PF260482MZ PATROL BOAT.pdf

PDF 748 KB Posted

Attached to
ENFORCEMENT PATROL BOAT
Solicitation number
PF260482MZ
Issued by
Washington

About this file

This Invitation for Bid (IFB) is issued by the Washington Department of Fish and Wildlife (WDFW) for the procurement of a new, unused, dual outboard engine-powered, all-welded aluminum patrol vessel. The procurement seeks one patrol boat with delivery to Port Orchard Marina, and quotations must be submitted by 5:00 p.m. Pacific Time on December 21, 2026. A pre-bid conference is scheduled for November 17, 2026, at 11:00 a.m. Pacific Time via Microsoft Teams, with attendance requests due by November 16, 2026. The vessel must be delivered by April 1, 2028, to a maritime-based location within 100 miles of Port Orchard Marina, with the specific delivery site to be determined by WDFW. The specification requires a 31–33-foot marine-grade aluminum monohull with a 10-foot beam, equipped with twin electronically controlled 425-horsepower Mercury Verado outboard engines, full cabin with navigation and electronics package, and personnel recovery cutouts on both sides. The contract permits placement of future purchase orders on an indefinite delivery-indefinite quantity basis under the same terms and conditions within one year of award, though no additional orders are guaranteed.

Bidders must submit pricing for the patrol vessel, outboard engines, Garmin GPS systems, and delivery, with pricing terms on a firm fixed-price, FOB Destination basis, with all freight and shipping costs included in the bid price. Washington State sales tax will be added to the billing invoice. Payment will be processed net 30 days following satisfactory acceptance of delivery and receipt of proper invoices; progress payments are not available. Mandatory bidder requirements include licensure to do business in Washington State, U.S. entity status, and registration in the Washington Electronic Business Solution System. Desirable qualifications include five years of minimum experience in design and construction of patrol and rescue all-welded aluminum boats and documentation of having built at least five boats in the last two years using the same basic hull design. A 3-percent bid preference will be awarded to vendors certifying that they do not require employees to sign mandatory individual arbitration clauses or class action waivers. An additional preference point is available for bidders certified as Washington State small, micro, mini, or veteran-owned businesses. Bidders must submit detailed design drawings, warranty information for all components, and descriptive literature demonstrating compliance with specifications. The vessel must include a 15-year hull warranty, 5-year fuel tank warranty, and manufacturer extended or optional warranties for propulsion, electrical, electronics, and steering systems.

View the file

Other files

File Type Posted
AMENDMEnT 1 VENDOR QUESTION CLARIFICATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASHINGTON DEPARTMENT OF FISH AND WILDLIFE

INVITATION FOR BID

Return Quotation To:

Washington Department of Fish and Wildlife Contracts and Procurement Office

Quotation Number:

PF260482MZ

Mailing Address:

WDFW Purchasing Attn: JoAnna Anderson PO Box 43160 Olympia WA 98504-

Physical Address (for couriers):

Natural Resources Bldg. (5th Floor), 1111 Washington St.

SE

Olympia WA 98501

Ship To Address: (FOB Destination, Freight Prepaid, Allowed) Freight/shipping costs included in the bid price

WDFW Port Orchard Marina ATTN: Ken Balaz 707 Sidney Parkway Port Orchard, WA 98366

Contact Name: Michael Zessin

E-mail: Michael.zessin@dfw.wa.gov

Quotation Required By (Date and Time):

12/21/2026

Required Delivery Date:

04/01/2028

VENDOR QUOTATION

Vendor Name:

Name of Person providing Quotation:

ITEM NO. SPECIFICATIONS QTY UNIT UNIT PRICE TOTAL PRICE

NEW UNUSED PATROL VESSEL 1 EA

DELIVERY 1 LOT

Minimum Specifications provided – All ___pages to be completed and returned with quote

In addition to the initial purchase quantity identified in this bid document there is no guarantee to the contractor of any additional orders under the award. However, the order will allow the placement of future purchase orders on an as needed basis (also referred to indefinite delivery – indefinite quantity orders) under the same terms and conditions as those established for the initial purchase quantity within one year of award of the bid.

Destination WA State Sales Tax Applies, added to billing invoice (not w/bid) Subtotal:

Any and all questions must be directed to Michael Zessin @ Michael.zessin@dfw.wa.gov . Any vendors that make contact with anyone outside of the WDFW contracts and purchasing office could result in their bid being disqualified.

mailto:Michael.zessin@dfw.wa.gov

VENDOR INFORMATION

Vendor Name: UBI No. Statewide Vendor Number:

Vendor Street Address: Vendor Mailing Address (if different): Federal

TIN/SSN:

E-mail: Telephone No. Fax No.

Vendor’s Proposed Delivery Date: Prompt Payment Discount:

_____% discount for payment within _____ days

OMWBE Minority or Women-Owned Business Certification Number (if applicable):

Department of Veteran Affairs Veteran-Owned Business Certification Number (if applicable)

Type/Print Name of Person Signing Quotation:

Authorized Signature and Date Signed:

INSTRUCTIONS FOR VENDORS

1. This Invitation for Bid (IFB) is not an order. If your quotation is accepted WDFW will issue a Field Order or other order document that will indicate what items have been accepted.

WDFW may accept or reject quotations by each item separately or as a whole.

2. Please provide a price quote via fax, email or regular mail for the item(s) specified in this IFB.

3. Please complete the VENDOR QUOTATION, VENDOR INFORMATION and VENDOR CERTIFICATION EXECUTIVE ORDER 18-03 pages of this form to respond to this request. Failure to complete and use this form may result in rejection of a vendor’s quote.

4. Responses for the items indicated must be returned by no later than the date and time indicated.

5. Unless otherwise indicated, all prices offered must be FOB Destination, with all transportation and handling charges paid by the Vendor.

6. All quotations provided by the Vendor are good for a minimum of 60 calendar days from the Quotation Required By date/time on Page 1 of this document.

7. Vendors must be registered in the Statewide Vendor Payment System prior to submitting any requests for payment. The Washington State Department of Enterprise Services (DES) maintains the Statewide Vendor Payment System; to obtain registration materials contact the Statewide Payee Desk at (360) 407-8180; or go to Statewide Vendor/Payee Services | Office of Financial Management (wa.gov)

8. Washington Department of Fish and Wildlife Additional Terms and Conditions for Invitations for bid and Field Orders govern this IFB. These terms and conditions can be found at https://wdfw.wa.gov/about/administration/contracts Deviations from, or additions to, these terms are attached. By signing this IFB the Vendor certifies that they have read, understand, and agree to these terms and conditions.

https://ofm.wa.gov/it-systems/accounting-systems/statewide-vendorpayee-services https://ofm.wa.gov/it-systems/accounting-systems/statewide-vendorpayee-services https://wdfw.wa.gov/about/administration/contracts

VENDOR CERTIFICATION EXECUTIVE ORDER 18-03 – WORKERS’ RIGHTS WASHINGTON STATE GOODS

& SERVICES CONTRACTS

Pursuant to RCW 39.26.160(3) (best value criteria) and consistent with Executive Order 1803 –

Supporting Workers’ Rights to Effectively Address Workplace Violations (dated June 12, 2018), the

Washington Department of Fish and Wildlife will evaluate bids for best value and provide a bid preference in the amount of 3% to any bidder who certifies, pursuant to the certification below that their firm does NOT require its employees, as a condition of employment, to sign or agree to mandatory individual arbitration clauses or class or collective action waiver.

I hereby certify, on behalf of the firm identified below, as follows (check one):

NO MANDATORY INDIVIDUAL ARBITRATION CLAUSES AND CLASS OR COLLECTIVE ACTION WAIVERS

FOR EMPLOYEES. This firm does NOT require its employees, as a condition of employment, to sign or agree to mandatory individual arbitration clauses or class or collective action waivers.

OR

MANDATORY INDIVIDUAL ARBITRATION CLAUSES AND CLASS OR COLLECTIVE ACTION WAIVERS FOR

EMPLOYEES. This firm requires its employees, as a condition of employment, to sign or agree to mandatory individual arbitration clauses or class or collective action waivers.

I HEREBY CERTIFY, UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF WASHINGTON, THAT THE CERTIFICATIONS HEREIN ARE TRUE AND CORRECT AND THAT I AM AUTHORIZED TO MAKE

THESE CERTIFICATIONS ON BEHALF OF THE FIRM LISTED HEREIN.

FIRM NAME: _____________________________________________________

Name of Vendor – Print full legal entity name of firm

By: ______________________________

Signature of authorized person

Title: ______________________________

Title of person signing certificate

Date: ________________________________

Print Name of person making certifications for firm

Place: ________________________________

City and state

PROJECT TITLE: PF260482MZ PATROL BOAT

PRE-BID CONFERENCE: [time] p.m., Pacific Time (PT) on [date]

DUE DATE: 5:00 p.m., Pacific Time (PT) on 12/21/2026 (Time may be changed at the Procurement Coordinator’s discretion)

SUBMIT PROPOSAL TO: Michael.zessin@dfw.wa.gov

All communications concerning this Invitation for Bid (IFB) must be directed only to the IFB Coordinator via email. Any other communication will be considered unofficial and non-binding on WDFW. Bidders are to rely on written statements issued by the IFB Coordinator. Communication directed to parties other than the IFB Coordinator may result in disqualification of the Bidder.

ESTIMATED PROCUREMENT SCHEDULE

Item Action Date

1. WDFW issues solicitation 11/09/2026

2. Question and Answer period 11/17-12/11 2026

3. WDFW hosts Pre-bid Conference 11/17/2026

4. WDFW posts Pre-Bid Conference Addendum (if necessary) TBD

5. Last date for questions regarding solicitation 12/11/2026

6. Complaints due 12/15/2026

7.

WDFW posts final Question and Answer Addendum or Amendment (if necessary)

12/15/2026

8. Quotes due 12/21/2026

9. WDFW conducts evaluation 12/22/2026 <

10.

WDFW announces “Apparent Successful Bidder” and sends notification to unsuccessful Bidder(s)

TBD

11. WDFW conducts debriefing conferences (if requested) As requested, per debriefing instructions

The procurement schedule may be adjusted as necessary

PRE-BID CONFERENCE

A pre-bid conference is scheduled to be held on 11/17/2026 at 11:00 AM PT. The pre-bid conference will be held virtually: https://teams.microsoft.com/meet/2188730589226291?p=zAYWEhUCcmCxJmG8R4

You must submit your request for attendance by 11/16/2026 5:00 PM PT.

All prospective Bidders should attend; however, attendance is not mandatory. Written questions may be submitted in advance to the IFB Coordinator. WDFW shall be bound only to written answers to questions. Any oral responses given at the pre-bid conference shall be considered unofficial.

Questions arising at the pre-bid conference or in subsequent communication with the IFB Coordinator will be documented and answered in written form. A copy of the questions and answers in the form of an Addendum will be posted on WEBS under the commodity code(s) listed on the cover page of this IFB.

Within five (5) business days of the pre-bid conference, a copy of the questions and answers from the pre-bid conference will be posted on WEBS under the commodity code(s) listed on the cover page of this IFB.

MANDITORY BIDDER REQUIREMENTS

• Licensed to do business in the State of Washington. If not licensed, provide a written intent to become licensed in Washington within thirty (30) calendar days of being selected as the Apparent Successful Bidder.

• Bidders must be a United States (U.S.) Entity. If awarded Bidders use staff or subcontractors that are foreign entities or reside abroad, they still must comply with all U.S. and Washington State employment regulations and any specific requirements.

• Vendor must be registered in the Washington Electronic Business Solution (WEBS) System; the procurement announcement system for Washington State government. Information on registering in WEBS is located at https://des.wa.gov/sell/how-work-state.

Bidders who do not meet these minimum qualifications will be rejected as non-responsive and will not receive further consideration. Any proposal that is rejected as non-responsive will not be evaluated or scored.

BIDDER QUALIFICATIONS/SCORRING SYSTEM

Minimum Qualifications: These are the attributes on which bidders will be scored. Scores are based on a 5 point system, below is a List of the 5 points available. Bidders can formally complain or protest if they feel the qualifications unnecessarily restrict competition. The Procurement Coordinator will review all responses for responsiveness to these minimum qualifications; Bidders who do not meet the minimum qualifications will not be passed to the evaluation team for further review. A visual representation of the bid tabulations can be found below.

1. Bidders must submit bid by EOB (5 P.M.) of the date the bidding period is scheduled for close.

https://teams.microsoft.com/meet/2188730589226291?p=zAYWEhUCcmCxJmG8R4 https://des.wa.gov/sell/how-work-state

2. An additional preference point will be given to bidders who are certified as a Washington State small/micro/mini business or veteran owned business.

3. Bidders must meet all technical specifications or equivalent listed below and check the box indicating so. (if checking equivalent box, the vendor must give additional details. Preference will be given to bidders who meet the exact specification.)

4. Bidders must specify they can meet the delivery time frame and check the box indicating so.

5. Bidders must submit a dollar amount for their bid excluding taxes.

In the event of a tie breaker, the WDFW intends to award the bid to the bidder with the lowest dollar amount to determine best value, so long as they scored a point in each of the 4 other categories. In the event that no bidders scored all 4 points in the first 4 categories, a review will be conducted by the IFB coordinator and the project management team starting with the lowest bid by price point to determine if there bid meets the needs of the agency.

Example of bid tabulation

Desirable Qualifications:

• Bidder must have 5 years minimum experience in design and construction of patrol/rescue all-welded aluminum boats.

• Bidder must have built a minimum of five (5) boats in the last 2 years of the same basic hull design as described in the attached specification. Proof of delivery of vessels to be provided.

SMALL BUSINESSES, MINORITY & WOMEN’S BUSINESS ENTERPRISES (MWBE), AND VETERAN-OWNED

BUSINESS PARTICIPATION

In accordance with the legislative findings and policies set forth in chapter 39.19 RCW, the State of

Washington encourages participation in all of its contracts by firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be on a prime or subcontractor basis.

For information on certification, firms may contact the Washington State Office of Minority and

Women’s Business Enterprises.

RCW 43.60A.200 also encourages the participation of Veteran-Owned Businesses certified by the

Washington State Department of Veterans Affairs (DVA) pursuant to RCW 43.60A.195. For information on certification, firms may contact the Washington State Department of Veteran Affairs.

Additionally, consistent with Department of Enterprise policy, agencies are encouraged to purchase from Washington small businesses, including microbusinesses and minibusinesses.

No minimum level of participation by minority- or women-owned business, Washington small businesses, or Washington State certified veteran-owned businesses is required as a condition for receiving an award. Proposals will not be rejected or deemed non-responsive on that basis. Any http://apps.leg.wa.gov/rcw/default.aspx?cite=39.19 http://omwbe.wa.gov/ http://omwbe.wa.gov/ http://app.leg.wa.gov/rcw/default.aspx?cite=43.60A.195 https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses applicable affirmative action requirements set forth in federal laws, regulations, or referenced contract provisions shall apply.

For competitive procurements with an estimated total value of $150,000 or less, WDFW shall award to the highest-ranked bidder or proposer that is determined to be responsive and responsible and is a certified small business or veteran-owned business, in accordance with applicable state procurement laws and rules.

If no certified small business or veteran-owned business submits a responsive and responsible bid or proposal, WDFW shall award in accordance with the solicitation’s evaluation and award methodology, including award to the lowest responsive and responsible bidder for invitations for bids (IFBs) and requests for quotations (RFQs), or to the highest-ranked proposer for requests for proposals (RFPs), consistent with applicable procurement statutes and rules.

Vendors who meet criteria set forth in chapter 39.19 RCW, should complete and submit the Business

Enterprise Certification Form, Attachment [ ].

Note: Small business and veteran-owned business participation requirements apply to all competitive procurements, except to the extent that the use of federal funds if application of this policy would be inconsistent with applicable federal law or would result in the loss or reduction of federal funding.

PROCURMENT COMPLAINT, DEBRIEF AND PROTEST PROCEDURES

Complaints Prospective bidders may submit complaints regarding specific procurements to WDFW. The process and requirements for submitting a complaint are outlined in the agency’s formal complaint procedure (PDF).

Debriefs A debrief conference is an opportunity for any vendor who submitted a bid, to meet with the Procurement Coordinator and/or Evaluator(s) to discuss their proposal and evaluation. The process and requirements for requesting a debrief are outlined in the agency’s formal debrief procedure (PDF).

Protests Vendors that submit bids may file a protest regarding that procurement, provided the vendor participates in a debriefing conference. The process and requirements for submitting a procurement protest are outlined in the agency’s formal protest procedure (PDF).

SPECIFICATIONS

This specification describes a new and un-used dual outboard engine powered, all-welded aluminum patrol craft.

Note: Polychlorinated biphenyls, commonly known as PCBs, have adverse effects on human health and the environment. Accordingly, the State of Washington through its procurement of goods is trying to http://apps.leg.wa.gov/rcw/default.aspx?cite=39.19 https://wdfw.wa.gov/sites/default/files/2026-02/complaint-process-procedure.pdf https://wdfw.wa.gov/sites/default/files/2026-02/procurement-debrief-procedure.pdf https://wdfw.wa.gov/sites/default/files/2026-02/procurement-protest-procedure.pdf minimize the purchase of products with PCBS and to incentive its vendors to sell products and products in packaging without them. WDFW respectfully requests any packaging be without color or dyes.

Item Description

Check [X]

If As

Specified

Describe Fully If Equivalent/Not As

Specified

General Description:

1.1 This specification describes a new

and un-used dual outboard engine powered, all-welded aluminum patrol craft. It shall in all respects be suitable for rough water operations, day or night in salt waters of Washington State and Puget Sound. It shall be built to withstand heavy use in rough conditions and at high speeds.

The Vessel shall be a heavy duty, marine grade aluminum monohull between 31’-33’ in length, with a 10’ foot beam. Vessel to be equipped with a foam collared (non-marking) or permanent, solid-state type fendering system;

full cabin; electronically controlled twin 4-Stroke outboard motors;

and complete navigation and electronics package. The vessel shall include standard features and aft deck with personnel recovery cutouts (PRC) on both port and starboard.

1.2 The vendor is to furnish all material, labor, equipment, and deliver vessel ready for operation in accordance with good practice and pertinent regulatory bodies.

Vendor shall be responsible for detail outfit engineering and obvious errors or omissions in these specifications shall not relieve the Vendor of their responsibility for the delivery of a complete and serviceable vessel.

Should discrepancies exist within the specifications, the discrepancies shall be referred to the WDFW’s

Representative whose decision shall be final.

1.3 Bidder must have 5 years minimum

experience in design and construction of patrol/rescue all-welded aluminum boats.

1.4 Bidder must have built a minimum of

five (5) boats in the last 2 years of the same basic hull design as described in the attached specification. Proof of delivery of vessels to be provided.

1.5 Bidder must include draft design

drawings showing detail of hull, cabin, deck, swim step/motor bracket, and rails for evaluation of design. No departures from principal characteristics, basic arrangements, major dimensions, or structural design shall be made after bid award without prior written approval from WDFW.

While it is recognized that minor modifications may become necessary in processing from contract plans to completed vessel, any deviations made by the Vendor shall be kept to a minimum, shall be brought to the attention of the

WDFW’s Representative, and may be subject to written approval.

1.6 Material and Workmanship: Where

a specific brand is named, it shall be construed solely for the purpose of indicating the standard of operations, quality, performance, or use described. Brands of equal quality, performance, and use shall be considered, provided the Vendor specifies the brand and model and submits descriptive literature to the

WDFW’s Representative and obtains written approval prior to procurement.

1.7 All apparatus (machinery, equipment, piping, etc.) is to conform to good marine practice for vessels of this class.

Materials shall be ordered to recognized standard sizes wherever such apply, to facilitate replacement or repair. All materials and equipment shall be new and of the best commercial quality.

1.8 The Patrol Boat as specified shall

comply with all the applicable laws of the United States and Washington State. The following publications should be used as a guide for design and shall be followed during construction.

• United States Coast Guard regulations

• American Bureau of Shipping, Welding Standards

• American Boat and Yacht Council

• University of Michigan, “Small Craft Engineering: Structures” (Silvia, Peter A.; Scott, Robert J.;

Michalopolous, Constantine;

University of Michigan, 1971-10-01)

1.9 Bidder shall submit descriptive

literature with Response.

Descriptive literature shall clearly describe how the product bid is equal in quality, function and performance to the bid specifications herein. This information is in addition to all other documents required for bid submittal, and cannot be submitted in lieu of other required documents.

1.10 Bidder must possess a current

Washington State Master License that includes the dealer endorsement pursuant to RCW 88.02.710 and must be a factory authorized warranty service dealer for manufacturer(s) of vessel bid. A current copy must be submitted with bid.

2. General Hull Structure

2.1 The Vendor will take care to obtain

good alignment of structural members, particularly where such members oppose each other on opposite side of bulkheads, decks, or tank tops. In such cases, misalignment exceeding half the thickness of the thicker member shall be considered cause for rejection.

Where discontinuities of structure are unavoidable, suitable brackets or other reinforcement shall be installed.

2.2 All workmanship entering into the

construction of the vessel shall conform to the highest standard of commercial shipbuilding practice and shall result in fair lines and smooth surfaces. Sharp and ragged edges or corners of structure which are unsightly or which could cause injury to personnel shall be removed and/ or ground smooth.

http://apps.leg.wa.gov/rcw/default.aspx?cite=88.02.710

2.3 The boat hull shall be longitudinally

framed. Substitutions of equivalent sections or minor alterations in detail may be considered provided they do not impair the efficiency, strength or appearance of the structure.

2.4 All welded heavy-duty aluminum

construction, AISI 508X (5088, 5086, etc) alloys, compatible with salt water.

2.5 Bidder to provide any existing ballistic

test results on hull material or construction.

3. Hull Structure Specifics

3.1 NOTE: All plates used on the hull

bottoms and sides shall be one-piece, full length of the hull. Butt welds of the plates to get the proper length will not be allowed.

All welds are to be continuous. The hull shall be framed in accordance with all acceptable practices and shall have as a minimum the following:

3.2 Hull length 31-33 feet, including swim

step/motor bracket, excluding engines. Length Overall: Appx. 35’

3.3 Waterline length, transom to bow, between 30 and 34 feet.

3.4 Dead rise at transom: 22 degrees.

3.5 Dead rise at entry at bow: 48 degrees.

3.6 Overall beam: 10 feet

3.7 The hull bottom shall be a minimum

1/4” (.250”) aluminum plate, 5086 or better.

3.8 The sides shall be a minimum 3/16”

(.190”) aluminum plate, 5086 or better.

3.9 The gunnels shall be 1/4” (.250”)

aluminum plate, 5086, welded in place.

3.10 The superstructure shall be 5/32”

(.160”) aluminum plate, 5086 or better.

3.11 5” wide flat chine interceptor, 5086 Extrusion

4. Deck

4.1 The deck shall be a minimum 5/32”

(.160”) aluminum plate, 5086 welded in place. The decks shall be dry, self-bailing.

4.2 Stainless steel or aluminum grab rails

throughout interior of craft. Grab rail placement must minimize obstructions to operators visibility and approved by WDFW representative prior to installation.

4.3 Stainless steel fasteners-ASTM A 276.

Type 316 throughout vessel.

4.4 Stainless steel bow eye, type 316.

4.5 Aluminum or Stainless-steel cleats to be

mounted fore/mid/aft of boat on port and starboard. Aluminum cleats must be welded.

4.6 Foam collar or non-marking, permanent

fendering system installed on the hull.

4.7 High-capacity deck drains through

transom with elephant trunks (unless documentation is provided showing equal alternative)

4.8 Aluminum or stainless-steel deck tie-

down fittings mounted near flush with the deck, minimum 8 (10”)

4.9 Additional strengthening and material

selection able to withstand occasional boat beaching to unload personnel without damaging boat.

4.10 Aft tow post. Tow post to have cross

bar and arrangement to accept 3/4 inch diameter line. Tow post to withstand a minimum pull of 2x the gross vessel weight applied at the cross bar. An arch with fairlead shall be provided to prevent towline from fouling gear aft of the tow post.

4.11 Tow spool with at a minimum 300 ft. of

line with cover and hand brake.

4.12 Tow light with mast.

4.13 Anti-slip rubber matting with padding

on cabin interior walking surfaces (or equal).

4.14 Aggressive, non-skid coating on all

exterior walking Surfaces.

4.15 Taft/crash rail around outboard motors

with fairleads for tow line.

4.16 Raw water washdown.

5 Diving

5.1 Cutout on port and starboard side

gunwale.

5.2 Foam collar or non-marking

fendering system installed on the hull. Collar segment to be provided on exterior of dive door.

5.3 Stainless steel Garelick or better 5

step dive ladder on port side of outboard bracket, with storage mount.

5.4 Dive light mast (red, white, red).

5.5 Two (2) Dave X3 Surface mount

underwater lights or

Better.

6 Cabin

6.1 Cabin shall be constructed with .160”

aluminum with two (2) forward leaning windshields; Starboard side dash composes the operator’s station and shall be designed for all instruments, gauges, switches and controls.

Aluminum aft bulkhead with oversized

28” DSG hinged back door. Exact location of aft door shall be approved by

WDFW. Aluminum aft bulkhead shall include Port and Starboard windows;

DSG door will have window for a total of three (3) aft windows.

6.2 Framed windows installed to provide

360-degree field of vision from operator’s station minimally obstructed, shatter resistant clear laminated safety glass, minimum thickness of 3/8th inch, shall be used in all cabin windows and Overhead spotter windows (tinted). Final design to be provided in 3D renderings and approved by WDFW representative prior to the build process.

6.3 Cabin shall have aft access doors and

sliding full sized side doors on port and starboard side of crew cabin at helm seat and opposite side crew seat. Side slider doors shall be half glass on top and full aluminum panel below. Doors and windows to be Diamond Sea Glaze (or equal). Doors to have full sized handles and positive latching in the open position and key locks in the closed position.

6.4 The roof shall be a minimum .160

aluminum and strong enough to support the radar mast and associated equipment, and to support the weight of crewmen walking on it without “oil canning” (deformation or buckling).

For visibility from an aerial view, the roof shall display “WDFW POLICE” in lettering at least 12” in size made with non-skid material.

6.5 All windows shall be laminated or

tempered tinted safety glass with black powder-coated frames and at minimum:

• Two (2) forward facing fixed pane windows

(windshields)

• Four (4) side windows, two on each side

•Two (2) fixed windows in the aft cabin wall with one on each side of the aft cabin door

• Sliding windows shall include a lock when closed.

6.6 Cabin with thermal insulation, heavy

duty, weathertight, non-rattling/non-vibrating hatches, doors and accesses.

Sliding side windows.

6.7 Forward windows inverted/inward

slanting with windshield wipers. Wiper drive motors provided with RFI noise filters. Wiper arms and equipment suitable for the marine environment.

Each window will have independent wiper switches with intermittent settings. The switches to be installed at the helm station.

6.8 Washer reservoir to be installed in an

easily accessible area where it will not obstruct access to storage spaces or crew areas.

6.9 The wipers shall be installed in such a

manner where they do not rattle against the window when the engines are running.

6.10 The pilothouse shall be equipped with

two (2) windshield defrost fans. One for each windshield window (the heat will be supplied with the diesel forced air heater).

6.11 Anti-slip rubber matting with padding

on cabin interior walking surfaces (or

6.12 Aggressive non-skid coating on all

exterior walking surfaces.

6.13 Marine grade carpet and insulation with

upholstered head liner and appropriate side panels.

6.14 WDFW supplied laptop cradle point

mount. Final location approved by

WDFW’s Representative prior to installation.

6.15 WDFW will supply gun locks for shotgun

and M16 style long guns. Final location approved by WDFW’s Representative prior to installation.

6.16 Additional hand rail interior of cabin.

Final placement to be determined by

WDFW Representative.

7 Anchor Equipment

7.1 There shall be a self-bailing anchor

locker with a hatch for access.

7.2 There shall be a stainless steel bow

roller installed to accommodate an anchor with a 12V windlass.

7.3 An appropriately sized anchor shall

be included.

7.4 25’ of chain and 200’ of braided nylon line, appropriately sized as per manufacturer specifications, shall be included.

Interior Helm Station

8.1 The interior helm station shall be

on the starboard side.

8.2 Minimum seating for (4) crew inside

the main cabin with minimum (3) shock mitigating seats, suspension seats with Height Adjust and height adjustable footrests. Shockwave S2 (or better)

8.3 Bench seat with storage on Port aft side

of the cabin.

8.4 Craft electrical components and

subcomponents suitable for saltwater marine environment.

8.5 Vendor shall provide electrical systems

system suitable for saltwater marine environment (Eaton switches and Blue

Sea 360 or equal breakers).

8.6 Minimum dual starting batteries and

dual house batteries. Vessel 12 VDC system shall have 20% spare breakers, 2 spares minimum, 5 & 10 amp.

8.7 All switches to be waterproof (Eaton or

8.8 The control consoles (helm station)

location shall be laid out by the Vendor and approved by WDFW’s

Representative prior to installation.

8.9 The “dash” shall be large enough to

accommodate all the controls, electronics, and gauges. The helm station shall accommodate but not be limited to the following:

8.9a Appropriate engine controls for engine package installed as per manufacturer specifications. Layout to be done in conjunction with WDFW

Representatives.

8.9b Flush mounted screens and gauge layouts in conjunction with WDFW

Representatives.

8.9c Power Hydraulic steering that meets or exceeds manufacturer specifications for dual engine applications.

8.10 Battery stowage/securing method to

be suitable to provide support and prevent movement in any direction, including rollover, for four 12 VDC batteries. Battery cables fit with terminal lugs. Lugs secured to the battery terminal studs with self-locking nuts. Batteries to be Marine type, heavy duty. Engine starter batteries to be sized per engine manufacturer’s specifications. House batteries to be sized to give a minimum of two hours operation at maximum house load.

8.11 Spotlight, GO LIGHT 20214 (or better)

with remote control.

8.12 Eight (8) DR LED 600+ or greater deck

floodlights with layout in conjunction with WDFW Representative.

8.13 Two bilge pumps, w/manual and

automatic switches on control console and mercury free float switch

(Ultra Safety Systems JR pump switch or equal); minimum rating of 1100 gph.

Bilge pumps shall be powered directly from the engine batteries and not through the disconnect switch or breaker. A visual indicator of pump operation to be provided at the helm as well as a manual switch to turn on the pumps (if not a sealed hull).

8.14 Electrical connections in bilge areas

(e.g. bilge pumping system connections) and areas exposed to water will be made by terminal strips in

National Electrical Manufacturers

Association (NEMA) 4X electrical enclosures. Watertight splices are utilized in locations where NEMA 4X enclosures are impractical (if not a sealed hull).

8.15 Instruments for dual engine installation

including tachometers, hour meters, voltmeters, oil pressure gauges, engine temp gauges, key switches and low oil/overheat warning system. All installed as per engine manufacturer specifications.

8.16 Two (2) LED cabin red and white

lighting. Note: Red and white light switch control should be independent function.

8.17 Low light deck lighting to provide

visibility during nighttime operations on working decks without compromising night vision of crew.

8.18 12 VDC cabin fans (2) capable of being directed toward the forward windows.

8.19 Four (4) 120 VAC duplex outlets in

cabin supplied by inverter/shore power. Location shall be laid out by the

Vendor and approved by WDFW’s

Representative prior to installation.

8.20 12 VDC to 110VAC Marine grade power inverter Xantrax or better. Minimum

2000 watts.

8.21 120 VAC / 60hz to 12 VDC battery charger.

8.22 25' (15.25 m), 30 Amp 120 VAC shore power receptacle & cord set w/1 duplex receptacle. Receptacle to be located on exterior of cabin, specific location TBD during construction.

Receptacles to be furnished with water tight covers.

8.23 LED lights are to be used on all lighting

systems.

8.24 Cathodic protection system (Zincs). Size

and location for hull protection TBD during construction.

8.25 Three (3) Dual USB outlets shall be

installed in the vessel, this outlet enables the charging of USB devices.

8.26 Sliding laptop mount tray on forward

port console with power adapter.

9 Heating System

9.1 Webasto AT2000 Diesel Heater with at

least a 6 gallon diesel fuel tank. In addition to window defrosters, the heater vents shall be placed in a manner that will adequately heat the entire cabin, to include the cuddy cabin. A fuel gauge for this heater shall be positioned at the helm.

10 Crab Davit

10.1 Downrigger mounting pads welded

near the stern of each gunwale, on both side. Exact location to be determined by WDFW Representative.

10.2 Two (2) 12V Electrical outlets near the

downrigger mount pads – one outlet for each pad.

10.3 One (1) Scotty 2500 Line Puller

11 Propulsion

11.1 Twin 425 HP MERCURY Verado

Outboards, Includes all Necessary

Rigging, Controls, Power Steering w/

Tilt Helm, Stainless Steel Propellers, Vessel View 7". Engines feature Digital

Electronic Control (DEC) and integrated

Digital Electronic Steering (DES).

11.2 Each engine will come with a stainless

steel propeller that is properly pitched and sized as per the engine manufacturer specifications.

11.3 Mercury, or comparable dual or equal

kit for dual engine configuration shall be used along with dual engine control panel assembly.

11.4 Power assist hydraulic steering for twin

engines.

11.5 Vessel digital display specifically for

Mercury outboard Engines.

11.6 Engines must be able to perform all HP

requirements with 87 octane fuel.

11.7 Each engine and all associated OEM

controls, harnesses, instruments and electrical equipment will be installed as per the manufacturer specifications for double engine applications. The precise location of the OEM throttle controls and engine instruments will be determined in conjunction with WDFW

Representative.

11.8 Zipwake Gyro Stabilized 300 series Trim

Kit.

12 Fuel System

12.1 Built in fuel tank(s) accessible through

deck for inspection and repair.

Minimum 185 gallon capacity.

12.2 Hart Systems (or equal) Tank Tender

fuel level gauge with cross-referenced label plate.

12.3 Racor (or equal) fuel filter system, one per engine, easily accessible for regular maintenance.

12.4 The fuel tanks and associated fill

and vent lines must be designed accept high-volume fueling until full without burping or leaking fuel from the vent holes.

12.5 Deck fill hole shall be positioned on the

gunwale, not on the flush deck.

12.6 Precise location of fuel fill holes will be

done in conjunction with WDFW

13 Radar and Electronics

13.1 Location and layout of electronic

equipment to be coordinated with

WDFW’s Representative at the time of construction. All IT technology must be approved by WDFW IT department before instillation.

13.2 One (1) Garmin GPSMAP 9017-17”

Chart plotter (or better). One to be installed at the helm station.

13.3 One (1) Garmin GPSMAP 9017-17”

Chart plotter (or better). One to be installed at the port console.

13.4 One (1) Garmin GMR Fantom 18HD

dome radar or better

13.5 One (1) Garmin Transducer

13.6 One (1) Garmin USB Card Reader

13.7 Garmin MSC 10 Marine Satellite

Compass

13.8 All necessary chart cards for Puget

Sound, including the Straits of Juan de Fuca and San Juan Islands, including Neah Bay area.

13.9 One (1) GARMIN AIS 800 Blackbox

Transceiver. Send and Receive AIS data

(Class B/SO).

13.10 One (1) ACR GlobalFIX V4 406 GPS

EIPRB, CAT I Auto

13.11 One (1) FLIR MD265 Fixed

13.12 Icom IC-M506 of better VHF with

included loudhailer, hailer horn and antenna w / stainless steel mounts.

13.13 Install One (1) R2100 Cradlepoint

Router. Router will be supplied by

WDFW. Cable will terminate at a location to be determined in

13.14 Installation of WDFW

supplied police radio at helm. Requires independent 12v DC power source, antenna mounting, cable run, speaker/siren installation, and aft deck radio speaker installed with wire run. Exact location of the radio will be determined in

Representative.

13.15 All radios shall be flush mounted at

helm panel or in separate panel above helm panel. Radios shall be installed to limit any obstructions of view out cabin windows.

13.16 Note: All antennas shall be marine

grade and meet or exceed radio manufacturer specifications.

Antennas will be mounted with stainless steel adjustable hardware.

13.17 Whelen Liberty II Light Bar (or

equal) with all blue LED lights. Light bar shall be mounted on an unobstructed portion of the radar mast/arch. Switch and indicator light to be installed at helm.

13.18 Four (4) corner blue strobes to be

activated in conjunction with the light bar. Placement will be done in

13.19 Whelen Loudhailer System.

WPA112, WPA2, SA315 (or equal) with siren.

13.20 Exact installation location of the

light bar and switch will be done in

13.21 One (1) Stereo Headunit with

Bluetooth and four marine speakers mounted in the cabin.

13.22 Six (6) 12v Marinco USB power

sockets (cigarette lighter style) shall be installed, two (2) at the helm seat area, two (2) at the co-pilot dash area, two (2) at rear locker bench seat. Power sockets will be installed in locations where an occupied socket will not interfere with movement of crew.

13.23 The Vendor shall provide all

electrical equipment and materials unless specifically noted and shall be suitable for marine applications in the service intended.

14 Electrical System and Equipment

14.1 The electrical system shall be a

grounded all bonded system. All electrical devices aboard the vessel shall be connected to power by means of a positive supply wire and a negative return wire. All senders shall be two pole devices. In no case shall the hull be used as a return path for any electrical equipment.

14.2 All switches, circuit breakers and

other electrical components shall be of heavy-duty marine quality.

14.3 Wiring shall be neatly run, suitably

supported at least every 18 inches, kept clear of the bilge areas, and wherever possible, neatly strapped to the underside of the decks.

14.4 All AC and DC wires shall be run

separately.

14.5 Wherever cables enter enclosures

or pass through bulkheads, frames, etc., they shall be protected from chafing by suitable bushings, softeners or connections, etc.

14.6 Stuffing tubes shall be used to

assure watertight integrity where cables penetrate decks or watertight bulkheads

14.7 Wiring shall be exposed throughout

the hull and shall be enclosed in an accessible wireway throughout the pilothouse.

14.8 All wiring connections shall be made

with solderless compression lugs and bolted together or connected to a stud terminal. All splices shall be insulated. Wire connections made by twisting the conductors together will not be accepted.

15 Navigation and Anchor Lights

15.1 The LED anchor light (all around)

shall be mounted on top of the cabin so as to not interfere with radar. It shall have a minimum three

(3) mile range.

15.2 The LED stern light shall have a

minimum two (2) mile range.

15.3 The LED port side (red) and LED

starboard (green) navigation lights shall be installed on the cabin top as far outboard as possible.

15.4 Two (2) spotlights under the bow to

be used as driving lights at night.

15.5 All wiring shall be multi-stranded

wet/dry and PVC jacketed. Wiring shall meet the standards detailed in the U.S. Code of Federal Regulations

#46, Subchapter J.

15.6 Where the electrical connections

must be made to the hull, the connection shall be coated with

KOPRshield, a conductive anti-seize, anti-corrosive compound.

16 Battery Power System

16.1 Three (3) Group 27 deep cycle

batteries for starting (in secured boxes).

16.2 Two (2) Group 31 deep cycle battery

(in secured box) for wheelhouse electronics (All batteries shall be easily accessed for maintenance).

16.3 Minimum of two (2) BlueSea on/off

battery switches installed per manufacturer specifications for specified battery configuration.

16.4 Minimum 2,000 watt inverter for

A/C power

16.5 If the primary battery cables to the

battery select switch at the helm is longer than 72”, a 250 amp, 12-volt fuse shall be installed in each cable as required by the US Coast Guard.

16.6 BlueSea AC/DC electrical breaker

distribution panel, custom designed and engineered for this application and installed as per manufacturer specifications.

16.7 All necessary BlueSea water-

resistant rocker switches and fuse blocks will be provided and installed.

16.8 The electrical breaker panel will be

located in conjunction with WDFW

16.9 The bilge pumps must be wired into

the electrical system to allow for automatic activation by automatic float switches. These must be operable even when all other electrical systems (DC) are shut off and the vessel is not manned.

17 Shore Power

17.1 The shore power (110 volt AC

electrical) service shall be rated at a minimum 30 amps with battery charger. The system must be protected and isolated from the hull to prevent electrolysis.

17.2 There shall be a main AC breaker

panel with a main circuit breaker.

Circuit breaker protected circuits on all electrical systems on the vessel.

17.3 Outlet location will be in

17.4 All outlet locations are approximate

and exact locations will be determined in conjunction with

WDFW Representative.

17.5 The shore power shall include a

minimum twenty five (25) foot long umbilical cord with marine fittings.

The thru hull fittings must be watertight in installed in cabin’s aft bulkhead.

18 Paint Systems and Deck Coatings

18.1 Exterior painting of the cabin shall

include properly preparing the aluminum for paint adhesion: Metal

Jacket Coating – clear coat all topsideAluminum.

18.2 Paint Colors: Aluminum above

waterline and black ordark antifouling below the waterline. "FISH AND

WILDLIFE POLICE" in contrast markings.

Dark Green color fendering system.

18.3 Bottom paint shall include properly

preparing the aluminum for paint adhesion and Anti-Fouling Black

Bottom Paint (as per manufacturer specifications).

18.4 Non-skid deck coating shall be applied

to all walking surfaces on the deck, walk-around, steps, bow, and gunnel tops.

18.5 Nonskid rail wrap on all hand rails.

18.6 All paint and/or coating applications in

this section shall be completed in accordance with the paint and/or coating manufacturer instructions.

18.7 Two (2) WDFW provided Police Badge

decals shall be installed port and starboard sides of cabin.

18.8 A placard shall be posted in the

pilothouse of the vessel warning against overboard discharge of oily water as required by the US Coast

Guard.

19 Safety Equipment

19.1 Vendor shall provide the following

equipment and installation according to manufacturer recommendations (if applicable):

19.2 One (1) USCG approved 24" life ring

with heaving line (in bag) and stainless steel mounts.

19.3 Two fire extinguishers and USCG

approved signal flares.

19.4 USCG Approved Emergency Positioning

Indicating Radio Beacon (EPIRB) Cat 2, 406 Mhz, shall be supplied and installed to allow it to float-free in the event of vessel sinking.

19.5 Four (4) large black 5.5” by 20”

cylinder-shaped fenders.

19.6 Four (4) black 3/8" X 9' fender whips.

19.7 Four (4) 5/8” X 30’ braded mooring

lines.

19.8 One (1) heavy duty telescoping boat

hook.

19.9 One (1) marine-grade smoke and

carbon monoxide detector.

19.10 Locations where safety equipment will

be mounted will be done in conjunction with WDFW Representative.

20 Testing and Sea Trials

20.1 The Vendor shall test noise levels, according to OSHA standards, in the pilothouse with WDFW’s

Representative as a witness.

20.2 The Vendor shall be responsible for

delivering the vessel with noise level less than 85db in the pilothouse, based on an eight (8) hour weighted average of operation.

20.3 The tests shall be performed in the

pilothouse at the operators and crews ear level.

20.4 The Vendor shall conduct such dock

trials as may be necessary to demonstrate that all machinery and systems are in satisfactory working order.

20.5 Final sea trial(s) shall be conducted

within 100 miles of Bremerton, Washington State with WDFW authorized representatives aboard and participating in said trial(s). Delivery of vessel to the sea trial(s) location will be the responsibility of the Vendor.

20.6 Maneuvering tests shall be conducted

to determine the handling qualities of the boat and adequacy of steering mechanisms.

20.7 A minimum of two sets of speed test

shall be performed; both shall be with full fuel aboard.

21 Warranty Information

21.1 The warranties shall be at a minimum

as follows:

• Hull, 15-year warranty

• Fuel Tank, 5-year warranty.

• The propulsion, electrical, electronics and steering systems shall carry the manufacturers

(OEMs) extended or optional warranty plan.

• Include any insurance plan(s) that maybe related to extended warranty plans and/or related to equipment performance.

Complete warranty explanation shall be included with return of bid for all components.

21.2 Warranty Repairs: All warranty

repairs shall be conducted at vessel’s duty station. Vendor may transport vessel or related equipment, at Vendor’s expense, to a secured location or vendor’s facility if necessary to complete the repairs within a reasonable time frame.

22 Publications

22.1 Two (2) copies each of an

Operations and Maintenance manual shall be complied and delivered with the vessel. Each instruction manual shall be bound in a good quality loose-leaf notebook with labeled dividers between each section.

22.2 The manual shall include

instructions for operation, maintenance intervals and part lists for all equipment and systems on the vessel. This shall include but not be limited to:

22.3 Engines

22.4 All electronic components

22.5 Electrical panels (AC and DC)

22.6 Bilge pumps

22.7 Windshield wipers

23 Notes to Vendor:

23.1 Inspections: During construction, the vessel including all outfitting machinery and equipment shall be subject to inspection by the WDFW’s Representative. These representatives shall have the free access to the vessel and the Vendor’s plant for the purpose of inspecting materials and work in progress.

The WDFW’s Authorized

Representative for this project is

Sergeant Ken Balazs (360) 912-1577

Kenneth.Balazs@dfw.wa.gov

Secondary Contact is Lieutenant Kit

Rosenberger (360) 708-7254

Kit.Rosenberger@dfw.wa.gov

They have the authority to reject defective material and workmanship.

23.2 Preparation for Delivery: Prior to

delivery, Vendor and/or its agents along with WDFW will conduct sea trials. Sea trials will include performance of boat and attached specified equipment, according to OEMs maximum performance specifications.

Should boat or attached equipment fail sea trial or fail to meet performance expectations, vendor shall within a reasonable time frame resolve all performance issues.

All interior spaces, tanks, bilges, and other spaces are to be clean and thoroughly cleared of dunnage, scrap, refuse, and dirt.

mailto:Kenneth.Balazs@dfw.wa.gov mailto:Kit.Rosenberger@dfw.wa.gov

Special care is to be taken that all surfaces in the tanks, pipelines, and machinery are clean and free from any foreign material, and that all painted surfaces are touched up and that all machinery is in perfect running order.

24 Delivery

24.1 Delivery shall be completed by no

later than April 1, 2028, with a maritime based delivery location within 100 miles of the Port Orchard Marina. Specific location shall be determined by WDFW and agreed upon by Vendor prior to delivery. Vessel will be fully fueled at time of delivery.

24.2 The Vendor shall provide boat

registration application documents to the WDFW at time of delivery and shall provide titles, registrations and a complete itemized invoice. Following review of specifications with Vendor, WDFW shall sign and date purchase order, attach invoice, and submit to

WDFW purchasing agent showing that this contract is completed.

25.1 Delivery will NOT be considered

complete until all forms necessary for titling with the State of Washington Department of Licensing:

• Manufacturer’s Certificate of Origin

• Odometer Disclosure Statement (as required)

• Vehicle/Vessel Title Applications) are received in correct form

These documents shall be provided at time of delivery with the ordered herein. The words “Same as Above” will be used in the “Legal Owner” block.

DO NOT PROCESS OR FORWARD these documents to the Department of

Licensing. WDFW will process all title applications.

Should vendor fail to deliver on said date this order shall be void. State shall not take delivery. State shall not be liable for any cost

Delivery Hours:

Mon – Fri. 9:00 am – 4:00 pm

Payment terms: WDFW will process payment (net 30 days) to the awarded vendor at the time of conclusion of all goods and services having been received, location contact has satisfactorily accepted the delivery and vendor provides proper invoice. Progress payments are not an option

Submitted bid needs to have literature

(brochure) with specifications and picture of the item’s make and model available and ready

PRICE SHEETS

Req.

Item

Comm.

Code

Description

PF260482MZ

Qty Unit Unit

Price

Total

Price

1. GARMIN GPS SYSTEM

For Product Bid State:

Mfg.:

Brand/Model:

1 EA $ $

2. OUT BOARD ENGEINE

For Product Bid State:

Mfg.:

Brand/Model:

2 EA $

3. New/unused Patrol Vessel

For Product Bid State:

Mfg.:

Brand/Model:

1 EA $ $

4. Delivery

For Product Bid State:

Mfg.:

Brand/Model:

1 EA $ $

Subtotal $

Prompt Payment Discount: _____% discount for payment within _____ days

MANDITORY BIDDER REQUIREMENTS
• Licensed to do business in the State of Washington. If not licensed, provide a written intent to become licensed in Washington within thirty (30) calendar days of being selected as the Apparent Successful Bidder.

This is the start of the file's text. The full file is on GovTribe.