About this file

This document is a comprehensive set of engineering and design plans for the Avondale Water and Sanitation District's Upgrades to Potable Water Treatment Plant (Phase 1) located in Avondale, Colorado. The project involves a significant upgrade and renovation of the existing water treatment facility, including replacing yard piping, demolishing and removing existing exterior and interior piping and filters, and installing a new filter system. The project is scheduled for bid receipt on Friday, June 13, 2025, at 2 pm local time, with a mandatory pre-bid conference on May 28, 2025, at 1 pm at the district's facility. The expected project duration is 90 days, and bidding documents are available through the designated website https://www.bidnetdirect.com/colorado/avondalewater-co.

The project involves multiple water treatment buildings (WTP Bldg. #1, #2, and #3), with detailed plans for site modifications, piping configurations, filter replacements, and infrastructure improvements. The engineering plans include extensive technical specifications for trench details, anchor bolt installations, concrete thrust block configurations, and tracer wire installations. Bidders are required to attend the mandatory pre-bid conference to be eligible to submit a bid, and all official notifications and addenda will be published exclusively on the designated bidding website. The project is being managed by Jesik Consulting, located in Pueblo, Colorado, with contact information provided for potential bidders seeking additional information.

View the file

Other files

File Type Posted
phase 1 bid add.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

CS-1

LEGEND

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

C O

V E

R S

H E

E T

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

PLAN SHEET INDEX:

Sheet P-1: Exisitng Site Plan

Sheet P-3: Demolition (Plan & Cross Section)

Sheet N-1: Notes Sheet P-2: Demolition Plan (Site)

Sheet P-6: Proposed Raw Water Piping

Sheet L-1: Label Description

Sheet P-5: Proposed Site Plan

Sheet P-7: Proposed Filter & Piping Sheet P-8: Proposed Exterior Piping Sheet CS-1: Cross Sections- 1 Sheet CS-2: Cross Sections- 2 Sheet CS-3: Cross Sections- 3 Sheet D-1: Details- 1 Sheet D-2: Details- 2

Sheet P-4: Deep Well Piping

WTP BLDG. #1

WTP BLDG. #2

WTP BLDG. #3

(Not in Service)

A P

R

S

T U

F.F.=4,536.17'

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

E X

IS

T

IN

G

S

IT

E P

LA

N

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL WORK IS

PERFORMED IN ACCORDANCE WITH THE APPLICABLE STANDARDS AND

REGULATIONS SET FORTH BY THE OCCUPATIONAL HEALTH ND ADMINISTRATION

(O.S.H.A).

NO FIELD CHANGES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF

THE ENGINEER.

SUBMITTALS SHALL BE MADE FOR ALL MATERIALS TO BE INCORPORATED INTO

THIS PROJECT.

UTILITY LINES ARE SHOWN BASED ON THE BEST AVAILABLE INFORMATION AT

THE TIME OF DESIGN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

VERIFICATION AND PROTECTION OF ALL UTILITIES IN PLACE.

THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF

COLORADO AT 1-800-922-1987 THREE BUSINESS DAYS IN ADVANCE OF

EXCAVATION OR DIRT WORK. FOR A LIST OF SPECIFIC CONTACTS SEE

SPECIFICATIONS.

THE CONTRACTOR SHALL PROTECT AND MAINTAIN ALL UTILITIES AND

STRUCTURES AFFECTED BY THE WORK AND ANY DAMAGE SHALL BE REPAIRED

AND RESTORED TO THE SATISFACTION OF THE ENGINEER. THE CONTRACTOR IS

RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL UTILITIES DURING

CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE ALL UTILITY

RELOCATIONS AS NECESSARY.

THE CONTRACTOR SHALL NOTIFY ANY PRIVATE UTILITIES IN THE WORK AREA.

TEMPORARY COVER SHALL BE AT LEAST 18 INCHES OVER ANY GAS LINES.

FINISH GRADE SHALL BE AT LEAST 2 FEET AND NO MORE THAN 6 FEET OVER

THE GAS CONDUIT.

THE CONTRACTOR SHALL OBTAIN ANY UTILITY PERMITS AND APPROVED

TRAFFIC CONTROL PLANS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

THE PHYSICAL FEATURES WITHIN THE LIMITS OF THE PROJECT HAVE BEEN

SHOWN BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF THE

DESIGN. THE ENGINEERING ASSUMES NO RESPONSIBILITY FOR THE ACCURACY

OF THE FEATURES SHOWN. THE CONTRACTOR SHALL REVIEW AND VERIFY

EXISTING PHYSICAL FEATURES AND ELEVATIONS AND INFORM THEMSELVES OF

THE CONDITIONS TO BE ENCOUNTERED DURING CONSTRUCTION.

WORK OR STORAGE IN ANY PRIVATE OR PUBLIC AREAS NOT INDICATED IN THE

PLANS OR SPECIFICATIONS MUST BE APPROVED IN WRITING BY THE PROPERTY

OWNER OR REPRESENTATIVE.

ALL CONSTRUCTION IS TO INCLUDE COMPACTION, TRAFFIC CONTROL, FENCE

REPAIR, AND FINISH GRADING IN THE UNIT PRICE OF THE RELATED WORK ITEM.

ALL WORK IS TO BE DONE TO THE LINES, GRADES, SECTIONS, AND ELEVATIONS

SHOWN ON THE PLANS UNLESS OTHERWISE NOTED OR APPROVED BY THE

ENGINEER.

ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION AND

APPROVAL BY THE OWNER AND ENGINEER.

THE ENGINEER SHALL BE NOTIFIED WITHIN 48 HOURS OF STARTING

CONSTRUCTION.

PAYMENT, DIMENSIONS, AND RADII ARE SHOWN TO THE FLOWLINE UNLESS

OTHERWISE NOTED.

THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS

WITHIN THE LIMITS OF DISTURBANCE AND/OR TOES OF SLOPE SHOWN ON THE

PLANS AND CROSS SECTIONS. ANY DISTURBANCE BEYOND THESE LIMITS SHALL

BE RESTORED TO ORIGINAL CONDITIONS BY THE CONTRACTOR AT HIS/HER

EXPENSE. CONSTRUCTION PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL

OF LITTER, AND ANY OTHER ACTION WHICH WOULD ALTER EXISTING

CONDITIONS.

THE CONTRACTOR SHALL NOT REMOVE AND SHALL PROTECT FROM DAMAGE

ALL TREES, SHRUBS, AND EXISTING IMPROVEMENTS INSIDE AND OUTSIDE OF

THE LIMITS OF WORK. SPECIFIC PROVISIONS ARE SHOWN IN THE PLANS.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

1.

2.

3.

4.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL LABOR,

MATERIAL, EQUIPMENT, AND INCIDENTAL ITEMS NEEDED TO PROVIDE

ADEQUATE CONSTRUCTION SIGNING, BARRICADES, TRAFFIC CONTROL

DEVICES, AND OTHER RELATED ITEMS FOR THE PROJECT AREA DURING

CONSTRUCTION.

THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO

THE START OF WORK. THIS IS TO BE CONSIDERED INCIDENTAL AND THE COST

OF THIS ITEM IS TO BE INCLUDED IN OTHER PAY ITEMS.

COORDINATE AWSD CUSTOMER NOTIFICATION AND SHUT OFF WITH AWSD

STAFF. THIS INCLUDES PROVIDING AN ACCURATE WORK SCHEDULE SO

CUSTOMERS CAN BE NOTIFIED IN A TIMELY MANNER.

WATER MAIN MAY BE BORED OR OPEN CUT.

1.

2.

3.

4.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LEGAL DISPOSAL

OF ANY EXCESS SOIL, DEBRIS AND WASTE MATERIAL OFF OF THE SITE.

ANY SOIL LYING BELOW THE SUBGRADE WHICH IS DISTURBED BY

CONSTRUCTION OPERATIONS SHALL BE REMOVED AND REPLACED

WITH STRUCTURAL FILL IN ACCORDANCE WITH SPECIFICATION

REQUIREMENTS.

ANY MATERIAL NOT SUITABLE FOR BACKFILL SHALL BE REMOVED FROM

THE SITE AND DISPOSED OF BY AND AT THE EXPENSE OF THE

CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR ALL DEWATERING COSTS

ALT Alternate ASTM Americal Society of Testing & Materials AVC Arkansas Valley Conduit AWWA American Water Works Association CDOT Colorado Department of Transportation CIP Cast Iron Pipe C/L Center Line C/S Cross Section DWG Drawing DI (or) DIP Ductile Iron Pipe DIA Diameter EA Each ELEV Elevation EX Existing GPM Gallons Per Minute GV Gate Valve HDPE High-Density Polyethylene INV Invert LF Linear Foot MIN Minimum MJ Mechanical Joint N/A Not Applicable NO Number NTS Not to Scale PVC Polyvinyl Chloride SCH Schedule TYP Typical

NO TREES SHALL BE REMOVED OR TRIMMED WITHOUT PRIOR

ACKNOWLEDGEMENT FROM THE PROPERTY OWNER AND/OR ENGINEER.

THE CONTRACTOR SHALL PROTECT THE EXISTING DRAINAGE STRUCTURES AND

RE-ROUTE ANY RUNOFF AS NECESSARY DURING CONSTRUCTION ACTIVITIES TO

PREVENT EROSION AND DAMAGE. SILT, TRASH AND OTHER CONSTRUCTION

DEBRIS SHALL E REMOVED FROM STRUCTURES DURING AND UPON

COMPLETION OF CONSTRUCTION.

THE CONTRACTOR SHALL PROVIDE SAFE PEDESTRIAN ACCESS OR LIMIT

ACCESS AT ALL TIMES DURING THE PROJECT.

THE CONTRACTOR SHALL CLOSELY MONITOR HEAVY CONSTRUCTION

EQUIPMENT ACCESS THROUGH THE PROJECT AND NEIGHBORING AREAS.

WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. THE COST OF

WATER SHALL BE INCIDENTAL TO OTHER BID ITEMS.

PHYSICAL FEATURES THAT REQUIRE REMOVAL SHALL BECOME THE PROPERTY

OF THE OWNER.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESERVING ANY MONUMENT,

RANGE POINTS, TIES, BENCHMARKS, AND/OR SURVEY CONTROL POINTS.

DESTROYED OR DAMAGED POINTS SHALL BE REFERENCED AND REPLACED

WITH AN APPROPRIATE MONUMENT BY REGISTERED PROFESSIONAL LAND

SURVEYOR AUTHORIZED TO PRACTICE LAND SURVEYING IN COLORADO.

ANY DISCREPANCY IN THESE PLANS SHOULD BE BROUGHT TO THE IMMEDIATE

ATTENTION OF THE ENGINEER.

ALL WORK WITHOUT A SPECIFIC BID ITEM IS INCIDENTAL TO OTHER PAY ITEMS.

19.

20.

21.

22.

23.

24.

25.

26.

27.

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

N O

T E

S

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

W T

P B

LD

G

W T

P B

LD

G

W T

P B

LD

G

(N ot in S er vi ce

A P

R

S

T U

F .F

4, 6.

T H

IR

D

L A

N

EP

-3G

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

D E

M O

LI

T

IO

N

P

LA

N

S

IT

E

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

WTP BLDG. #1

WTP BLDG. #3

(Not in Service)

A P

R

S

T U

F.F.=4,536.17'

P-3

G

C

CS-1

LEGEND

Cross Section G - Existing Piping WTP Bldg. #1

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

D E

M O

LI

T

IO

N

P

LA

N

C

/S

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

LA

B

E L

D E

S C

R

IP

T

IO

N

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

WTP BLDG. #3

(Not in Service)

D16

D17

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

D E

E P

W E

LL

P

IP

IN

G

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

A P

T U

H1 D1

D2

H5

G1

T1

T2

F1

D3 D4 D5

D6

G2

G3 D7D8

D10

B C

S -1

B C

S -1C

C S

-2 C

C S

-2

D

CS-1

D

CS-1

A C

S -3

A C

S -3

H2

E

CS-2

CS-2

F C

S -3

F C

S -3

D9

D11

3 5

O1 O2

D12 D13

U

U

H8

H9

G7

G8

V1

V2

O3

O4

S1

S2ET

D14 D15

M1

M2

A

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

P R

O P

O S

E D

S

IT

E P

LA

N

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

WTP BLDG. #3

(Not in Service)

A P

T U

H1 D1

D2

H5

G1

T1

T2

D3 D4 D5

D6

G2

G3 D7D8

D10

H2

D9

D11

O1 O2

D12 D13

U

U

M1

M2

A

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

P R

O . R

A W

W A

T E

R P

IP

IN

G

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

A P

T U

D1

D2

H5

G1

T1

T2

F1

D3 D4 D5

D6

G2

G3 D7D8

D10

H2

D9

D11

3 5

O1 O2

D12 D13

U

U

H8

V1

M1

M2

A

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

P R

O P

O S

E D

F

IL

T E

R

P

IP

IN

G

H9

V2

D15

H8

G7

G8

V1

O3

O4

S1

S2ET

D14

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

E X

T E

R

IO

R P

IP

IN

G

B

ID

A

LT

. 1

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

F1 R

F3

F2

F4

H4 H5

G2

G3

T5

Cross Section D - Proposed Filter and Piping WTP Bldg. #1

T4

U3

SS2

A

H10

R

H3

H4

G2

G3

G4

G5

T3

T4

T7

D9

D10

Cross Section B - Proposed Filter and Piping WTP Bldg. #1

D11

Pumps & Piping Design in Progress For Phase 2

U3

A

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

C R

O S

S S

E C

T

IO

N S

-1

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

F1

F3

F2

F4

H5

G2 T5

Cross Section E - Proposed Filter and Piping WTP Bldg. #1

C

T6

D8

T2

D7

D9

SS2

D2

G4

G5

C

T6

T7

Cross Section C - Proposed Filter and Piping WTP Bldg. #1

G6

Pumps & Piping Design in Progress For Phase 2

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

C R

O S

S S

E C

T

IO

N S

-2

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

C ro ss S ec tio n A

E xi st in g

P ip in g

W T

P B ld g.

H 6 H 7 D

D

T2

G

O 1 O

D

D 12 D

U

U

C ro ss S ec tio n F

E xi st in g

P ip in g

W T

P B ld g.

H

H

T1 H

O 1 O

D 5 D

D 12 D

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

C R

O S

S S

E C

T

IO

N S

-3

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

PROPOSED TRENCH DETAIL

4 Min.

Installation Depth

4.5

0.750.75

3/4"-101.125

1.469

ANCHOR BOLTS

HOLE DRILL & SEAL

7/8"

ELEVATION

SECTION A-A

2" GALVANIZED DOOR

TRACK

DOOR OVERLAPS JAMB

1" EACH SIDE

5/16"-12 X 1"

SELF DRILLING TEK

SCREW

16 GA. "C" SHAPED

MUNTINS

OPENING WIDTH

16 GA. "C" SHAPED

END STILES

2" ROLLER W/ STEEL

STEM

14 GA. (MIN.)

GRADUATED END

HINGE

1/4"-14

SHEET METAL

SCREWS

(TYP. ALL HINGES)

14 GA. (MIN.) #1

COMMERCIAL HINGE

STEEL JAMBS BY

OTHERS:

MINIMUM LEG = 2 1/2"

(2) GALV. INTERIOR

STEP PLATES

6"X8" PAD

REQ'D

DIE-CAST ALUMINUM

CABLE DRUM

CENTERLINE OF

SPRINGS

A A

B

B

GALVANIZED RETAINER

W/ PVC ASTRAGAL

DEEP SHIPLAP JOINT

EXTERIOR IS 16 GA.

CONTINUOUS COIL,

ACID TREATED AND

PRE-PAINTED PRIOR TO

MANUFACTURING WITH

A 2-COAT SYSTEM OF

POLYESTER PAINT WITH

A TOTAL THICKNESS OF

.9 MIL

SECTION B-B

GALVANIZED,

ADJUSTABLE TOP

BRACKET

GRADUATED,

GALVANIZED STEEL

END HINGE

(4) FASTENERS

MINIMUM FOR

ATTACHMENT

MUNTINS & END

STILES ARE

GALVANIZED STEEL

AND FIT THE

CONTOUR OF THE

SECTION. MUNTINS &

END STILES WILL BE

SECURED TO THE

PANELS WITH 1/8"

FASTENERS &

ADHESIVE.

DEPTH INTO ROOM

12' (FINISH

HEIGHT)

EXTEND JAMBS TO

SLAB BOTTOM

HEADROOM

SIDE ELEVATION

STANDARD LIFT

TYPICAL STANDARD INSULATED

(R-12) GARAGE DOOR REVERSE ANCHOR ASSEMBLY DETAIL

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

D E

T A

IL

S

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

Finished Grade

Coil Wires Counter Clockwise

18"x18"x6" Conc. Pad (See Valve Notes)

Gate Valve (See Detail)

Tracer Wire Splice Tracer Wires with "3M" Type DBY-6 Low Voltage Direct Bury Splice or Equal Install per Manufacturer's Instructions

NOTE:

Space Tracer Wire Test Stations at 500' Max. Spacing

Tape Wire on each side of Fittings and at 10' Max. on Centers along Top of Pipe of Loop Wire around each pipe section 2 or 3 times w/ 2" PVC Tape

Installation at Valve

TRACER WIRE INSTALLATION AND TEST STATION DETAIL

Not to Scale

AREA

PIPE ID FIGURE FIGURE

1.53.06.0

INTO CONCRETE)

(EXTEND 2'

#5 REBAR

AREA (T

YP)

BEARING

EARTH

UNDISTURBED

(FIGURE 2)

(FIGURE 4)(FIGURE 3)

(FIGURE 1)

FIGURE 4,FIGURE 3,

21 45°45°90°

CONC/CU YDSBEARING AREA IN SQ FT

1.52.54.02

1.01.53.01

0.51.01.51

0.50.51.01

4815116

361184

24753

12432

12222

12"

10"

8"

6"

4"

TRENCH

UNDISTURBED

SOIL

TRENCH

BEARING

(TYP)

45°

TYP

D

7"

NOTES:

1. Bearing Surfaces Shown in the Chart are Minimum Square Feet.

2. Based on 150 PSI Internal Pipe Pressure Plus Water Hammer.

4", 6", 8" & 12" Water Hammer=110 PSI

3. Based on 3000 psf Soil Bearing Capacity, Use Type ll Portland Cement 3000 PSI Concrete.

4. All Valves, Tees, Bends and Plugs shall be Restrained and Thrust Blocked.

11-1/4°22-1/2°

HORIZONTAL OR UPWARD VERTICAL BEND DOWNWARD VERTICAL BEND

CROSS TEE, PLUG OR CAP

22-1/2° 11-1/4°

CONCRETE THRUST BLOCK DETAILS

CONCRETE ENCASEMENT DETAILS

OVERFLOW PIPE REPLACEMENT

A V

O N

D A

LE

W

A T

E R

A N

D S

A N

IT

A

T

IO

N D

IS

T

R

IC

T

U P

G R

A D

E S

T O

P O

T A

B

LE

D E

T A

IL

S

T R

E A

T M

E N

T P

LA

N

T

P H

A S

E

AWSD TP-P1-Cover
Sheets and Views
AWSD TP-P1-Cover
AWSD TP-P1- Exst. Site Plan
Sheets and Views
AWSD TP-P1- Exst. Site Plan
AWSD TP-P1-Notes
Sheets and Views
AWSD TP-P1-Notes
AWSD TP-P1-Demolition
Sheets and Views
AWSD TP-P1-Demolition
AWSD TP-P1- Floor Plan & Section
Sheets and Views
AWSD TP-P1- Floor Plan & Section
AWSD TP-P1-Labels
Sheets and Views
AWSD TP-P1-Labels
AWSD TP-P1-Deep Well
Sheets and Views
AWSD TP-P1-Deep Well
AWSD TP-P1-Pro. Site Plan
Sheets and Views
AWSD TP-P1-Pro. Site Plan
AWSD TP-P1-Pro. Raw Water Piping
Sheets and Views
AWSD TP-P1-Pro. Raw Water Piping
AWSD TP-P1-Pro. Filter and Piping
Sheets and Views
AWSD TP-P1-Pro. Filter and Piping
AWSD TP-P1-Pro. Exterior Piping
Sheets and Views
AWSD TP-P1-Pro. Exterior Piping
AWSD TP-P1-Cross Sections-1
Sheets and Views
AWSD TP-P1-Cross Sections-1
AWSD TP-P1-Cross Sections-2
Sheets and Views
AWSD TP-P1-Cross Sections-2
AWSD TP-P1-Cross Sections-3
Sheets and Views
AWSD TP-P1-Cross Sections-3
AWSD TP-P1-Details-1
Sheets and Views
AWSD TP-P1-Details-1
AWSD TP-P1-Details-2
Sheets and Views
AWSD TP-P1-Details-2

File details come from the government source that posted it. Updated .