submitting the offer and divisions providing substantial support to the design-build team. The Government reserves the right to verify the past performance record of other team members besides the prime contractor, and DOR and may evaluate their PPIRS - If no relevant past performance history is available for your DUNS number, you may choose to utilize the attached Customer Satisfaction Survey/ Past Performance Questionnaire (PPQ) (Attachment 4) which will be used for evaluation.