Performance Work Statement_Fuel Barge Rental.docx
DOCX document 30 KB Posted
- Solicitation number
- R2124762764499
About this file
This Performance Work Statement (PWS) details requirements for a fuel barge rental service for the U.S. Navy in San Diego, California. The Navy seeks a contractor to provide a fuel barge with 400,000-gallon capacity capable of transporting JP-5 and F-76 fuel between the Point Loma Fuel Farm and Navy ships in San Diego Bay. Key specifications include U.S. Coast Guard certification, compliance with federal and state environmental regulations, and the ability to perform multiple daily trips with strict safety and operational standards.
The contract will be a base year with four one-year option periods, anticipated to be awarded in July 2026 with an RFP release in February 2026. The Navy intends to set aside the acquisition for small businesses and will evaluate the contractor based on fuel delivery efficiency (98% on-time rate), safety compliance, zero fuel spills, and 98% operational availability. The contract will be a Multiple Award Contract (MAC) Indefinite Delivery Indefinite Quantity (IDIQ) task order, with monthly fixed-price payments contingent on meeting performance objectives and deliverables such as barge operations reports and certification documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Barge Rental for Fuel Transportation – San Diego, CA
1. Introduction This Performance Work Statement (PWS) outlines the requirements for renting a barge to transport fuel from the Navy Fuel Farm in Point Loma to various Navy ships located in the San Diego Bay area. The contractor will provide all necessary resources, equipment, and personnel to safely and efficiently deliver fuel as per the specifications and schedules defined herein.
2. Background The Navy requires a reliable and efficient means of transporting fuel from the Point Loma Fuel Farm to Navy ships operating in the San Diego Bay. The rental of a fuel barge will ensure the timely and safe transfer of fuel from the shore facilities to ships at various mooring locations.
3. Scope of Work The contractor shall provide a fuel barge that meets the following requirements:
· Barge Specifications:
· Capacity: 400k gallon capacity.
· Fuel Types: Capability to transport JP-5 and F-76 fuel.
· Certification: The barge must meet U.S. Coast Guard (USCG) regulations and be fully compliant with all applicable federal, state, and local environmental and safety standards.
· Condition: The barge must be in good working condition, free from significant leaks, and with no environmental hazards.
· Equipment: The barge must be equipped with fueling systems, hoses, pumps, and any other equipment necessary for the safe transfer of fuel.
· Material: Requesting for barge to have three 2.5m or 3.3m diameter fenders, as well as an 8" or 6" hose flange with approximately 50' to 75' of hose. If the barge is unable to meet the above requirements, then we can use a 4" quick disconnect hose to our bunker station with 30' to 40' hose.
· Operational Requirements:
· The contractor will be responsible for all aspects of fuel barge operation, including loading, transport, and unloading of fuel.
· The barge must be capable of performing multiple trips per day between the Fuel Farm in Point Loma and various Navy ships located in the San Diego Bay.
· The contractor must provide a detailed fuel transportation schedule, which includes coordination with the Navy to ensure that fuel delivery aligns with ship operational requirements.
· Safety and Compliance:
· The contractor must ensure that all operations comply with OSHA, USCG, and other relevant regulatory bodies concerning fuel transfer operations.
· The barge must include spill prevention and response equipment.
· The contractor must provide training to all personnel involved in fuel handling and transportation.
· The contractor shall ensure that all required inspections and certifications are maintained throughout the performance period.
· Certifications and Special Requirements:
· U.S. Coast Guard (USCG) Certifications (for vessels operating in the U.S.)
· Certificate of Inspection (COI): A fuel barge must have a valid COI issued by the USCG, confirming it meets the safety standards set out by the Coast Guard.
· Oil Pollution Prevention (OPA 90) Compliance: Fuel barges must meet the requirements of the Oil Pollution Act (OPA) of 1990, which mandates the creation of contingency plans, the use of double-hull construction, and other safety measures to prevent oil spills.
· USCG Spill Response Plan: Fuel barges must have an oil spill response plan approved by the USCG that outlines procedures for addressing potential spills or leaks.
· Vessel Pollution Prevention Certificate (VPP): This certificate ensures the vessel complies with the standards set under the Clean Water Act (CWA), including measures for preventing discharge of oil or hazardous materials into U.S. waters.
· California State Regulations
· California Air Resources Board (CARB): The barge must comply with CARB regulations, particularly regarding emissions from vessels and vapor recovery for fuel transport.
· California State Lands Commission (CSLC): Oversees vessel operations in California waters, including the requirement for proper permitting for fueling operations, spill prevention, and environmental protection measures.
· San Diego Port District Regulations
· Port Safety: The Port of San Diego requires fuel barges to adhere to local safety regulations, including emergency response protocols, operational limits in specific zones, and communication requirements with the Port.
· Port Entry Permits: Fuel barges must obtain entry and operating permits to operate in the Port of San Diego. This includes documenting compliance with environmental and safety standards.
· Wastewater and Waste Oil Discharge: Strict regulations prevent the discharge of waste oil or other pollutants into the bay. Fuel barges must have systems in place for managing wastewater and hazardous materials.
· Environmental Protection Requirements
· California Environmental Quality Act (CEQA): If new facilities or infrastructure related to fueling operations are being developed in San Diego Bay, the barge operator may need to adhere to CEQA requirements for environmental review and mitigation measures.
· Marine Pollution Regulations: Compliance with MARPOL Annex I for pollution prevention by oil, and adherence to local policies for wastewater treatment and ballast water management.
· Safety and Emergency Preparedness
· San Diego Fire Rescue: The barge operator must coordinate with local fire and rescue services, including having firefighting equipment and emergency plans specific to San Diego Bay's hazards.
· Oil Spill Contingency Plans: California requires fuel barges to have detailed spill contingency plans that coordinate with the local response teams in case of a spill or other emergency.
· Insurance and Liability
· State Liability Coverage: In addition to federal marine pollution insurance, state-level liability coverage may be required for spill response and environmental cleanup.
· San Diego Port Liability Insurance: Operators should have insurance that covers incidents that may occur specifically within the San Diego Port District.
· Marine Pollution Liability Insurance: A fuel barge operator is typically required to maintain insurance coverage for potential environmental damages, including fuel spills.
· Performance Period:
· The contract term will be for one base year plus 4 one-year options.
· Delivery and Pickup:
· The barge must be available for immediate deployment upon notice from the Navy.
· The barge will operate in San Diego Bay waters, servicing Navy vessels at various docks, piers, or other fueling locations as directed by the Navy.
· Emergency Response and Contingency Planning:
· The contractor shall develop an emergency response plan, including actions in case of spills, accidents, or other unforeseen events.
· The contractor must be capable of responding to emergencies within a specified time frame, as outlined in the emergency response plan.
4. Performance Objectives
· Fuel Delivery Efficiency: The contractor is required to meet the scheduled fuel delivery times and maintain a 98% on-time delivery rate.
· Safety Standards Compliance: All fueling operations must be conducted in compliance with safety regulations, with no incidents or violations occurring.
· Environmental Protection: Zero fuel spills or leaks are acceptable, with penalties for non-compliance to environmental standards.
· Operational Availability: The barge must be available for use at least 98% of the contracted days during the term of the agreement.
5. Deliverables
· Barge Operations Report: Report summarizing fuel transfers, maintenance performed, fuel usage, and any incidents or irregularities.
· Inspection and Certification Documentation: Copies of all inspection reports and certifications from relevant authorities (e.g., USCG, environmental agencies).
· Emergency Response Plan: A comprehensive plan detailing procedures and contact information for potential incidents.
6. Government-Furnished Equipment (GFE) and Services
· The Navy will provide the following equipment and services:
· Access to fueling facilities at the Point Loma Fuel Farm.
· Docking facilities for the fuel barge at designated Navy ships.
· Communication equipment for scheduling and coordination with Navy personnel.
7. Contractor-Furnished Equipment (CFE)
· The contractor is responsible for providing all equipment necessary to fulfill the requirements of this PWS, including but not limited to:
· Fuel barge with proper specifications.
· Fueling hoses, pumps, and related equipment.
· Safety and spill containment equipment.
8. Performance Monitoring and Evaluation The Navy will evaluate the contractor’s performance based on the following:
· Timeliness: Adherence to the fuel delivery schedule.
· Safety: Compliance with all safety regulations and incident response.
· Operational Efficiency: Efficient use of resources, including maintaining barge availability and minimizing downtime.
· Environmental Compliance: Adherence to environmental regulations, with penalties for spills or mishandling of fuel.
9. Payment and Invoicing
· The contractor will be paid based on a fixed-price basis as agreed in the contract.
· Payments will be made monthly, contingent upon successful completion of deliverables and performance standards.
10. Point of Contact
· For coordination and clarification, the contractor will liaise with the Navy’s designated contracting officer and point of contact at the Point Loma Fuel Farm.
11. Delivery Orders
· Work shall be performed in accordance with the contract and each separately placed delivery order authorized by the contracting officer.
File details come from the government source that posted it. Updated .