Performance Work Statement Outbound Veterans Communication - TAC 053124.docx

DOCX document 141 KB Posted

Attached to
W074--Critical Veterans Outbound Communications Software (VA-24-00047201)
Solicitation number
36C10B24Q0460
Issued by

About this file

This document is a Performance Work Statement (PWS) for an Outbound Veterans Communication system for the Department of Veterans Affairs (VA) Central Virginia VA Healthcare System. The key objectives are to enhance the dissemination of vital information to veterans, such as appointment reminders, lab results, program details, and other correspondence, while reducing reliance on manual labor.

The PWS provides detailed requirements for the outbound communication system, including the required equipment, software features, maintenance and service, training, and project management. The system must be Personal Identity Verification (PIV) card enabled. The period of performance is 12 months with four 12-month option periods. The PWS also includes comprehensive VA enterprise, security, and privacy requirements the contractor must comply with. The VA is conducting market research through a Request for Information, with responses due by July 3, 2024.

View the file

Other files

File Type Posted
36C10B24Q0460.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Critical Outbound Veterans Communication 36C10B24Q0460

DRAFT

PERFORMANCE WORK STATEMENT (PWS)

DEPARTMENT OF VETERANS AFFAIRS

Central Virginia VA Healthcare System Richmond VA Medical Center

Critical Outbound Veterans Communication

Date: May 21, 2024

VA-24-00047201

PWS Version Number: 1.3

Contents

1.0BACKGROUND3
2.0APPLICABLE DOCUMENTS3
3.0SCOPE OF WORK6
4.0PERFORMANCE DETAILS6
4.1PERFORMANCE PERIOD6
4.2PLACE OF PERFORMANCE7
4.3TRAVEL7
5.0SPECIFIC TASKS AND DELIVERABLES7
5.1SALIENT CHARACTERISTICS7
5.1.1EQUIPMENT7
5.1.2SOFTWARE REQUIREMENT8
5.2MAINTENANCE AND SERVICE9
5.3CONTRACTOR PROVIDED TRAINING10
5.4PROJECT MANAGEMENT10
5.4.1CONTRACTOR PROJECT MANAGEMENT PLAN10
5.4.2REPORTING REQUIREMENTS10
5.5CONTRACTOR ON-SITE SUPPORT SERVICES11
6.0GENERAL REQUIREMENTS11
6.1ENTERPRISE AND IT FRAMEWORK11
6.1.1VA TECHNICAL REFERENCE MODEL11
6.1.2FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)12
6.1.3INTERNET PROTOCOL VERSION 6 (IPV6)13
6.1.4TRUSTED INTERNET CONNECTION (TIC)13
6.1.5STANDARD COMPUTER CONFIGURATION14
6.1.6VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM)14
6.1.7PROCESS ASSET LIBRARY (PAL)15
6.1.8AUTHORITATIVE DATA SOURCES15
6.1.9SOCIAL SECURITY NUMBER (SSN) REDUCTION16
6.1.10SOFTWARE AND LICENSING REQUIREMENTS16
6.2SECURITY AND PRIVACY REQUIREMENTS16
6.2.1POSITION/TASK RISK DESIGNATION LEVEL(S)16
6.2.2CONTRACTOR PERSONNEL SECURITY REQUIREMENTS17
6.3METHOD AND DISTRIBUTION OF DELIVERABLES19
6.4PERFORMANCE METRICS19
6.5FACILITY/RESOURCE PROVISIONS20
6.6GOVERNMENT FURNISHED PROPERTY22
6.7SHIPMENT OF HARDWARE OR EQUIPMENT22
ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED23
ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE28

BACKGROUND

The Central Virginia VA Health Care System (CVHCS) at the Richmond VA Medical Center and its affiliated Community Based Outpatient Clinics (CBOCs) heavily rely on traditional postal services and printed letters to communicate with over 79,900 enrolled Veterans eligible for care. Currently, the facility manages an average of 612,400 letters and postal items annually, necessitating manual processing by Medical Support Assistants. This labor-intensive process involves tasks such as folding, addressing envelopes, and ensuring accurate patient information insertion, highlighting the inefficiencies of the current system.

Recognizing the need for modernization, there is a call to upgrade this critical outbound Veteran’s communication system. The aim is to enhance the dissemination of vital information such as appointment reminders, lab results, program details, and other correspondence, while reducing reliance on manual labor. As the primary support hub for the entire CVHCS, including its CBOCs and National Program Offices, the Richmond VA Medical Center is committed to delivering high-quality, effective, and efficient mail communication services to Veterans. By implementing a more streamlined and automated approach, the facility seeks to improve overall communication processes, ensuring timely and accurate information delivery to Veterans across the catchment area across central Virginia and into northern North Carolina.

APPLICABLE DOCUMENTS

In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:

1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”

2. “Federal Information Security Modernization Act of 2014”

3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”

4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004

5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006

6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013

7. 10 U.S.C. § 2224, "Defense Information Assurance Program"

8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”

9. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters

10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”

11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm

12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm

13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019

14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017

15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016

16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”

17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008

18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017

19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004

20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021

21. VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021

22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” March 12, 2019

23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010

24. VA Handbook 6500.6, “Contract Security,” March 12, 2010

25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011

26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018

27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017

28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp

29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)

30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014

31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015

32. VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016

33. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017

34. VA Directive 6300, “Records and Information Management,” September 21, 2018

35. VA Handbook, 6300.1, “Records Management Procedures,” March 24, 2010

36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018

37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)

38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015

39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014

40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005

41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019

42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008

43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)

44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018

45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020

46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014

47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile Devices (Draft),” October 2012

48. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014

49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)

50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)

51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896

52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents

53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019

54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008

55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007

56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005

57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018

58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001

59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013

60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013

61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103

63. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371

64. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28

65. “DevSecOps Product Line Management Playbook” version 2.0, May 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946

66. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020

67. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version 6 (IPv6),” November 19, 2020

68. Social Security Number (SSN) Fraud Prevention Act of 2017

69. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018

SCOPE OF WORK

The Contractor shall provide all equipment, software, services, labor, and maintenance for an outbound Veteran's communication system. The system shall be Personal Identity Verification (PIV) card enabled.

PERFORMANCE DETAILS

PERFORMANCE PERIOD

The Contractor shall install equipment and software within 60 days from the date of award. The period of performance (POP) shall continue through the base period of twelve (12) months, with the option for four (4) 12-month option periods.

Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).

There are eleven (11) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:

Under current definitions, five are set by date:

New Year's DayJanuary 1
JuneteenthJune 19
Independence DayJuly 4
Veterans DayNovember 11
Christmas DayDecember 25

If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.

The other six are set by a day of the week and month:

Martin Luther King's BirthdayThird Monday in January
Washington's BirthdayThird Monday in February
Memorial DayLast Monday in May
Labor DayFirst Monday in September
Columbus DaySecond Monday in October
ThanksgivingFourth Thursday in November

PLACE OF PERFORMANCE

Tasks under this PWS shall be performed in VA facilities located in the CVHCS. Specific locations are listed below. The equipment will be installed at the Richmond VA Medical Center. On-site support services may be required at any of the facilities listed below.

Medical Centers, Health Clinics and Health Care Centers

Richmond VA Medical Center
1201 Broad Rock Blvd.
Richmond, VA 23249-5411
Charlottesville VA Clinic
590 Peter Jefferson Parkway, Suite 250
Charlottesville, VA 22911-4655
Emporia VA Clinic
1746 East Atlantic Street
Emporia, VA 23847-6584
Fredericksburg VA Clinic
130 Executive Center Parkway
Fredericksburg, VA 22401-3100
Fredericksburg 2 VA Clinic
10401 Spotsylvania Avenue, Suite 300
Fredericksburg, VA 22408-8606
Henrico County VA Clinic
7702 East Parham Road, Parham Doctors Hospital, MOB III, Suite 201
Richmond, VA 23294-4372
Massaponax VA Clinic
4830 Southpoint Drive
Fredericksburg, VA 22407-2606
Fredericksburg HCC
10432 Patriot Highway
Fredericksburg, VA 22408

TRAVEL

The Government does not anticipate travel under this effort.

SPECIFIC TASKS AND DELIVERABLES

SALIENT CHARACTERISTICS

The Contractor shall provide an Outbound Veterans Communication system that meets the following salient characteristics.

EQUIPMENT

The Outbound Veterans Communication system shall consist of one (1) inserter, and two (2) color production print devices. All equipment must be compatible with software requirements set forth in this PWS.

The Contractor shall perform all services on the mail hardware such as: installation, deinstallation, maintenance, repair and/or replacement, relocations, training and responding and resolving incidents, service requests and changes, transportation, service delivery management system(s), equipment, parts, and all required supplies necessary for operation of the mail hardware.

SOFTWARE REQUIREMENT

The Contractor provided software shall be installed on a VA server.

The Contractor shall provide a software package which meets the following technical requirements:

The provided software must produce production control barcodes on every page of every mail piece, to automate inserting by the contractor provided hardware system; The software must support VMWare, run on Windows 64-Bit physical Server, or logical VMWare Server partition for Windows. The software shall accept PDF files as input and shall be capable of indexing the address fields in different locations for different types of jobs.

The provided software shall be US Postal Service (USPS) Coding Accuracy Support System (CASS) certified for address cleansing and supports the utilization of the National Change of Address (NCOA) database. The Contractor must maintain CASS and NCOA current. The software must provide a USPS Presort Accuracy, Validation, and Evaluation (PAVE) certified sort and prepares all USPS artifacts (cage/pallet and tray tags, Postage Statement 3600-FCM/3602 Qualification Report, and mail.dat file) for USPS delivery; Print pages in PAVE-sorted order to minimize postage; Provide Postal savings with grouping, batch printing, sorting and margin.

The Software shall meet the following salient characteristics:

1. Include Quick Response (QR) code and AR technology on the individual letter;

2. Allow changes in real-time without IT involvement;

3. Support integrity barcodes: OMR, BCR, 2D;

4. Include multi-lingual document management;

5. Deliver the mail.dat file directly, and electronically, to the USPS “PostalOne!” system.

6. Deliver a list of any problem addresses to VA, for each print job, including return codes to enable address correction.

7. Produce USPS Full Services Intelligent Mail® barcodes on every mail piece.

8. Associate each login with one and only one role, which defines what that user is allowed to do, record all user actions in job logs for accountability and chain-of-custody, and allow print files to be viewed on the spool, prior to paper production.

9. Shall be compatible with VA systems needed to run the software solution

10. Build all applicable workflows for outbound mail fulfillment including but not limited to appointment reminders, flu shot and other Veteran correspondence, doctor change notifications, and all other correspondence requested by clinics and staff within the Central Virginia VA Health Care Center.

11. Assure that the proper correspondence is being inserted into the appropriate envelope and that Intelligent Mail Barcodes are appropriately placed for presort discounts.

MAINTENANCE AND SERVICE

The Contractor shall perform the following annual maintenance support services covering hardware and software including routine, periodic preventative maintenance, upgrades and enhancements, and repair efforts to return the system to service in the event of failure. This maintenance agreement is for bug fixes and enhancements, as well as standard support services.

The Contractor shall maintain a tracking system for all “tickets” entered for repair, maintenance and service, and user assistance. The Contractor shall provide a reference (ticket) number when a request is received, either over the phone or through email. The Contractor shall provide a log of all service and maintenance tickets monthly, the status, and any open tickets from previous months until closed.

The Contractor shall provide an initial response to all requests for maintenance, service, and assistance within one (1) hour of receipt. For issues that can’t be resolved over the phone or through email, the Contractor shall respond to make on-site repairs within 24 hours of the initial response.

For repairs that can’t be completed on-site to the leased equipment within 24 hours, the Contractor shall provide loaned equipment until such time the VA’s equipment can be returned to full service. VA owned and/or leased equipment shall not be removed from the medical center until loaned equipment is in place and certified to function as designed.

For items that can’t be repaired, (to include all hardware, software, and peripherals) the Contractor shall replace the items with like or better items within seven (7) calendar days that the item was determined to be unrepairable.

Deliverables:

A. Service and Maintenance ticket log

CONTRACTOR PROVIDED TRAINING

The Contractor shall:

1. Provide in-person and/or virtual end-user training for up to six (6) train the trainer personnel. Upon completion of installation and acceptance, contractor shall provide one week of comprehensive in-person boot camp to review hardware, software, applications and how to incorporate new technology and workflows into the current system.

2. End-user training shall include the development of service templates, letters and other correspondence needed by the end users of the software to maximize the effectiveness of the staff at the CVHCS.

3. Coordinate and provide training activities for the Richmond VA Medical Center mailroom personnel on utilization of Mail Automation Software. Approximately 500 VA personnel at the Richmond VAMC will utilize the software.

4. Provide training on hardware and software operations and workflow

5. Provide a Process Specific Users’ Guide in MS Word and/or PDF formats for distribution to users.

Deliverable:

A. Process Specific Users’ Guide

PROJECT MANAGEMENT

CONTRACTOR PROJECT MANAGEMENT PLAN

The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP. The Contractor shall provide the Name and Contact Information for a person designated to manage and supervise performance.

Deliverable:

A. Contractor Project Management Plan B. Name and Contact Information for a person designated to manage and supervise performance.

REPORTING REQUIREMENTS

The Contractor shall provide the COR with Monthly Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding month.

The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.

The Contractor shall provide the COR with a list of all VA participants in each and every training session upon completion of the training.

Deliverable:

A. Monthly Progress Report B. List & Copy of templates developed.

C. Roster of Employees Trained

CONTRACTOR ON-SITE SUPPORT SERVICES

The contractor shall provide one full-time subject matter expert to provide technical assistance throughout the Base Period.

The Contractor shall provide and maintain a Site Operation Guide for all VA users of the system.

Deliverable:

A. Site Operation Guide.

GENERAL REQUIREMENTS

ENTERPRISE AND IT FRAMEWORK

VA TECHNICAL REFERENCE MODEL

The Contractor shall support the VA enterprise management framework. In association with the framework, the Contractor shall comply with OIT Technical Reference Model (VA TRM). The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OIT. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.

FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)

The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled by accepting HSPD-12 PIV credentials using VA Enterprise Technical Architecture (ETA), https://www.ea.oit.va.gov/EAOIT/VA_EA/Enterprise_Technical_Architecture.asp, and VA Identity and Access Management (IAM) approved enterprise design and integration patterns, https://www.oit.va.gov/library/recurring/edp/index.cfm. The Contractor shall ensure all Contractor delivered applications and systems comply with the VA Identity, Credential, and Access Management policies and guidelines set forth in VA Handbook 6510 VA Identity and Access Management, VA Handbook 0735 Homeland Security Presidential Directive 12 (HSPD-12) Program, and align with the Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance v2.0.

The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500 Appendix F, “VA System Security Controls”, and VA IAM enterprise requirements for direct, assertion based authentication, and/or trust based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV card and/or Common Access Card (CAC), as determined by the business need.

The Contractor shall ensure all Contractor delivered applications and systems conform to the specific Identity and Access Management PIV requirements set forth in the Office of Management and Budget (OMB) Memoranda M-05-24, M-19-17, and NIST Federal Information Processing Standard (FIPS) 201-2. OMB Memoranda M-05-24 and M-19-17 can be found at: https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/memoranda/2005/m05-24.pdf, and https://www.whitehouse.gov/wp-content/uploads/2019/05/M-19-17.pdf respectively. Contractor delivered applications and systems shall be on the FIPS 201-2 Approved Product List (APL). If the Contractor delivered application and system is not on the APL, the Contractor shall be responsible for taking the application and system through the FIPS 201 Evaluation Program.

The Contractor shall ensure all Contractor delivered applications and systems support:

1. Automated provisioning and are able to use enterprise provisioning service.

2. Interfacing with VA’s Master Person Index (MPI) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.

3. The VA defined unique identity (Secure Identifier [SEC ID] / Integrated Control Number [ICN]).

4. Multiple authenticators for a given identity and authenticators at every Authenticator Assurance Level (AAL) appropriate for the solution.

5. Identity proofing for each Identity Assurance Level (IAL) appropriate for the solution.

6. Federation for each Federation Assurance Level (FAL) appropriate for the solution, if applicable.

7. Two-factor authentication (2FA) through an applicable design pattern as outlined in VA Enterprise Design Patterns.

8. A Security Assertion Markup Language (SAML) implementation if the solution relies on assertion-based authentication. Additional assertion implementations, besides the required SAML assertion, may be provided as long as they are compliant with NIST SP 800-63-3 guidelines.

9. Authentication/account binding based on trusted Hypertext Transfer Protocol (HTTP) headers if the solution relies on Trust based authentication.

10. Role Based Access Control.

11. Auditing and reporting capabilities.

12. Compliance with VIEWS 00155984, PIV Logical Access Policy Clarification https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896.

The required Assurance Levels for this specific effort are Identity Assurance Level 3, Authenticator Assurance Level 3, and Federation Assurance Level 3.

INTERNET PROTOCOL VERSION 6 (IPV6)

The Contractor solution shall support Internet Protocol Version 6 (IPv6) based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). IPv6 technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6” (https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices shall support native IPv6 and dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g. web, email, DNS, ISP services, etc.) shall support native IPv6 and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall communicate using native IPv6 and dual stack (IPv6 / IPv4) operations.

TRUSTED INTERNET CONNECTION (TIC)

The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents). Any deviations must be approved by the VA TIC 3.0 Working Group at vaoisesatic30team@va.gov.

STANDARD COMPUTER CONFIGURATION

The Contractor IT end user solution that is developed for use on standard VA computers shall be compatible with and be supported on the standard VA operating system, currently Windows 10 (64bit), Edge (Chromium based), and 365 Apps for enterprise. Applications delivered to VA and intended to be deployed to Windows 10 workstations shall be delivered as a signed .msi package with switches for silent and unattended installation and updates shall be delivered in signed .msp file formats for easy deployment using Microsoft Endpoint Configuration Manager (CM) VA’s current desktop application deployment tool. Signing of the software code shall be through a vendor provided certificate that is trusted by VA using a code signing authority such as Verizon/Cybertrust or Symantec/VeriSign. The Contractor shall also ensure and certify that their solution functions as expected when used from a standard VA computer, with non-admin, standard user rights that have been configured using the United States Government Configuration Baseline (USGCB) and Defense Information Systems Agency (DISA) Secure Technical Implementation Guide (STIG) specific to the particular client operating system being used.

VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM)

The Contractor shall support VA efforts IAW the updated Veteran Focused Integration Process (VIP) and Product Line Management (PLM). The major focus of the new VIP is on Governance and Reporting and is less prescriptive, with a focus on outcomes and continuous delivery of value. Product Line Management (PLM) is a framework that focuses on delivering functional products that provide the highest priority work to customers while delivering simplified, reliable, and practical solutions to the business, medical staff, and our Veterans. The VIP Guide is a companion guide to the PLM Playbook and can be found at: https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 and the PLM Playbook can be found at https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946. The PLM Playbook pivots from project-centric to product-centric delivery and contains descriptive practices that focuses on outcomes. The PLM Playbook contains a set of “plays” that implement Development, Security, and Operations (DevSecOps) principles and processes such as automated development, continuous integration/continuous delivery, and release on demand. The PLM Playbook details how product lines implement Lean-Agile principles, methods, practices, and techniques through levels of maturity. VIP and PLM are the authoritative processes that IT projects must follow to ensure development and delivery of IT products.

PROCESS ASSET LIBRARY (PAL)

The Contractor shall perform their duties consistent with the processes defined in the OIT Process Asset Library (PAL). The PAL scope includes the full spectrum of OIT functions and activities, such as VIP project management, operations, service delivery, communications, acquisition, and resource management. PAL serves as an authoritative and informative repository of searchable processes, activities or tasks, roles, artifacts, tools and applicable standards and guides to assist the OIT workforce, Government and Contractor personnel. The Contractor shall follow the PAL processes to ensure compliance with policies and regulations and to meet VA quality standards. The PAL includes the contractor onboarding process consistent with Section 6.2.2 and can be found at https://www.va.gov/PROCESS/artifacts/maps/process_CONB_ext.pdf. The main PAL can be accessed at www.va.gov/process.

AUTHORITATIVE DATA SOURCES

The VA Enterprise Architecture Repository (VEAR) is one component within the overall EA that establishes the common framework for data taxonomy for describing the data architecture used to develop, operate, and maintain enterprise applications. The Contractor shall comply with the department’s Authoritative Data Source (ADS) requirement that VA systems, services, and processes throughout the enterprise shall access VA data solely through official VA ADSs where applicable, see below. The Information Classes which compose each ADS are located in the VEAR, in the Data & Information domain. The Contractor shall ensure that all delivered applications and system solutions support:

1. Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.

2. Interfacing with Capital Asset Inventory (CAI) to conduct real property record management actions, if the solution relies on real property records data. CAI is the authoritative source for VA real property record management data.

3. Interfacing with electronic Contract Management System (eCMS) for access to contract, contract line item, purchase requisition, offering vendor and vendor, and solicitation information above the micro-purchase threshold, if the solution relies on procurement data. ECMS is the authoritative source for VA procurement actions data.

4. Interfacing with HRSmart Human Resources Information System to conduct personnel action processing, on-boarding, benefits management, and compensation management, if the solution relies on personnel data. HRSmart is the authoritative source for VA personnel information data.

5. Interfacing with Vet360 to access personal contact information, if the solution relies on VA Veteran personal contact information data. Vet360 is the authoritative source for VA Veteran Personal Contact Data.

6. Interfacing with VA/Department of Defense (DoD) Identity Repository (VADIR) for determining eligibility for VA benefits under Title 38, if the solution relies on qualifying active duty military service data. VADIR is the authoritative source for Qualifying Active Duty military service in VA.

SOCIAL SECURITY NUMBER (SSN) REDUCTION

The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the ICN in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.

SOFTWARE AND LICENSING REQUIREMENTS

The Contractor shall be responsible for the provision of all software licenses and any associated licensing maintenance required for any development, delivery, integration, operation, and/or maintenance associated with its proposed application(s), software products, software solution, and/or system including, but not limited to, any and all application(s), software and/or software products that comprise, are a part of, or integrate with the Contractor’s proposed application(s), software products, software solution, and/or system for the life of any resulting contract.

SECURITY AND PRIVACY REQUIREMENTS

A signed Business Associate Agreement (BAA) may be required.

POSITION/TASK RISK DESIGNATION LEVEL(S)

In accordance with VA Handbook 0710, Personnel Security and Suitability Program, the position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:

Position Sensitivity and Background Investigation Requirements by Task

Task Number
Tier1 / Low Risk
Tier 2 / Moderate Risk
Tier 4 / High Risk
5.1
|X|
|_|
|_|
5.2
|X|
|_|
|_|
5.3
|X|
|_|
|_|
5.4
|X|
|_|
|_|
5.5
|X|
|_|
|_|

The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.

CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

Contractor Responsibilities:

1. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak, and understand the English language.

Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement (based upon Section 6.2 Tasks), etc. The Contractor shall submit full Social Security Numbers either within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc. throughout the Period of Performance. The Contractor Staff Roster shall remain a historical document indicating all past information and the Contractor shall indicate in the Comment field, employees no longer supporting this contract. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.

1. The Contractor should coordinate with the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized. The Contractor shall bring their completed Security and Investigations Center (SIC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.

b. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:

1) Optional Form 306

2) Self-Certification of Continuous Service

3) VA Form 0710

4) Completed SIC Fingerprint Request Form The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC).

The Contractor employee shall certify and release the e-QIP document, print, and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC. These documents shall be submitted to the COR within 3 business days of receipt of the e-QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via e-QIP).

1. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.

1. A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (Appendix C, Section 9), signed “Contractor Rules of Behavior”, and with a valid, operational PIV credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by OPM. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of OPM.

1. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.

Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.

Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.

Deliverable:

A. Contractor Staff Roster

METHOD AND DISTRIBUTION OF DELIVERABLES

The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include: Microsoft 365, MS Word 2000/2003/2007/2010/2019, MS Excel 2000/2003/2007/2010/2019, MS PowerPoint 2000/2003/2007/2010/2019, MS Project 2000/2003/2007/2010/2019, MS Access 2000/2003/2007/2010, MS Visio 2000/2002/2003/2007/2010/2019, AutoCAD 2002/2004/2007/2010, and Adobe Postscript Data Format (PDF).

PERFORMANCE METRICS

The table below defines the Performance Standards and Acceptable Levels of Performance associated with this effort.

Performance Objective
Performance Standard
Acceptable Levels of Performance
A. Technical / Quality of Product or Service
1. Demonstrates understanding of requirements

2. Efficient and effective in meeting requirements

3. Meets technical needs and mission requirements

4. Provides quality services/products

5. Incorporates “ease of use” Human Centered Design principles in any software developed.

Satisfactory or higher

B. Project Milestones and Schedule
1. Established milestones and project dates are met

2. Products completed, reviewed, delivered in accordance with the established schedule

3. Notifies customer in advance of potential problems Satisfactory or higher

C. Cost & Staffing
1. Currency of expertise and staffing levels appropriate to perform tasks required

2. Personnel possess necessary knowledge, skills, and abilities to perform tasks Satisfactory or higher

D. Management
1. Integration and coordination of all activities to execute effort
Satisfactory or higher

The COR will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable level of performance. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion.

FACILITY/RESOURCE PROVISIONS

The Government will provide office space, telephone service and system access when authorized contract staff work at a Government location as required in order to accomplish the Tasks associated with this PWS. All procedural guides, reference materials, and program documentation for the project and other Government applications will also be provided on an as-needed basis.

The Contractor shall request other Government documentation deemed pertinent to the work accomplishment directly from the Government officials with whom the Contractor has contact. The Contractor shall consider the COR as the final source for needed Government documentation when the Contractor fails to secure the documents by other means. The Contractor is expected to use common knowledge and resourcefulness in securing all other reference materials, standard industry publications, and related materials that are pertinent to the work.

VA may provide remote access to VA specific systems/network in accordance with VA Handbook 6500, which requires the use of a VA approved method to connect external equipment/systems to VA’s network. Citrix Access Gateway (CAG) is the current and only VA approved method for remote access users when using or manipulating VA information for official VA Business. VA permits CAG remote access through approved Personally Owned Equipment (POE) and Other Equipment (OE) provided the equipment meets all applicable 6500 Handbook requirements for POE/OE. All of the security controls required for Government furnished equipment (GFE) must be utilized in approved POE or OE. The Contractor shall provide proof to the COR for review and approval that their POE or OE meets the VA Handbook 6500 requirements and VA Handbook 6500.6 Appendix C, herein incorporated as Addendum B, before use. CAG authorized users shall not be permitted to copy, print, or save any VA information accessed via CAG at any time. VA prohibits remote access to VA’s network from non-North Atlantic Treaty Organization (NATO) countries. The exception to this are countries where VA has approved operations established (e.g. Philippines and South Korea). Exceptions are determined by the COR in coordination with the Information Security Officer (ISO) and Privacy Officer (PO).

This remote access may provide access to VA specific software such as Veterans Health Information System and Technology Architecture (VistA), ClearQuest, PAL, Primavera, and Remedy, including appropriate seat management and user licenses, depending upon the level of access granted. The Contractor shall utilize government-provided software development and test accounts, documents, and requirements repositories, etc. as required for the development, storage, maintenance, and delivery of products within the scope of this effort. The Contractor shall not transmit, store, or otherwise maintain sensitive data or products in Contractor systems (or media) within the VA firewall IAW VA Handbook 6500.6 dated March 12, 2010. All VA sensitive information shall be protected at all times in accordance with VA Handbook 6500, local security field office System Security Plans (SSP’s) and Authority to Operate (ATO)’s for all systems/LAN’s accessed while performing the tasks detailed in this PWS. The Contractor shall ensure all work is performed in countries deemed not to pose a significant security risk. For detailed Security and Privacy Requirements (additional requirements of the contract consolidated into an addendum for easy reference) refer to ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED and ADDENDUM B - VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE.

GOVERNMENT FURNISHED PROPERTY

Not Applicable

SHIPMENT OF HARDWARE OR EQUIPMENT

Inspection: Destination Acceptance: Destination Free on Board (FOB): Destination

Ship To and Mark For:

Primary

Alternate

Name:
John Matthews
Name:
Address:
1201 Broad Rock Blvd Richmond, VA 23249
Address:
Voice:
804-675-4132
Voice:
Email:
John.Matthews2@va.gov
Email:

Special Shipping Instructions:

Prior to shipping, Contractor shall notify Site POCs, by phone followed by email, of all incoming deliveries including line-by-line details for review of requirements. Contractor shall not make any changes to the delivery schedule at the request of Site POC.

Contractors shall coordinate deliveries with Site POCs before shipment of hardware to ensure sites have adequate storage space.

All shipments, either single or multiple container deliveries, shall bear the VA IFCAP Purchase Order number on external shipping labels and associated manifests or packing lists. In the case of multiple container deliveries, a statement readable near the VA IFCAP PO number shall indicate total number of containers for the complete shipment (e.g. “Package 1 of 2”), clearly readable on manifests and external shipping labels.

Packing Slips/Labels and Lists shall also include the following:

IFCAP PO #: ____TBD_____ (e.g., 166-E11234 (the IFCAP PO number is located in block #20 of the SF 1449)) Project Description: (e.g. Tier I Lifecycle Refresh)

Total number of Containers: Package ___ of ___. (e.g., Package 1 of 3)

ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED

Cyber and Information Security Requirements for VA IT Services The Contractor shall ensure adequate LAN/Internet, data, information, and system security in accordance with VA standard operating procedures and standard…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .