This is an Advertisement for Bids issued by the Cobb County-Marietta Water Authority for the Pete Shaw Tank No. 1 Perimeter Handrail Project located at 3145 Pete Shaw Road, Marietta, Georgia. The project encompasses the addition of perimeter handrail to the Pete Shaw Tank No. 1 ground storage tank, including mobilization, tank access, removal of existing handrail, installation of new handrailing around the full perimeter of the tank's dome top, installation of a safety gate at the existing ladder, and cleaning of the work area outside the tank. Sealed bids will be received until 2:00 p.m. on May 4, 2023, at the Cobb County-Marietta Water Authority offices located at 1170 Atlanta Industrial Drive, Marietta, Georgia. A non-mandatory Pre-Bid Conference will be held on April 18, 2023, at 10:00 a.m. at the project site, with site tours to follow. All project questions must be submitted by email no later than 5:00 p.m. on April 21, 2023, to the project engineer David Haas at dhaas@hazenandsawyer.com. Pre-qualification applications are required and must be received by 2:00 p.m. on May 2, 2023. The project will be awarded as a single contract with a completion period of 180 consecutive calendar days from the date of commencement.
Bidders must be properly pre-qualified and licensed in Georgia at the time of bid submission. Each bid must be accompanied by a Bid Bond equal to five percent of the total contract amount or equivalent certified check, a notarized Non-Collusion Affidavit, Contractor's License Certification, an Affidavit Verifying Status for the Public Benefit Application, and a Security and Immigration Compliance Act Certification. The successful bidder will be required to furnish a Performance Bond, Payment Bond, and Pre-Construction Oath prior to contract execution. Bids will remain subject to acceptance for 60 days after the bid opening date. The Owner reserves the right to reject any or all bids and to waive informalities. Contract documents are available from the Engineer's Project Manager, David Haas, at Hazen and Sawyer, 1300 Altmore Avenue, Suite 520, Atlanta, Georgia 30342.
Text of this file
651982B.GN1
ADVERTISEMENT FOR BIDS
SEPARATE SEALED BIDS for furnishing all materials and providing all labor, tools, and equipment will be received by the Cobb County-Marietta Water Authority at 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066 until 2:00 p.m., local time, May 4, 2023, for the Project known as:
PETE SHAW TANK NO. 1 PERIMETER HANDRAIL PROJECT
at which time and place the Bids will be publicly opened and read aloud. Bids received after the designated time for receival of bids will not be considered. Unsealed Bids, including facsimile Bids or Bids sent by e-mail, will not be considered. The Owner of the project is Cobb County-Marietta Water Authority. The Engineer for the project is Hazen and Sawyer. Bid opening time is subject to extension pursuant to O.C.G.A. Section 36-91-20(d).
Bidders shall inform themselves concerning Georgia Laws and comply with same.
The Project will result in the addition of perimeter handrail to Pete Shaw Tank No. 1 ground storage tank located at 3145 Pete Shaw Road, Marietta, Georgia 30066, including: mobilization, tank access, removal of existing handrail, installation of new handrailing around the full perimeter of the tank’s dome top, installation of safety gate at existing ladder, and cleaning of work area outside of tank.
The time allowed for Final Completion and readiness for final payment is 180 consecutive calendar days from the date of commencement.
The Work will be awarded in one Contract.
PRE-QUALIFICATION OF BIDDERS is required. Only Bids submitted by properly pre-qualified Bidders will be opened. A copy of the application and qualification requirements for this Project can be obtained from the Engineer, Hazen and Sawyer, Attn: David Haas, 1300 Altmore Avenue, Suite 520, Atlanta, Georgia, 30342, 404/459-6363, dhaas@hazenandsawyer.com.
Applications for Pre-qualification of Bidders will be received at the Administration and Engineering Office of the Cobb County-Marietta Water Authority, 1170 Atlanta Industrial Drive, Marietta, Georgia 30066 until 2:00 p.m., local time, May 2, 2023. Pre-qualification application documents must be submitted separately from the sealed bid documents. Notification of pre-qualification status will be made by e-mail prior to the Bid Opening date.
A non-mandatory Pre-Bid Conference will be held for all Bidders beginning at 10:00 a.m., local time, April 18, 2023, at the Project site (3145 Pete Shaw Road, Marietta, Georgia 30066). A tour of the Project site to follow. All Bidders are encouraged to attend.
Additional visits to the sites may be allowed for Bidders and will be by appointment only. Requests for additional visits should be sent to Cobb County-Marietta Water Authority following the instructions provided at the Pre-Bid Conference.
All questions related to the Project shall be submitted by email no later than 5:00 p.m., local time, April 21, 2023 to the Engineer’s Project Manager, David Haas, at dhaas@hazenandsawyer.com. Questions, if answered, will be addressed by addendum to the Contract Documents. Receipt of any amendment to this Advertisement for Bids shall be acknowledged, in writing, and shall be submitted with the Bid.
Copies of Electronic Contract Documents may be obtained from the Engineer’s Project Manager, David Haas, at DHaas@hazenandsawyer.com. The Issuing Office Address is: 1300 Altmore Avenue, Suite 520, Atlanta, GA 30342 (404/459-6363).
By obtaining the Contract Documents, company agrees to allow company information (company name, address, phone and fax numbers) to be published as a registered planholder. The Owner is not obligated to consider a Bidder's proposal if Bidder is not on record with the Issuing Office as having received a complete set of Bidding Documents from the Issuing Office.
All Bids must be made out on the bid form to be obtained from the Engineer with the contract documents, in accordance with the Instructions to Bidders. No interlineations, additions or deletions shall be made in the bid form by the Bidder.
Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the Owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the Owner in an amount equivalent to five percent of the total amount payable by the terms of the contract or, in lieu thereof, a certified check, cashier's check, or cash in equal amount. The Bid Bond shall be prepared on the Bid Bond form attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as Surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570.
Each Bid must also be accompanied by a notarized Non-Collusion Affidavit of Bidder, Contractor’s License Certification, Affidavit Verifying Status for Cobb County-Marietta Water Authority Public Benefit Application, and Security And Immigration Compliance Act Certification. Out-of-state corporations and other entities must submit evidence of authority to conduct business in Georgia as an out-of-state entity.
Each Bidder must be licensed in the State of Georgia at the time of the Bid. Bids shall be submitted only under the legal name certified to transact business in Georgia by the Georgia Secretary of State.
The Owner will in no way be liable for any costs incurred by any Bidder in the preparation of its Pre-Qualification Application or its Bid in response to this Advertisement for Bid.
The successful Bidder will be required to furnish a Performance Bond, Payment Bond, Certification of Contractor’s Attorney, and Contractor’s Affidavit and Agreement with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The successful Bidder will also be required to furnish the Pre-Construction Oath pursuant to O.C.G.A. §36-91-21 from every person who procures the Agreement. The successful Bidder shall also provide an executed Subcontractor Affidavit for each subcontractor working on the Project, using the form attached to the Agreement. The terms and time for payment are set forth in the Agreement.
All Bids will remain subject to acceptance for sixty (60) days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.
The Owner reserves the right to reject any or all Bids, to waive informalities and re-advertise.
Cobb County-Marietta Water Authority
Cole Blackwell, CPA General Manager
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK
Revised August 12, 2003, JJG Revisions 12/06/04
AFB-3 03/04/05 2046-017/XA00020
| ADVERTISEMENT FOR BID | PW/DEN001/651982 |
| 00 01 20 - 2 | APRIL 6, 2023 |
| 32485-029 / 00020 / 03/28/2023 | 00020-1 | PETE SHAW TANK NO. 1 | |
| BID SET | PERIMETER HANDRAIL PROJECT |
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .