Performance Work Statement.pdf
PDF 399 KB Posted
- Solicitation number
- FA8524-20-R-0021
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR: FD2060-21-00007 PWS REVISION: 0
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall be referred to 411 SCMS/GULD, Robins AFB, GA 31098-1670
Performance Work Statement for
Repair of HH-60G Color Weather Radar (CWR) system consisting of:
NSN NOUN
5841-01-363-2767SO Receiver-Transmitter
5841-01-267-5934SO Receiver-Transmitter
5985-01-009-2872SO Antenna Drive Unit
5841-01-267-5932SO Indicator
5841-01-412-7459SO Interface unit
Purchase Request: FD2060-21-00007
December 13, 2019
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
1.0 Description of Services
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required perform depot level repair of the Color Weather Radar (CWR) system installed on the HH-60G helicopter. The CWR system consists of one Receiver-Transmitter, either NSN: 5841-01-363-
2767SO or 5841-01-267-5934SO, which is interchangeable, one Antenna Drive Unit, NSN:
5985-01-009-2872SO one Interface Unit, NSN: 5841-01-412-7459SO and one Indicator, NSN:
5841-01-267-5932SO. These services include inspection, test bench check, and required disassembly, needed for ensuring conformance to the Original Equipment Manufacturer (OEM) data and specifications. The extent of repair work required shall be determined by the initial inspection/ functional checkout and the disassembly/assembly required to return an asset to a serviceable end item that shall efficiently serve its intended purpose. The contractor shall comply with the quality levels of repair necessary to return each Color Weather Radar asset to serviceable condition and on time. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes are authorized in writing by the Cognizant Government Engineering Authority and the Procuring Contracting Officer (PCO). The contractor shall deliver quality data/documents free of technical errors. Timely and accurate reporting in CAV-AF shall be provided by the contractor.
1.2 Benefit to United States Air Force (USAF): The CWR system is Mission Critical for the HH-
60G helicopter combat search and rescue mission. Without continued repair coverage of the
CWR system, mission capability and effectiveness will be degraded. Crew effectiveness could be hampered without full situational awareness tools provided by the CWR system. The current workload placed on HH-60G aircrew performing combat missions are already at critical levels and could negatively impact mission success if a break in repair coverage occurs. This acquisition will benefit the USAF by ensuring continued repair coverage and result in more aircraft available with a functional CWR system to perform the Special Operation Forces (SOF) mission.
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
2.0 Services Summary
Performance Objective PWS
Reference
Performance Threshold
Delivery of repair
4.1 Repaired assets shall be delivered in accordance with the schedule defined by the contract/order.
There shall be no more than one late delivery per NSN per quarter. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date. The late asset shall be delivered by a revised delivery date acceptable to the
Government.
Quality of CDRL deliverable 4.3.1 There shall be no more than one rejection of any single deliverable per Ordering Period. There shall be no more than one total rejection(s) of deliverables per quarter. The
Government will reject the submitted data/document if any technical errors are found within the data/document. A technical error is defined as the format not being in accordance with the
CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. The rejected data/document shall be corrected and resubmitted within 15 business days of notification of Government rejection.
Receipt of CDRL deliverable 4.3.2 There shall be no more than one late submission(s) of deliverables per quarter. The Contractor shall notify the
Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
Quality of repair 4.4.6 There shall be no more than one PQDR and/or QDR per NSN per contract year.
CAV-AF reporting 4.10 The Contractor shall report production in CAV-AF. The
Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.
Contractor Manpower
Reporting
5.7 Within 30 calendar days of contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data.
The Contractor shall provide a count of contractor/subcontractor personnel performing services for each fiscal year and report all contractor/subcontractor labor hours required for performance of services for each fiscal year. All data shall be reported no later than October 31 of the following fiscal year.
Adherence to Contractor QMS 5.9 100% compliance with the QMS is required.
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
3.0 Government Property
3.1 Contractor Responsibility: The Contractor shall be responsible for Government property in their possession in accordance with the Federal Acquisition Regulation (FAR) and applicable supplements including, but not limited to, FAR Part 45, Government Property; FAR 52.245-1, Government Property; and Defense Federal Acquisition Regulation Supplement (DFARS) Part
245, Government Property. The FAR and applicable supplements can be accessed at http://farsite.hill.af.mil.
3.2 Government Property to be Provided: Government property will be provided in accordance with the GFP attachment, attached to the contract.
3.3 Reporting of Government Property: The Contractor shall create and maintain records of all
Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID)
Registry.
3.4 Loss of Government Property: In accordance with DFARS 252.245-7002, Reporting Loss of
Government Property, “loss of Government property” means unintended loss of or damage to
Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, theft, loss due to lack of security, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or
Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing.
Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property
Administrator.
3.4.1 Reporting Loss of Government Property: The Contractor shall use the Defense Contract
Management Agency (DCMA) eTools software application to report loss of Government property at the site below in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract. The reporting requirements does not change any liability provisions or other reporting requirements that may exist under the contract/order. http://www.dcma.mil/aboutetools.cfm
4.0 Technical Requirements
4.1 Repair Turn Around Time (RTAT): The contractor is required to perform depot level repair services for the Color Weather Radar (CWR) system installed on the HH-60G helicopter. The
CWR system consists of one Receiver-Transmitter, either NSN5841-01-363-2767SO or 5841-
01-267-5934SO, which is interchangeable, one Antenna Drive Unit, NSN5985-01-009-2872SO one Interface Unit, NSN5841-01-412-7459SO and one Indicator, NSN5841-01-267-5932SO.
There shall be no more than one late delivery per quarter. The Contractor shall notify the http://farsite.hill.af.mil/
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
Government if the delivery of any asset will not meet the scheduled delivery date specified in the contract. The late asset shall be delivered by a revised delivery date acceptable to the
Government. In the event there is a need for long-lead time parts, the contractor shall notify the
Government PCO within 10 calendar days.
4.2 Period and Place of Performance
4.2.1 Contract/Order Period of Performance: The period of performance for the contract/order will extend March 2021 to April 2026
4.2.2 Place of Performance: These services will be performed at TBD after Contract Award.
4.3 Contract Data Requirements List(s) (CDRL)
A001, DI-MISC-82003, AFTO Form 349 Maintenance Data Collection Record
A002, DI-PSSS-81995, Contract Depot Maintenance Production Report
A003, DI-MGMT-81634C, Commercial Asset Visibility Air Force
(CAVAF)/Contractor Furnished Material Report)
A004, DI-MISC-81832, Counterfeit Prevention Plan
A005, DI-MGMT-81803, Item Unique Identification (IUID) Marking Plan
A006, DI-MGMT-81804, IUID Marking Activity, Validation & Verification Report
A007, DI-MGMT-80441C, Government Property Inventory Report
A008, DI-QCIC-81722 Quality Program Plan (QPP)
4.3.1 Quality of CDRL Deliverable: There shall be no more than one rejection of any single deliverable. There shall be no more than one total rejection(s) of deliverables per quarter. The
Government will reject a deliverable if any technical errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. The rejected deliverable shall be corrected and resubmitted within 15 business days of notification of
Government rejection.
4.3.2 Receipt of CDRL Deliverable: CDRL deliverables may be submitted via Procurement
Integrated Enterprise Environment (PIEE) / Wide Area WorkFlow (WAWF) and/or be submitted directly to the MFT member identified on the CDRL. There shall be no more than one late submission(s) of deliverables per quarter. The Contractor shall notify the Government if the
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.
4.3.3. Maintenance Records, Forms, and Publications: AFTO Form 349, AFTO 95 Maintenance
Data Collection Record is required and shall be IAW T.O. 00-20-2. (CDRL A001, DI-MISC-
82003)
4.3.4 Contract Depot Maintenance Production Report: The contractor shall submit the report
IAW the CDRL. (CDRL A002, DI-PSSS-81995)
4.4 Condemnation and Repair
The contractor shall be required to repair all end items unless the Procuring Contracting Officer
(PCO) through the Administrative Contracting Officer (ACO) provides written direction.
Requests for condemnation shall be submitted in writing through the ACO to the PCO within
(10) ten calendar days following initial inspection/functional testing. Prices exclude the replacement of any Shop Replaceable Assemblies (SRA’s) that may be found Beyond Physical
Repair (BPR), Beyond Economical Repair (BER) or Missing on Induction (MOI). These items shall be priced separately as Over and Above Repair (OAR), on a case by case basis.
An item sent to the contractor requiring repair considered highly unusual or not the type of repair that would be anticipated as a result of normal wear and tear of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item, will be considered OAR. Therefore, repair of OAR items will be subject to “equitable adjustment.”
Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions:
a. Physical damage affecting more than 75% of material within the end item (i.e., crushed).
b. Burn damage affecting more than 80% of end item internal electrical components & connections.
b. Beyond Economical Repair/remanufacture (BERs) has been determined where repair cost is greater than 75 percent of the cost for a new end item.
1. SF-364 Report of Discrepancy (ROD) will be submitted within 10 calendar days except in cases of BER/BPR where the DCMA delegate DND QAR is involved
c. Beyond Physical Repair due to obsolencence issues
d. Obsolesence:
Following contract award, in the event that one or more parts involved in the production of any of the requirements contained in this contract are obsolete, non-procurable or out of production, the contractor shall provide written notice to the contracting officer. This notice will include the contractor’s recommendation to correct the problem and should be in one of the following general categories: (A) Alternative sources within industry, (B) Hardware
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall redesign, or (C) out of production nonrecurring (NRE) effort. Included with the recommendation will be the contractor’s assessment of any costs and schedule impacts associated with the recommendation.
1. Upon receipt of the notification, the contracting officer will determine the appropriate course of action and will give written direction to the contractor.
2. Redesign, vendor qualification, or out of production NRE effort undertaking by the contractor to implement the contracting officer’s direction will be charged as a cost plus fixed-fee contract line item to be established in the contract. In no event will the contractor proceed with implementation without written approval of the contracting officer. If the contracting officer implements this provision, costs associated with the change will be evaluated and negotiated at that time.
3. If after all efforts stated in paragraphs a), b) and c) above have been exhausted and the contractor notifies the Government (in writing) that no vendor can be obtained or qualified and component part cannot be redesigned due to technical or cost limitations, the contracting officer will commence with the issuance of a termination for convenience of the Government for that CLIN.
Furthermore, the PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions. The Government is authorized to replace condemned end items with replacement reparable end items of the same NSN at no additional cost. The contractor is authorized reclamation from condemned units. The contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit. The contractor shall report the use of reclaimed items to the PCO.
4.4.1 Teardown, Test, and Evaluation (TT&E): TT&E is performed by the contractor to determine the cause of failure prior to conducting actual repair of the item. When situations occur where an asset is provided to the contractor for repair, but the contractor cannot duplicate the fault, No Fault Found (NFF), the contractor will notify the Procuring Contracting Officer
(PCO) within 60 business days after receiving the assets . The contractor shall charge the NFF or
TT&E actions CLIN.
4.4.2 Accessory and Component Reuse, Repair and Replacement: The Contractor shall submit
SF-364 Report of Discrepancy (ROD) for items received which are misidentified, misdirected or have Air Force recoverable subassemblies missing shall be reported within 10 calendar days from receipt of asset through the ACO to the PCO, to 411 SCMS/GULA for disposition instructions. Missing Repairable Expendability, Reparability, Recoverability Code (ERRC) “T” subassemblies or ERRC Code “T” subassemblies that are generated as part of the Next Higher
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
Assembly (NHA) and subsequently require condemnation, will be replaced by the government.
The replacement item may be repairable or serviceable. The repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost
IAW T.O. 00-25-234.
4.4.3. Cannibalization: Upon approval by the Government, the contractor is authorized to cannibalize Repair Shop Replaceable Unit (SRU) necessary to accomplish timely repair to meet production schedule and/or accomplish Repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.
4.4.4. Facility Requirements: The contractor shall provide a repair facility. The facility shall serve as the depot to carry out the repair and will include contractor owned test equipment, fixtures, adapters and workbenches needed for repair of the assets.
4.4.5 Repairable Components: Repairable components will be repaired to Original Equipment
Manufacturer (OEM) specifications.
4.4.6 Quality
4.4.6.1 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. The QMS shall address detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The QMS shall include a schedule of quality assurance/control inspections. 100% compliance with the QMS is required. (CDRL A008, DI-
QCIC-81722)
4.4.6.2 The Contractor’s quality program shall be established and maintained IAW FAR 52.246-
11 or equivalent. The Contractor’s quality program shall meet the requirements of ISO
9001:2008 or equivalent. When requested, the contractor shall assist the cognizant Contract
Administration Office in evaluating Product Quality Deficiency Reports (PQDR) and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program. The contractor shall establish and maintain a program to accomplish the requirements set forth in Air
Force T.O. 00-35D-54. There shall be no more than one PQDR and/or Quality Deficiency Report
(QDR) per contract year during the performance of this contract repair effort.
4.4.7 DD Form 1574 Serviceable Tags: Contractor shall complete, DD Form 1574 Serviceable
Tags IAW MIL-STD-129R. Insure DD Form 1574 Serviceable Tags are attached to the asset and also to the outside of the box it is packaged in.
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
4.5 Item Unique Identification
4.5.1 Marking Requirement: Unique Item Identification is required for all items to be delivered to the Department of Defense (DoD) that meet the criteria established by the FAR.
The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item
Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics
Information System (FLIS). All assets subject to marking must be recorded in the DoD IUID
Registry.
4.5.2. IUID Marking Plan: The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130N, DoD Standard Practice Identification
Marking of US Military Property. The plan must be approved by the Government Engineer
(who is identified in the QASP) prior to implementation. (DI-MGMT-81803, CDRL A005)
4.5.3 IUID Marking Activity and Verification Report: The contractor shall provide an IUID
Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.
(DI-MGMT-81804, CDRL A006)
4.5.4 Reporting in IUID Registry
4.5.4.1 Transmission of Government property must be recorded in the IUID Registry. The
Government is required to record the transfer of GFP to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.
4.5.4.2 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.
4.6 Government Property Inventory Report: The contractor shall perform an annual 100% physical inventory of all received Control Display Units (CDU), NSN 5895-20-010-9425, Part
Number 100-602653 for the contract. Once an annual physical inventory has been accomplished, the contractor shall provide their internal property management control records in accordance with FAR Part 52.245-1(f)(1)(iv), Physical Inventory. Findings and corrective actions of contractor annual physical inventory results requires the PMS to review, analyze, and comparison to CAV AF system reported inventory and identify any variances. After CAV AF
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall system research, with input from IMS/MM and the repair contractor, the PMS shall determine required CAV AF contractor reporting corrective actions on all identified variances. Upon defining required corrective actions, the PMS will engage the CO to provide government results and corrective reporting actions to the contractor and will direct those actions. These results shall be shared with respective DCMA representative for review and/or follow-up inspection. NOTE:
Contractor property records shall include all government provided material where process tracking is accomplished outside of the CAV AF system, thereby allowing the PMS to conduct a review and confirmation inventory tracking accuracy. (CDRL A007, DI-MGMT-80441C)
4.7 Maintenance Records, Forms, and Publications: Maintenance Data Collection Record
(MDCR) is required and may be in Contractor format. Information collected shall be IAW
Technical Order (TO) 00-20-2, Maintenance Data Documentation. Following repair of each repairable asset received by the contractor, the contractor shall provide an MDCR which shall include the serial number, Federal Stock Class and National Stock Number and the date inducted for repair the date repaired , the discrepancy and corrective action. Contractor format is acceptable. (CDRL A001, Data, DI-MISC-81371A/T)
4.8 Depot Maintenance Production Report: The contractor shall submit the report on the 10th calendar day after the end of each reporting period IAW the Contract Data Requirements List
(CDRL). (CDRL A002, Data Item Description, DI-ALSS-80728A/T)
4.9 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and all applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial
Security Program Operating Manual (NISPOM).
4.9.1 The Contractor shall package and mark material for movement, shipment, receipt and storage in a manner that ensures the protection and preservation of the material for shipment to and storage at the destination. The Contractor shall package electronic parts susceptible to electrostatic discharge damage in accordance with MIL-STD-1686C, Department of Defense
Standard Practice / Electrostatic Discharge Control Program for Protection of Electrical and
Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive
Devices), and MIL-HDBK-263B, Military Handbook / Electrostatic Discharge Control
Handbook for Protection of Electrical and Electronic Parts, Assemblies and Equipment
(Excluding Electrically Initiated Explosive Devices).
4.10 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor shall report production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The
Contractor shall report as actions occur. [CDRL A003, DI-MGMT-81634C, Commercial Asset
Visibility Air Force (CAVAF) / Government Furnished Material Report]
4.11 Counterfeit Prevention Plan (CPP): The Contractor shall establish and maintain a counterfeit electronic part detection and avoidance system to mitigate the risk of counterfeit
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall electronic parts being installed in end items or otherwise entering the USAF/DoD inventory. At a minimum, CPP shall address the following:
4.11.1. Prevention Of Counterfeit Parts Entering The USAF/DoD Supply Chain: Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and for disposition of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be documented in a CPP for submission and approval in accordance with the Data Item Description
(DID) DI-MISC-81832 and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit
Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply. (CDRL
A004, DI-MISC-81832).
4.11.2 Applicability: The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
4.11.3 Definitions: The Contractor shall utilize definitions per AS5553A to ensure consistency.
Any contractor-derived definitions must be included in an appropriate CPP appendix or annex.
(Ref. AS5553A, paragraph 3, 3.1, 3.2, 3.3, appendix H).
4.11.4 Parts Availability and Use of Parts Brokers: The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts Brokers when available from Original
Manufacturers (OM) or their Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their Authorized
Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553A, paragraph 4.1.1, 4.1.2.e., appendix A).
4.11.5 Procurement Policies: The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify specific roles and responsibility for each. (Ref. AS5553A, paragraph 4.1.2, 4.1.3, appendix B, C, D).
4.11.6 Risk Assessment: The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553A, paragraph 4.1.2, 4.1.3, appendix B, C, D).
4.11.7 Detection and Avoidance Responsibilities: The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section
893 of the Ike Skelton National Defense Authorization Act for Fiscal Year 2011 (Public Law
111–383; 124 Stat. 4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per Office of Deputy Assistant Secretary of
Defense (ODASD) Memo titled “Overarching DoD Counterfeit Prevention Guidance”, dated 16
March 2012. (Ref. AS5553A, paragraph 4.1.4, 4.1.5, appendix E).
4.11.8 Testing and Verification: The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential. These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of
Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553A, paragraph 4.1.4, appendix E).
4.11.9 Configuration Identification and Traceability: The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts is not possible. The Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractor’s control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government.
(Ref. AS5553A, paragraph 4.1.6, appendix F).
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
4.11.10 Counterfeit Notification and Reporting: The Contractor shall report in writing to the
Procuring Activity within 30 calendar days of determining any end item, component, part, or material contained in supplies purchased by the Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI). The Procuring
Contracting Officer (PCO) shall coordinate reporting to the appropriate Program
Management/Item Management, System Engineering Management, the AFMC Discrepant
Materiel Reporting Program (DMRP) Office in 406 SCMS/GULAB, and the AFOSI.
Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange Program
(GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553A, paragraph 4.1.7, appendix G).
4.11.11 Counterfeit Prevention Training: The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training. The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The CPP shall describe and list the training provided by the contractor to their personnel.
5.0 General Information
5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.
5.2 Security Requirements
5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the security requirements of the facility. The Contractor shall comply with all applicable Government security regulations.
5.2.2 Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of
USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with Department of Defense Directive (DoDD) 5205.02E, DoD Operations
Security (OPSEC) Program, and Department of Defense (DoD) Manual 5205.02-M, DoD
Operations Security (OPSEC) Program Manual, to protect United States (U.S.) Government interests. The Contractor shall ensure contractor/subcontractor personnel who perform work on a Government facility comply with the OPSEC procedures of the facility.
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
5.2.3 Communications Security (COMSEC): The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified information and/or Controlled Unclassified Information (CUI) in accordance with DoD 5220.22-
M. Applicable equipment shall be safeguarded, maintained and operated in accordance with
DoD 5220.22-M.
5.2.4 Security Clearance: It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements. Contractor
/subcontractor personnel shall not be authorized access to classified information and/or
Controlled Unclassified Information (CUI) and classified items or be permitted to work on classified projects and/or programs without appropriate security clearance and need-to-know.
5.2.5 Security Incident or Violation: The Contractor shall immediately notify the Government
Security Office of any potential or actual security incident or violation.
5.3 Environmental Management System (EMS): These services shall not be performed at a
Government facility; therefore, the EMS requirement does not apply.
5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of
Environmental Protection Agency (EPA)-designated products (Formerly Green Procurement
Plan) or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.
5.5 Safety Requirements
5.5.1 Contractor Compliance: The Contractor shall comply with all applicable Government safety and health regulations including, but not limited to, Public Law 91-596 as amended by
Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH).
5.5.2 Safety and Health Plan/Program: If the Contractor does not have a Safety and Health Plan previously and currently approved by the MFT, they shall submit a Safety and Health Plan as indicated by CDRL instructions. The Contractor shall establish and maintain a safety program in accordance with the contract/order, all applicable Government safety and health regulations and the Safety and Health Plan.
5.5.3 Mishap Notification/Investigation
5.5.3.1 Mishap Reporting: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty
DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.
The Contractor shall ensure the Safety Office and PCO are notified of mishaps. The Contractor
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall shall contact the MFT (COR, if available, or another MFT member) by telephone within eight business hours. The Contractor shall cooperate with Government safety investigations.
5.5.3.2 Damage to Government Property: The contractor shall notify the Contracting Officer
(CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two business days, for any damage to government property less than $500,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.
5.7 Contractor Manpower Reporting: In accordance with 10 United States Code 2330a, the
Contractor shall provide an annual count of contractor/subcontractor personnel performing work for each fiscal year if the DoD is the requiring activity, if the acquisition is using U.S.
Government appropriated funds, and if the acquisition is in excess of $3,000,000.00. The
Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract in the Enterprise-wide Contractor
Manpower Reporting Application (eCMRA). Reporting shall be conducted for each fiscal year, which extends October 1 through September 30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The
Contractor shall establish a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. The Contractor shall enter Order Data, Contact Data and
Location Data. Data for Air Force service requirements must be input at the Air Force CMRA link. Additional information and user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
5.8 Invoicing/Payment and Receipt/Acceptance: Contractor shall submit/process payment requests and receipt/acceptance documents via PIEE/WAWF.
http://www.ecmra.mil/
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
5.9 Trafficking in Persons: The Contractor shall comply with all applicable Government regulations including, but not limited to, FAR 52.222.50, Combating Trafficking in Persons.
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall
6.0 Appendices
6.1 Appendix A, Reference(s)
Publication
Title of Publication
Date of Publication
Sections(s) that Apply
T.O. 00-35D-54
USAF Deficiency Reporting, Investigation, and Resolution
1 May 2007
Entire
Document
FAR 52.222.50
Combating Trafficking in Persons
Jan 2019
FAR 52.245-1
Government Property Aug 2010
FAR 52.246-11
Higher-Level Contract Quality Requirement Feb 1999
DoDD 4715.1E
Environment, Safety, and Occupational
Health (ESOH)
March 19, 2005
Document
DFARS 252.245-7002
Reporting Loss of Government Property
T.O. 00-20-2
Maintenance Data Documentation (PWS paragraph 4.3.2) Sep 2010
Public Law 91-596 as amended by Public Law
101-552
Occupational Safety and Health Act of 1970
December 29, 1970 as amended through
January 1, 2004
MIL-STD-129R Military Marking for Shipment and Storage 19 Sep 2007; Chg 4
DFARS 252.211–7003 Item Identification and Valuation Jun 2011
DoD 4100.39-M Federal Logistics Information System May 2010; Chg Letter
Oct 2010
MIL-STD-130N
DoD Standard Practice Identification
Marking of US Military Property 17 Dec 2007
ISO 9001:2008
Quality Management Systems
Requirements
1 DEC 2008
MIL-STD-1686C
Electrostatic Discharge Control Program for
Protection of Electrical & Electronics Parts, Assemblies and Equipment (Excluding
Electrically Initiated Explosive Devices)
Metric used simultaneously
25 Oct 1995
MIL-HDBK-263B
ESD Handbook for Protection of Electrical /
Electronic Parts, Assemblies & Equipment
(excluding electrically Initiated Explosives
Devices) Metric MIL-STD-1686C and
MIL-HDBK-263B Used simultaneously
31 Jul 1994
File details come from the government source that posted it. Updated .