Performance Work Statement (PWS) Shoretie Receptacles.pdf
PDF 1 MB Posted
- Solicitation number
- 70Z02924QNEWO0002
About this file
This performance work statement and related federal contract opportunity request quotes to replace two shore power boxes with 200 amp breakers at a United States Coast Guard facility in Paris Landing, Tennessee. The performance work statement provides requirements for the work including coordinating with Coast Guard points of contact, complying with safety standards, verifying utility locations, completing all work within 30 days, and other details. Quotes are due by January 22, 2024 with award as a firm-fixed price construction contract to the offeror with the lowest price. This small business set-aside is issued by the Department of Homeland Security United States Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determinations - Henry County TN.pdf | ||
| Construction Clauses Provisions FAC 2023-01.doc | DOC document | |
| SF 1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Homeland Security United States Coast Guard
Performance Work Statement (PWS)
For
Replace Shore Tie Boxes and Breakers
At
USCGC Chippewa/USCG Facilities, Paris Landing, TN
January 2024
United States Coast Guard
Performance Work Statement
General: United States Coast Guard Facility Paris Landing, Tennessee is accepting proposals for qualified individuals or firms to replace two shore power boxes with 200 AMP breakers at USCG Facility Paris Landing, Tennessee. Prior to submitting a quote, it is mandatory to examine the performance work statement and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Facility Paris Landing, Tennessee.
Location:
United States Coast Guard Facility Paris Landing, TN 700 Coast Guard Rd.
Buchanan, TN 38222
I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 7:45am to 4:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.
II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard two weeks prior to start of work.
III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities.
MKC South Knight Southworth.m.knight@uscg.mil 731-694-8172 MK1 Ryan Steglich Ryan.a.steglich@uscg.mil 731-694-8172
IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters.
V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.
VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.
VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.
VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.
IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.
X: Scope of Performance: Contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below:
1. All work in this contract shall be completed in Building 68685 onboard Coast Guard Facility Paris Landing, Tennessee.
2. Replace two shore power receptacles with 200 AMP breakers of the same type and specification.
3. Receptacles shall be at the same location and have the same height above ground level.
4. Add grounding at the receptacle location for both receptacle boxes.
5. Contractor shall protect all equipment and merchandise in work locations.
6. All work must be approved by the Contracting Officer’s Representative.
XI: Period of Performance:
Project must be completed within thirty (30) calendar days after award date.
| Location: |
| United States Coast Guard Facility Paris Landing, TN |
File details come from the government source that posted it. Updated .