This document is a Performance Work Statement (PWS) for custodial services at the United States Army Signal Activity, Presidio of Monterey Enclave (UPE) located in Camp Roberts, California. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, materials, supervision, and other items and non-personal services necessary to perform scheduled routine cleaning, special event cleaning, and unscheduled service cleaning at 7 facilities covering approximately 117 acres. Key services include hard and carpeted floor cleaning, dusting, trash removal, restroom and locker room cleaning and disinfecting, stocking/restocking of supplies, and glass cleaning. The government will award a firm fixed price contract with some "As Required" contract line items. The contractor shall follow all applicable federal, state, and local laws and regulations, and comply with security requirements, including training in antiterrorism, operational security, and threat awareness. The PWS includes detailed performance standards, deliverables, quality control requirements, and government-furnished and contractor-furnished equipment and materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUSTODIAL SERVICES
PERFORMANCE WORK STATEMENT (PWS)
United States Army Signal Activity, Presidio of Monterey Enclave (UPE) - Camp Roberts, California
19 Mar 2024 ii
Table of Contents
| 1.0 | General | 1 |
| 1.1 | Description of Services/Introduction | 1 |
| 1.2 | Background | 1 |
| 1.3 | Objectives | 1 |
| 1.4 | Scope | 2 |
| 1.4.1 | Changes in Scope of Work | 2 |
| 1.5 | Traffic Flow (if applicable) | 3 |
| 1.6 | Restoration of Real Property Damage | 3 |
| 1.7 | General Information | 3 |
| 1.7.1 | Locations to Receive Custodial Service | 3 |
| 1.7.2 | Schedule of Services Work Log | 3 |
| 1.7.3 | Recognized Holidays | 3 |
| 1.7.4 | Hours of Operation | 4 |
| 1.7.4.1 | Installation Closures | 4 |
| 1.7.4.2 | Emergency Delays and Support | 4 |
| 1.7.4.3 | Unforeseen Buildings Closures | 4 |
| 1.7.5 | Place of Performance | 4 |
| 1.7.6 | Type of Contract | 5 |
| 1.7.7 | Security Requirements | 5 |
| 1.7.7.1 | Access and General Protection/Security Policy and Procedures | 5 |
| 1.7.7.2 | Physical Security | 5 |
| 1.7.7.3 | Security Training | 5 |
| 1.7.7.4 | Key Control | 7 |
| 1.7.7.5 | Lock Combinations (not applicable) | 7 |
| 1.7.8 | Post Award Conference/ In-Progress Review Meetings | 7 |
| 1.7.9 | Government Roles and Responsibilities | 8 |
| 1.7.9.1 | Contracting Officer (KO) | 8 |
| 1.7.9.2 | Contracting Officer’s Representative (COR) | 8 |
| 1.7.10 | Specific Contractor Requirements, Roles and Responsibilities | 9 |
| 1.7.10.1 | U.S. Residency | 9 |
| 1.7.10.2 | Contractor Hiring Restrictions | 9 |
| 1.7.10.3 | Contractor Identification | 9 |
| 1.7.10.4 | Standards of Conduct | 9 |
| 1.7.10.5 | Contractor Key Personnel | 10 |
| 1.7.10.6 | Phase In /Phase Out Period | 11 |
| 1.7.10.7 | Quality Control | 11 |
| 1.7.10.8 | Emergency Services | 11 |
| 1.7.10.9 | Accident Reporting | 11 |
| 1.7.10.10 | Environment and OSHA | 11 |
| 1.7.10.11 | Asbestos Awareness (not applicable) | 13 |
| 1.7.11 | Environmental Compliance | 13 |
| 1.7.11.13 Safety Data Sheets. | 13 | |
| 2.0 | Definitions and Acronyms | 15 |
| 2.1 | Definitions | 15 |
| 2.1.1 | AbilityOne Commission | 15 |
| 2.1.2 | Acceptable Quality Level (AQL) | 15 |
| 2.1.3 | Carpet Care.\ | 15 |
| 2.1.4 | Child, Youth and School Services (CYSS) | 15 |
| 2.1.5 | Cleaning | 15 |
| 2.1.6 | Contractor | 15 |
| 2.1.7 | Contractor Acquired Property (CAP) | 15 |
| 2.1.8 | Contracting Officer (KO) | 15 |
| 2.1.9 | Contracting Officer’s Representative (COR) | 16 |
| 2.1.10 | Deficient Service | 16 |
| 2.1.11 | Deliverable | 16 |
| 2.1.12 | Disinfect | 16 |
| 2.1.13 | Dry Buffing | 16 |
| 2.1.14 | Equipment | 16 |
| 2.1.15 | Exterior Windows | 16 |
| 2.1.16 | Government Furnished Property (GFP) | 16 |
| 2.1.17 | Government Property | 17 |
| 2.1.18 | Government Project Manager | 17 |
| 2.1.19 | Hard Surface Floor Care | 17 |
| 2.1.20 | High-efficiency Particulate Air Vacuum Cleaners (HEPA) | 17 |
| 2.1.21 | Heating, Ventilation and Air Conditioning (HVAC) | 17 |
| 2.1.22 | Institute of Inspection, Cleaning and Restoration Certification (IICRC) | 17 |
| 2.1.23 | Interior Window | 17 |
| 2.1.24 | International Sanitary Supply Association (ISSA) | 17 |
| 2.1.25 | Lavatories/Latrines/Bathrooms | 17 |
| 2.1.26 | Legal and Other Requirements | 18 |
| 2.1.27 | Loss of Government Property | 18 |
| 2.1.28 | Material | 18 |
| 2.1.29 Mold/Mildew | 18 | |
| 2.1.30 | Non-Personal Services | 18 |
| 2.1.31 | Performance Requirements Summary (PRS) | 19 |
| 2.1.32 | Physical/Community Fitness Centers | 19 |
| 2.1.33 | Physical Security | 19 |
| 2.1.34 | Property | 19 |
| 2.1.35 | Property Records | 19 |
| 2.1.36 | Provide | 19 |
| 2.1.37 | Public Traffic Areas | 19 |
| 2.1.38 | Quality Assurance | 19 |
| 2.1.39 | Quality Assurance Surveillance Plan (QASP) | 19 |
| 2.1.40 | Quality Control | 19 |
| 2.1.41 | Real Property | 20 |
| 2.1.42 | Recyclable Materials | 20 |
| 2.1.43 | Sanitize | 20 |
| 2.1.44 | Schedule of Services | 20 |
| 2.1.45 | Sensitive Property | 20 |
| 2.1.46 | Service Calls | 20 |
| 2.1.47 | Soil | 20 |
| 2.1.48 | Spill Plan | 21 |
| 2.1.49 | Spray Buffing | 21 |
| 2.1.50 | Spot Cleaning | 21 |
| 2.1.51 | Stairwell Cleaning | 21 |
| 2.1.52 | Stripping | 21 |
| 2.1.53 | Subcontractor | 21 |
| 2.1.54 | Sweep | 21 |
| 2.1.55 | Trash Removal | 21 |
| 2.1.56 | Wide Area Workflow (WAWF) | 22 |
| 2.1.57 | Workday | 22 |
| 2.1.58 | Work Week | 22 |
| 2.2 | ACRONYMS. | 23 |
| 3.0 | Government Furnished Property, Equipment and Services. | 25 |
| 3.1 | General | 25 |
| 3.2 | Basic Requirements | 25 |
| 3.3 | Facility/Area(s) | 25 |
| 3.4 | Privately Owned Vehicles (POVs) | 25 |
| 3.5 | Utilities and Services | 26 |
| 3.6 | Materials and Supplies. | 26 |
| 4.0 | Contractor Furnished Materials and Equipment. | 27 |
| 4.1 | General. | 27 |
| 4.2 | Classified Controlled Facility Clearance. | 27 |
| 4.3 | Materials and Supplies. | 27 |
| 4.3.1 | List of Cleaning Products | 28 |
| 4.3.2 | Known Hazards | 28 |
| 4.3.3 | Cleaning Solutions Requirements | 28 |
| 4.4 | Equipment | 28 |
| 4.4.1 | Carpet, Tile / Grout Cleaning | 29 |
| 4.4.2 | Unserviceable Contractor Equipment. | 29 |
| 5.0 | Specific Tasks for General Cleaning | 30 |
| 5.1 | General | 30 |
| 5.2 | Perform Special Event Cleanings (i.e., VIP and/or event cleaning) | 30 |
| 5.3 | Specific Tasks for scheduled general cleaning | 30 |
| 5.3.1 | Hard Floors. (Vinyl, Ceramic, Wood, Concrete, etc.) | 31 |
| 5.3.1.1 | Spray and Buff | 31 |
| 5.3.1.2 | Stripping/Scrub/Finishing | 31 |
| 5.3.1.3 | Wet Mop | 31 |
| 5.3.2 | Carpeted Floors | 32 |
| 5.3.2.1 | Removable Walk off Mats | 32 |
| 5.3.2.2 | Carpet Cleaning and Shampooing | 32 |
| 5.3.2.3 | Spot Cleaning Carpets | 33 |
| 5.3.3 | Quarry / Ceramic / Porcelain Tile Cleaning | 33 |
| 5.3.4 | Stairways/Elevators/Handicap Lifts | 33 |
| 5.3.5 | Solid Waste Collection and Removal | 33 |
| 5.3.5.1 | Recycle Collection and Removal | 34 |
| 5.3.6 | Restrooms/Toilet Areas/Locker Rooms | 34 |
| 5.3.6.1 | Clean and Disinfect Restrooms | 34 |
| 5.3.6.2 | Restroom and Locker Room NHSW Removal | 34 |
| 5.3.6.3 | Floor Care | 35 |
| 5.3.6.4 | Stocking and Restocking of Supplies | 35 |
| 5.3.7 | Drinking Fountains | 35 |
| 5.3.8 | Dusting | 36 |
| 5.3.8.1 | Dusting, Low Areas (under six (6) feet) | 36 |
| 5.3.8.2 | Dusting, High Areas (over six (6) feet) | 36 |
| 5.3.8.3 | Dusting, Light | 36 |
| 5.3.8.4 | Dusting, Heavy | 36 |
| 5.3.9 | Interior Glass | 36 |
| 5.3.10 | Exterior Glass | 36 |
| 5.4 | Child, Youth and Student Service(CYSS) Centers | 37 |
| 5.5 | Gymnasiums and Physical Fitness Centers (PFC) | 37 |
| 5.6 | General Cleaning of Libraries and Museums | 37 |
| 5.7 | University-level Cleaning | 37 |
| 5.8 | High Traffic Areas | 37 |
| 5.9 | Schedules and Reports | 37 |
| 5.9.1 | Schedule of Services | 37 |
| 5.9.1.1 | Alternate Day Work Schedule | 38 |
| 5.9.1.2 | Service Delay Notification | 38 |
| 5.9.2 | Floor Schedule Report | 38 |
| 5.9.3 | Scheduled Cleaning Work Reports | 38 |
| 5.9.4 | Unscheduled Cleaning Work Reports | 38 |
| 5.9.5 | Access and Condition Report | 39 |
| 5.9.6 | General Report Submittals | 39 |
| 5.10 | Contractor Management Reporting | 39 |
| 5.11 | Quality Control Report | 39 |
| 6.0 | Applicable Publications (Current Editions) | 41 |
| 6.1 | Regulations, Publications, Manuals, Local Policies and Procedures | 41 |
| 7.0 | Mandatory Records and Report Forms | 44 |
| 8.0 | Attachment/Technical Exhibits (TEs) | 45 |
| 8.1 | Attachment 1/TE-1 – Performance Requirements Summary | 46 |
| 8.2 | Attachment 2/TE-2 – Deliverables Schedule | 46 |
| 8.3 | Attachment 3/TE-3 – Estimated Workload Data | 49 |
| 8.4 | Attachment 4/TE-4 –Municipal Custodial Services Performance Standards | 51 |
| 8.5 | Attachment 5/TE-5 – List of Facilities to receive services | 52 |
| 8.6 | Attachment 6/TE 6 – Installation Map(s) | 53 |
| 8.7 | Attachment 7/TE-7 – Floor Plans | Error! Bookmark not defined. |
| 8.8 | Attachment 8/TE-7 – SATCOM Camp Roberts Access Request Form | 54 |
| 8.9 | Attachment 8/TE-7 –California Real ID Information | 56 |
United States Army Signal Activity, Presidio of Monterey Enclave (UPE) - Camp Roberts, California Custodial Services Enterprise-wide Performance Work Statement (PWS) (Service 402 - Custodial Services) (U)
General
This is a non-personal services contract to provide Custodial Services for the United States Army Signal Activity, Presidio of Monterey Enclave (UPE) - Camp Roberts, California.
The Government will not exercise any supervision or control over the contract service providers.
The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this PWS.
Description of Services/Introduction
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform all custodial service tasks and frequencies as described and defined in this Performance Work Statement (PWS), Part 5 Specific Tasks and Part 8 Attachment/Technical Exhibits, TE-4 Municipal Custodial Services Tasks and Frequency Performance Standards, except for those items specified as Government furnished property and services (If applicable, see Part 4 Contractor Furnished Items and Services). The Contractor shall perform to the standards in this contract.
The Contractor shall perform to the standards in this contract.
Background
United States Army Signal Activity, Presidio of Monterey Enclave (UPE) is located in California, San Luis Obispo County, inside Camp Roberts. UPE consists of approximately 117 acres and has seven (7) cleanable buildings. The Post population consists of approximately 150 military, government civilian, and contractor personnel working 24-hour operations.
Objectives
The Contractor shall ensure all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives, and other requirements (LOR) (See Definitions & Acronyms, 2.2 Acronyms --- Legal and Other Requirements) to include the documents in Part 6, Applicable Publications.
Part 8, Attachment/Technical Exhibit Listing, TE-5 – List of Facilities to receive services identifies which buildings/areas belong to each building type, the square footage of the building/areas to be cleaned, any special security considerations, and any constraints as to when during the day or week scheduled services can be performed. Part 8, Attachment/Technical Exhibit Listing, TE-4 Municipal Custodial Services Performance Standards identifies tasks and frequencies for maximum standards for each type of building.
Scope
The Contractor shall perform custodial services in accordance with (IAW) the PWS and the technical exhibits, including the Municipal Custodial Services Performance Standards in a manner that will maintain the condition and cleanliness of each covered facility and present a professional appearance.
Services include:
Scheduled Cleaning Services (for all covered facility types) IAW the PWS performance standard.
· As Ordered / Requested Task included (based on separate CLIN structure and applying a reimbursement MOA, as required):
Cleaning of windows located on exterior walls (ground floor and above) to prevent algae/moss/mold growth.
Special Event Support Cleaning.
Limited to minimal Tasks absolutely required to maintain health and appearance of prominent areas (empty trash receptacles, pick-up litter, sweep / mop, vacuum, wipe down high touch hard surfaces, clean restrooms, etc.)
· Services not included:
Biohazard cleaning service for casualty/trauma, defecation, and bodily fluids decontamination at Medical Treatment Facilities (MTFs) and other facilities performed by installation assets (hazardous material response team, garrison staff, or mission personnel) IAW MEDCOM Reg. 40-35, Management of Regulated Medical Waste, para 16 (2017) Toilet overflow, mold cleaning, flood cleaning within a covered facility resulting from inclement weather, or waterline break in the building serviced by a separate water cleanup and restoration contract with expertly trained staff.
Cleaning and disinfecting buildings and areas previously occupied by ’pandemic’ positive personnel. (Note: This type of cleaning and disinfecting will be performed by installation assets IAW Army Public Health Command (APHC) Technical Information Paper (TIP) No. 98-105-0421 and TIP No. 98-120-0620).
Changes in Scope of Work
The Government reserves the right during the term of the contract to add or remove one or more buildings or any portion of buildings thereof outlined in the PWS and TEs. The Government reserves the right to reduce the contractor's payment as reflected by any removals/additions with adjustment in the contract price of the remaining building or buildings. Provided, that only a portion of the building or buildings should be removed, the Contractor shall be paid for the performance of the proportionate sum of the contract price of the remaining building area.
There will be a variance of accumulated building changes of +/- 5,000 square footage based on the TE1. A modification to the contract will be executed to incorporate changes in excess of 5,000 square footage +/- variance. Building changes will be submitted to the contractor by the 15th of the month. Contractor will have 5 business days to provide a revised schedule and a proposed routine price if +/- 5,000 square feet. Schedule will be set to start on the 1st day of the new month.
Traffic Flow (if applicable)
The Contractor shall maintain the free flow of vehicular and pedestrian traffic while conducting custodial service tasks.
Restoration of Real Property Damage
Any damage to Government Real Property by the Contractor’s operations shall be restored to the original state at no additional cost to the Government (e.g. structural damage, damage to landscape or fencing, et al).
General Information
Locations to Receive Custodial Service
The work to be performed under this contract will be performed at seven (7) cleanable government facilities on United States Army Signal Activity, Presidio of Monterey Enclave (UPE), Camp Roberts. The Contractor shall provide the KO a schedule no later than (10) workdays prior to commencing work. Schedule shall outline tasks to be performed by specific building and identify the timeline for the task to be accomplished. The KO will provide the Contractor with requirements to make changes to the schedule as they occur. A list of UPE buildings to be cleaned is located in Part 8, Attachment/Technical Exhibit Listing, TE 5 - List of Facilities to receive services.
Schedule of Services Work Log
The Contractor shall keep a detailed log of work accomplished in each building receiving custodial services IAW performance standards.
The log shall include relevant custodial cleaning task practices and the dates custodial cleaning task is completed.
The Contractor shall submit this log to the COR not later than the 5th day of each month (Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Attachment 2/TE-2 – Deliverables Schedule, Deliverable, A001).
Recognized Holidays
| New Year’s Day | Labor Day |
| Martin Luther King Jr.’s Birthday | Columbus Day |
| President’s Day | Veteran’s Day |
| Memorial Day | Thanksgiving Day |
| Independence Day | Christmas Day |
| Juneteenth | ADD LN Holidays |
Hours of Operation
Normal hours of operation are between the hours of 0700 - 1600 hours, Monday through Friday, excluding Federal holidays or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. However certain facilities on UPE, Camp Roberts have 24-hour operation.
The Contractor shall coordinate with Building Managers or the KO and/or the COR/ACOR if no Building Manager is available to establish a schedule to conduct business if services are required outside of normal hours of operation. This schedule or any schedule changes shall be documented and approved by the KO.
The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when Government facilities are not closed for the above reasons.
Installation Closures
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
Emergency Delays and Support
If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor shall notify the KO and his/her designated representative, the COR/ACOR, two (2) hours prior to curtailing operations (Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A002).
The Contractor shall obtain KO approval to resume operations.
The Contractor shall coordinate with the DPW designated representative(s), the COR/ACOR and COTR, once guidance has been provided by the KO in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.
Unforeseen Buildings Closures
When an unforeseen building closure occurs on a regularly scheduled day of work (i.e., severe weather, training holiday, day of mourning, etc.).
The Contractor shall reschedule the service on any day satisfactory to the customer and minimizes impact on the Contractor’s normal work schedule.
Place of Performance
The work to be performed under this requirement will be performed throughout the entire area occupied by UPE, Camp Roberts and at any pertinent locations in and around UPE UPE, Camp Roberts. A map of UPE, Camp Roberts is located in Part 8, Attachment/Technical Exhibit Listing, TE 6 Installation Map.
Type of Contract
The government will award a FIRM FIXED PRICE (FFP) type of contract with some “As Required” CLINs (See Frequency Table located in Part 8, Attachment/Technical Exhibit Listing, TE-4 Municipal Custodial Services Tasks and Frequency Performance Standards).
Security Requirements
The Government may require the contractor to provide service to a HIGHLY CLASSIFIED FACILITY. In such instances, the custodial contractor personnel shall be trained in security requirements and/or escorted during the entire time needed to complete the tasks outlined in this PWS at such facilities.
Access and General Protection/Security Policy and Procedures
Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Physical Security
At the close of each work period, the contractor shall ensure government facilities, equipment, and materials are secured.
Security Training
In the event of a National Defense Emergency affecting UPE, Camp Roberts the UPE, Camp Roberts POC will immediately notify the contract POC. At that time, the contractor shall take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until notice is given by the installation and UPE, Camp Roberts POC that National Defense Emergency conditions are no longer in effect.
Anti-Terrorism (AT) Level I Training
IAW Department of Defense Instruction (DoDI) 2000.16, Vol. 1 DoD Antiterrorism Standards and Army Regulation (AR) 525-13 Antiterrorism, all Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A003).
If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government. The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A003).
iWATCH Training
The Contractor shall brief the local iWATCH program (training standards provided by the Installation Anti-Terrorism Officer (ATO)) to all its’ employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to UPE, Camp Roberts, Military Police and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A004).
Operational Security (OPSEC) Awareness Training
For contracts that require OPSEC Training. All contractor employees, to include subcontractor’s employees, requiring access to Army installation, facilities, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after contract start date or effective date of incorporation of this requirement into the contract. The Contractor shall provide certificates of completion for each affected contractor employee and subcontractor employee to the COR, or to the KO if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A005).
Threat Awareness and Reporting Program Training
For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment TARP training will be completed annually IAW AR 381-12 Threat Awareness and Reporting Program. The Contractor shall provide certificates of completion for each affected contractor employee and subcontractor employee to the COR, or to the KO if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A006).
Local Health Protection Conditions
Contractor will comply with all national and DoD policies with regard to health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area UPE, Camp Roberts in cooperation with local, state and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.
Key Control
The Government will issue no keys, key cards nor combinations to the Contractor.
Lost Keys (not applicable)
No keys issued to the Contractor by the Government shall be duplicated.
The Contractor shall immediately report any occurrences of lost keys/key cards to the KO in the event keys, other than master keys are lost or duplicated.
In the event a key is lost, the Contractor shall, upon direction of the KO, have the Government re-key or replace the affected lock or locks.
When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.
In the event a master key is lost, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
Prohibited use of Government provided keys or key cards (not applicable)
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees.
Lock Combinations (not applicable)
The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons.
These procedures shall be included in the Contractor’s Quality Control Plan.
Post Award Conference/ In-Progress Review Meetings
The Contractor agrees to attend any post award conference convened by the contracting activity IAW Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance.
In progress reviews (IPR) will be held at least quarterly (each 3rd month, counting from the performance start date).
At a minimum, the KO, COR, and Contractor lead shall attend these IPRs. The written minutes will be distributed within five (5) business after the meeting.
At these meetings, the Government will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
Government Roles and Responsibilities
Contracting Officer (KO)
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor.
All contract administration will be affected by the KO.
Communications pertaining to contractual administrative matters shall be addressed to the KO.
No changes in or deviations from the terms and conditions shall be affected without a written modification to the contract, executed by the KO authorizing such changes.
The KO will approve all Deliverables and plans required in this PWS.
Contracting Officer’s Representative (COR)
The KO will appoint a COR during the performance of this requirement.
Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and Oversight of Service Acquisitions.
Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification.
The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems.
The COR will perform IAW the responsibilities and duties identified in the appointment letter.
COR Authority
A letter of designation will be issued to the COR by the KO.
A copy of the letter will be sent to the Contractor.
The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates.
The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
COR or Designated Government Representative Functions
The COR or designated Government representative shall monitor all technical aspects of the contract and assists in contract administration.
The COR or designated Government representative is authorized to perform the following functions:
assure the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract,] issue written interpretations of technical requirements, monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies, coordinate availability of Government-Furnished Property and provides direction or assistance for site entry requests of Contractor personnel.
Specific Contractor Requirements, Roles and Responsibilities
U.S. Residency
All CONUS Contractor employees shall be legal U.S. residents.
The Contractor shall immediately remove any employee that is not a legal U.S. resident.
The Contractor personnel shall be able to communicate clearly in the English language.
OCONUS Contractors employees should primarily U.S. residents but may utilize legal host nation residents.
Contractor Hiring Restrictions
The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation 30 August 1993, to include change dated 17 November 2011.
Contractor Identification
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees.
The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
Contractor owned/leased vehicles and trailers shall be clearly identified.
Standards of Conduct
Contractor personnel’s conduct shall not reflect discredit upon the Government.
The Contractor shall ensure all personnel present a professional appearance while working on the Government installation.
The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.
The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement Integrity.
· The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
Contractor Key Personnel
Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A007).
These key personnel shall be available during normal duty hours. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
Project Manager (PM)
The Contractor shall provide a PM who is responsible for the performance of the work.
A minimum of two (2) years of documented service contract management experience with team management and scheduling of workflow is required.
The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract.
The name and contact information of the PM shall be provided to the KO and shall be available during normal duty hours.
The PM shall be available by phone and email and return phone calls and emails within a designated time frame approved by the KO.
In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
Quality Control Manager (QCM)
The Contractor shall designate a full time QCM on site during normal duty hours.
As a minimum, the QCM shall have at least two (2) years of documented relative custodial services experience and shall be responsible for the overall management and implementation of the Contractor's Quality Control Plan.
Quality Control Inspectors (QCI)
The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements.
Depending on the size of the contract, the QCM may also serve as the QCI.
Phase In /Phase Out Period
RESERVED
Quality Control
The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he/she assures himself/herself that his/her work complies with the requirement of the contract. After acceptance of the quality control plan (QCP) the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system five (5) days prior to the plan being effected (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A008).
Emergency Services
Emergency Medical Treatment
The Contractor or their employees shall immediately notify their supervisor of any incident requiring immediate emergency medical treatment.
The Government may provide 911 emergency support ambulance service and/or DoD medical facility, if available.
If injuries incurred while an employee is performing work under this contract, the contractor shall verbally notify the KO/COR no later than (NLT) two (2) hours after an emergency medical event, followed by a documented summary of events (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A009).
The Contractor shall be responsible for reimbursement of any cost of provided emergency medical treatment services provided to Contractor personnel.
Reimbursement shall be paid to the U.S. Treasury.
Accident Reporting
The Contractor shall comply with Operational Safety and Health Administration (OSHA) for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact.
The Contractor shall provide a verbal report to the KO/COR within two (2) hour of each such occurrence followed up by an email documenting each such occurrence (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A010).
The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 4 Contracting Safety) and DA Pam 385-40, Army Accident Investigations and Reporting.
Environment and OSHA
IAW para. 1.4 Scope, any apparent conflict between compliance (with such local, State, and Federal environmental and occupational safety laws, rules, and regulations) and the requirements of the contract shall be immediately brought to the attention of the KO and authorized representative(s) (i.e., Environmental Officer, Safety Officer, and COR ) verbally.
The Contractor shall notify the KO and authorized representative(s) via email outlining the details for each said conflict such that a final resolution is derived (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A011).
The Contractor shall be liable for all fines, penalties, and costs that result from violations of, or failure to comply with para. 1.4 Scope.
Safety
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.
The Contractor shall comply with AR 385-10, The Army Safety Program.
All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO to halt any and all Contractor performance until such unsafe conditions are corrected.
The Contractor shall take due caution not to endanger personnel during performance of this contract.
Upon discovery of a serious hazard, the Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A012).
Safety Plan
The Contractor shall develop and implement a safety plan for its employees.
The Contractor shall submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A012).
Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A013).
Spill Plan (not applicable)
The Contractor shall comply with the UPE, Camp Roberts Spill Prevention Control and Countermeasure Plan (See Part 8, Attachment/Technical Exhibit Listing TE-8).
The Contractor shall submit a Spill Plan to the KO or designated Government representative/COR for approval within 30 calendar days of contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A014).
The Contractor shall verbally notify the KO and COR, followed by written notification as required in the UPE, Camp Roberts Spill Plan, if the Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.)
Asbestos Awareness (not applicable)
IAW 29 CFR 1910.1101 Asbestos, all personnel that may come into contact with asbestos while performing work duties shall attend asbestos awareness training annually (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, X).
· This training course is targeted for employees who may disturb asbestos containing materials while performing normal work duties.
· This includes all cleaning and custodial personnel.
Environmental Compliance
The contractor shall implement the following environmental objectives in accordance with FAR 23.4; FAR 23.7; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance):
Maximize the utilization of environmentally preferable products.
Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.
Maximize the reutilization of nonhazardous and recovered materials.
Eliminate or reduce the generation of hazardous waste and the need for special material processing (including special handling, storage, treatment, and disposal).
1.7.11.12 Mold Awareness
IAW Army Technical Bulletin Medical 531, Facility Sanitation Controls and Inspections and the U.S. Army Public Health Center Technical Guide 277, Army Mold Remediation Guidance. The contractor shall comply with recommended guidance for the routine cleaning and disinfecting of areas where mold is most likely to occur. These include, but are not limited to, rest rooms, shower rooms, kitchen areas, water fountains, carpeted areas where liquids or moisture are present. Exterior door and window areas where moisture condensation may occur. Contractors shall perform routine cleaning procedures to reduce and prevent mold formation. Where the contractor identifies mold concentrations, the contractor shall immediately notify the building manager and or COR informing them of their findings. Building managers and or CORs are responsible for following the (installation name here) Standard Operating Procedures (SOPs) for mold assessment and remediation
1.7.11.13 Safety Data Sheets.
For materials that have Safety Data Sheets (SDS) associated with them, the Contractor shall submit the SDS to the KO or designated Government representative (i.e., COR/ACOR) for approval five (5) business days after contract award (See Part 8, Attachment/Technical Exhibit Listing, paragraph 8.2, Deliverables Schedule, Deliverable, A016).
The Contractor shall adhere to all applicable requirements of the Installation Hazardous Waste Management Plan.
The Contractor shall provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials or toxic materials.
PART 2
DEFINITIONS & ACRONYMS
Definitions and Acronyms
Definitions
AbilityOne Commission
Formally known as “The Committee For Purchase For People Who Are Blind Or Severely Disabled”. This is the independent Government Agency responsible for the AbilityOne Program. (For more information, go to website http://www.AbilityOne.gov)
Acceptable Quality Level (AQL)
The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
Carpet Care.\
Cleaning and maintenance to keep carpet reasonably free of all stains, soil, and dirt. Methods used for carpet care are vacuum cleaners and carpet shampooers.
Child, Youth and School Services (CYSS)
Overarching naming convention for Child Development Center (CDC); Youth Activity Center (YAC); and School Age Services (SAS) are Child, Youth and School (CYS), Services (CYSS). CYSS shall be used when referring to all programs.
Cleaning
Removing stains, soil, and dirt. May be accomplished by chemical or mechanical means.
Contractor
A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor Acquired Property (CAP)
Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Contracting Officer (KO)
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer’s Representative (COR)
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Deficient Service
A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable
Objective evidence that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Disinfect
This is the process of removing dirt and bacteria, with physically removing debris and bacteria with a chemical solution, killing any remaining germs on surfaces, which further reduces any risk of spreading infections and/or diseases.
Dry Buffing
Procedure to utilize floor, buffing equipment to remove minor scratches and scuff marks without applying solution or wax.
Equipment
A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
Exterior Windows
Windows surrounding entrances and exits of contracted buildings but not windows located on exterior walls.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government Property
All property owned or leased by the Government. Government property includes both Government- furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Government Project Manager
The DPW Engineering Division, Project Engineer/Technician (i.e., COR/ACOR/COTR) assigned to manage this PWS.
Hard Surface Floor Care
Hard surface floor care includes, but is not limited to tile, vinyl, rubber tile, mosaic tile, quarry tile, ceramic tile, marble, concrete, terrazzo, and linoleum. Floor care includes, but is not limited to dust mopping, wet mopping, scrubbing, stripping, waxing, re-finishing, or sealing.
High-efficiency Particulate Air Vacuum Cleaners (HEPA)
HEPA stands for high-efficiency particulate air, and it typically refers to a filter inside a machine. A true HEPA filter can trap 99.97 percent or airborne particles, minimizing dust, dander, and other common allergens in the air.
Heating, Ventilation and Air Conditioning (HVAC)
HVAC refers to the different systems used for moving air between indoor and outdoor areas, along with heating and cooling both residential and commercial buildings.
Institute of Inspection, Cleaning and Restoration Certification (IICRC)
The certification and standard-setting non-profit organization for the inspection, cleaning, and restoration industries.
Interior Window
Windows surrounding interior entrances and exits but not windows located on an exterior wall.
International Sanitary Supply Association (ISSA)
The leading resource for information, education, networking, and industry standards.
Lavatories/Latrines/Bathrooms
A room containing commodes, urinals, toilets, partitions/stalls, washbasins, bathtubs, shower stalls, sinks, lavatories, faucets, fixtures, mirrors, floors, walls, and dispensers (soap. paper towels, toilet tissue).
Legal and Other Requirements
Applicable Federal, State, local, DoD and Army laws, codes, regulations and other requirements.
Loss of Government Property
Unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:
Items that cannot be found after a reasonable search;
Theft;
Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair. Contractor shall prepare damage reports monthly and submit to COR.
Material
Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
2.1.29 Mold/Mildew
Mold is a naturally occurring microscopic fungi that can grow on indoor and outdoor surfaces. Mold can live in all environments, climates, and seasons but requires oxygen, moisture, and a nutrient source to grow. The types of molds and their abundance in an area depend on the availability of nutrients like dirt, water, and temperature. Molds grow well on cardboard, ceiling tiles, paper, and wood products. Mildew is a general term used to refer to certain kinds of mold or fungus that typically grow in a flat growth pattern and found on shower walls, windowsills, and other places with high moisture levels.
0. Non-Personal Services
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non personal service contracts are authorized by the Government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
Performance Requirements Summary (PRS)
Identifies the key service outputs of the Contractor.
Physical/Community Fitness Centers
Physical/Community Fitness Center facilities may include a gymnasium, athletic courts, work out areas, weight rooms, showers, restrooms, locker rooms, indoor hand ball courts, whirlpool, sauna, administrative space, and storage space. Outdoor fitness/recreation facilities, indoor/outdoor swimming pools, ice- and/or roller-skating rinks, physical educational training facilities, and buildings that house a fitness center are not included.
Physical Security
Actions that prevent the loss or damage of Government property.
Property
All tangible property, both real and personal.
Property Records
Records created and maintained by the Contractor in support of its stewardship responsibilities for the management of Government property.
Provide
To furnish, as in Government-furnished property, or to acquire, as in Contractor-acquired property.
Public Traffic Areas
Lobbies, hallways, corridors, stairwells, meeting rooms, and lavatories.
Quality Assurance
The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP)
An organized document written by the Government specifying the surveillance methodology used for surveillance of Contractor performance.
Quality Control
All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Real Property
See Federal Management Regulation 102-71.20 (41 CFR 102-71.20).
Recyclable Materials
Materials that are separated from mixed municipal solid waste for the purpose of reuse, donation, recycling, or composting, including paper, glass, plastics, metals, automobile oil, batteries, source-separated compostable materials, and sole source food waste streams that are managed through bio-degradative processes.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .