Performance Work Statement PWS 12May2025 - WSMS FINAL .pdf
PDF 271 KB Posted
- Attached to
- Wireless Systems Maintenance Services
- Solicitation number
- R1S3AC4326AC01R
About this file
This Performance Work Statement (PWS) details Wireless Systems Maintenance Services (WSMS) for the Air Force Test Center at Edwards Air Force Base, California, dated 12 May 2025. The primary objective is to provide efficient, effective maintenance for wireless communication systems supporting Edwards AFB, Air Force Research Laboratory, and Air Force Plant 42, focusing on priority and routine maintenance of complex radio communication infrastructure.
Key service requirements include priority maintenance (responding within 2 hours of outage notification), routine maintenance (addressing issues within 8 business hours), equipment removal/installation, and repairs for various wireless systems manufactured by Motorola, General Dynamics, and others. The contract involves maintaining approximately 3 system client computers, 5 site routers, 27 site switches, 37 consoles, 30 repeaters, and additional supporting equipment. Technicians must have specialized maintenance experience, certifications, and proficiency in vehicle installations across different vehicle types. The contractor will be responsible for maintaining accountability records, performing installations/removals, and ensuring all work meets industry standards and manufacturer specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Responses 2 as of 04Jun25.pdf | ||
| RFI Responses as of 30May2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE TEST CENTER (AFTC)
PERFORMANCE WORK STATEMENT (PWS) FOR
WIRELESS SYSTEMS MAINTENANCE SERVICES AT
EDWARDS AFB, CALIFORNIA
12 May 2025
SECTION 1
1.1 INTRODUCTION:
The mission of Edwards AFB (EAFB), Mission Support Group, 412CS/SCOTR is to provide top quality, customer-oriented communications nonpersonal services for Edwards AFB (EAFB), Air Force Research Laboratory (AFRL) and Air Force Plant 42 (AFP 42).
The objective of this Performance Work Statement (PWS) is to provide EAFB with efficient, effective, performance-based Wireless Systems Maintenance Services (WSMS) by the contractor’s highly qualified, fully trained and dedicated workforce who shall provide all resources (labor and materials) to perform the WSMS described within this PWS in a manner that meets the objectives stated herein performed in accordance with commercial industry standards for professional WSMS.
1.2 SCOPE of WORK:
Maintenance Support Requirements: Provide priority and routine maintenance support nonpersonal service on a recurring and nonrecurring basis. Work in conjunction with other necessary maintenance personnel, to return the equipment back to an operational status.
Necessary maintenance personnel can include, but are not limited to, Civil Engineers, Telephone Maintenance, Commercial Telecommunications Providers, and other government, contractor employees, and escorting vendors. Any removal of fixed government equipment from the installation must be pre-approved in writing by the Contracting Officer (CO) or his/her designated representative. Government has a need for contractor support of the upgrade, refresh, and retirement process during this contract, in addition to the currently estimated workload and quantifies see appendix 2.16.
1.3 SERVICES:
1.3.1 Ensure all requests for service are initiated by only authorized government personnel as identified by the COR or Contracting Officer.
1.3.2 Priority Service: Provide priority maintenance service, in accordance with the Wireless System Restoration Priorities, required to repair or maintain an item so that its performance shall equal or exceed the original manufacturer's specifications.
Within two hours from government notification of a priority equipment outage, the contractor's representative shall be on-site and actively engaged in identifying the cause of the outage. Complete all priority service requests and return the equipment to fully operational status within 24 hours from outage notification. Excess delays due to material availability or circumstances beyond the contractor's control shall be identified in writing to the Wireless Systems Manager (WSM) as soon as possible but not later than 24 hours from notification. Respond to priority outages and repairs 24 hours a day, seven days a week including holidays and weekends. Coordinate required system downtime with the WSM.
1.3.3 Routine Service: Provide routine maintenance and repair service as required to repair or maintain an item so that its performance shall equal or exceed the original manufacturer's specifications. Within eight business hours from government notification of a routine equipment outage, the contractor's representative shall be on-site and actively engaged in identifying the cause of the outage. Complete all routine service requests and return the equipment to fully operational status within 10 business days of the equipment outage. Excess delays due to material availability or circumstances beyond the contractor's control shall be identified, in writing, to the WSM as soon as possible but not later than 10 business days from outage notification. Coordinate additional system downtime with the WSM not later than 2 hours before the required system downtime.
1.3.4 Recurring Maintenance and Repair: Accomplish recurring maintenance and repair of equipment and return the item to operational status. Recurring maintenance and repair includes preventive maintenance and Inspections; Corrosion Control Inspection; equipment wiring; installing missing components and voltage compliance checks; adjustment and/or repair required on a recurring basis. Conduct recurring maintenance in order to sustain safe and reliable operating condition of the equipment annually, at a minimum, or in accordance with manufacturer's specifications and standard commercial practices. Contractor will use manufacturer's specified numbered parts and include all installed options and accessories. In the case of scheduled maintenance, that requires system downtime, notify the WSM a minimum of two business days prior to the scheduled maintenance. Recurring repairs shall not include replacement of user-installed batteries.
1.3.5 Non-recurring Maintenance Service: Nonrecurring maintenance is service needed on an "as required basis" and is not covered under recurring maintenance service.
Nonrecurring maintenance service shall be accomplished no later than 5 business days after notification. Nonrecurring maintenance of handheld equipment may be accomplished at the government furnished location, the user’s location or at the contractor's place of business. All handheld equipment removed from EAFB, AFRL, or AFP42 shall be identified on a "work order" to maintain accountability of the items. Use only manufacturer's specified numbered parts. Ensure the radio operates within the manufacturer’s specifications. Ensure that intrinsically safe radios are maintained to retain their intrinsically safe/factory mutual or UL status after repair.
Ensure Advanced Encryption Standard (AES) radios are maintained in compliance with current technical industry standards. The contractor shall not use unauthorized components that will void the Factory Mutual or UL Approval. All non-recurring maintenance service shall be guaranteed for 30 days after work order is closed.
Inspect new radios at the end of the warranty period. Maintain accurate accountability records for all equipment transported off base for repairs.
1.3.6 Over and Above Repairs. Over and above repairs are specific repairs which are considered beyond fair wear and tear and must be performed to ensure the WSMS are adequately maintained. The Contractor must obtain approval from the WSM (<$2,500) or from the CO (=>$2,500) prior to performing the actual Over and Above Work. Approval will be done in writing, unless under emergency conditions where oral approval may be used for less than $2,500. All oral approvals will be followed up in writing. The approval will establish a firm-fixed price for the work request. Failure of the Contractor to provide the information required on the Over and Above Work Request, within the specified time frame, may be grounds for the Government to openly compete the Over and Above Work. If the Government and the Contractor cannot agree upon a firm-fixed price for the Over and Above Work request, the Government has the right to openly compete the Over and Above Work. Permits the Government and the contractor to negotiate parts and labor, which are within the general scope of the contract and are necessary to make repairs or prevent malfunctions but are not specifically identified and priced. If, during the maintenance/repair, the contractor recommends work not priced elsewhere in contract, the contractor will submit a work order request, with detailed cost estimate and warranty terms, to the COR, and WMS within five business days. The contractor shall not proceed with the over and above repair work until the work order has been approved by the COR or WSM. The contractor shall commence work and complete work by the mutually agreed upon dates. All Over and Above repairs shall be guaranteed for 30 days after work order is closed.
1.3.7 Inherently Governmental Function: The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this PWS.
1.3.8 Reports: Prepare and submit to the WSM a written report of the month’s completed tasks by the fifth business day each month.
1.4 EQUIPMENT
1.4.1 Equipment Removal and Installation: Removal and installation of fixed and mobile equipment and other accessories as requested. After equipment is removed, return the equipment to the WSM unless otherwise specified on the removal request.
Remove or install mobile equipment on EAFB, AFRL, or AFP 42 at the location specified by the WSM.
1.4.2 Fixed and Mobile Equipment Removal: Remove only the fixed and mobile equipment as requested on the removal work order. In cases where the work order requests removal of associated equipment, remove all equipment related to the fixed equipment.
Associated equipment may include, but is not limited to, antennas, coaxial cables, towers, hardware ground rods, ground wires, guy wires, and anchors. Remove all items related to the mobile radio or vehicle charger installation. Plug all mounting holes or cable entrances extending to the exterior and interior of the vehicle because of equipment installation.
1.4.3 Equipment Installation: Install, program, system start-up/check-out, certify for both fixed and mobile equipment in accordance with industry standards and the installation work order. Installations made to Fire Department Vehicles shall meet National Fire Protection Association 1901 standard for Automotive Fire Apparatus. Installation of Radio Equipment in Vehicles and at customer locations and in the shop. Install wiring, hardware, and field terminate all devices all necessary complete equipment installation and then verify the serviceability of the equipment prior to departing the area. For mobile equipment installations, install a separate independent power cutoff switch. In some cases, a bracket may need to be fabricated to make the equipment stable and operational for vehicle use. Vehicle installations are to be complete within 10 days.
Upon completion of installation, work area will be left free of all tools, rubbish or scrap material. Any panels removed during equipment installation will be returned to the customer if not reused. Completion on installation technician will inspect and test systems, batteries, and wiring; adjusts and repair.
1.4.4 Perform diagnosis, troubleshooting and repairs on radio equipment to ensure optimal functionality.
1.4.5 Equipment Relocation: Relocate fixed equipment as requested on work order.
Associated equipment may include, but is not limited to, mobile equipment, desk sets, power supplies, computers, consoles, Voice Processing Module (VPM), fixed mobile equipment, antennas, coaxial cables, towers, hardware ground rods, grounding wires, guy wires, and anchors. Upon completion of installation, the work area will be left free of all tools, rubbish or scrap material.
1.4.6 Equipment Neglect or Misuse: The contractor shall not be held responsible for repair times due to neglect or misuse on the part of the government. The contractor shall provide a written cost estimate to the WSM within 10 days from the date notified of/or the contractor identified suspected neglect or misuse. The written cost estimate shall be provided to the government at no additional charge. Written estimates shall include the estimated cost of labor and material, and the specified time needed to bring the equipment into fully operational condition. No repairs will be made until the contractor and the government have agreed, in writing, to the cost and time frame for the repair.
This work will be handled as an Over and Above type action.
1.4.7 Travel to remote sites is required.
1.4 Wireless System Restoration
1.5.1 Priority/System
a) Motorola 2022HS SmartZone Regional Core Trunk System
b) Motorola MCC 7500 Consoles/ NICE playback recorder/ KMF client
c) 911 Center Fire Station (FS1)
d) Security Forces (ECC)
e) Maintenance Operations Center (MOC)
f) All other Consoles
1.5.2 Multiple Individual Net/System repairs will be accomplished in the following order:
a) Multiple net outages will be repaired in order, following the above priorities
b) Base Stations, Repeaters and Controllers
c) Remotes
d) Other fixed ancillary equipment
e) Mobile Radios and/or vehicle chargers
f) Portable equipment
1.5.3 RF Site List
a) Red Hill 345209.44N/1180705.58W Elev: 2716 ft Building #: 5783 Tower
Height: 140 FT
b) Main Site 345644.78N/1175448.21W Elev: 2555 ft Building #: 4971
Tower Height: 140 FT
c) AFRL 345617.90N/1174128.95W Elev: 3190 ft Building #:8743 Tower Height: 140 FT
d) Shadow Mountain 344414.39N/1173339.00W Elev: 4004 ft
e) Plant 42 (AFP42) Building #: 510 Tower Height: 120 FT
1.5.4 Vehicles
a) Trucks
b) SUVs
c) Cars
d) Fire Trucks
e) Tankers
f) Other Vehicles
SECTION II
2.0 Service Summary (SS)
2.1 General
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success but do not represent all contract performance requirements.
All contract performance requirements in this PWS will be monitored.
2.2 Performance Evaluation
Performance of a service shall be evaluated to determine whether or not it meets the performance requirements of this contract. Re-performance of unacceptable services at no additional cost is the preferred course of action when appropriate. In the case of issued Corrective Action Reports (CARs), the Contracting Officer shall take appropriate measures according to inspection of services clause in the contract, i.e., FAR 52.246-4, 52.246-5, or 52.212-4(a). Corrective Action Reports may categorize nonconformance as minor, major or critical IAW the following FAR 46.101 definitions:
“Minor nonconformance” means a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose or is a departure from established standards having little bearing on the effective use or operation of the supplies or services.
“Major nonconformance” means a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose.
“Critical nonconformance” means a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission.
SS
# Performance Objective PWS
Section Performance Threshold
Rating Criteria
Quality
Priority Maintenance Service
1.3.1 100% of the time
Discrepancies:
0 = Satisfactory > 0 = Unsatisfactory
Nonrecurring maintenance service shall be accomplished no later than 5 business days after notification.
1.3.5 Completed within 5
business days
Based on average observation Discrepancies:
1-2 Days = Exceptional 3-4 = Very Good 5 = Satisfactory 6-7 = Marginal > 8 = Unsatisfactory
Maintain accurate accountability records for all equipment transported off base for repairs.
1.3.4 100% of the time in accordance with record procedures
Discrepancies:
0 = Satisfactory > 0 = Unsatisfactory
Performs radio installations and removals according to all applicable industry standards
1.4 100% of the time. Discrepancies:
0 = Satisfactory > 0 = Unsatisfactory
Schedule
Prepare and submit to the WSM a written report of the month’s completed installations, removals, relocations.
1.3.8 Completed within the
first 5 business days of the following month.
1-3 Days = Exceptional 4 = Very Good 5 = Satisfactory 6-7 = Marginal > 8 = Unsatisfactory
Installations/Removals 1.4.2, 1.4.3 Within 10 business days 1-3 Days = Exceptional 4-9 = Very Good 10 = Satisfactory
11-12 = Marginal > 13 = Unsatisfactory
Cost Control
N/A
Management
The Contractor must obtain approval from the WSM (<$2,500) or from the CO (=>$2,500) prior to performing the actual Over and Above Work. Approval will be done in writing, unless under emergency conditions where oral approval may be used for less than $2,500.
1.3.5 100% of the time. Discrepancies:
0 = Satisfactory > 0 = Unsatisfactory
Small Business
N/A
Regulatory
N/A
Other Areas
N/A
2.3 Government Quality Assurance. The government shall inspect and evaluate the contractors’ performance to ensure services are received in accordance with requirements set forth in this contract. The COR will use the contractor’s work schedule, or modified version thereof, to record validation results. Results of the validation then becomes the official Air Force record of the contractor’s performance. Government surveillance of tasks not listed in the PWS Service Summary or by methods other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the CO as a result of surveillance or otherwise in connection with nonconforming supplies or services of the contractor will be according to the terms of this contract and in accordance with FAR 46.102, FAR 46.407, DFARS 46.407 and DFARS PGI
46.407 which specify procedures for reductions of fee or for reductions to the price of a fixed-price contract when supplies are nonconforming or services are not performed or do not meet contract requirements.
2.3.1 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during surveillance inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality assurance inspections if performance dictates.
2.3.2 When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a Corrective Action Report (CAR) for issuance to the contactor. The contractor shall respond to the CAR IAW instructions provided and in the CAR. While the formal process of this paragraph to address unacceptable contractor performance is always available, the Government reserves the right to initiate a less formal process involving the contractor, the COR and the CO meeting together at no additional cost to the Government regarding unacceptable contractor performance.
2.4 Performance Assessment.
2.4.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
2.4.2 Customer Complaints. The COR will receive and investigate all complaints. The COR will be responsible for validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Validated customer complaints shall be corrected within 2 hours of notification. CO will validate corrective action.
2.4.3 Review of Audits. COR reviews results of the contractor’s accepted quality management system audits and related quality metrics.
2.4.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all tasks performed. Appropriate for tasks that occur infrequently. Usually only deals with Safety and/or Security, unless mandated by an Air Force Instruction (AFI) or industry standard.
2.5 Quarterly Progress Meetings. The CO, Government’s Program Manager (PM), /Functional Services Manager (FMS), COR, other government personnel as appropriate, and the contractor shall meet quarterly to discuss the contractor’s performance.
2.5.1 The following issues, at a minimum, shall be discussed:
a) Opportunities to improve the contract,
b) Any modifications required of the contract,
c) Unsatisfactory inspections,
d) Valid customer complaints against each performance objective observed, and
e) Steps taken by the contractor to prevent occurrences in the future.
2.5.2 The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
2.5.3 The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor will provide a written notification within 5 working days to the CO identifying areas of non-concurrence for resolution.
2.6 Contracting Officer Representative (COR). CORs are representatives of the CO and will participate in the administration of this contract. After award of the contract, the contractor will be provided a letter identifying the COR and setting forth their duties and authorities. The COR is not authorized to change any of the terms and conditions of the contract/task order.
2.6.1 Acquisition Team Meetings. The contractor’s Contact Manager (CM) with the CO, Contract Administrator (CA), COR, and other government personnel constitute an acquisition team (See FAR 1.102 (c) and shall meet on a regular basis. The Acquisition Team will establish how often meetings are needed based on contract complexity. As a subset of the Acquisition Team, Government members of the Acquisition Team are often referred to as the Multi-Functional Team (MFT) and may meet as determined by the MFT. The contractor may request a meeting with the CO when the contractor believes such a meeting is necessary. If the CO or CA deems necessary, written minutes of any such meetings shall be recorded by the CA in the contract file and signed by the PM and the CO or CA. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the CO within 10 calendar days following receipt of the minutes.
2.6.2 Contractor’s Performance. The government assesses a contractor’s performance on an on-going basis, both positive and negative, and provides a record on a given contract during a specified period of time.
2.6.3 Past Performance Information (PPI). PPI can be provided to other government agencies, as requested.
2.6.4 Contractor Performance Assessment Report (CPARS). Depending on the estimated value of the contract, formal assessment and reporting of contractor performance is required and is documented using the CPARS system. An assessment usually provided on an annual basis is sent to the contractor’s representative for their comment. The contractor will have up to 60 days to review and comment on the assessment.
2.7 Environmental Protection
2.7.1 The Contractor shall comply with all applicable Federal, state, and local laws, regulations, and standards, including Air Force and installation policies, directives, and instructions, that are or may become applicable to the Contractor’s activities in performance of this contract.
2.8 Security Information and Site Access
2.8.1 The Contractor shall designate in writing to the CO, within five (5) calendar days prior to performance, the name and local telephone number of the individual to act as his/her representative. The representative shall be responsible for the overall management and coordination of the contract and shall have full authority to act for the Contractor on all matters relating to the daily operations of this contract.
2.9 Hours of Operation
2.9.1 Contractor is responsible for performing services in support of EAFB, AFRL, and AFP42 between the hours of 7:30 am through 4:30 pm PST, Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
2.9.2 The Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons.
2.9.3 Recognized Holidays: The Contractor is not required to perform services on the following Federal holidays.
a) New Year’s Day
b) Martin Luther King Jr.’s Birthday
c) President’s Day
d) Memorial Day
e) Juneteenth
f) Independence Day
g) Labor Day Martin
h) Columbus Day
i) Veteran’s Day
j) Thanksgiving Day
k) Christmas Day
2.10 Base Facility
2.10.1 The government will furnish or make available to the contractor, as base support, approximately 200 square feet office on main base. The contractor will occupy only those facilities required to perform the services required by this PWS. AF guidelines and those in AFTCI 32-15 to ensure that the initial utilization, and any changes in scope of utilization, mission and personnel requirements by the contractor from the current government use of these facilities, will result in the equivalent change in scope of facility occupancy by the contractor. All facilities unused by the contractor shall be turned back to the government. Government facilities have been inspected for compliance with Occupational Safety and Health Act (OSHA). Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the government will assume no liability or responsibility for the contractor's compliance or noncompliance with such requirements. Prior to any modification of the facilities performed by the contractor at his/her expense, the contractor must give the Wireless Systems Manager (WSM) and the CO documentation describing, in detail, the modification requested. No alterations to the facilities shall be made without specific written CO approval;
however, in the case of alterations necessary for OSHA compliance, such approval shall not be unreasonably withheld. The contractor shall return the facilities to the government in the same condition as received, fair wear and tear and approved modifications excepted. The government will furnish electricity, gas and water for the facilities provided.
2.10.2 Official Mail Distribution Center: The government will provide on-base mail distribution and United States Postal Service and United Parcel Service for, but limited to, official government mail, required to perform this PWS.
2.10.3 Telephone/Internet Access: The government will provide telephone service and
Internet access for official use in the performance of this PWS. Telephone service will consist of Class “C” access only. All base regulations must be followed for internet connectivity AFI 33-202 and AFI 33-129.
2.10.4 The government will provide maintenance and repair of real property facilities.
Requests for repair will be submitted by the contractor on AF Form 332 (work order request) to the WSM for approval.
2.10.5 The government will provide fire prevention, protection, inspection, and maintenance of government-furnished fire extinguishers and systems, pest control, and grounds maintenance through organic or contract resources. The Fire
Department telephone extension is 911 for emergencies and 7-4540 for routine calls.
The contractor shall comply with the fire prevention and protection program as outlined in AFTCI 91-202 and other Air Force directives.
2.10.6 The government will provide emergency medical treatment and emergency patient transportation service for contractor personnel who are injured or become critically ill. The contractor shall reimburse the government for the cost of medical treatment and patient transportation service at the current inpatient or outpatient treatment rate. Telephone 911 for emergency medical care.
2.10.7 The government will provide general on-base Security Police service. Security police phone extensions 911 for emergencies, and 7-3340 for routine calls.
2.10.8 The government will provide small computer maintenance and computer network support from 0730 to 1630, Monday through Friday. Computer trouble calls are made through the centralized Customer Service Center, 7-3444. Only authorized software shall be installed on government owned computer equipment.
2.11 CONTRACTOR PERSONNEL REQUIREMENTS:
2.11.1 The contactor shall not employ any person who is an employee of the U.S.
Government if employing that person would create a conflict of interest.
Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoDD 5500.7-R. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to Permanent Change of Station (PCS), change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the service provider’s ability to perform. Their absence, at any times, shall not constitute an excuse for nonperformance under this contract.
2.11.2 The contractor’s contract manager shall provide a list of qualifications of contractor personnel as described in pars 2.11.3-2.11.5.4, prior to assignment to the contract, to the Contracting Officer. The Government will then review and the CO indicate acceptance or non-acceptance of the qualifications within 5 business days.
2.11.3 Contractor Manager: The name of this person, and alternate(s), who shall act for the contractor in the absence of the contract manager, shall be designated in writing to the CO prior to the performance start date and updated when changes occur. The Contract Manager and alternate(s) shall have full authority to act for the contractor on all matters relating to the daily operation of this contract.
2.11.4 The Contract Manager, or alternate, shall be available during normal working hours within four (4) hours to meet on the installation with the CO, WSM, or other designated government personnel to discuss problem areas. After normal working hours, the Contract Manager or alternate shall be available within eight
(8) hours. Furnish, in writing, to the CO the names and telephone numbers of contractor key personnel no later than 10 days after contract award. The CO shall be notified immediately whenever changes are made.
2.11.5 Technicians:
2.11.5.1 Must have documentation of successful completion of a military or commercial electronics school, or a demonstrated ability to perform specialized maintenance on radio communications equipment, usually obtained by three (3) years or more experience. Technicians must possess a Certificate of Competency issued by the Radio Industry prior to performing on this contract. Certificates of Competency shall be provided to CO prior to the performance start date and upon the hire of new technicians.
2.11.5.2 Must have, as a minimum, three (3) years specialized maintenance experience or demonstrated ability to perform on equipment listed in appendix 2.16
2.11.5.3 Must have completed the Motorola, ASTRO 25 IV&D System
Core or equivalent.
2.11.5.4 Must be proficient in vehicle installations, to include but not limited to Trucks, Cars, SUVs, Emergency vehicles, gas, hybrids, and fully electric.
2.11.6 Housekeeping: Dust and clean furniture and equipment as necessary to maintain a professional appearance in work areas. Upon completion of all work, all areas will be left free of all tools, rubbish or scrap material. All trash will be removed and thrown away.
2.12 Security Requirements
2.12.1 All Contractor employees will be subject to a criminal history background check IAW DoDM 5200.08V3_AFMAN 31-101V3, Installation Perimeter Access Control, and 412th Test Wing Integrated Defense Plan (IDP) 31, Volume I (the AFMAN and IDP are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Contracting Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles. Installation Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.
2.12.2 Base Access. For Contractor personnel requiring frequent base access to perform work at Edwards AFB will be granted access via an Air Force Materiel Command (AFMC) Form 496,
2.12.3 Application for AFMC Identification Card. Department of the Air Force Federal
Acquisition Regulation Supplement (DAFFARS) Clause 5352.242-9000, Contractor Access to Air Force Installations, the Prime Contractor shall submit a written request on company letterhead to the CO with the following information (prior to submitting a request for Base access via an AFMC Form 496): 1) contract number, 2) location of work, 3) contract start and stop date (must be on or before contract’s expiration date), and 4) names of employees/ subcontractor employees needing access to the base, to include each employee’s company name.
2.12.4 It is recommended that the Prime Contractor provide a copy of the request letter to each employee for verification purposes when the employee comes to the Contracting Office at Building 2800 to get their AFMC Form 496 signed.
Employees for which no request letter can be found or provided will result in the employee being asked to return on another date/time so verification can be made.
2.12.5 Base passes will be limited to the length of the contract not to exceed 3 years from the date the AFMC Form 496 is submitted to the Contracting Office for signature.
2.12.6 The AFMC Form 496 will be reviewed/approved by the CO, then taken by the Contractor employee to the Edwards AFB Pass & Registration Office in Building 3000, or the Visitor Control Center in Building 1004, for the security portion and issuance of the Base pass.
2.12.7 The contractor shall comply with all base security regulations. Additionally, the contractor shall comply with actions dictated by force protection condition (FPCON) changes/measures and/or health protection condition (HPCON) changes/measures. For real-world situations/exercises, changes to force/health protection conditions could impact contractor performance of work and can include denial of access to the installation to perform work
2.12.8 Only employees who will be working on the contract consistently/frequently should be submitted for a long-term Base pass.
2.12.9 The Contractor shall comply with all security requirements imposed by the Installation. Specific security considerations will be handled on an individual Task Order/contract basis as required.
2.12.10 The contractor shall report suspicious activity (refer to Edwards AFB Contractor
Antiterrorism Awareness pamphlet) to Security Forces at 661-277-3340 in a timely manner.
2.12.11 The Contractor and its employees shall comply with all base traffic regulations.
2.12.12 Anyone entering EAFB without a CAC or Dependent ID will need a Real ID compliant Driver’s License, or TWO of the following: Enhanced driver’s license issued by a State, territory, possession, or the District of Columbia. (usually has a 2D barcode on the back) United States Passport or United States Passport Card.
US Birth Certificate of Naturalization or Certificate of Citizenship (Form-550).
Any other U.S. Federal, State, territory, possession, or District of Columbia Government-issued credential bearing a photograph, including credentials from other paragraphs in this section that are deemed acceptable by the DoD Component head and consistent with applicable laws. (ex. Global Entry, NEXUS, SENTRI, FAST, TWIC, Tribal Card, VHIC, PIVs). Identification Card Issued by Federal, State, or Local Government Agencies Provided It Contains a Photograph and Biographic Information such as Name, Date of Birth, Gender, Height, Eye Color, And Address. Any other government-issued credential bearing a photograph and deemed acceptable by the DoD Component. Non-CAC LRC issued by the local installation or region. Permanent Resident Card/Alien Registration Receipt Card (Form I-551). Foreign passport with a temporary (I-
551) stamp or temporary (I-551) printed notation on a machine-readable immigrant visa.
2.12.13 Contractor personnel who require routine physical access to the installation shall comply with Level I - Antiterrorism Awareness training requirements. Routine physical access applies to contractor personnel whose contract, performance work statement/statement of work has a 45 day or more period of performance. AT Level I training provides contractor employees with the requisite knowledge necessary to remain vigilant for possible terrorist threats. AT Level I training can be taken at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf for non-Common Access Card (CAC) holders. CAC holders may complete AT Level I training (Force Protection course) via myLearning at https://lms-jets.cce.af.mil/moodle/.
AT Level I training will be completed by all contractor personnel within 30 days of requiring access and annually thereafter. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit Antiterrorism Representative.
2.12.14 The Contractor shall be responsible for safeguarding all government property, equipment and materials provided for Contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.
2.12.15 During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel.
2.12.16 The Contractor shall be responsible for prompt return of credentials and vehicle passes for: 1) any employee who no longer requires access to the work site; 2) upon request by a CO; and 3) upon completion or termination of the contract.
The Prime Contractor shall ensure that all Base identification passes issued to employees and subcontractor employees are returned to the issuing office. Failure to comply with these requirements may result in withholding of payment.
2.12.17 Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within Contractor-owned or privately owned vehicle while on Edwards AFB.
2.13 Safety and Health Requirements
It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of OSHA requirements. Detailed information is available on the OSHA website at http://www.osha.gov. Contractors are responsible for complying with federal and state occupational safety and health standards for their employees, except where the Air Force contractually agreed to assume responsibility.
2.14 Mishap Reporting
2.14.1 The Contractor shall promptly report pertinent facts to the Government Program
Office (GPO) regarding mishaps involving government personnel or property, on or off the Air Force Installation, incidental to work performed IAW DAFI 91-204, Safety Investigation and Hazard Reporting. Direct costs related to the mishap shall be separated from other cost and provided to the GPO and Safety Investigators
2.14.2 The Contractor is responsible for establishing requirements for all subcontractors who qualify as subcontractors under the resulting contract.
2.15 OPSEC
The Contractor shall comply with DOD, USAF, and locally established Operations Security (OPSEC) policies and procedures to protect sensitive and unclassified information and/or equipment, which is furnished to and operated by the Contractor, and prevent compromise of classified information and equipment.
2.15.1 Contractor shall maintain Operations Security (OPSEC) in accordance with DOD
Directive & Manual 5205.02, DOD Operations Security (OPSEC) Program, AFI 10-701, Operations Security (OPSEC), and Edwards AFB OPSEC policies and procedures.
2.15.2 Completion of OPSEC Training of contractor employees offered by the Government IAW AFI 10-701, para. 4.1 and 4.2.3 shall be required of all Contractor employees within 90 days of initiating work. Access to mission critical information will not be allowed until OPSEC education has been completed and documented. This training provides Contractor employees with the requisite knowledge necessary to remain vigilant for possible threats, understand basic security procedures, understand the obligation to report security violations and the continued obligation to safeguard information. The requiring unit Security Manager/OPSEC Coordinator will coordinate, and track completed training with the Contractor.
2.15.3 Contact the unit Security Manager/OPSEC Coordinator or Wing OPSEC
Signature Manager at (661) 277-2066 for questions or reporting.
2.15.4 Contractor Access Cards. The contractor shall be provided with government identification either a Defense Biometric Identification System (DBIDS) or a Common Access Card (CAC) when warranted to accomplish their assigned task.
If a government identification is issued, the contractor must surrender the card upon completion of the contract, or when an individual is no longer employed to support said contract.
2.16 Appendix
2.16.1 Overview of Edwards Infrastructure
Manufacturer Model Name Estimated Motorola System Client
Computers
Motorola All Site Routers 5 Motorola All Site Switches 27 Motorola Paging
Interface/Tone Alert
Motorola Logging Recorder/Playback
Motorola Consoles 37 Motorola Repeater 30 BTG TxRx Systems
TX Combiner 50
BTG TxRx Systems
Receive Multicoupler 5
Microwave Microwave 2 Black Box Fiber extender 4 Black Box Ethernet Network
Extender
2.16.2 Recurring Equipment Removal, Installation, Relocation, Programming (PWS 1.4)
2.16.3 Nonrecurring maintenance service (PWS 1.3.4-1.3.5)
Equipment Estimated Monthly Estimated Yearly Repair Motorola APX
Handhelds 2 24
Repair Motorola APX Mobile
2 24
Repair General Dynamics URC
200/300 UHF/VHF
Transceivers
~As Needed 6
Repair General Dynamics URC
200/300 UHF/VHF
Amplifier
~As Needed 3
Repair Rockwell Collins 721 UHF/VHF
~As Needed 3
Equipment Estimated Monthly Estimated Yearly Install Mobile (APX) 5 60
Remove Mobile (APX) 5 60 Install Mobile Control Head (APX/General Dynamics)
5 60
Remove Mobile Control Head (APX/General
Dynamics)
5 60
Install Fixed Antenna 1 12 Remove Fixed Antenna 1 12
Install Light bar 4 48 Remove Light bar 4 48
Install URC-200/300 2 24 Remove URC-200/300 2 24
Install Support Equipment (Radar/LiDAR/Sirens/other)
4 48
Remove Support Equipment
(Radar/LiDAR/Sirens/other)
5 60
Relocate Console (Motorola)
As Needed 2
Relocate Console Accessories (Motorola)
As Needed 2
Relocate VPM (Motorola) As Needed 2 Relocate (Motorola) APX
Mobile As Needed 2
Program MCC7500 As Needed 2 Program (Motorola) APX subscriber units 5 60
Program URC -200/300 Control Head
1 12
Transceivers Repair Support
Equipment 5 60
| SECTION 1 |
| 1.1 INTRODUCTION: |
| 1.2 SCOPE of WORK: |
| 1.3 SERVICES: |
| 1.4 EQUIPMENT |
| 1.4 Wireless System Restoration |
| 1.5.1 Priority/System |
| 1.5.3 RF Site List |
| 1.5.4 Vehicles |
| SECTION II |
| 2.0 Service Summary (SS) |
| 2.7 Environmental Protection |
| 2.8 Security Information and Site Access |
| 2.9 Hours of Operation |
| 2.10 Base Facility |
| 2.11 CONTRACTOR PERSONNEL REQUIREMENTS: |
| 2.12 Security Requirements |
| 2.13 Safety and Health Requirements |
| 2.14 Mishap Reporting |
| 2.15 OPSEC |
| 2.16 Appendix |
File details come from the government source that posted it. Updated .