Performance Work Statement Management Leadership Training.pdf

PDF 57 KB Posted

Attached to
Management Leadership Training Federal contract opportunity
Solicitation number
70FBR020Q00000008
Issued by
Federal Emergency Management Agency

View the file

Other files for this federal contract opportunity

Other files attached to Management Leadership Training, newest first.
File Type Posted
Best_Value_Qualifications (003).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement 7/31/2020

PROJECT TITLE

Management Leadership Training

BACKGROUND

FEMA Region 10 requires a mix of virtual and on-site leadership assessment and training in support of the professional growth of regional supervisory staff to adopt and implement FEMA’s 2018-2022 Strategic Plan, Strategic Goal II. Ready the Nation for Catastrophic Disasters, Objective 2.1 Organize the “BEST” (Build, Empower, Sustain, and Train) scalable and capable incident workforce.

SCOPE

The contractor shall provide FEMA - Region 10 with assessment, instructor, training, course materials and present training, both virtual and on-site, for a leadership program and course of instruction.

APPLICABLE DOCUMENTS

None

SPECIFIC TASK

The contractor shall provide FEMA - Region 10 with all instructor, course materials, and present virtual and on-site leadership program assessment and course of instruction for forty-one (41) students. Each student will be provided a 360 assessment, individual course material, and study material such as books and handouts.

DELIVERABLE AND DELIVERY SCHEDULE

Deliver a leadership training and individual assessment components, both virtual and on-site, completed no later than December 2020.

GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION

The government will provide to the contractor, except as otherwise specified, at no charge to the contractor, the following materials, facilities, and services listed hereunder for incorporation into the work and/or use in performance of the work. Any work or action indicated to be accomplished by the contractor, including the furnishing of materials therefore unless otherwise specified, shall be at the contractor’s expense.

Training Room w/podium.

Display Screen.

Wireless internet connectivity.

PLACE OF PERFORMANCE

The contractor shall perform work virtually and at the following FEMA Region 10 locations:

Performance Work Statement 7/31/2020

FEMA Region 10 20700 44th Ave W Lynnwood, WA 98036

PERIOD OF PERFORMANCE

The focus dates for course provision are Aug – December 2020.

SITE SECURITY REQUIREMENTS

Security requirement of this facility include, but are not limited to a 100% identification check, all contractors conducting work on site must be verified U.S. Citizens prior to being granted access on site, sign-in and distribution of FEMA visitors’ badge. Contractor personnel will always be escorted by FEMA personnel while on site and are not permitted to roam the facility unescorted. All boxes, crates, bags, toolboxes, etc. are subject to random search, and shall not be left unattended in public areas, except by prior approval of the FEMA Region 10 Security Officer or designee.

SAFETY REQUIREMENTS

All personal protective equipment required to be provided by the contractor.

In order to provide safety controls for protection of the life and health of employees and other persons;

for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all applicable Federal laws and regulations with such additional measures as the government may deem necessary.

All tools and personal protective equipment required to be provided by the contractor. The contractor shall ensure all tools, equipment, and machinery is in good working order.

M. PROJECT WORK HOURS AND SITE ACCESS

Project work hours with this project are from 8:00AM to 5:00PM – with a minimum of 30 minutes lunch break.

Work performed under this contract shall be performed during these hours designated above, unless otherwise approved in advanced by the Contracting Officer. The Contractor shall coordinate the contracted and/or related work items with the FEMA Region 10 Contracting Officer or Contracting Officers Representative.