This is a Performance-Based Work Statement (PWS) for maintenance services related to Praxair (HVOF) Thermal Spray Equipment at Hill Air Force Base (HAFB), Utah, dated October 20, 2025. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to inspect, service, repair, calibrate, and certify specific thermal spray equipment items. The estimated frequency is one annual on-site visit per year, with total parts not exceeding $10,000 for the Period of Performance.
The core service requirements include annual equipment inspection and testing with government equipment operators present; pressure testing consoles and powder feeders for leaks; verification of rotary powder feeder RPM meters and gauges within ±5% full scale; calibration of pressure gauges, flow meters, mass flow controllers, and powder feeders to specified tolerances; and affixing certification labels to each calibrated device showing service provider name, calibration date, due date, and technician name. The contractor must provide detailed service reports identifying assets by government asset number or part/serial numbers, cost breakdowns (labor vs. material), parts lists, service dates, and work type classifications. Emergency response capability is required with a maximum response time of seven calendar days from notification, not exceeding $10,000 in repair costs including all labor and travel. Contract Data Requirement Lists include inspection reports (A001), service reports (A002), calibration certifications (A003), a Quality Control Plan due within 30 days of award (A004), a Safety Plan due within 15 days of award (A005), and mishap reports as required (A006). The place of performance is HAFB with normal operating hours Monday through Friday 0530–1600, excluding federal holidays and base closures. The contractor must comply with OSHA standards, implement a safety program with written safety plan approval, provide TCIR/DART rates annually, maintain foreign object damage and tool control per AFI 21-101, follow security requirements including in/out-processing, communications security, and operations security protocols, and maintain an acceptable Quality Control Plan addressing inspection systems, defect prevention, and record-keeping. Equipment to be serviced includes five JP 8100 HVOF consoles, four 1264 powder feeders, eight PD 3200HP powder feeders, five 9910i arc spray machines, one PB 400 arc spray machine, one 6600C plasma controller, and one PS1000 plasma power supply, identified by serial numbers in Appendix B.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE SERVICES
i
CUI
PERFORMANCE-BASED WORK STATEMENT (PWS)
Praxair (HVOF) Thermal Spray Equipment (532 CMXS)
U.S AIR FORCE
Matt Arnold
10/20/2025 ii
TABLE OF CONTENTS
1 DESCRIPTION OF SERVICES
2 BASIC SERVICES
3 SERVICE SUMMARY
4 CONTRACT DATA REQUIREMENT LIST (CDRL) SUMMARY
5 QUALITY ASSURANCE
6 ADDITIONAL REQUIREMENTS
7 SECURITY
8 GENERAL INFORMATION
Appendix A – ACRONYMS AND ABBREVIATIONS Appendix B – EQUIPMENT LISTING Appendix C – SAFETY
CUI
CUI
1 DESCRIPTION OF SERVICES
1.1 The contractor shall provide all management, tools, supplies, equipment, and labor necessary to inspect, service, repair (as necessary), calibrate and certify specific thermal spray equipment items located at Hill Air Force Base (HAFB), Utah.
1.2 The contractor shall notify the Contracting Officer's Representative (COR), Shop Supervisor’s and Subject Matter Expert (SME) at a minimum of two (2) weeks prior to the on-site work start date.
John Pedri - john.pedri.1@us.af.mil - 801-775-6122 Michael Weston - michael.weston@us.af.mil - 801-777-1941 Ryan Ewing - ryan.ewing.3@us.af.mil - 801-777-1942 David Astle - david.astle@us.af.mil - 801-586-7087
2 BASIC SERVICES
Service and Calibration: The equipment items to be serviced under this PWS are listed in Appendix B. All equipment items shall be adjusted, serviced, repaired and returned to the most current Original Equipment Manufacturer (OEM) configuration / status, as required. The Government estimates repair services to occur, 1 time per year. Total parts will not exceed $10,000 for the Period of Performance (POP).
2.1 The contractor shall conduct an annual on-site visit to inspect, service, repair (as necessary), calibrate, adjust and certify specific thermal spray equipment items located at HAFB, Utah.
2.2 Equipment Inspection. All equipment items listed in Appendix B shall be inspected and tested to determine functionality and serviceability. A Government equipment operator shall run the equipment with the contractor in attendance prior to servicing the equipment.
All problems identified and all remedies made shall be documented by the contractor and reported to the SME. (CDRL A001)
2.2.1 Inspect and replace critical orifices as needed.
2.2.2 Test all console safeties.
2.2.3 Pressure test consoles for leaks and any faults corrected.
2.2.4 Rotary powder feeder RPM meters and gauges will be verified to be within +/- 5% full scale.
mailto:john.pedri.1@us.af.mil mailto:michael.weston@us.af.mil mailto:ryan.ewing.3@us.af.mil mailto:david.astle@us.af.mil
CUI
CUI
2.2.5 Pressure test all powder feeders for leaks.
2.3 Service Report. The contractor shall provide the details of work performed on/with the invoice when submitting. (CDRL A002)
2.3.1 Identify asset(s) by Government designated asset number. If no Government asset number is designated, asset(s) must be identified by Part Number (P/N) AND Serial Number (S/N).
2.3.2 Provide cost breakdown (Labor vs. Material) per asset serviced.
2.3.3 Provide list of parts used for preventative/corrective maintenance.
2.3.4 Provide date of service for each asset serviced.
2.3.5 Identify the type of work performed. Corrective maintenance / Preventative Maintenance / Calibration Service.
2.4 Equipment Calibration. All equipment items listed in Appendix B shall be recalibrated as required. These items include calibration of individual devices such as but not limited to meters, gauges, and pressure transducers. (CDRL A003)
2.4.1 Calibrate pressure gauges and digital displays. Faulty items shall be replaced.
2.4.2 Calibrate flow meters and mass flow controllers at a minimum of five points.
2.4.3 Calibrate systems with roto-meters or critical orifices within +/- 5% full scale.
2.4.4 Calibrate systems with mass flow controllers within +/- 2% full scale.
2.4.5 Calibrate all powder feeders.
2.4.6 If adjustment or repair is not possible, the device will be replaced with the exact part number or an equivalent part when approved by the SME. The replacement device(s) shall be calibrated before a certification can be issued for the equipment item.
2.5 Equipment Certifications. Upon completion, a label shall be affixed to each individual device calibrated showing the service provider name, date of calibration, the calibration due date, and the technician performing the work. (CDRL A003)
CUI
CUI
2.6 All deficient parts identified by the contractor will be identified to the Procurement Contracting Officer (PCO) for authorization of parts replacement.
2.7 Emergency response is required if equipment becomes inoperative as determined by the SME. Emergency repairs not to exceed $10,000 and shall include all labor and travel costs.
2.7.1 The SME will notify the contractor of the inoperative equipment. The contractor shall report to the work location no later than seven (7) calendar days from notification. The contractor shall take corrective actions as required and verbally brief the SME on all corrective actions.
3 SERVICE SUMMARY
Performance Objective PWS Para
Performance Threshold
Scheduling 1.2 (Satisfactory) The contractor shall notify the COR, Shop Supervisor’s and SME at a minimum of two (2) weeks prior to the on-site work start date
Reporting 2.2 (Satisfactory) All problems and all remedies made shall be documented by the contractor and reported to the COR, Shop Supervisor’s and
SME. (CDRL A001)
Equipment Certifications 2.5 (Satisfactory) Upon completion, a label shall be affixed to each individual device calibrated showing the service provider name, date of calibration, the calibration due date, and the technician performing the work. (CDRL A0003)
Emergency Response Time 2.7.1 (Satisfactory) The contractor shall report to the work location no later than seven (7) calendar days from notification
CUI
CUI
4 CONTRACT DATA REQUIREMENT LIST (CDRL) SUMMARY
Contract information data shall be delivered electronically in accordance with the corresponding requirement for each Data Item listed in Table 3-1 (below). The contractor shall have no more than one error per quarter for all CDRL submittals. The contractor shall submit CDRLs according to the due date indicated and have no more than one CDRL per quarter submitted after the identified due date. Grammatical errors do not count as an error. Substantive mistakes shall be corrected within two working days and corrective action taken to prevent recurrence of inaccurate late CDRLs.
Table 3-1
Exhibit Title PWS Paragraph
Delivery
A001 Inspection 2.2 Annually & As Required
A002 Service Report 2.3 As Required
A003 Calibration 2.4 – 2.5 Annually & As Required
A004 Quality Control Plan 5.5.1 NLT 30 days after notification of award
A005 Safety Plan 6.2.4 Appendix C
NLT 15 days after notification of award
A006 Mishap Report 8.6.2 Appendix C As Required
5 QUALITY ASSURANCE
5.1 Government Quality Assurance
5.1.1 The government shall inspect and evaluate the contractors’ performance to ensure services are received in accordance with requirements set forth in this contract. The Contracting Officer's Representative (COR) will use the contractor’s work schedule, or modified version thereof, to record validation results. Results of the validation then becomes the official Air Force record of the contractor’s performance. Government surveillance of tasks not listed in the PWS or by methods other than those listed in the PWS (such as provided for by the Inspection of Services clause) may occur during the PoP of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the PCO as a result of surveillance will be according to the terms of this contract.
CUI
CUI
5.1.2 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections if deemed appropriate because of repeated failures discovered during surveillance inspections or because of repeated customer complaints. Likewise, the government may decrease the number of quality assurance inspections if performance dictates.
5.1.3 When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the PCO a Corrective Action Report (CAR) for issuance to the contactor. The contractor shall respond to the CAR In Accordance With (IAW) instructions provided and in the CAR. While the formal process of this paragraph is to address unacceptable contractor performance, the Government reserves the right to initiate a less formal process involving the contractor, the COR and the PCO meeting together at no additional cost to the Government regarding unacceptable contractor performance.
5.2 Performance Assessment.
5.2.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.
5.2.2 Customer Complaints. The COR will receive and investigate all complaints.
The COR will be responsible for validating customer complaints. The PCO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Validated customer complaints shall be reperformed, if possible, within 3 business days of notification at no additional cost to the Government IAW the inspection clause of the contract and the direction of the Contracting Officer.
5.2.3 Review of Audits. COR reviews results of the contractor’s accepted quality management system audits and related quality metrics.
5.2.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all task performed. Appropriate for tasks that occur infrequently.
Usually only deals with Safety and/or Security, unless mandated by an Air Force Instruction (AFI) or industry standard.
CUI
CUI
5.3 Quarterly Progress Meetings. The PCO, Government’s Program Manager (PM), /Functional Services Manager (FSM), COR, other government personnel as appropriate, and the contractor shall meet quarterly to discuss the contractor’s performance.
The following issues, at a minimum, shall be discussed:
- Opportunities to improve the contract,
- Any modifications required of the contract,
- Unsatisfactory inspections,
- Valid customer complaints against each performance objective observed, and
- Steps taken by the contractor to prevent occurrences in the future.
The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.
5.3.1 The minutes of these meetings will be reduced to writing, signed by the PCO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor will provide a written notification within 5 working days to the PCO identifying areas of non-concurrence for resolution.
5.4 Contracting Officer Representative. CORs are representatives of the PCO and will participate in the administration of this contract. After award of the contract, the contractor will be provided a letter identifying the COR and setting forth their duties and authorities. The COR is not authorized to change any of the terms and conditions of the contract/task order.
5.4.1 Acquisition Team Meetings. The contractor’s Contact Manager (CM) with the PCO, Contract Administrator (CA), COR, and other government personnel constitute an acquisition team [See FAR 1.102 (c)] and shall meet on a regular basis. The Acquisition Team will establish how often meetings are needed based on contract complexity. As a subset of the Acquisition Team, Government members of the Acquisition Team are often referred to as the Multi-Functional Team (MFT) and may meet as determined by the MFT. The contractor may request a meeting with the PCO when the contractor believes such a meeting is necessary. If the PCO or CA deems necessary, written minutes of any such meetings shall be recorded by the CA in the contract file and signed by the PM and the PCO or CA. If the contractor does not concur with any portion of the minutes, such nonoccurrence shall be provided in writing to the PCO within 10 calendar days following receipt of the minutes.
5.5 Quality Control. In compliance with the applicable contract clauses FAR 52.246-4 thru FAR 52.246-5, entitled, “Inspection of Services (Fixed Price and Cost-Reimbursement),” or FAR 52.212-4(a) Commercial Terms and Conditions Inspection/Acceptance, develop and maintain an effective quality control program to ensure services are performed IAW this PWS, applicable laws and regulations and IAW best commercial practices.
CUI
CUI
5.5.1 Quality Control Plan (QCP). The contractor shall be required to submit and maintain an acceptable QCP (CDRL A004). Within 30 days after contract award or within 14 days after the need for changes to an existing QCP, the contractor will submit a QCP to the CO. The CO will notify the contractor of acceptance or required modifications to the plan. The contractor shall make appropriate modifications and obtain acceptance of the plan by the CO within 14 days. The contractor’s QCP shall contain, at a minimum, the following descriptive items:
A. The inspection system to cover all services. Description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).
B. The methods to be used for identifying and preventing defects in the quality of services performed.
C. How the records will be kept. Records must document all inspections and corrective or preventive actions taken.
5.6 Contractor’s Performance. The government assesses a contractor’s performance on an on-going basis, both positive and negative, and provides a record on a given contract during a specified period of time.
5.6.1 Past Performance Information (PPI). PPI can be provided to other government agencies, as requested.
5.6.2 Contractor Performance Assessment Report (CPARS). Depending on the estimated value of the contract, formal assessment and reporting of contractor performance is required and is documented using the CPARS system. An assessment usually provided on an annual basis is sent to the contractor’s representative for their comment. The contractor will have up to 60 days to review and comment on the assessment.
6 ADDITIONAL REQUIREMENTS
6.1 Government provided support
6.1.1 The Government will provide necessary working space, including heat, light, ventilation, and electrical powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be HAFB.
CUI
CUI
6.1.2 Government telephones shall be used for official business only.
6.1.3 The contractor shall be responsible for safeguarding all Government property provided for contractor use.
6.2 SAFETY AND HEALTH STANDARDS
6.2.1 The contractor shall follow and adhere to the Air Force is part of the Occupational Safety and Health Administration (OSHA).
6.2.2 The contractor is required to attain familiarization with the requirements of Voluntary Protection Program (VPP). Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. VPP requirements apply to contractors whose employees work more than 1,000 hours per quarter. The contractor shall flow down these requirements to all sub-contractors who qualify as applicable contractors under this contract.
6.2.3 The contractor shall provide from its OSHA 300 information the Total Case Incident Rate/Days Away Restricted or Transferred (TCIR/DART) rate by 15 January of each year to the CO for submission as part of the installation's annual OSHA VPP self-evaluation report.
6.2.4 System Safety Program Plan - The contractor shall implement a safety program that ensures protection of Government personnel and property. As part of the Safety Program the contractor shall establish a Safety Plan IAW Appendix C of this PWS. The contractor shall submit the Safety Plan within 15 days after contract award. (CDRL A005)
7 SECURITY
Security Review Date: 20 January 2026 Reviewed By: Stiefken
7.1 Conflicts of Interest
7.1.1 The contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R, Standards of Conduct, and any
CUI
CUI
other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.
7.1.2 Contractors will not use any other form of identification to access any government installation or facility while working on a government contract except the issued credentials associated with the awarded contract or task order.
Example: using a military retiree card to access an installation to work on a contract.
7.2 Security Requirements
7.2.1 Government telephones, computers, fax machines, copy machines, and other equipment shall be used only for official Government business
7.2.2 Foreign nationals (FN) will not be escorted, or sponsored, onto the installation without being properly vetted. Any request must follow 309 MXSG OI 16-102, Security Requirements section 7. FNs must be approved for access via the Foreign Disclosure Office and Air Force Office of Special Investigations
(AFOSI).
7.2.3 Contractor will schedule all visits and coordinate Base entry by contacting Shop Supervisor Michael Weston at michael.weston@us.af.mil 801-777-1941. The contractor shall be escorted at all times.
7.2.4 The contractor shall comply with all security, force protection, operation security and antiterrorism requirements at each installation.
7.2.5 The contractor shall comply with 309 MXSG in and out-processing procedures for all contractor personnel to ensure required security-related briefings and debriefings are accomplished. Specific in and out-processing checklists may be included at the task order level.
7.2.6 The contractor will use the COR. as the primary means of reviewing and approving forms and for communicating with necessary government representatives.
7.2.7 Communications Security
7.2.7.1 All communications with DoD organizations are subject to Communications Security (COMSEC) review.
mailto:michael.weston@us.af.mil
CUI
CUI
7.2.7.2 The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
7.2.7.3 The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures.
7.2.7.4 The contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.
7.2.8 Operations Security (OPSEC) Requirements
7.2.8.1 During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the PWS and/or other references provided, the contractor will adhere to the following minimum requirements.
7.2.8.2 Introduction of personnel electronic devices into government spaces, laptops, tablet Personal Computers (PC)s, cellular phones, cameras, recording devices, and data recording/storage devices is strictly controlled and forbidden in most cases.
Company issued equipment required for the performance of work must be approved by the government 309 MXSG security manager (SM). Photography and recording is not allowed in restricted areas and controlled areas except for official use and by approved photography letter only. NOTE:
Unless otherwise stipulated in the contract, contact the Installation Public Affairs or SM for approval.
7.2.8.3 Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications.
Official Business controlled unclassified information (CUI) may only be transmitted as directed in the PWS as it adheres to CUI Guidelines.
7.2.8.4 The Contractor shall not post to company websites, publications, newsletters, or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI. When in doubt, company press releases, related to this contract, will be coordinated through the Public Affairs Office prior to release.
7.2.8.5 Contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including all Social Networking sites) any images, data or information that reveals
CUI
CUI
sensitive government operations, personnel, equipment, including, but not limited to: Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to Air Force installations, property or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, project schedules, logistics or material delivery schedules; specialized equipment orders, deliveries, shipments, etc. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.); Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the SM and/or installation SFS, COR, and, if applicable, the company FSO and/or the Defense Security Service.
7.2.8.6 Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and activities vigilance or degrade the planning and execution of military operations performed or supported by the contractor in support of the mission. Protection of CI will include the adherence to and execution of countermeasures which the contractor initiates or as provided by OPSEC manager or installation OPSEC Program Manager, for CI on or related to PWS.
7.2.8.7 The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies.
7.2.8.8 Contractors who have access to the Ogden Air Logistics Complex (OO-ALC) and Government Servicing Units (GSU)s facilities or critical information shall have OPSEC training IAW AFI 10-701, OPSEC. Initial training will be approximately one (1) hour and follow-on recurring annual training will be approximately 1/2 (0.5) hour. OPSEC training will be conducted within 30 days of assignment.
7.3 Contractor Identification & Badges
7.3.1 All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or
CUI
CUI
where they might be mistaken for civil service employees. At a minimum, contractor management staff or contractor personnel shall clearly identify themselves using the label “contractor” in email addresses in accordance with Federal Acquisition Regulation (FAR) 37.114(c), Special Acquisition Requirements; opening ALL phone conversations with a statement materially the same as, “[office name], I am [employee name], a [prime contractor’s company name] employee,” including the employing contractor’s name in the letterhead and/or signature block of any written correspondence; and any other means necessary.
7.4 In/Out-Processing
7.4.1 All contractors are required to in/out-process from each respective organization regardless of if they are issued a Defense Biometric Identification System (DBIDS) or Common Access Card (CAC).
7.5 Security Incident
7.5.1 Should a security incident occur, the contractor shall: immediately report to the site location Group SM and COR all available facts related to each instance, take such precautions as the SM may reasonably require for security purposes, take reasonable and prudent action to establish control of the scene; prevent further violation, to preserve evidence until released by proper authority; and cooperate fully and assist Government personnel as the Government conducts an investigation of the violation. NOTE: Participation shall last until the investigation is complete.
8 GENERAL INFORMATION
8.1 Hours of Operation
8.1.1 Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0530- 1600 – EXCEPT FEDERAL HOLIDAYS and other base closures.
8.1.2 Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it is observed on Friday and working hours are Monday through
CUI
CUI
Wednesday for that week. If the holiday falls on a Sunday, it is observed on Monday. Any other circumstances that may prompt base closure, such as Days of National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.
8.1.3 NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination;
however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.
8.1.4 Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.
8.1.5 Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.
8.2 Environmental Controls
8.2.1 Hazardous Work Environment: The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas.
The industrial complex at HAFB has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure are expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.
8.3 Compliance with Laws and Regulations.
8.3.1 The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations
CUI
CUI
change during the term of this contract, the contractor is required to comply as such laws come into effect.
8.4 Conservation of Utilities
8.4.1 The contractor shall ensure that contractor employees follow applicable Air Force base utilities conservation practices to reduce waste as much as practicable. The contractor shall be aware of OO-ALC Energy Policy. A copy shall be provided upon request. (See: ePubs>Units>OO-ALC21-110 para. 9.2).
Contractors contribute to the effectiveness of the OO-ALC Energy Management System (EnMS), including the achievement of its objectives and energy targets.
Through this contribution, the benefits of improved energy efficiency are realized. It is expected that the contractor ensures their activities are in line with improving OO-ALC energy performance. Contractors found negligent of these requirements can have a negative impact.
8.4.2 The contractor shall be responsible for operating under conditions that prevent the waste of utilities, which include the following:
A. Lights shall be used only in areas where and when work is being performed.
B. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
C. Water faucets or valves shall be turned off after the required use.
8.5 Notification of Environmental Spills
8.5.1 If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the COR and area Supervisor. The liability for the spill or release of such substances rests solely with the contractor and its agent.
8.6 Safety Program
8.6.1 The contractor shall implement a safety program that ensures protection of Government personnel and property. (See Appendix C)
8.6.2 In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the
CUI
CUI
mishap / incident notification shall be sent within one (1) hour to the COR, who will forward it to OO-ALC safety. (CDRL A006)
8.7 Government Observations
8.7.1 During the period that the contractor is working on equipment, government personnel, other than CO, may, from time-to-time, observe contractor operations.
However, these personnel may not interfere with contractor performance.
8.8 Foreign Object Damage (FOD) and Tool Control
8.8.1 The contractor shall follow the applicable guidance in
chapters/paragraphs/sections of AFI 21-101 and HQ AFMC, Hill AFB, and 309 MXW supplements to the AFI 21-101 concerning base tool (chapter 10 section B), and FOD control policies (chapter 14, and sub paragraphs designated as 41), daily. Cloth rags are considered tools and will follow the same regulations and procedures as tools.
8.8.2 If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFMC supplement to AFI 21-101, chapter 10, section B.
8.8.3 Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.
8.9 Environmental
8.9.1 Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.
8.9.2 Inclement Weather. If the base closes due to inclement weather, the contractor will be released, by the installation commander, with the general population of the base at no decrement to contract price. The contractor will follow the local procedures for reporting in inclement weather as advertised on local television and radio stations.
8.10 Miscellaneous
CUI
CUI
8.10.1 Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.
8.10.2 Data Rights. The government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be government owned and are the property of the government with all rights and privileges of ownership/copyright belonging exclusively to the government. These documents and materials may not be used or sold by the contractor without written permission from the CO. All materials supplied to the government shall be the sole property of the government and may not be used for any other purpose. This right does not abrogate any other government rights.
CUI
CUI
APPENDIX A – ACRONYMS AND ABBREVIATIONS
Acronym/Abbreviations Definition ABW Air Base Wing AFI Air Force Instruction AFOSI Air Force Office of Special Investigations CA Contract Administrator CAC Common Access Card CAR Corrective Action Report CDRL Contract Data Requirement List CI Critical Information CM Contact Manager COMSEC Communications Security COR Contracting Officer's Representative CPARS Contractor Performance Assessment Report CUI Controlled Unclassified Information DART Days Away Restricted or Transferred DBIDS Defense Biometric Identification System EnMS Energy Management System FN Foreign nationals FOD Foreign Object Damage FSM Functional Services Manager GFP Government Furnished Property HAFB Hill Air Force Base IAW In Accordance With MFT Multi-Functional Team OEM Original Equipment Manufacturer OO-ALC Ogden Air Logistics Complex OPSEC Operations Security OSHA Occupational Safety and Health Administration P/N Part Number PC Personal Computers PCO Procurement Contracting Officer PM Program Manager PoP Period of Performance PPI Past Performance Information PWS Performance-Based Work Statement QASP Quality Assurance Surveillance Plan QCP Quality Control Plan S/N Serial Number SM Security Manager SME Subject Matter Expert TCIR Total Case Incident Rate VPP Voluntary Protection Program
CUI
APPENDIX B – EQUIPMENT LISTING
Equipment Model Numbers Quantity Serial Numbers
JP 8100 (HVOF console) 5
AC1040011
AC1040010
AG1040007
AG1040008
AJ1040002
1264 (powder feeder) 4
BA300748
BA300749
BA300750
BA300751
PD 3200HP* (powder feeder) 8
PD32HP000001
PD32HP000002
PD32HP000003
PD32HP000004
PD32HP000005
PD32HP000006
PD32HP000007
PD32HP000008
9910i (arc spray machine) 5
BB970200
BB970201
BD970207
BD970212
BD970213
PB 400 (arc spray machine) 1 AF020241 6600C (Plasma Controller) 1 AN159008 PS1000 (Plasma Power Supply) 1 AN162006
CUI
APPENDIX C – SAFETY
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
20 Jan 2026 Reviewed by:
Alec Green
OO-ALC/SE
801-586-0477
Control Number: AG2601002
A. Safety Program Requirements
The contractor shall implement a safety program plan that ensures protection of Government personnel and property. (CDRL A005) The program shall consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements, and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
CUI
CUI
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify OO-ALC/SE Workflow (OO-ALC.SE.Workflow@us.af.mil) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(CDRL A006)
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations.
Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
mailto:OO-ALC.SE.Workflow@us.af.mil
CUI
CUI
4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.
The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety Investigations and Reports, Contract Safety, and the protection of their employees.
Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.
Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0
CUI
CUI
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
• Provide contact information for on-site personnel
• Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
• Identify employee safety and health training requirements and the documentation process
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4;
DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition:
AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
| 1 DESCRIPTION OF SERVICES |
| 2 BASIC SERVICES |
| 2.2.1 Inspect and replace critical orifices as needed. |
| 2.2.2 Test all console safeties. |
| 2.2.3 Pressure test consoles for leaks and any faults corrected. |
| 2.2.4 Rotary powder feeder RPM meters and gauges will be verified to be within +/- 5% full scale. |
| 2.2.5 Pressure test all powder feeders for leaks. |
| 2.3.1 Identify asset(s) by Government designated asset number. If no Government asset number is designated, asset(s) must be identified by Part Number (P/N) AND Serial Number (S/N). |
| 2.3.2 Provide cost breakdown (Labor vs. Material) per asset serviced. |
| 2.3.3 Provide list of parts used for preventative/corrective maintenance. |
| 2.3.4 Provide date of service for each asset serviced. |
| 2.3.5 Identify the type of work performed. Corrective maintenance / Preventative Maintenance / Calibration Service. |
| 2.4.1 Calibrate pressure gauges and digital displays. Faulty items shall be replaced. |
| 2.4.2 Calibrate flow meters and mass flow controllers at a minimum of five points. |
| 2.4.3 Calibrate systems with roto-meters or critical orifices within +/- 5% full scale. |
| 2.4.4 Calibrate systems with mass flow controllers within +/- 2% full scale. |
| 2.4.5 Calibrate all powder feeders. |
| 2.4.6 If adjustment or repair is not possible, the device will be replaced with the exact part number or an equivalent part when approved by the SME. The replacement device(s) shall be calibrated before a certification can be issued for the equipment... |
| 2.7.1 The SME will notify the contractor of the inoperative equipment. The contractor shall report to the work location no later than seven (7) calendar days from notification. The contractor shall take corrective actions as required and verbally br... |
| 3 SERVICE SUMMARY |
| 4 CONTRACT DATA REQUIREMENT LIST (CDRL) SUMMARY |
| 5 QUALITY ASSURANCE |
| 5.1.1 The government shall inspect and evaluate the contractors’ performance to ensure services are received in accordance with requirements set forth in this contract. The Contracting Officer's Representative (COR) will use the contractor’s work sch... |
| 5.1.2 The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). The government may inspect each task as completed and increase the number of quality assurance inspections... |
| 5.1.3 When an observation indicates defective contractor performance, the COR will require the contractor’s Contract Manager or representative at the site to initial the observation. The formal process is, when a performance threshold has not been me... |
| 5.2.1 Periodic Surveillance. This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s services. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or ... |
| 5.2.2 Customer Complaints. The COR will receive and investigate all complaints. The COR will be responsible for validating customer complaints. The PCO shall make final determination of the validity of customer complaint(s) in cases of disagreement wi... |
| 5.2.3 Review of Audits. COR reviews results of the contractor’s accepted quality management system audits and related quality metrics. |
| 5.2.4 100 Percent Inspection. This method requires the COR to do 100 percent inspection on all task performed. Appropriate for tasks that occur infrequently. Usually only deals with Safety and/or Security, unless mandated by an Air Force Instructio... |
| 5.3.1 The minutes of these meetings will be reduced to writing, signed by the PCO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor ... |
| 5.4.1 Acquisition Team Meetings. The contractor’s Contact Manager (CM) with the PCO, Contract Administrator (CA), COR, and other government personnel constitute an acquisition team [See FAR 1.102 (c)] and shall meet on a regular basis. The Acquisiti... |
| 5.5.1 Quality Control Plan (QCP). The contractor shall be required to submit and maintain an acceptable QCP (CDRL A004). Within 30 days after contract award or within 14 days after the need for changes to an existing QCP, the contractor will submit ... |
| A. The inspection system to cover all services. Description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s). |
| B. The methods to be used for identifying and preventing defects in the quality of services performed. |
| C. How the records will be kept. Records must document all inspections and corrective or preventive actions taken. |
| 5.6.1 Past Performance Information (PPI). PPI can be provided to other government agencies, as requested. |
| 5.6.2 Contractor Performance Assessment Report (CPARS). Depending on the estimated value of the contract, formal assessment and reporting of contractor performance is required and is documented using the CPARS system. An assessment usually provided o... |
| 6 ADDITIONAL REQUIREMENTS |
| 6.1.1 The Government will provide necessary working space, including heat, light, ventilation, and electrical powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the... |
| 6.1.2 Government telephones shall be used for official business only. |
| 6.1.3 The contractor shall be responsible for safeguarding all Government property provided for contractor use. |
| 6.2.1 The contractor shall follow and adhere to the Air Force is part of the Occupational Safety and Health Administration (OSHA). |
| 6.2.2 The contractor is required to attain familiarization with the requirements of Voluntary Protection Program (VPP). Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. VPP requirements apply to contractors whose emp... |
| 6.2.3 The contractor shall provide from its OSHA 300 information the Total Case Incident Rate/Days Away Restricted or Transferred (TCIR/DART) rate by 15 January of each year to the CO for submission as part of the installation's annual OSHA VPP self-e... |