PERKEPAVE_STANDARD_DETAIL_5-20-24_(1).pdf

PDF 2 MB Posted

Attached to
Porous Flexible Pavement (Bid Discount)
Solicitation number
26-P-00383
Issued by
Hillsborough County, Florida

About this file

This is a technical specification document and standard detail drawing for porous flexible pavement installation prepared by PerkEPave designs for Hillsborough County, Florida. The document outlines the standard elevation detail for porous flexible pavement used in trails, paths, sidewalks, tree surrounds, and erosion control applications. The specification details the layered construction methodology, which includes stabilized sub-base prepared per loading requirements, clean #57 stone contoured and compacted to site-specific existing grade, and a standard 1-1/2" porous flexible pavement layer. The county is soliciting bids for installation of this system covering 1,600 square feet adjacent to the Riverfront Recreation Center at 1301 N Boulevard, Tampa, Florida, with bids due July 6, 2026. The project scope encompasses mobilization, excavation, material haul-off, base gravel placement, and porous flexible pavement installation.

The technical specifications recommend a minimum 3" depth of clean #57 stone to create a stormwater management reservoir, with actual volume calculations to be determined by the design professional. Optional enhancements include geo-tech fabric, permanent landscaping edging, and stabilizing geo-grid (VEVOR Ground Grid rated at 1,885 lbs per square foot). The county has designated this solicitation with a bid discount incentive, indicating potential price advantages for qualifying responsive bids. ADA compliance is required for the project, and Occupational Safety and Health Administration material safety data requirements apply to all installation work. Payment and invoicing requirements are tied to Small Local Business Enterprise (SLBE) and ADA compliance frameworks, with a Tampa Cloud Hosting Policy applicable to any digital submission systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

drw scale date rev

5/20/24NTS

This drawing is the property of PerkEPave designs. The drawing is being furnished for information only. The use does not represent an engineers certi�cation of required local building codes or regulations unless it has been approved by local authorities

Trails, Paths, Sidewalks, Tree Surrounds, Erosion Control, Trench Drains

TEC 2

www.perkepave.com

STANDARD ELEVATION DETAIL

Note: The 3” of clean #stone is a recommendation for creating a reservoir for holding stormwater. The actual calculation of the volume needed for managing stormwater is a function of the design professional

Existing Soils Stabilized Sub-base Per Loading Requirements

Clean #57 Stone Contoured and Compacted

Site Speci�c

Existing Grade

Depth of stone to be per engineers need for managing stormwater, 3” minimum depth recommended.

Standard Thickness - 1-1/2”

Geo-tech Fabric (Optional)

Permanent Landscaping Edging

Optional Stablizing Geo Grid VEVOR Ground Grid, 1885 lbs per Sq Ft Load Geo Grid, 3" (Recommended) or Temporary Forms

File details come from the government source that posted it. Updated .