Pest Control_Base and Sector PWS 26-27_Updated 16JUL2026.docx
DOCX document 1 MB Posted
- Solicitation number
- 70Z02926QGALV0068
About this file
This is a Performance Work Statement (PWS) for pest control services at USCG Base Galveston and USCG Sector Houston-Galveston for a 60-month period (Base Year Plus 4 Option Years, 2026-2031). The contract is a Total Small Business Set-Aside awarded on a Firm-Fixed Price basis to the lowest bidder. The contractor must provide comprehensive integrated pest management (IPM) including monthly spot treatments for rodents, crawling insects (roaches, ants, spiders), and stinging insects (wasps, hornets) across all buildings and exterior grounds. Additional services include monthly mosquito abatement with both larvicide treatments of breeding sites and adulticide applications during peak season (April-October), monthly termite monitoring with localized treatment capabilities, pest and animal removal and disposal, monthly grounds inspections for ant hills and pest harborage areas, 24-hour response to service calls for pest intrusions, and detailed monthly reporting of all treatments, conditions, products applied, and dates. The contractor must submit Safety Data Sheets for all products at contract commencement.
Services are required at two primary locations: US Coast Guard Sector Houston-Galveston (13411 Hillard St., Houston, TX 77034) including the MSST Building and Main Sector Building (approximately 23,000 square feet), and US Coast Guard Base Galveston (3000 Fort Point Road, Galveston, TX 77550) encompassing multiple facilities including FRC MAT, Warehouse, Engineering, Services, Administration & Command, Armory buildings, Unaccompanied-Personnel Housing, and Armory Gun Range. Work hours are 7:00 AM to 3:00 PM, Monday through Friday, excluding federal holidays. The contractor must contact the Facilities Point of Contact five days prior to scheduled treatments, may use reasonable federal utilities with connections being contractor responsibility, and must comply with environmental restrictions preventing work during adverse weather. The contractor bears full responsibility for proper disposal of all hazardous materials in accordance with federal, state, and local regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z02926QGALV0068_0_US.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG BASE GALVESTON & SECTOR HOUSTON-GALVESTON
GENERAL PEST CONTROL
PERFORMANCE OF WORK STATEMENT
DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD
USCG BASE GALVESTON
SECTOR HOUSTON-GALVESTON
Performance of Work Statement
FOR
Pest Control Service Base Year Plus 4 Option Years 2026-2031
1.0 GENERAL
Description of Work: The United States Coast Guard (USCG) is accepting proposals for Pest Control Services as described within this Performance of Work Statement for USCG Base Galveston, USCG Sector Houston-Galveston site, and its accompanying MSST building. Base Galveston's goal is to provide on-time and affordable pest control services that consistently meet or exceed the expectations of the Coast Guard. USCG requires the following to accomplish this goal; it is essential that the facility is pest-free and that military etiquette is adhered to.
The purpose of this Performance of Work Statement (PWS) is to provide expectations of services to be performed. The Contractor shall provide all labor, equipment, materials, and transportation necessary to complete the following work for pest control services at USCG Base Galveston, USCG Sector Houston-Galveston, and its accompanying MSST building. The service is to cover 60 months. All work should be completed in accordance with this PWS.
· This is for Small Business Set-Aside.
· This will be a Firm-Fixed Price Award to the lowest bidder.
1.1 SCOPE OF WORK
The Contractor shall provide comprehensive pest management services as follows:
· Integrated Pest Management (IPM): Perform monthly integrated pest management of spot/partial/localized treatments for covered pests within all buildings and surrounding exterior grounds. Covered pests include, but are not limited to: rodents (rats, mice), crawling insects (roaches, ants, spiders), and stinging insects (wasps, hornets). Vendor provides all necessary services, supplies, and equipment.
· Mosquito Abatement: Provide a comprehensive mosquito control program as detailed in Section 1.2.
· Termite Monitoring: Perform monthly inspections for evidence of termite activity. If localized termite activity is discovered, the Contractor shall perform spot/partial/localized treatments and immediately report the findings to the Facilities POC for further action. This PWS does not cover full structure termite remediation.
· Pest and Animal Removal: Perform disposal services for any captured pests or animals caught within traps (e.g., rats, rodents, or other vermin).
· Grounds Inspection: Perform monthly inspections of grounds to identify, treat, and report ant hills and other pest harborage areas.
· Service Calls: Respond to all service calls placed for pest intrusion/infestation for any interior and exterior location as mentioned below within 24 hours of notification.
· Reporting: Provide a detailed monthly report of all treatments conducted, conditions found, pest activity, amount and type of product applied, and date of application for each location.
· Safety Data Sheets (SDS): Submit SDS for all products to be used at the beginning of the contract period for government review and records.
1.2 MOSQUITO ABATEMENT SERVICES
Contractor(s) shall provide a comprehensive mosquito control program that includes, but is not limited to:
· Larvicide: Perform monthly inspection and treatment of all potential mosquito breeding sites (e.g., standing water in drains, ditches, containers, and low-lying ground areas) with an appropriate larvicide to prevent mosquito larvae from maturing.
· Adulticide: Apply adulticide treatments (e.g., barrier spraying, fogging) in outdoor common areas, around building perimeters, and in recreational areas. Standard application shall be monthly, with increased frequency during peak season (April-October) or as directed by the Facilities POC in response to a documented increase in mosquito activity.
· Site Surveillance: Conduct regular surveillance of the grounds to identify, document, and eliminate (or report to the POC) sources of standing water that may serve as mosquito breeding grounds.
1.3 LOCATIONS
· US Coast Guard Sector Houston-Galveston 13411 Hillard St.
Houston, TX 77034 Buildings within address include:
· MSST Building
· Main Sector Building (approx. 23,000 sq/ft)
· Sector Security Guard Shack
· US Coast Guard Base Galveston 3000 Fort Point Road Galveston, TX 77550 Buildings within address include:
· FRC MAT Building
· Warehouse Building
· Engineering Building
· Base Security Guard Shack
· Services Building
· Unaccompanied-Personnel Housing (UPH)
· Multi-Mission Building
· Administration & Command Building
· Base Armory Building
· Armory Gun Range - When not Hot (Actively in Use)
1.4 LOGISTICS AND RESTRICTIONS
· Hours of Operation: 7:00 AM – 3:00 PM, Monday – Friday, excluding federal holidays.
· Scheduling: The contractor is to contact the Facilities POC 5 days prior to any scheduled treatment to coordinate access and scheduling.
· Utilities: The contractor may use reasonable amounts of Federal Agency utilities. Connections shall be the responsibility of the contractor. Restroom facilities are available.
· Environmental Restrictions: Work shall not proceed when weather conditions (e.g., rain, high winds) will detrimentally affect the quality and safety of the application.
· Disposal of HazMat: The contractor shall be responsible for the proper disposal of all hazardous materials generated from the service process in accordance with federal, state, and local regulations.
END OF SECTION
image4.png image1.jpg image2.png image3.jpeg
File details come from the government source that posted it. Updated .