Performance Work Statement (SOO).pdf

PDF 540 KB Posted

Attached to
Logistical Assistance Training (LAT)
Solicitation number
W9124M-26-R-LAT
Issued by

About this file

This is a Performance Work Statement (PWS) for Logistical Assistance Training services dated August 25, 2026, to be performed at Fort Stewart, Georgia (FSGA) and Hunter Army Airfield, Georgia (HAAF) in support of the 3rd Infantry Division.

The contractor shall provide full-time logistics readiness assistance, training, and processing services including staff assist visits (SAVs) to 29 Battalion-level and below units, assistance with Division G4 command inspections for 7 Brigade-level units and below, and instruction of not less than seven Army Training Requirements and Resources (ATRRS) logistics courses and four non-ATRRS courses annually. The contract encompasses approximately 21,000 man-hours annually distributed across logistics course instruction (12,500 MH), SAVs (5,250 MH), inspection assistance (1,250 MH), and onsite assistance (2,000 MH). Key training courses include GCSS-Army Plant Maintenance Manager, Unit Supply Manager, Unit Armorer Certification, Company Commander/First Sergeant Preparation, Executive Officer Maintenance, Master Driver Refresher, Equipment Records Parts Specialist, Commander Supply, and various one-day courses such as TMDE Coordinator, Publications Management, and Ammunition/Fuel Handlers Certification. The contractor must provide 40 computers meeting TPM 2.0 specifications and employ personnel classified within skill codes 15090 (Technical Instructor) and 15095 (Technical Instructor Course Developer). The contract includes a 12-month base period plus four one-year option periods, with normal operating hours of 8:00 AM to 4:30 PM Monday through Friday. Performance requirements include monthly status reporting on classes taught, students trained, SAVs conducted, inspections assisted, and onsite assistance provided, with 95% reporting compliance required by the first business day of each month.

View the file

Other files

File Type Posted
W9124M-26-R-LAT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Logistical Assistance Training

25 August 2026

PART 1 – GENERAL INFORMATION

1. GENERAL: This is a non-personal service contract to provide Logistics Readiness Assistance, Processing and Training Services on Fort Stewart, GA (FSGA) and Hunter Army Airfield, GA (HAAF). If there is conflict among any law, regulation, specification, standard, or policy, the most stringent shall apply. The following provisions shall apply to the performance of work under this contract:

1.1. SCOPE OF WORK: The program shall provide FSGA and HAAF units with training and assistance to aid in meeting Army objectives for deployment, GCSS Army data entry and processing for maintenance and supply to include unit level tasks, ground maintenance, small arms, drivers training, conduct formal logistics readiness training, unit assistant visits, assess equipment readiness and provide corrective solutions to systemic problems. Services will also include the ability to execute tasked missions associated with supply and maintenance activities, providing a planned and coordinated program, course curriculum, subject or routine instruction in professional, technical, administrative, or other fields designed to improve individual and organization performance and assist in achieving the agency’s mission. Support provided shall be full-time staffing to conduct Staff Assist Visits for 26 Battalion level and below units, assist Division G4 with Command Inspections for five (5) Brigade level units and below, and teach not less than ten (10) ATRRS Logistics courses and not less than five (5) Non-ATRRS courses throughout the year. The specific efforts required of the Contractor are those task areas detailed in section five (5) of this document. The Contractor shall perform non-personal services in these primary areas. The contractor shall ensure professional execution of this effort in support of the 3rd Infantry Division units’ mission. In the event of a national emergency this contract shall have the capability to be surged. This service contract shall have a Period of Performance (POP) of 12 months plus four (4) option years.

1.2. BACKGROUND INFORMATION: The 3rd Infantry Division is required to train, mobilize, deploy, sustain, and reconstitute combat ready forces to meet requirements of Combatant Commanders across the full spectrum of operations. To meet worldwide deployment requirements, 3rd Infantry Division units must be highly trained, well equipped, properly maintained, and logistically ready. Due to the complexity of systems, turn-over of personnel and unit operational tempo (OPTEMPO) a logistics readiness training support capability is required to sustain a basic level of knowledge and proficiency in the areas of GCSS-Army applications, supply operations, property accountability, property book operations, ground maintenance operations, small arms, drivers training and deployment readiness. The Contractor shall provide logistics expertise through training to increase and sustain Soldier knowledge in logistics, deployment readiness, maintenance systems and unit supply systems.

1.3. Objectives:

1.4. HOURS OF OPERATION: Contractor operating hours shall be consistent with normal core duty hours of Fort Stewart unless otherwise directed by the Contracting Officer (KO) or the Contracting Officer Representative (COR). Normal core duty hours are 8:00 AM - 4:30 PM, Monday through Friday, excluding Government holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. The Contractor can expect that a portion of the work may be performed outside of these core hours and on weekends or holidays.

1.4.1. DOWN DAYS/WEATHER DELAYS: The Fort Stewart area is prone to heavy rains and wind as a result of thunderstorms and hurricanes, which can often result in delays to the start of the work shift or cancellation of the workday entirely. These delays apply to all “Non- Mission Essential” personnel. Contractors are not mission essential personnel and shall abide by the delay or workday cancellation. These delays are broadcast by the Fort Stewart Alert System and on local television and radio stations. The Contractor Project Manager (PM) shall notify each contractor on the team of the closure or delay, either directly or through a contact roster chain notification system.

1.4.2. RESCHEDULING: Time lost due to weather delays/closures, electrical outages and other cases of workplace non-availability will be addressed on a case by case basis. The COR will coordinate with the contract PM and will come to a consensus of whether to reschedule based upon mission requirements and the time of occurrence in the work week (i.e.

end or beginning of period). A modified work schedule to compensate for lost work performance is highly encouraged, and must be authorized by the COR and the PM. Extended work days may be implemented to accomplish the 40 hours per week workload requirement when approved by the COR and PM. This decision will be made upon evaluation as soon after the occurrence of delay as possible. The intent is to make this decision within the first 2-3 hours after reporting for duty after the lost time occurs.

1.5. CONTRACTOR PERSONNEL: For the purpose of this contract, the term “Contractor personnel” applies to all Contractor employees, subcontractor employees, or any other person(s) acting for or on behalf of the Contractor to perform work on this contract.

1.5.1. Project Manager: Prior to contract performance, the Contractor shall designate in writing, to the Contracting Officer, a Project Manager (PM), who shall be responsible for the overall management, coordination, and supervision of the work performed. The PM shall have knowledge of the terms and conditions of the contract. This PM shall have full authority to act for the Contractor on all contract matters relating to daily operations of this contract. The PM shall be available, by phone, anytime Contractor personnel are performing services on Fort Stewart.

1.5.2. Contractor Employee

1.5.2.1. General Qualifications: Contractor employees shall be trained, qualified, certified and/or licensed under the requirements specified in this contract prior to starting work. The Contractor shall maintain records of training qualifications, certifications, and licenses and provide them to the Contracting Officer upon request. The Contractor shall ensure that the employees remain fully qualified to perform work under this contract. The Contractor shall maintain the work force in such a manner as to ensure that the employees remain fully qualified. The Contractor shall only employ persons able to speak, read, write, and understand English for those positions interacting with Government personnel, and where English is used or essential to provide the product, record, data, information, or service. Contractor personnel shall be physically capable of performing work under all climatic conditions.

1.5.2.2. Specialized Qualifications: Subject Matter Experts (Contractor personnel) must possess a minimum of 3 years experience in the discipline they provide support, as noted in Section 5, to include the following functional areas:

• The Army Maintenance Management System

• The Army Materiel Maintenance Policy

• Supply Policy Below the National Level

• Using Unit Supply Systems

• Physical Security

• Environmental Programs

Proficiency in the following Logistics Information Systems:

• Global Combat Support System – Army (GCSS-ARMY)

• Army Enterprise Systems Integration Program (AESIP)

• Transportation Coordinator’s Automated Information for Movement System

(TC-AIMS)

• Air Load Plans

• Integrated Computerized Deployment System (ICODES)

• HAZMAT Code of Federal Regulations (CFR) 49

• Very Small Aperture Terminal (VSAT)

• Microsoft Office Suite

Knowledgeable in:

• Army Award for Maintenance Excellence.

• Army Oil Analysis Program

• Army Warranty Program

• Sample Data Collection Program

• Army Modification Program

• Army maintenance Floats

• Drivers Training

• Product quality deficiency and/or improvement reports

• Administrative storage of materiel

• Army tire retread program

• Tool improvement program

• National Maintenance Program

• Ground safety Notification System

• Army Corrosion Prevention and Control Program

• Army Battery Program

• Property Accountability

• Financial Liability Investigation Property Loss

• Supply Excellence Award Program (SEA)

• Inventory and inventory adjustments

• Supply Support Activity (SSA) operations

• Requesting and receiving supplies

• Property responsibility

• Organizational Clothing & Individual Equipment (OCIE)

• Management of Classes of Supply; I, II, III, IIIP, IV, VIII

• Hazardous Materiel

• Stock Control

• Excess management

• Ammunition management

• Food service equipment management

• Medical equipment management

• Highway Traffic Regulation

• Rail Load Operations

• Air Load Operations

1.5.3. Employee Conduct: The Contractor shall not allow any employee to perform work who has illegal possession of, or who is under the influence of alcohol or controlled substances. Government rules, regulations, laws, directives, and requirements, which are in place or issued during the contract term shall be applicable to all Contractor employees or representatives who enter the Installation or who travel using Government transportation.

Violation of such rules, regulations, laws, directives, or requirements shall be grounds for removal (permanently or temporarily as the Government determines) from the work site.

Individuals who violate such rules, regulations, laws, directives, or requirements may be denied access to the Installation, either temporarily or permanently. Contractor personnel receiving a driving under the influence (DUI) conviction may be prohibited from driving on the installation.

1.5.4. Employee Appearance: Contractor employees shall be appropriately dressed including any necessary individual protective clothing and equipment.

1.5.5. Personnel Constraints/Conflicts of Interest: The Contractor shall not hire for this contract, any person whose employment would result in a conflict of interest, or employment which is prohibited by Department of Defense Regulation 5500.7-R entitled "Joint Ethics Regulation (JER)", Dated August 30, 1993, including Change 7, Dated November 17, 2011.

1.5.6. Personnel Safety: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work. The Contractor shall comply with all applicable federal, state, local, and Fort Stewart laws and regulations including, but not limited to environmental, safety, and occupational health laws and regulations.

Except as otherwise stated in the contract, if the Contractor encounters material on the project site reasonably believed to be hazardous (such as munitions), the Contractor shall immediately stop work in the affected area and give notice of the condition to Range Control (912-435-8184) and notify the COR. Work in the affected area shall not resume without written permission of the Contracting Officer or COR.

1.4 SERIOUS ACCIDENT AND INCIDENT REPORTING:

1.4.1 The Contractor shall report serious accidents and incidents incurred while performing work under this contract immediately by the most expeditious means possible but not more than one hour following the accident or incident to the Fort Stewart Directorate of Emergency Services, the Safety Office, and Contracting Officer. Serious accidents and incidents include, but are not limited to, those defined in AR 385-10 and AR 190-40 respectively or referenced in other applicable directives. Examples are as follows: One or more lives lost, one or more persons critically injured, three or more persons hospitalized due to one incident, property damage estimated to exceed $2,000, fire causing major damage to structures, equipment, or vehicles, and HAZMAT, hazardous substances, and HAZWASTE incidents.

1.4.2 Record of Injury Form: Immediately after a job-connected injury, the Contractor shall prepare a record of the incident/accident and forward it to the COR. The COR will forward the incident/accident report to the Command Safety Office. If more information is required the Command Safety office will coordinate with the COR for the required information.

1.5 CLAIMS LIABILITY ARTICLE: The Contractor shall indemnify, save harmless, and defend the Government from and against any and all claims, damages, actions, debts, liabilities, and attorneys' fees arising out of or in any manner predicated upon loss of or damage to the property of, and injury to or death of any and all persons whatsoever, in any manner caused or contributed to by the Contractor, his agents, servants, employees or subcontractors while in, upon, or about the military installation wherein this work is located, or while going to or departing from the same; and to indemnify and save harmless the Government from, and on account of damage of any kind which the Government may suffer as the result of acts of negligence, fraud or misconduct of any of Contractor's agents, servants, employees, or subcontractors in or about said military installation.

1.6 SECURITY, INSTALLATION ACCESS AND CONTROL, AND TRAINING:

1.6.1 Anti-terrorism (AT) Level I training: All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee in WAWF with their invoice for the applicable invoicing period. If requested by the Contracting Officer, the Contractor shall also submit certificates of completion to the COR or to the contracting officer within 5 days of request. AT Level I awareness training is available at the following website: https://jkodirect.jten.mil

1.6.2 Access and general protection/security policy and procedures.

1.6.2.1 Installation Access and Identification of Contractor’s Employees: Entry to the https://jkodirect.jten.mil/ installation requires the following: current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and picture identification for other personnel. Contractors/ Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The Government will not be responsible for damages due to delay/stoppages caused by failure to comply. Contractors shall be restricted to physically signing in at the Fort Stewart Main or the HAAF Main Gates for entry to the installation, unless they have a DoD issued ID card or a local temporary pass. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the Director of Emergency Services or Security Office.

Contractor personnel must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes to contractor security matters or processes.

1.6.2.2 The Contractor shall provide a list of names and dates of birth of all employees that will be working on this contract to include subcontractors. CORs/Contract Technical Representatives are required to complete an IMDR-ES Form 2 (Application for Sponsorship) for all individuals needing access under the contract and submit to Fort Stewart Personnel Center CAC card office at least 7 days prior to access being needed.

1.6.2.3 Each employee who requires access to Fort Stewart to perform work under any contract, at any tier, must obtain a DoD identification credential or temporary pass to obtain access to Fort Stewart.

1.6.2.4 The Contractor shall provide information as required by the Fort Stewart Chief, Physical Security to enable the government to conduct a criminal history background check (CHBC) on contractor employees who are to have access to Fort Stewart. If the CHBC is not adverse, a 30 day temporary access pass will be prepared by the Fort Stewart Physical Security Division while the contractor’s employee makes an appointment for a Local Access Badge (LAB) to be created if access is needed longer than 30 days. A LAB will be issued for a period of no longer than 365 days at a time. If the CHBC is adverse, the employee will be denied access. If access is denied for any reason, the contractor’s employee may request a waiver from the installation utilizing the Access Waiver Denial Program. If a contractor’s employee is denied access for any reason the employee will not be allowed access until a waiver is requested and approved. There is an appeals process through the Directorate of Emergency Services. Final determination to allow entry and the issuance of a DoD credentials rest with the Garrison Commander or his designee, the Director, Emergency Services.

1.6.2.5 If an employee no longer needs the DoD identification credential for any reason (e.g. quits his/her job or no longer performs under the contract), the contractor is required to collect the DoD identification credential from the employee and surrender it to the Fort Stewart Physical Security Division within four (4) calendar days of such change. If the DoD identification credential cannot be returned within the required time frame for any reason, the contractor shall immediately notify the Physical Security Division verbally, followed up in writing the next work day. Email notification is authorized. An employee’s inability to obtain entrance to a Government installation because he/she does not have the required identification badge or visitor’s pass shall not excuse timely performance of the requirements of this contract. DoD identification credentials are currently issued at the Fort Stewart Physical Security Division located in the Fort Stewart Human Resource Center. The Government may change the location at which DoD identification credentials are issued or returned, with or without advance notice to the contractor. Any such changes shall not be a basis for adjusting the contract price under any clause of this contract.

1.6.2.6 DoD identification credential will not be reproduced or copied by the contractor, its subcontractors, or their employees. If an employee’s DoD identification credential is lost, stolen, or reproduced, the contractor shall verbally report the loss, theft, or reproduction to the Fort Stewart Physical Security Division on the day such loss, theft, or reproduction is discovered, followed by a written report of the circumstances to the Fort Stewart Physical Security Division within two (2) calendar days.

1.6.2.7 Each contractor employee shall possess/wear the DoD identification credential while performing work under the contract. The DoD identification credential shall be worn on the upper front of the outer garment unless precluded by OSHA regulation(s). The DoD identification credential will not be used for access to any Government installation except for performance of work under the contract for which is was issued. The contractor, shall upon expiration or termination of the contract, collect all DoD identification credentials and turn them into the COR.

1.6.2.7.a Personnel using Government Computers to access networks or other Government systems will process necessary documents through the COR to obtain a Common Access Card (CAC). Before CAC issuance, the contract employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Continued employment in any position requiring use of Government networks or systems may be contingent upon receiving a favorable background check. Within ten days of termination of employment, or at the end of this contract (whichever comes first), all identification cards shall be returned to the Contracting Officer. In the event an identification card is lost, the Contractor shall immediately notify the Contracting Officer’s Representative.

1.6.3 RESERVED

1.6.4 Army Training Certification Tracking System (ATCTS): All Contractor employees with access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete DOD Information Assurance Awareness Training prior to access to the IS and then annually thereafter.

1.6.5 RESERVED

1.6.6 OPSEC Training Requirement: All Contractor employees, to include Subcontractor employees, requiring access to an Army installation, facility, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after contract start date. The Contractor shall provide either certificates of completion or dates of attendance at the Garrison's Workforce Development quarterly training, for each affected Contractor employee and Subcontractor employee to the COR, within 15 calendar days after completion of training. OPSEC Level 1 training is available on AKO (ALMS), at the Multipurpose Auditorium (MPA) Garrison quarterly mandatory training, or DOD Civilian/Contractor training at https://securityawareness.usalearning.gov/opsec/index.htm.

1.6.7 For information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees accessing government information systems must meet all General User (IT-III) requirements IAW AR 25-2 (Information Assurance), which includes appropriate Background Investigation, DoD IA Training requirements, and signing an Acceptable Use Policy (AUP), before issuance of network access, and annually thereafter.

1.6.8 RESERVED.

1.6.9 RESERVED.

1.6.10 RESERVED.

1.6.11 Handling of Classified Information: For contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204‐2, Security Requirements.

This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22‐M); (2) any revisions to DOD 5220.22‐M, notice of which has been furnished to the contractor.

1.7 ENVIRONMENTAL COMPLIANCE:

1.7.1 The Contractor shall comply with all Federal, State, and local regulations covering environmental protection. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. If a Federal, State, or regulatory agency assesses any fine, penalty, or fee against the Government that is attributable to Contractor noncompliance with any environmental law or regulation, the Contractor shall indemnify the Government for the amount of the fine and other Government costs attributable to the violation (e.g., the cost of cleaning up a hazardous waste spill). In the event of Contractor noncompliance with any applicable environmental law or regulation, the Contracting Officer will determine whether the Government or the Contractor is responsible for abating or correcting the violation. This provision is not intended in any way to waive the Government’s rights under any other provision of this contract. The Contractor shall fully comply with current and future Fort Stewart regulations, plans and changes. Of particular importance are Fort Stewart Regulation 420-7 and the most current Endangered Species Act Requirements and Guidance document (available upon request). All Contractors and Sub-Contractors shall be provided copies of these documents and are required to read and understand all facts.

https://securityawareness.usalearning.gov/opsec/index.htm

1.7.2 Cultural Resources: The Contractor shall comply with all laws pertaining to cultural resources while conducting work on Fort Stewart, including the National Historic Preservation Act, the Archaeological Resources Protection Act, and the Native American Graves Protection and Repatriation Act. Federal Law mandates that all cultural resources eligible for listing on the National Register of Historic Places must be protected from damage. Cultural resources include, but are not limited to, historic buildings and structures, cemeteries, historic and prehistoric archeological sites. Areas on Fort Stewart containing National Register eligible cultural resources are marked with OFF LIMITS signs and/or Seibert Stakes, and shall be avoided. Federal Law prohibits Artifact/relic collecting on any cultural resource located on Fort Stewart. In the event that an inadvertent discovery of items that appear to be cultural remains (historic foundations, graves, historic or prehistoric artifacts) occurs during ground disturbing activities, all work shall cease within a 30-meter radius of the find. DPTMS, Range Division (772-7152) and DPW, Environmental Division 571-801-0241 shall be contacted immediately.

Any fill brought from outside the installation onto Fort Stewart for any project must come from a mining source that is permitted by the GA DEC and has been evaluated and cleared by an archaeologist.

1.7.3 Fort Stewart has implemented an Environmental Management System (EMS) to proactively deal with the environmental impacts of its processes, activities, and services. Fort Stewart uses the ISO 14001:2004 as the standard for its EMS. All personnel performing work for or on behalf of Fort Stewart must be aware of and understand Fort Stewart’s Environmental Policy. Fort Stewart offers EMS General Awareness Training in the form of a printed Handout.

All Contractors and their employees are required to be made aware of EMS General Awareness Training and to post an EMS handout so that it is available to all employees. Contractors are also responsible for ensuring all subcontractors hired on their behalf receive EMS General Awareness Training handouts and that they are posted at the subcontractor’s site. The Contractor is also responsible to ensure that all goods and services used by the Contractor or any of its subcontractors do not deviate from the installation Environmental Policy, and objectives and targets of the EMS.

1.7.4 Sustainable Acquisitions:

1.7.4.1 The Contractor shall use Contractor-provided products that meet or exceed the following specifications IAW FAR 23.103-Sustainable Acquisitions.

(1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)- designated);

(2) Water-efficient;

(3) Bio-based;

(4) Environmentally preferable (e.g., EPEAT®-registered, or non-toxic or less toxic alternatives);

(5) Non-ozone depleting; or

(6) Made with recovered materials.

1.7.4.2 The required products in the contract actions for services include products that are:

(1) Delivered to the Government during performance;

(2) Acquired by the contractor for use in performing services at a Federally-controlled facility; or

(3) Furnished by the contractor for use by the Government.

1.7.4.3 The Contractor shall ensure that the required products in the contract actions must meet agency performance requirements.

1.7.4.4 For the purposes of meeting the 95 percent sustainable acquisition requirement, the term “contract actions” includes new contracts (and task and delivery orders placed against them) and new task and delivery orders on existing contracts.

1.7.5 Wetlands.

1.7.5.1 No activity is authorized within wetlands that are not specifically addressed in the contract. No type of fill (e.g., soil, stumps, and trees) shall be placed in wetlands outside of those areas specifically permitted for fill. All work shall be accomplished from the existing roadways, to the greatest extent possible. If work in wetlands is unavoidable, equipment mats must be used and removed immediately upon completion of work in wetlands.

1.7.5.2 All wetland boundaries will be physically marked in the field in such a way that provides a visible barrier to all personnel and equipment operators. All boundary line markers will be maintained throughout the duration of the contract and removed upon final inspection.

1.7.5.3 All clearing in wetlands not permitted for fill will be accomplished using hand tools and all material cut will be left in place, unless it can be removed by non-ground disturbing machinery, or if possible, through felling and removal by non-ground disturbing machinery. In either case, grubbing will not be allowed.

1.7.5.4 Pesticide usage shall be in accordance with all applicable federal, state, and local requirements. Permits must be obtained from the Fort Stewart Environmental Protection Office prior to the application of pesticides within GAEC regulated wetlands and the associated buffer areas. Contact Fort Stewart’s Wetlands Program with the limits of work for pesticide usage. Fort Stewart’s Wetlands Program will be responsible for obtaining the required permits. Permitting may take up to 60 days from application submission to the issuance of the permit(s) from the

GAEC.

1.7.5.5 All inadvertent unauthorized impacts to wetlands will be immediately halted and reported to the KO. The KO will contact Public Works Environmental Division for guidance in further reporting and/or correcting the incident.

1.7.6 Biological Resources/Fish and Wildlife.

1.7.6.1 The Contractor shall minimize interference with, disturbance to, and damage of fish and wildlife. Species that require specific attention along with measures for their protection shall be listed by the Contractor prior to beginning of construction operations.

1.7.6.2 The US Fish & Wildlife Service under Section 7 of the Endangered Species Act impacts Fort Stewart. Fort Stewart is home to 7 species that receive federal protection under the Endangered Species Act. The contractor (and all subcontractors) shall be responsible for coordination with Fort Stewart's Fish & Wildlife Management Program to ensure compliance with the Endangered Species Act and all other applicable laws and regulations pertaining to wildlife.

Overall the contractor (and all subcontractors) shall minimize interference with, disturbance to, and damage to plants, fish, wildlife, and their habitats on and adjacent to the project area. Fish and wildlife branch (571) 801-2225

1.7.6.3 Flagging or signs must be used to demarcate construction limits of a given project prior to any construction activity, vegetation, and/or tree clearing. Clearing must only occur within the flagged area, and flagging must be removed upon completion of the project.

1.7.6.4 Project planning and design should attempt to minimize building footprints by combining infrastructure (i.e. roads, utility lines, etc.) for multiple buildings or by constructing multi-story versus multiple or expanded single story buildings whenever possible.

1.7.6.5 Pesticide usage shall be in accordance with all applicable federal, state, and local requirements. Fort Stewart requirements can be located, in part, within the most recent Fort Stewart Endangered Species Act Implementing Document. Fort Stewart’s Wetland’s Program and Pest Control Office should be contacted for any additional requirements.

1.8 TOXIC/HAZARDOUS MATERIAL AND WASTE MANAGEMENT

1.8.1 Reserved

1.8.2 Hazardous Materials: The Contractor shall submit any hazardous material inventory list to DPW-ENV detailing the type of hazardous materials and maximum quantities of the materials on hand. The hazardous material will be properly identified to include manufacturer and national stock number (if applicable). The Contractors shall maintain copies of the Safety Data Sheets for all hazardous materials and provide copies to DPW ENV upon request.

1.8.3 Hazardous Waste: If a Contractor generates or accumulates hazardous waste, i.e., mercury containing items, batteries, PCB ballasts, waste oils, off-spec fuels, waste paint related items, or aerosols, in addition to complying with ALL Federal, State, and Local Environmental Laws and Regulations, the Contractor must also follow the Fort Stewart Hazardous Waste Management Plan (HWMP) procedures in notifying the Hazardous Waste Manager regarding the Use, Storage, and Ultimate disposal of any Hazardous Wastes (HW) to include Universal Waste (UW) generated. The HW/UW must be disposed of within GA State Department of Environmental Conservation (GAEC) Laws and Regulations, for timeliness and proper Manifesting requirements. Fort Stewart has an approved EPA ID number for the disposal of HW/UW from the Installation, this is the only EPA ID number that shall be used for disposal of Waste generated at Fort Stewart, Contractor’s shall NOT use their own EPA ID number in any event to dispose of HW/UW that is generated on Fort Stewart. The PW Environmental, HW Manager or appointed representative must review and sign the waste profiles/waste analysis, Land Ban restriction forms (if applicable), all manifests, and Bill of Ladings for waste that is generated on Fort Stewart, prior to shipment off the Installation.

1.8.3.1 The Contractor shall provide a copy of the GA State Regulating Authority permit for each treatment, storage, disposal or recycling facility utilized. Provide a letter to Fort Stewart stating that they are authorized to receive the waste stream from Fort Stewart. The transporter of hazardous waste shall be licensed and/or permitted to transport hazardous waste IAW GA State Department of Environmental Conservation (GAEC) and Department of Transportation (DOT) regulations. The Contractor must provide a letter to Fort Stewart stating that they are authorized to transport the waste stream from Fort Stewart and provide a copy of the DEC/DOT Transporter Operator Permit and driver’s license with hazmat endorsement.

1.8.4 Notification of the potential presence of Lead, Cadmium, Chromium (all forms), and lead in painted surfaces and dust: All areas of Fort Stewart where the maintenance and repair of ground and aviation equipment has been performed may potentially contain dust with detectible levels of toxic metals including, but not limited to, chromium (all forms), cadmium, beryllium and lead. Buildings, structures, and equipment present on Fort Stewart may be painted with surface coatings that contain lead and/or other toxic metals. Structures built before 1985 have the highest potential to have surface coating containing lead, but it is possible that newer structures and equipment also have surface coatings with toxic metals. All contractors shall take necessary precautions and work practices to protect workers from exposure to the hazards associated with dust and surface coatings containing toxic metals. The contractor shall comply with all State, federal and local regulations governing the protection of employees from hazards associated with toxic metals that may be present within infrastructure, utilities, facilities and equipment. This includes, but is not limited to, compliance with the Occupational Safety and Health Administration (OSHA) standards such as the Lead in Construction Standard (29 CFR 1926.62), the Hexavalent Chromium Standard (29 CFR 1910.1026) and any/all similar relevant, appropriate and applicable regulations and standards.

1.9 REPORTS:

1.9.1 The Contractor shall complete responses in a timely manner to all requirements for reports and requests for information and data, both one-time and recurring.

1.9.2 Monthly Status Report: The Contractor shall submit a status report every month to the COR, by the 1st day of each month, with data from the previous month. The status report shall include, at a minimum, the classes taught that month, the number of students in each class, the number of SAVs conducted, the number of inspections assisted with, and the number of onsite assistance provided.

1.9.3 Contractor Manpower Reporting: Contractor Manpower Reporting: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the U.S Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2026. Contractors may https://www.sam/ direct questions to the help desk at help desk at: https://www.sam.gov.

1.9.4 QUALITY CONTROL PLAN (QCP): The Contractor shall maintain an inspection system acceptable to the Government covering the services under this contract.

Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires upon request. The Contractor shall submit its QCP to the Contracting Officer no later than thirty (30) calendar days after the initial request is made. The format of the QCP shall be in Microsoft Word on company letterhead.

1.10. QUALITY CONTROL PLAN (QCP): The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract.

Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires. The Contractor shall submit its QCP to the Contracting Officer not later than thirty (30) calendar days after contract award. The format of the QCP shall be in Microsoft Word on company letterhead and be signed by Contractor.

1.11 Quality Assurance: The government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan in primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.12 Place of Performance: The work to be performed under this contract shall support 3ID units and be performed at designated sites across the installation.

1.13 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.13.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.

1.14 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the http://www.sam.gov/ definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.15 Non-Disclosure Agreements: The contractor shall obtain from each employee who has access to proprietary information under this contract, a written agreement which shall in substance provide that such employee shall not, during his/her employment by the Contractor or thereafter, disclose to others or use for their benefit, proprietary information received in connection with the work under this contract. The contractor will educate its employees regarding the restrictions imposed by FAR9.505-4, so that they will not use or disclose proprietary information or data generated or acquired in the performance of this contract, except as provided herein.

1.16 Phase-In/Phase-Out Periods:

1.16.1 Phase in: During the 1 month phase-in period, the Contractor shall inventory GFE/GFP, conduct facility checks, ensure employee training/testing is completed and become familiar with performance requirements to commence full performance of services. All contractor personnel shall in-process through the designated Government personnel to ensure compliance with the Government’s requirements for establishment of e-mail accounts, CAC, security measures, etc. during the Phase-In period.

1.16.2 Phase-Out: Prior to the completion of this contract, an observation period of no less than fifteen (15) days shall occur, at which time team management personnel of the incoming Cotractor may observe operations. This will allow for orderly turnover of facilities, equipment, and records, and will help to ensure continuity of services. The outgoing Contractor is ultimately responsible for performing full services IAW the contract, during the 30 day phase-out period, and shall not defer any requirements for the purpose of avoiding responsibility or transferring, such responsibility to the succeeding Contractor.

The outgoing Contractor shall fully cooperate with the succeeding Contractor and the Government. so as not to interfere with their work or duties.

1.16.3 To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have all personnel on board during the phase-out period. The Contractor shall be prepared to transition the workload to the newly selected Contractor during the phase out period, which will occur at the end of the Period of Performance of the contractual effort.

1.16.4 Phase-out Plan: The incoming Contractor shall develop a 30 day phase-out plan to affect a smooth and orderly transfer of contract responsibility to a successor. The plan shall fully describe the Contractor’s approach to the following issues, at a minimum: employee notification, turn-over of work in progress, inventories and turn-over of Government property, removal of Contractor property, data and information transfer, reconciliation of all property accounts, requisitions, and work in progress, turn-in of excess, clean-up of Contractor work areas, provision for training of the successor’s personnel on automated systems used in performance of the contract, security debriefings in accordance with AR 380-5 for incumbent personnel holding security clearances, and any other actions required to ensure continuity of operations. The Contractor shall provide the plan to the COR thirty (30) days before the phase-out period commences.

PWS PART 2: DEFINITIONS AND ACRONYMS

2.1. DEFINITIONS: The definitions set forth below are those unique to this contract.

Definitions for technical terms or words that are included in this contract can be found in the technical documents referenced in the individual functional areas of the PWS. The definitions provided below are oriented to Fort Stewart’s PWS. In many cases, definitions are specific by situation. The listing of definitions is not all-inclusive, but it has been derived from official publications (e.g., regulations and technical manuals) when available.

Accountability: Accountability is the obligation to keep accurate and complete records of property, documents, or funds. Important data elements may include, but are not limited to, identification data, gains, losses, due-ins, due-outs, and balances on hand or in use.

Army Regulations (ARs): Publications issued by Department of the Army (DA) which are directive in nature and contain missions, responsibilities, policies and administrative procedures necessary to insure uniform compliance with those policies.

Business Day: Monday through Friday, except for Government recognized holidays and days the Fort Stewart duty day has been cancelled for all but emergency business.

Contracting Officer (KO): An individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

Contracting Officer's Representative (COR): An individual from the functional activity appointed by the Contracting Officer and delegated specific authority to monitor contract performance and to perform specific contract administration functions.

Contract Discrepancy Report (CDR): A formal method documenting unsatisfactory Contractor performance (contract deficiencies and defects against the AQL) in the contract file.

Defective Service: A unit of service, which contains one or more defects and does not conform to specified requirements.

Federal Acquisition Regulation (FAR): Provides uniform policies and procedures for acquisitions by executive agencies of the federal Government.

Government Furnished Property: All tangible property of Government furnished to Contractor.

Hazardous Waste: A waste as defined in title 40, CFR, Part 261.3. Special handling procedures and disposal facilities are required for their disposal in compliance with federal, state and local regulations.

Performance Requirements Summary (PRS): The PRS identifies key performance indicators and standards that represent logical service outputs that will be evaluated by the Government to assure the Contractor is fulfilling the terms of the contract.

Performance Standard: A measurable output or result associated with the performance-based description of a requirement found in the PWS.

Performance Threshold: The Performance Threshold is the lowest case quality level (percent) of defective outcomes/service that the Government indicates will be accepted using acceptable sampling techniques and procedures. However the Contractor is still expected to meet the performance standard outlined utilizing the re-work process at no additional cost to the government.

Quality Control: Those actions taken by the Contractor to control the in-process performance of goods or services to ensure that contract quality standards are met.

Quality Assurance Surveillance Plan (QASP): An organized written document used by the Government for quality assurance surveillance.

2.2. ACRONYMS: For the purpose of the resultant contract, the acronyms listed below shall apply:

AESIP Army Enterprise System Integration Program AQL Acceptable Quality Level ARIMS Army Records Information Management System BOM Bill of Materials CFR Code of Federal Regulations COC Chain of Command CSDP Command Supply Discipline Program DA Department of the Army DA Cir Department of the Army Circular DA Pam Department of the Army Pamphlet DEC Department of Environmental Conservation DODAAC Department of Defense Activity Address Code DST Deployment Support Team ESR Equipment Status Report FLIPL Financial Liability Investigation of Property Loss FMSWeb Force Management System GCSS-A Global Combat Support System-Army GFP Government Furnished Property ME5A Unfunded Purchase Requests in GCSS-A MSDS Material Safety Data Sheets MTOE Military Table of Organization and Equipment GAEC GA State Department of Environmental Conservation ORL Office Records List POV Privately Owned Vehicle RIC Resource Identification Code SOC Statement of Charges SKO Sets, Kits, and Outfits SLOC Sea Lines of Communication TM Technical Manual UIC Unit Identification Code ZPROSTAT Order Status Report

PWS PART 3: GOVERNMENT FURNISHED RESOURCES

3.1. GENERAL: This section…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .