Performance Work Statement (DRAFT).docx
DOCX document 33 KB Posted
- Solicitation number
- W911QX-26-R-A007
About this file
This is a Performance Work Statement (PWS) for software development and user assistance services supporting the Transformation Decision Analysis Center (TDAC), Warfighter & Futures Integration Division (WFID) at Aberdeen Proving Ground, Maryland. The contractor will provide analytical, technical, and development support for survivability, lethality, and vulnerability (SLV) modeling and simulation software projects. Key deliverables and services include: software engineering enhancements to BRL-CAD, Vehicle Protection Systems-End Game Model (VPS-EGM), and related systems; software change request tracking and maintenance categorized as corrective, adaptive, perfective, and preventive; help desk support with monthly documentation of common user issues; code compatible with FreeBSD, Windows, and Linux operating systems; software development across multiple SLV applications including AJEM, ORCA, The Fire Tool, and Vpk Works; briefing materials and technical papers; and multi-media content for web release following the DF-100 public release process. Work will be performed at TDAC facilities in Aberdeen Area with telework options available.
The contractor must provide one Program Manager with a minimum of five years supervisory experience, a scientific or engineering degree, and demonstrated project management certification or equivalent experience. Key personnel must maintain proficiency in C, C++, CMake, Tcl, Java, AI tools, and DocBook. The contractor shall submit a recruitment and retention plan within 60 days of award, a Program Management Plan within 30 days of award, monthly status reports by the 10th of each month, and annual contract summary reports. All BRL-CAD-related software copyrights must be assigned to TDAC. Work hours are limited to 80 hours per two-week period (maximum 50 hours per week), Monday through Friday, during normal duty hours of 0630-1800 unless COR approval is obtained. The contractor must comply with extensive security requirements including AT Level I training within 14 days, AVS registration, DoD Information Assurance Awareness training, and U.S. citizenship certification to the TDAC Security Office. Travel for education, emerging software practices, and presentations will be reimbursed in accordance with Joint Travel Regulations with prior written COR approval required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Software Development and User Assistance for Transformation Decision Analysis Center (TDAC), Warfighter & Futures Integration Division (WFID) 20 January 2026
C.1 Background
The Warfighter & Futures Integration Division (WFID) in the Transformation Decision Analysis Center (TDAC) is the Army’s focal point for survivability, lethality, and vulnerability (SLV) materiel modeling and simulation and expertise. TDAC is a key resource for Program Managers (PMs) to enhance system and optimize soldier survivability/lethality in the systems they are developing. Results of TDAC’s SLV efforts, against the full spectrum of battlefield threats, are provided to the PMs, Evaluators, and Department of the Army decision makers. TDAC conducts the necessary investigations, simulations, laboratory/field experiments, and analyses to quantify the SLV of Army and select foreign combat, combat support, and combat service support systems when faced with electronic warfare (EW), ballistic, cyber, directed energy, and environmental threats. TDAC is in need of additional software engineering, software development, and analytical support in order to satisfy the needs of its customers.
C.2 Objective
The objective of this effort is for the Contractor to provide analytical, technical, and development support to TDAC for SLV Modeling and Simulation software development projects.
C.3 Scope
This project definition outlines the tasks required to ensure software engineering and development, and analysis support to TDAC. The Contractor shall perform tasks requiring the application of established methods, practices, and techniques, and shall recommend new procedures as applicable for SLV software development projects. The work ranges from specific tasks to complex work for which guidelines and precedents are usually applicable, but interpretation and analysis may be required. The Contractor shall apply professional judgment in providing software development, engineering, and analysis services or resolving problems of a procedural or factual nature. Assignment characteristics include, but are not limited to: gathering, researching, verifying and analyzing facts; skilled use of basic tools and techniques of the field (e.g., surveys, data bases, MS Windows based software, data collection methods, JAVA, QT, C, etc...); selecting and applying established methods, practices and procedures requiring only minor changes; assisting in the development of work proposal documents using historical data and researching new sources and coordinating with Government managers, Government employees, and TDAC Contractors to obtain information, attend team and branch meetings, provide input and feedback, orally and in writing, on status of work per request. Work products shall be delivered in both written and electronic format. Work shall be performed at TDAC facilities and/or via telework.
C.4 Requirements
The Contractor shall support experimental and applied research to assess technologies which minimize vulnerability, maximize lethality, and maximize survivability for those technologies in accordance with the following sections. Formal deliverables provided for C.4 marked in accordance with C.11 and provided electronically using appropriate operating system and software specified in C.14.1 and C.14.2.
C.4.1 BRL-CAD, Vehicle Protection Systems-End Game Model (VPS-EGM) and Related Development
C.4.1.1 The Contractor shall provide and implement a software engineering solution and related software development to produce software enhancements to the BRL-CAD project or the VPS-EGM or just EGM with the approval of the relevant Government model manager. Major enhancements, that will require a quarter or more of effort to complete, shall have a project plan and requirements that will be reviewed and/or modified by the TDAC, WFID, the System Vulnerability Modeling Development Branch Chief, The Digital Characterization Team leader, The System Vulnerability Methodology Team leader, and the relevant Configuration Control Board, or CCB as needed. The project plan shall identify goals, risks, assets and costs associated with the project. A schedule of software development milestones shall also be provided. The end software product shall be tested by the Contractor to verify that the requirements are satisfied, and approved by the relevant Model Manager.
C.4.1.2 The contractor shall provide the relevant model manager with support for Software Change Request, (SCR) tracking and prioritization for the model application. The Contractor shall provide and implement a software engineering solution to perform maintenance the project. This maintenance shall be categorized, tracked and documented. The major categories of maintenance are corrective, adaptive, perfective, and preventive maintenance.
C.4.1.3 The Contractor shall support and inform the relevant Configuration Control Board (CCB) of all user-visible software changes and bug fixes.
C.4.1.4 The Contractor shall provide help desk support for BRL-CAD or VPS-EGM and related software packages. The Contractor shall identify, analyze, develop work-arounds, and eliminate common problems encountered by users. Helpdesk activities shall be documented in monthly e-mail progress reports from the Contractor in order to inform end users about commonly asked questions, issues, and their resolutions.
C.4.2 System Development The Contractor shall provide code that is able to be run on all TDAC development and production machines (workstations and servers) that use FreeBSD, Windows, and Linux operating systems as well work seamlessly with the related software (e.g. Source Forge and Subversion) that supports the software development activities.
C.4.3 Software Development The Contractor shall provide software development for any of the SLV software activities within TDAC (BRL-CAD, VPS-EGM, Advance Joint Effectiveness Model (AJEM), Operational Requirements-based Casualty Assessment (ORCA), The Fire Tool (not an acronym), Vehicle Probability of Kill (Vpk)Works, etc.) to include gathering requirements, designing the software, writing software, developing test cases, writing user documentation, and providing user training.
C.4.4 Briefing Materials, Technical Papers, and Plans C.4.4.1 The Contractor shall prepare briefing materials, technical papers, and plans addressing technical projects, processes and capabilities, for presentation within TDAC, to TDAC customers and higher headquarters. The Contractor shall provide this to the Contracting Officer’s Representative (COR) on an ad-hoc basis.
C.4.4.2 The Contractor shall prepare multi-media content for World-Wide-Web presence which will go through our DF-100 public release process C.5 Personnel Management C.5.1 The Contractor shall retain the appropriate number of key personnel, as identified by the government’s needs and in the key personnel clause in the contract award, who have the necessary skills, education, and experience to effectively meet contract requirements to include proficiency in C, C++, CMake, and Tcl, JAVA, AI tools, and knowledge of DocBook. The Contractor shall maintain an active training, recruitment, and retention program to ensure qualified and clearable personnel sufficient to meet the contract requirements, including fill rate, are made available to support this effort.
C.6 Program Management C.6.1 The Contractor shall provide one (1) Program Manager (PM) to be available via e-mail and telephone during normal work hours (reference C.10). This position shall be located at the Contractor’s facility.
C.6.2 To facilitate efficient operations under this contract, the Contractor shall ensure the PM:
C.6.2.1 Serves as the main point of contact for all Contractor personnel.
C.6.2.2 Is responsible for overall management of the contract.
C.6.2.3 Conducts regularly scheduled meetings with the Contracting Officer Representative (COR) at a minimum of once per month, and additional meetings at the discretion of the COR.
C.6.2.4 Has a technical background, as listed in C.6.3, that facilitates understanding of Government technical requirements and communication with the COR.
C.6.2.5 Has a management background that facilitates supervision of Contractor personnel’s performance.
C.6.2.6 Ensures that all work performed meets the PWS requirements within the funding, timing and staffing constraints of the contract.
C.6.2.7 Facilitates effective planning and accomplishment of critical objectives in a timely manner.
C.6.2.8 Responds within twenty-four (24) hours and has emergency contact information available to the COR at all times.
C.6.2.9 If the Contractor uses subcontractors, manages all subcontractor interface requirements.
C.6.2.10 Notifies the COR, immediately, of any problems or issues.
C.6.3 PM shall have the following minimum Qualifications:
C.6.3.1 A minimum of five (5) years of supervisory experience to provide supervision, direction, and control of Contractor personnel.
C.6.3.2 Demonstrate successful past project management within the past five (5) years, through certification such as Project Management Professional, equivalent certification or experience documented in resume.
C.6.3.3 Familiarity with complex laboratory operations and associated personnel qualifications.
C.6.3.4 At a minimum, a scientific or engineering degree from an accredited school. Accredited schools are those reported to the US Department of Education and maintained within the Secretary of Education’s database.
C.7 Recruitment and Retention C.7.1 The Contractor shall provide a recruitment and retention plan sufficient for recruiting, attracting, hiring and retaining the high caliber scientists, engineers, and subject matter experts necessary to meet the personnel qualification requirements. The Contractor’s recruitment plan shall describe and demonstrate an approach for recruiting, vetting, preparing, hiring, and replacing personnel with the appropriate background, knowledge, and skills/expertise necessary to meet the requirements.
C.7.2 The Contractor’s retention plan shall include:
C.7.2.1 Procedures to ensure Contractor personnel meet and maintain the skills/expertise necessary to include proficiency in C, C++, CMake, JAVA, AI tools, and Tcl to meet the requirements established in this PWS. C.7.2.2 Ensure performance of Contractor personnel meet the requirements established in this PWS.
C.7.2.3 A Quality Assurance Surveillance Plan (QASP) that ensures proper oversight of personnel, training, certifications, subcontractors, and compliance with Operational Security requirements.
C.7.2.4 Procedures to identifying and removing any personnel not adequately performing required activities.
C.7.2.5 Procedures to help minimize disruption to government requirements caused by employee turnover, C.7.2.6 Procedures for addressing government concerns that the Contractor staff is not meeting requirements.5 C.7.2.7 Procedures for in processing new or returning employees.
C.7.2.8 Procedures for out-processing departing employees.
C.8 Program Management Plan C.8.1 The Contractor shall prepare a Program Management Plan. The Contractor shall submit the Program Management Plan to the COR in accordance with C.12.7 below. The Program Management Plan shall address at a minimum:
C.8.1.1 Personnel Management (see Section C.5) C.8.1.2 Occupational Safety and Health Program (see Section C.15) C.8.1.3 Safety Plan (see Section C.15) C.8.1.4 Telework Plan (see Section C.10) C.8.1.5 Additional Contractor procedures for ensuring efficient operation of this contract C.8.2 The Program Management Plan shall be maintained and implemented. The Contractor shall update and submit to the COR electronically and in hard copy a Program Management Plan revised on a bi-annual basis at a minimum.
C.9 Contractor Products C.9.1 The Contractor shall place the model source code, as well as all files needed to build the model source tree, in the relevant project repository, unless otherwise required by the COR. All software committed to the relevant project repository shall adhere to the terms of any associated license. No explicit survivability, lethality, and vulnerability (SLV) technologies shall be committed to the BRL-CAD project repository.
C.9.2 All BRL-CAD related software created and required to be delivered under the contract is to be copyrighted by the Contractor and the copyright is to be assigned to TDAC per DFAR 252.227-7020(c) (2).
C.9.3 All publicly released briefing materials, abstracts, technical papers, manuals, web content and reports shall adhere to the FORM 1 process. All BRL-CAD related documentation shall be written so as to be approved for distribution A, Public Release in according with the release of open-source code base. Documentation related to specific SVL tasks that may be required for further support under this contract will have distribution consistent with that specific task. This is subject to the approval by the BRL-CAD Model Manager. VPS-EGM will not be open-source, so this, so this requirement is not relevant for EGM.
C.10 Place of Performance/Work Hours C.10.1 The Contractor shall perform C.4 at TDAC facilities located in the Aberdeen Area of Aberdeen Proving Ground (APG-AA), Maryland. Travel to other facilities (Government and non-Government) may be required at the discretion of the COR.
C.10.2 While working at APG-AA facilities, the workday shall be consistent with the options included in the current TDAC Work Life Program, and subject to the approval of the COR. Cumulative work hours for a two (2) week period shall not exceed 80 hours with no more than 50 hours per week. The Contractor shall perform this effort from Monday through Friday, excluding Federal holidays. The Contractor shall request permission from the COR in writing and in advance to perform work outside of normal duty hours (i.e., 0630-1800, Monday through Friday). The Contractor shall request permission from the COR in writing and in advance to perform work on a Federal holiday, Saturday or Sunday. The Contractor shall attend meetings conducted Monday through Friday that lie outside the core workday hours of 0900-1500; most TDAC meetings are scheduled between the hours of 0800-1700.
C.10.3 The Contractor shall request permission from the COR in writing and in advance to perform work at places that do not concur with C.10.1 and/or with hours that do not concur with C.10.2.
C.11 Release of Information – Distribution Statements The Contractor shall adhere to the following distribution statement for all contract award documents and attachments for BRL-CAD:
C.11.1 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited The Contractor shall adhere to the following distribution statement for all contract documents/information generated during the performance of the contract:
C.11.2 DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors due to the technical data and computer software associated with the contract (Date of Determination: 25 February 2021). Other reasons for this document shall be referred to the COR (FCDD-DAW-S), in collaboration with the Operation Security Office at Aberdeen Proving Ground (APG): usarmy.apg.tdac.mesg.g2-security-office@army.mil For VPS-EGM:
C.11.3 DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors due to the technical data and computer software associated with the contract (Date of Determination: 25 February 2021). Other reasons for this document shall be referred to the COR (FCDD-DAW-S), in collaboration with the Operation Security Office at Aberdeen Proving Ground (APG):
C.12 Meetings and Contractor Deliverables C.12.1 Kick Off Meeting: The Contractor shall meet with the COR, as well as the Branch Chief of FCDD-DAW-S, for a contract kick-off meeting within thirty (30) days after date of contract award.
C.12.2 Monthly Reports: The Contractor shall provide Monthly Status Reports containing all efforts scheduled/accomplished for the reporting period and a schedule for the next sixty (60) days, current costs/status/updates, identified issues/problems with any action required by the Government. The Contractor shall provide the first monthly report to the COR on the first working day of the first whole month ACA. The Contractor shall provide all subsequent reports to the COR by the tenth (10th) day of every month thereafter.
C.12.3 Monthly Funds and Man-Hour Expenditure Reports: The Contractor shall provide a Monthly Funds and Man-hour Expenditure Report due in conjunction with and corresponding to the Monthly Status Report in section C.12.2. The Contractor shall provide the first monthly report to the COR on the first working day of the first whole month after date of contract. The Contractor shall provide all subsequent reports to the COR by the tenth (10th) day of every month thereafter. These reports shall include cost breakout for each person and complete documentation of updates, conclusions, recommendations, and suggested approaches for each area as described in C.4.
C.12.4 Software Engineering Solution: The Contractor shall provide a Software Engineering Solution to provide software enhancements in accordance with requirements at C.4.1. These enhancements shall have a Project Plan. This shall be provided to the COR within fourteen (14) days of proposed initiation dates for proposed software solutions.
C.12.5 Software Development: The Contractor shall propose software development solutions in briefing format for review by the relevant CCB on a quarterly basis in accordance with C.4.3. Approved development activities shall be reported on via monthly status reports to be provided to COR by the 10th of each month for activities incurred the month prior.
C.12.6 Recruitment and Retention Plan: The Contractor shall provide a recruitment and retention plan within sixty (60) days after contract award. The Plan shall provide information sufficient for recruiting, attracting, hiring and retaining the high caliber scientists, engineers, and subject matter experts necessary to meet the personnel qualification requirements as stated in Section C.7.
C.12.7 Program Management Plan: The Contractor shall submit the Program Management Plan in both electronic and hard copy no later than thirty (30) days after date of contract award. The COR will provide approval or comments within two (2) weeks of receipt. The Contractor shall submit a final Program Management Plan to the COR both electronically and in hard copy within one (1) week of receipt of approval. The Plan shall contain the information as stated in section C.8.
C.12.8 Annual Contract Summary Report: The Contractor shall provide an Annual Contract Summary Report detailing all work performed and deliverables received during that Period of Performance. The Contractor shall submit a summary technical report at the conclusion of every fiscal year and no later than thirty (30) days prior to the end of the contract period of performance (PoP). The Government will review and respond within fifteen (15) days. The Contractor’s final submissions are due within fifteen (15) days of receipt of Government remarks. These reports shall contain a summary of major changes and enhancements to the code during the contract period that was covered.
C.13 Government Furnished Property, Equipment and Data C.13.1 The Government will provide the Contractor with TDAC computer and network access (as deemed necessary by the COR) and project-specific licensed software access to perform AJEM and relevant project tasks. The Contractor shall adhere to all software license agreements, user agreement, and memorandum of agreements. Contractor employees shall sign software license agreements, user agreement, and memorandum of agreements to use Government-owned computer assets (hardware or software).
C.13.2 The Government will provide Contractor employees with access to object and source code for ORCA, FIRE, AJEM, BRL-CAD, VPS-EGM, and other government programs required by this effort. The Government may, at the COR’s discretion, provide Contractor employees with access to object and source code for other Government-owned or licensed software.
C.13.3 The Government will provide Contractor employees working at APG-AA facilities with the use of conference room facilities, office equipment (such as facsimile machines, copiers, printers, document binding devices, electric staplers and shredders), telephones, and operating supplies (such as paper, toner, and staples).
C.13.4 The Government will provide Contractor employees working at APG-AA facilities with access and use of electronic databases and file servers to perform tasks. Contractor employees shall complete a need-to-know form (COSATI form) approved by the COR, verified by the TDAC Security Office (for a favorable national authorization check) before libraries and staff may be accessed. The library staff may require verification by the COR prior to assisting a Contractor employee with a specific request from the library collection or to borrow interlibrary loan materials. The Contractor shall obtain COR signature for all materials that a Contractor employee seeks to borrow from the libraries. The Contractor employee shall promptly return all borrowed library materials to the COR when finished with borrowed materials. The Contractor employee shall return all borrowed materials within 15 days prior to the end of the contract period of performance. The Contractor shall replace all unreturned materials borrowed by the Contractor in accordance with AR-735.17.
C.14 Software packages and methodologies C.14.1 The Contractor shall use the following software operating systems: MAC OS (version 11 and higher), Windows OS (version 10 and higher), and UNIX variants.
C.14.2 The Contractor shall use the following software packages and tools: Microsoft Office [version 10 or higher; includes MS Word, MS Excel, MS PowerPoint, MS Access], Subversion version control system (SVN); and Java development kit (JDK), C, C++, shell scripting, NetBeans integrated development environment, and NetBeans rich client platform.
C.14.3 The Contractor shall use the following Government-owned and maintained software packages: AJEM, FIRES, VpkWorks, BRL-CAD, VPS-EGM, and ORCA... Access to TDAC owned codes (AJEM, BRL-CAD, VPS-EGM,and others) will be made available at contract award.
C.15 Safety and Medical Requirements C.15.1 The Contractor shall comply with Public Law 91-596 and each occupational safety and health standard promulgated under this act. The Contractor shall execute supervision to ensure immediate compliance with pertinent provisions of applicable regulations. Safety regulations, standard operating procedures, and guidance issued by the DEVCOM, AFC, TDAC, and Aberdeen Proving Ground Installation Commander also apply to the Contractor.
C.15.2 The Contractor shall perform all operations in strict compliance with all applicable safety and health procedures. The Contractor shall report incidents of injury or occupational illness or disease, and/or damages to Government property resulting from work performed at APG-AA location to the COR. Each incident shall be reported within 72 hours of occurrence and shall be delivered using applicable Government-furnished guidance and forms.
C.16 Contractor Motor Vehicles C.16.1 Vehicle registration and certification of insurance are required for each vehicle driven onto APG-AA. Upon entry to APG-AA, each vehicle driver and adult vehicle occupant is required to show federal or state-issued identification (e.g., driver’s license or identification issued by the Department of the Army) to authorized force protection personnel. Each vehicle entering APG-AA is also subject to random searches conducted by authorized force protection personnel.
C.17 Travel Requirements C.17.1 The Contractor shall, as required for the performance of specific tasks, carry out travel in accordance with (IAW) FAR 31.205-46, as applicable. The Contractor shall travel to facilities other than the Government’s work site to educate potential users, to stay abreast of emerging software practices and techniques, and to make presentations. The Government will reimburse the Contractor in accordance with these regulations.
C.17.2 Travel shall be required to fulfill the requirements under this PWS The Contractor shall ensure that all travel is performed in accordance with Joint Travel Regulations (JTR) in accordance with FAR 31.205-46. The Contractor shall obtain written COR or TM approval for all travel prior to departure. The COR will provide written approval within two (2) weeks after receipt of the travel request. Anticipated Contractor travel: (add information, if possible, of expected travel locations and how many times per year.)
C.18 Security C.18.1 Contractor employees assigned to work on or otherwise given access to contract information shall not be provided access to classified information unless the Contractor verifies that each employee possesses a security clearance of Secret or higher. A DD254 will be issued by the Government and formally incorporated into the contract to cover access to classified information.
C.18.2 The Contractor shall certify each employee’s U.S. citizenship to the TDAC Security Office at APG-AA prior to the performance of services at TDAC’s facilities. The Contractor shall write the certification using company correspondence and include the following information:
C.18.2.1 Contract number and its period of performance.
C.18.2.2 Name of individual, social security number, date of birth, place of birth, and citizenship.
C.18.2.3 TDAC point of contact and phone number.
C.18.2.4 Authorized signature block, phone number, and signature.
C.18.3 Contractor employees shall show current state or federally issued picture identification to gain access to APG-AA facilities. The Government will issue restricted temporary area badges to Contractor employees granted access to restricted APG-AA facilities in accordance with the following procedures:
C.18.3.1 Badges cannot be passed from one individual to another for entry into restricted areas.
C.18.3.2 Badges are to be worn only in the restricted area and removed from sight upon exiting the area.
C.18.3.3 Badges are not to be used as a means of identification outside of the restricted area.
C.189.3.4 Badges are to be protected in such a manner as to preclude unauthorized access by another individual.
C.18.3.5 Badges are to be returned at the conclusion of the visit or at the end of a period of authorized use.
C.18.3.6 Use and entry of portable electronic devices (e.g., cell phones, laptops, wireless electronic devices, removable media) to Government restricted areas is governed by TDAC and APG Installation policies. These policies pertain to Contractor-owned and personal property.
C.18.4 At a minimum, the following statements apply for all information that is assigned a distribution statement the performance of tasks in accordance with DoD Directive 5230.24, distribution Statements on Technical Documents or is Controlled Unclassified Information (CUI)/Sensitive Unclassified Information (SUI):
C.18.4.1 Distribution of information/reports of this contract shall be limited to personnel associated with this contract.
C.18.4.2 Electronic files, documents, and government furnished materials that are no longer needed and that are unclassified/sensitive or classified shall be destroyed by TDAC designated shredders, through TDAC authorized collection derbies, or via TDAC provided electronic degaussing services.
C.19 Anti-Terrorism Operations Security (AT/OPSEC) C.19.1 AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 14 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 7 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil
C.19.2 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
C.19.3 For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
C.19.4 iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
C.19.5 Account Validation System (AVS) registration for contractor employees who require access to government information systems. All contractor employees with access to a government info system must be registered in the AVS at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.
C.19.6 For contracts that require a formal OPSEC program. The contractor shall develop an OPSEC Standard Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.
C.19.7 For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
C.19.8 For information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.
C.19.9 For information assurance (IA)/information technology (IT) certification. Per DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
C.19.10 For contracts that require handling or access to classified information. Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with— (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.
C.19.11 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
C.20 Continuity of Operations (COOP)
C.20.1 This contract shall have to continue in order to support Directorate efforts to meet Mission Essential Functions in the event of a COOP action.
C.20.1.1 This contract is considered essential and as designated by the Government may have to continue during COOP emergency situations. Contractor Employees and associated subcontractor employees must be prepared to report for COOP situation. This information is provided by the COR as Government Furnished Information {GFI} at contract start date or effective date of incorporation of this requirement.
File details come from the government source that posted it. Updated .