PERFORMANCE WORK STATEMENT - sUAS SERVICES.pdf
PDF 223 KB Posted
- Attached to
- sUAS SERVICES Federal contract opportunity
- Solicitation number
- W50S9H26QA017
- Issued by
- Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for a Small Unmanned Aircraft System (sUAS) Mobile Training Team contract supporting the Sentry North exercise at Volk Field Combat Readiness Training Center.
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to deliver sUAS mobile training team services from June 1, 2026 through August 31, 2026. Services are performed Monday through Friday, 0630-1900 hours local time, except on recognized US holidays or when the Government facility is closed. The contract requires one Lead Facilitator and three licensed sUAS operators throughout the exercise period, with the Lead Facilitator serving as the single point of contact and reporting directly to the Exercise Director. During the Advance Echelon (ADVON) phase, the team must establish and configure at least eight sUAS with associated equipment, conduct a 16-hour course plus eight hours of practical exercises for four Air Force Special Warfare (AFSW) operators, and manage White and Red Cell activities including scenario development and data collection. The contractor must maintain an adequate on-site supply of spare parts and maintenance equipment to ensure a minimum of eight sUAS remain operational at all times, with capability to perform routine maintenance and minor repairs on-site.
Key requirements include scenario integration and mission planning support with 95-90% quality standards at instructor/Weapons School graduate level, facilitation of Large Force Exercises with multiple sUAS in multiple locations, analysis and lessons learned documentation capturing 95% of relevant training outcomes, and integration of threat-based realistic sUAS capabilities to enhance training effectiveness. Personnel must possess minimum five years of Special Warfare instructor and Joint Terminal Attack Controller experience, five years of joint integration experience with multiple aircraft types and intelligence/fires coordination, and experience planning large force exercises like Red Flag, NTC, and JRTC. The Lead Facilitator must be a USAF Weapons School graduate with squadron and group/wing level experience. All contractor personnel require SECRET security clearance eligibility, Common Access Card eligibility, and completion of mandatory training including Antiterrorism Level I, Information Assurance, OPSEC, and COMSEC requirements. The contractor furnishes all sUAS, communications equipment, transport vehicles, data management systems, and support materials; the Government provides workspace, utilities, and facility access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sUAS QUESTIONS AND ANSWERS - 5.7.2026.pdf | ||
| SF 1449 - W50S9H26QA017 sUAS SERVICES.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
SMALL UNMANNED AIRCRAFT SYSTEM
MOBILE TRAINING TEAM
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform small Unmanned Aircraft System (sUAS) Mobile Training Team (MTT), as defined in this PWS.
1.2 Background: A small Unmanned Aircraft System Mobile Training Team is essential to ensuring Sentry North exercises meet the training requirements for Special Warfare units participating from across the joint force. There is not a DoD capability to support the training objectives that require sUAS adversaries. Contract support will allow participating units to achieve training and readiness objectives that are unachievable elsewhere.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 June 2026 – 31 August 2026.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0630 – 1900 on Monday thru Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings.
Performance shall take place at the Volk Field CRTC. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all task defined within this PWS when the Government facility/installation are not closed for the aforementioned reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential. Telework is authorized under this contract.
1.4.1.1 Telework: The Government will permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government’s mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience delays. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operator by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may impact performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for the aforementioned reasons does not relieve the Contractor from responsibility for performance of this contract.
1.4.2 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on the following days:
1.4.2.1 New Year’s Day
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth
1.4.2.6 Independence Day
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day
1.4.3 Exercises:
1.4.3.1 Sentry North Exercise: Exercise Set-up.
1.4.3.1.1 The contractor shall work directly with any military personnel or organization to assist with scenario development and product creation. The contractor will specifically provide one (1) Lead Facilitator to work with military personnel, as directed by the Sentry North exercise director, to help manage sUAS integration into exercise scenarios.
1.4.3.2 Sentry North Exercise: Exercise Set-up, Exercise Execution and Lessons Learned.
1.4.3.2.1 Final Planning Meeting (FPM); The FPM is a tele-conference among all exercise participants to confirm planning efforts and identify administrative or logistical risks that may impact exercise execution. The Government anticipates requiring one (1) Lead Facilitator for this meeting, which may be conducted via conference call. The Air Force Special Warfare (AFSW) planning lead will inform the contractor of anticipated AFSW ADVON dates during the FPM.
1.4.3.2.2 Exercise Set-Up; Hours of Operation shall be 0800 – 1600 local for the set-up of the exercise. The Government anticipates requiring one (1) Lead Facilitator and three (3) licensed sUAS operators to set-up operations for the exercise. The contractor will provide one Lead Facilitator and three licensed sUAS operators to conduct Advance Echelon (ADVON) activities at Volk Field CRTC. During ADVON, the team will survey the site, establish and configure at least eight sUAS and communication systems, coordinate with base personnel, AFSW Team Leads, and White Cell, and conduct a 16-hour course with an additional 8 hours of practical exercises for four AFSW operators. The contractor will supply all necessary ADVON equipment, including sUAS, parts, batteries, radios, communication and IT equipment, supplies, and a transport vehicle. To manage White and Red Cell activities, the contractor will resource scenario development, inject management, data collection, real-time communication, and debrief preparation, including a Lead Facilitator to coordinate with the White Cell and brief the contractor team on daily injects and Desired Learning Objectives (DLOs), and up to three rental vehicles for travel between Volk Field and forward operating locations. The contractor will allocate resources for efficient data collection, management, analysis, and delivery to comply with data rights requirements and ensure timely delivery of all contract deliverables, capturing lessons learned and providing a written document to Sentry North leaders on the last day of the exercise, using appropriate software and hardware to ensure data accuracy, security, and accessibility, and following industry best practices for secure storage and destruction of media.
1.4.3.2.3 Exercise Execution; Hours of Operation shall be 0630 – 1900 local for the duration of the exercise. The Government may adjust the hours of service to meet mission requirements but under no circumstance shall the hours worked exceed 40 hours per week. The Government anticipates requiring one (1) Lead Facilitator and three (3) sUAS operators for the duration of the exercise. To ensure uninterrupted sUAS operations and minimize downtime, the contractor shall maintain an adequate on-site supply of essential spare parts and maintenance equipment. This includes, but is not limited to, additional charging kits for the sUAS batteries, spare rotor blades, field maintenance kits, and current versions of firmware and software. Additionally, the contractor shall provide a minimum of two (2) additional sUAS batteries per sUAS to maximize operational endurance. The contractor shall possess the capability to perform routine maintenance and minor repairs on-site. The contractor will have the necessary experience with instructing UAS tools and Android Tactical Assault Kit (ATAK) to ensure all software and firmware are operating correctly. The level of on-site maintenance capability shall be sufficient to address common equipment malfunctions and ensure a minimum of eight (8) sUAS are always operational, thus meeting the Sentry North exercise objectives.
1.4.3.2.4 Exercise Execution; The Government requires the (1) Lead Facilitator for the duration of the exercise to act as a single point of contact to ensure all tasks outlined in paragraph 5.0 and report to the Exercise Director for management of the other facilitators for all planning and debriefing requirements. The Lead Facilitator shall be one
(1) individual throughout the duration of the exercise to ensure continuity.
1.4.3.2.5 Lessons Learned; Capture lessons learned throughout the exercise covering scheduling, mission planning, execution, and debrief. This document is due to the Sentry North leaders on the last day of the exercise by 1800 hours local.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract.
Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with all local and federal policies.
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1 For Contractors Requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI/Tier 1) or higher investigation IAW DoDI 5200.46. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely;
(2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial/interim CAC may be issued based on a successfully scheduled NACI with the Office of Personnel Management and a favorable completion of an FBI fingerprint check.
1.4.5.2 For Contractors Requiring Common Access Card (CAC). For installation(s)/location(s) cited in the contract, contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel who meet one or both of the following criteria:
(a) Require logical access to Department of Defense computer networks and systems in either:
(i) the unclassified environment; or
(ii) the classified environment where authorized by governing security directives.
(b) Perform work, which requires the use of a CAC for installation entry control or physical access to facilities and buildings.
(c) While visiting or performing work on installation(s)/location(s), contractor personnel shall wear or prominently display the CAC as required by the Governing local policy.
Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 (T1) or higher investigation IAW DoDI 5200.46. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely;
(2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial/interim CAC may be issued based on a successfully scheduled T1 with the Office of Personnel Management and a favorable completion of an FBI fingerprint check.
1.4.5.2.1 Homeland Security Presidential Directive (HSPD)-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and shall process all CAC card applications. The contractor shall ensure that all employees requiring a T1 be vetted by the cognizant security activity Chief, Information Protection (CIP) to ensure a proper investigation is on record. The CIP will process the T1 if needed. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the investigation may take multiple weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.
1.4.5.2.2 Contractors and their personnel shall use the following procedures to obtain CACs:
(a) Contractors shall provide a listing of personnel who require a CAC to the contracting officer. The
Government will provide the contractor instruction on how to complete the Contractor Verification System (CVS) application and then notify the contractor when approved.
1.4.5.2.3 Contractor personnel shall obtain a CAC from the nearest Real Time Automated Personnel Identification Documentation System (RAPIDS) Issuing Facility (typically the local Military Personnel Flight (MPF)). At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by Social Security Number (SSN) and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification". Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.
1.4.5.2.4 During the performance period of the contract, the contractor shall:
1. Within 7 working days of any changes to the listing of the contract personnel authorized a CAC, provide an updated listing to the contracting officer who will provide the updated listing to the authorizing Government official;
2. Return CACs in accordance with local policy/directives within 7 working days of a change in status for contractor personnel who no longer require logical or physical access;
3. Return CACs in accordance with local policy/directives within 7 working days following a CACs expiration date; and
4. Report lost or stolen CACs in accordance with local policy/directives.
1.4.5.2.5 Within 7 working days following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the issuing office or the location specified by local policy/directives. A receipt for each returned card shall be provided to the TA/COR.
1.4.5.2.5.1 Failure to comply with these requirements may result in withholding of final payment.
1.4.5.2.6 For an Air Contractor that need access to the Army network this can be accomplished by going to:
http://www.us.army.mil and registering as an “Army Guest”, with the sponsor being the COR or a COR-designated individual if the COR is ineligible to Serve as an AKO Sponsor.
1.4.5.3 Reserved
1.4.5.4 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Air Force myLearning at https://lms-jets.cce.af.mil or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.5 Reserved
1.4.5.6 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to http://www.us.army.mil/ http://jko.jten.mil/
COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.7 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy and their actions affect the most vulnerable portion of the Air Force Infostructure. Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system.
Contractor employees shall:
1.4.5.7.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.7.2 Complete initial and/or annual Information Assurance (IA) training as required by applicable Air Force/ANG policy.
1.4.5.7.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.7.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.7.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.5.8 Air Force myLearning. All contractor employees and associated sub-contractor employees assigned to work on a government site and/or requiring access to a DoD network will be required to register with Air Force myLearning at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD Information Assurance, OPSEC, Protecting Sensitive Information). Air Force myLearning website: https://lms-jets.cce.af.mil.
1.4.5.9 Information Assurance (IA) Training. All contractor employees and associated sub-contractor employees shall complete the DoD Information Assurance Awareness Cyber Awareness Challenge before issuance of network access and annually thereafter. All contractor employees performing services involving IA/IT functions shall comply with DoD and Air Force training requirements in DoDD 8140.01, DoD 8570.01-M and AFMAN 17- 1301 within 180 days of the start of contract performance.
1.4.5.10 Information Assurance (IA) / Information Technology (IT) Certification. In accordance with DoD 8570.01M, DFARS 252.239.7001, and Air Force Policy Directive (AFPD) 17-1 contractor employees performing services supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M shall be completed upon contract award.
1.4.5.11 Reserved
1.4.5.12 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the myLearning website and refresher OPSEC training is conducted annually. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.
1.4.5.13 OPSEC Plan. The contractor shall develop an OPSEC Plan and provide it to the COR or KO within 15 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC officer, per
AFI 10-701, Operations Security. This Plan shall include the Government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. For the contractor to effectively comply with OPSEC provisions of the contract, the organization will provide the following guidance: (1) Organization’s Critical Information; (2) Adversaries’ collection threat information as it applies to the organization’s mission and the contract; (3) Operations Security guidance; and (4) Specific OPSEC measures the organization requires (as appropriate).
1.4.5.14 Contracts that require Handling or Access to Classified Information. For contracts that require handling or access to classified information, the contractor shall comply with FAR 52.204-2, Security Requirements, including the National Industrial Security Program Operating Manual (DoD 5220.22-M) and applicable updates/changes. This clause involves access to information classified “Confidential/Secret/Top Secret” and requires contractors to comply with a Visitor Group Security Agreement (VGSA) when designated as a Visitor Group (a Visitor Group is defined as 90 consecutive days or more) at all contractor operations located on Air Force/Air National Guard installations in accordance with this PWS. Contract personnel must be entered in the Defense Information System for Security
(DISS). A DD 254, DoD Contract Security Classification Specification, is required for all classified contracts. This contract requires a “SECRET” security clearance in which a DD 254, DoD Contract Security Classification Specification is required. The unit security monitor will initiate one that will become an attachment to this PWS after it is completed. Completion of localized security training (information protection related material) will be accomplished at the Wing/Unit level. Derivative Classification and Marking Classified CBTs may also be required as per assigned duties (i.e., SIPRNet).
1.4.5.15 Reserved
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.7 Special Qualifications:
1.4.7.1. sUAS operators must have minimum of 5 years of instructor experience as a Special Warfare (SW) instructor and Joint Terminal Attack Controller (JTAC) Instructor.
1.4.7.2. Minimum of 5 years of experience of joint integration with multiple aircraft types, intelligence, and fires.
1.4.7.3. Experience planning and facilitating joint Large Force Exercises (LFEs) like Red Flag, NTC, and JRTC, including managing a white cell team during event execution, is required..
1.4.7.4. Experience developing joint large force tactical scenarios to include both friendly (blue) and threat (red) scenarios and laydowns required.
1.4.7.5. Lead Facilitator must be a USAF Weapons School (WIC) graduate with experience as a Weapons Officer at the squadron and group/wing level.
1.4.7.6. Possesses experience and expertise with security protocols, regulatory compliance, and mission-focused sUAS applications for government personnel.
1.4.7.7. All contractors must possess direct experience instructing on and using UAS Tool and Android Tactical Assault Kit (ATAK) to ensure effective training and operational relevance.
1.4.7.8. Possesses a minimum of eight (8) sUAS and associated equipment required to support participating units’ training objectives and instructional requirements.
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Contractor Travel:
The contractor shall travel to Volk Field Combat Readiness Training Center during the performance of this contract attend required meetings and for the duration of the exercise execution.
The contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires COR recommendation for approval and/or authorization by the KO prior to travel arrangements being made
1.4.13 Data Rights: The Government has unlimited rights to all documents/materials produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AT/OPSEC Antiterrorism/Operational Security
AFSW
BI
CAC
Air Force Special Warfare Background Investigation Common Access Card
CM Contract Manager CMRA Contractor Manpower Reporting Application
COOP
COR
CRTC
Continuity of Operations Planning Contracting Officer Representative Combat Readiness Training Center
DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense
FAR
FPCON
FPM
GFP/M/E/S
IA
IS
JRTC
JTAC
LFE
KO
MTT
NGB
NTC
OCI
PII
POC
PoP
PRS
PWS
QA
QASP
QC
QCP
sUAS
TE
USD(I)
WIC
Federal Acquisition Regulation Force Protection Condition Final Planning Meeting Government Furnished Property/Material/Equipment/Services Information Assurance Information System(s) Joint Readiness Training Center Joint Terminal Attack Controller Large Force Exercise Contracting Officer Mobile Training Team National Guard Bureau National Training Center Organizational Conflict of Interest Personally Identifiable Information Point of Contact Period of Performance Performance Requirements Summary Performance Work Statement Quality Assurance Quality Assurance Surveillance Plan Quality Control Quality Control Program Small Unmanned Aircraft System Technical Exhibit Under Secretary of Defense for Intelligence Weapons Instructor Course
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment. The Government will not include any items meeting the definition of Government Furnished Property.
3.2 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract.
The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Secret Facility Clearance: The contractor shall possess or be eligible to receive and maintain a SECRET facility clearance from the Defense Counterintelligence and Security Agency (DSCA).
Contractor Security Clearance: The contractor’s employees performing work in support of this contract shall have been granted a SECRET security clearance from the Defense Industry Security Clearance Office, and will also be eligible for SAP access as defined in 1.4.5.13.
5.0 Requirements: The contractor shall:
5.1 Provide sUAS mobile training team services for Sentry North exercises and the necessary labor, instruction, materials, supplies, and equipment as indicated below to perform the following tasks.
5.2 sUAS mobile training team services will integrate into the daily Air Force Special Warfare (AFSW) mission schedule and attend daily AFSW synchronization meetings to accurately capture changes for the following day (e.g., duration of operation, expected role for Blue and Red sUAS teams, and so forth). The sUAS mobile training team will conduct any FAA drone coordination required and provide sUAS flight information to the Sentry North exercise staff as requested.
The sUAS mobile training team will serve as the primary sUAS White Cell Leads (WCL) during the exercise.
5.3 sUAS mobile training team will use the established scenario to meet the desired learning objectives (DLO). They will manage scenario injects, respond to requests for information or forces, and provide tactical input during mission planning to support AFSW mission success. They will also create a written product containing white force data (e.g., actual route, timing, timestamps, and significant event data) and deliver it to users during the debrief. The sUAS mobile training team representative responsible for White Force in AFSW operations will meet with unit instructors, weapons officers, and other relevant personnel the day prior to review the scenario and DLOs, ensuring the team fulfills their requirements and expectations.
5.4 Facilitate & execute Large Force Exercises (LFE) using White Cell and Red Cell control, including initiating and managing real-time scenario injects mid-event (in concert with real-time chatsurfer/mIRC, AFSW specific lines of communication, and direct AFSW White Cell Lead injects) and ensuring events are executed within the timeline allotted.
5.5 Prepare and present Blue and Red sUAS analysis and lessons learned to all AFSW members at the completion of the exercise for input into the overall exercise lessons learned.
5.6 Provide sUAS SME support, with an emphasis on AFSW operators, to manage the coordination, planning, and integration of sUAS into multiple weapons systems from across the joint force within the exercise range space.
5.7 Integrate threat based realistic sUAS capabilities into AFSW operations to enhance Find, Fix, Track, and Assess operations, and incorporate Red Force sUAS to challenge AFSW teams by simulating adversarial threats and prepare post-mission data reports detailing instances where teams were detected and identified by Red Force sUAS, including methods of detection.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page) Date of Publication
Website
Federal Acquisition Regulation https://www.acquisition.gov/
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/
Federal Information Processing Standards (FIPS) Publication 201-2
Personal Identity Verification (PIV) of Federal Employees and
Contractors
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf
DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel Security Program (PSP)
04/03/2017 http://www.dtic.mil/whs/directives/corres/pub1.html http://www.acquisition.gov/ http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.htmlor http://www.acquisition.gov/ http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://www.dtic.mil/whs/directives/corres/pub1.html
Homeland Security Presidential Directive (HSPD)-
Policy for a Common Identification
Standard for Federal Employees and Contractors
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12
DoD 5220.22-M National Industrial Security Program Operating Manual
02/28/2006 (Change 2:
05/18/2016)
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 254
Contract Security Classification Specification
DEC
http://www.dami.army.pentagon.mil/site/industsec/docs/DDForm254Fillable1.pdf http://www.dhs.gov/homeland-security-presidential-directive-12 http://www.dami.army.pentagon.mil/site/industsec/docs/DDForm254Fillable1.pdf
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective Performance Standard Acceptable Quality Levels
(AQL)
Surveillance Method / By
Whom
6.1.1 Scenario Integration
The contractor shall integrate sUAS into the scenario in a manner that aligns with White Force plan
(e.g. red sUAS) and with Blue Force plan (e.g. blue sUAS)
95% of plan and execution is realistic rep for near-peer/peer threats and in line with White/Blue Force requirements
Periodic Inspection / COR
6.1.2 Mission Planning
The contractor shall assist with mission planning as sUAS rep, and will report directly to AFSW lead planner
90% of planning shall be provided at instructor level
Daily Observation / COR
6.1.3 Large Force
Exercise (LFE)
The contractor shall facilitate and execute LFEs with multiple sUAS operating in multiple locations to support both red and blue operations
90% of execution will be at an instructor level as determined by AFSW
Weapons Officers
Periodic Inspection / COR
6.1.4 Analysis
The contractor shall assist with development of lessons learned and debrief presentations regarding red sUAS effects vs. blue forces, and sUAS effects in support of blue forces
90% of the analysis shall be at a
Weapons School graduate quality level and thorough report capturing 95% of lessons learned
Daily Observation / COR
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference / Deliverable Title
Frequency Number of Copies
Medium/Format Submit To
6.1.5 Overall Lessons
Learned for sUAS Integration into tactical training scenarios
End of Exercise 1 Electronic Submission
Exercise Director / AFSW Lead / COR
File details come from the government source that posted it. Updated .