Performance Work Statement - Propane services.docx

DOCX document 18 KB Posted

Attached to
Sources Sought: Propane Supply Services for the Cheyenne River Health Center, Eagle Butte, SD.
Solicitation number
IHS1530962
Issued by

About this file

This is a Performance Work Statement (PWS) for propane supply services to the Cheyenne River Health Center in Eagle Butte, South Dakota. The contractor shall deliver propane in approximately 3,000-gallon loads to support the facility's maintenance shop heating system and Dietary Department cooking operations. Specific delivery requirements include filling two 500-gallon propane tanks at the Upper Maintenance Shop and transferring remaining propane to a 12,000-gallon storage tank at the Lower Level Loading Dock. The contractor must deliver propane within 24 hours of notification by the Facility Manager, maintain sufficient inventory to prevent service interruptions, and provide all necessary labor, equipment, transportation, and materials. Normal delivery hours are Monday through Friday, 6:00 a.m. to 9:00 p.m., with prior approval required for outside-hours deliveries.

The contractor is responsible for maintaining all vehicles, equipment, hoses, and accessories; ensuring personnel compliance with OSHA, DOT, EPA, NFPA, and local safety requirements; obtaining all required licenses, permits, and insurance; and managing propane inventory storage at the contractor's facility. Performance standards require 100% compliance with tank filling procedures, zero safety violations, and immediate containment and remediation of any propane spills at the contractor's expense. The period of performance is one year from the date of award. Quality assurance will be conducted through delivery documentation review, observation of delivery procedures, verification of response times, tank fill inspections, and review of customer complaints and environmental/safety compliance. The Contracting Officer's Representative is Erik Twite, Facility Manager, at (605) 964-0592.

View the file

Other files

File Type Posted
Sources Sought Notice.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Propane Supply Services Cheyenne River Health Center 24276 166th Street Eagle Butte, South Dakota 57625

1. Objective The objective of this Performance Work Statement (PWS) is to obtain reliable propane delivery services to support the operations of the Cheyenne River Health Center (CRHC). The contractor shall provide propane to maintain an uninterrupted fuel supply for the facility’s maintenance shop heating system and Dietary Department cooking operations.

2. Scope of Services The contractor shall provide all labor, equipment, transportation, materials, supervision, and incidental services necessary to furnish and deliver propane to the Cheyenne River Health Center.

The contractor shall:

· Deliver propane in approximately 3,000-gallon loads, or other quantities necessary to meet operational requirements.

· Upon delivery, fill the two (2) 500-gallon propane tanks located at the Upper Maintenance Shop.

· Transfer the remaining propane to the 12,000-gallon propane storage tank located at the Lower Level Loading Dock.

· Maintain sufficient propane inventory to support timely deliveries throughout the period of performance.

3. Performance Requirements

Performance Objective
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
Propane Delivery
Deliver propane within 24 hours of notification by the Facility Manager or designated representative.
100% of deliveries completed within 24 hours.
Government inspection and delivery records.
Tank Filling
Completely fill both 500-gallon tanks before filling the 12,000-gallon tank.
100% compliance.
Government inspection and delivery verification.
Fuel Availability
Maintain sufficient propane inventory to fulfill delivery requests without interruption to facility operations.
No service interruptions attributable to contractor.
Review of delivery history and customer reports.
Safety Compliance
Perform deliveries safely and in accordance with all applicable federal, state, local, and industry safety requirements.
Zero safety violations attributable to contractor.
Government observation and incident reports.
Environmental Compliance
Clean and remediate any propane spills in accordance with EPA and applicable environmental regulations at no additional cost to the Government.
100% compliance.
Inspection and documentation of spill response.

4. Contractor Responsibilities The contractor shall:

· Provide qualified personnel to perform propane deliveries.

· Furnish and maintain all vehicles, equipment, hoses, and accessories required for safe delivery operations.

· Ensure personnel comply with all applicable OSHA, DOT, EPA, NFPA, and local safety requirements.

· Coordinate deliveries with the Facility Manager or designated representative.

· Maintain all required licenses, permits, and insurance necessary to perform the required services.

· Store propane inventory at the contractor’s facility until delivery is requested.

5. Government Responsibilities The Government shall:

· Notify the contractor when propane delivery is required.

· Provide reasonable access to the propane tanks during normal operating hours.

· Designate a Contracting Officer’s Representative (COR) to coordinate service requests and verify contractor performance.

6. Hours of Operation Normal delivery hours are:

· Monday through Friday

· 6:00 a.m. to 9:00 p.m.

Deliveries outside these hours require prior approval from the Contracting Officer or the Contracting Officer’s Representative (COR).

7. Environmental Requirements The contractor shall immediately contain, report, and remediate any propane spills resulting from contractor operations in accordance with EPA regulations and all applicable environmental requirements. All cleanup costs shall be the responsibility of the contractor.

8. Period of Performance One Year from date of award.

9. Quality Assurance The Government will evaluate contractor performance through:

· Delivery documentation

· Observation of delivery procedures

· Verification of delivery response times

· Inspection of completed tank fills

· Review of customer complaints or service interruptions

· Review of environmental and safety compliance

10. Contracting Officer’s Representative (COR) Erik Twite Facility Manager Cheyenne River Health Center Phone: (605) 964-0592 The COR is responsible for monitoring contractor performance, validating completion of required services, and serving as the primary point of contact for operational coordination. The COR is not authorized to modify the terms and conditions of the contract.

File details come from the government source that posted it. Updated .