Performance Work Statement.pdf
PDF 132 KB Posted
- Attached to
- Up Cut Saws
- Solicitation number
- SP330024Q0201
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document is a Performance Work Statement for the delivery and installation of two new up-cut saws at the Defense Logistics Agency Distribution Center in Barstow, California. The contractor is responsible for delivering and placing the saws into operation, which must be compliant with all relevant safety and regulatory requirements. The saws must have specific technical requirements, including 208/230V 3-phase electrical operation, 24-inch carbide-tipped blades, 10HP motors, and various automated features. The contractor must also provide warranty coverage, manuals, and training. The saws will be installed at the designated location, and final acceptance will be performed by on-site personnel.
This Performance Work Statement is related to a federal contract opportunity, Solicitation Number SP330024Q0201, for the procurement of the up-cut saws. The opportunity is a 100% Small Business Set-Aside with a NAICS code of 333243 and a size standard of 550 employees. The Defense Logistics Agency is the federal agency responsible for this acquisition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Performance Work Statement.pdf | ||
| SP330024Q0201.pdf | ||
| CSS SP330024Q0201.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Up Cut Saws (2) each.
1. Scope of Work to be Performed by Contractor:
deliver and place into operation (install) two (2) new up cut saws. All equipment furnished shall be new from the manufacturer’s most current production. The saws shall be in compliance with all OSHA, federal, state, and local codes and regulations and shall conform to the best quality of materials and workmanship.
Accessories not specifically mentioned herein, but necessary to furnish complete systems ready for use, shall also be included and named. All transportation/shipping of the purchased saws shall be provided by the contractor.
The machines must be equivalent to the below listed up cut saws.
2ea 24’ NON-MITER Up Cut Saw.
Salient Characteristics:
• 208/230 volt, 3 phase, 60 cycle electrical operation
• 24” diameter carbide tipped blade
• 10hp TEFC arbor drive motor
• 24VDC control for pushbutton operation
• Synchronous belt arbor drive
• VFD soft start and electronic braking of saw motor
• Saw access door with safety switch
• Automatic clamping of material before cutting
• Left side feed
• In-feed table 120” long X 20” wide solid 7 gauge steel with 6” fence rail including machine mounting brackets
• Out-feed table 240” long X 20” wide solid 7 gauge steel with 3” fence rail and ¾’ high tape rule inlaid on front face including machine mounting brackets
• Remote operated Air Operated swing down material stop with control valve and integrated tape measure (TIGER STOP)
• Air Supply prep package with filter, regulator and shut off valve
Exterior color – Manufacturer’s standard.
Warranty Coverage - Warranty coverage shall be manufacturer’s standard warranty but not less than one year parts and labor.
Operator, Parts and Service Manual(s) and Training – The contractor shall provide with delivery, one (1) complete set of manuals with each machine.
2. Description of Contractor’s Tasks:
Task 1: Deliver two (2) each Up Cut Saws to be connected to existing electrical connections by site electricians, no requirement for additional electrical work is required. Saws to be connected to existing ventilation system, no additional ventilation system modification is required. Site is responsible for any bolting down of equipment to flooring.
Task 2: Install two (2) Up Cut Saws in locations identified in section 1.
Task 3: Provide one (1) 8 hour period of training instruction on the safe operation and preventative maintenance procedures of the installed Up Cut Saws. Training to be conducted at one location to be identified by personnel at the receiving location on the day of delivery and installation.
3. Certification and Acceptance:
Final acceptance of the Up Cut Saws will be performed by personnel at the receiving location.
4. Shipping Location:
Defense Logistics Agency
Defense Distribution Center, Barstow, CA Warehouse 5 Bay 1 Barstow, CA 92311-5014