Performance Work Statement.pdf

PDF 215 KB Posted

Attached to
B169 AMU Coil and Condenser Replacement Federal contract opportunity
Solicitation number
FA857123Q0053
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to B169 AMU Coil and Condenser Replacement, newest first.
File Type Posted
FA8571-23-Q-0053_ Questions and Answers_ SAM.docx DOCX document
CDRL A003 - Accident Incident Report.pdf PDF
CDRL A001 - Maintenance Service Report.pdf PDF
RFQ _ Solicitation _ FA8571-23-Q-0053.pdf PDF
CDRL A002 - Contractors Safety Plan.pdf PDF
Appendix C for B169 AMU Coil and Condenser Replacement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

B169 AMU Coil and Condenser Replacement

21 FEBRUARY 2023

1.0 DESCRIPTION OF SERVICES. The Phosphoric Acid Anodize paint process utilizes a 100-ton Carrier HVAC unit (WR003749) that keeps temperature and humidity within specifications so that the paint can properly adhere to the sheet metal. This is a corrosion preventative process that utilizes an incredibly thin layer of paint to sheet metal to prevent any corrosion of aircraft skins. This paint booth is currently the only booth in CMXG capable of completing this process successfully. The air handler system has one condenser coil that needs to be replaced along with the entire 100-ton condenser unit. The contractor shall provide all equipment, tools, materials, transportation, and services to replace the leaking coil and condenser for the air handler system for the paint booth, and bring the Air Handler unit back into operational capacity in support of 402 CMXG at Robins AFB, GA.

1.1 Over and Above Work. Work discovered during performance that is:

1.1.1 Within the general scope of the contract, not covered by the line item(s) for the basic work under the contract, and necessary in order to satisfactorily complete the contract.

1.1.2 Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request. Upon request the Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work.

Contract modifications will be executed to definitize all over and above work.

1.2 The contractor shall replace the condenser coil in the HVAC unit and replace the condenser unit model 38AH-184-621HA and serial 4708027609.

1.3 The 100-ton condenser unit uses R410a, therefore, the contractor must be certified in the

State of Georgia to purchase, handle, and dispose of R410a.

1.4 Additional taskings:

1.4.1 The contractor shall remove R22 and store during replacement of the condenser,

1.4.2 The contractor shall provide nitrogen for flowing through piping and coils to eliminate oxidation while welding joints and to pressure check joints.

1.4.3 Once coils are replaced and the system is pressure checked, the contractor shall complete a triple evacuation of the system down to 500 microns.

1.5 Excluded items: The following items are excluded from this work:

(1) Any work related to evaporator coil leaks and expansion valves

(2) Condenser fan motors

(3) Compressors

(4) Contactors, control boards, DDC controls

(5) Power wiring

(6) Leaks in existing refrigerant pipe

1.6 The contractor shall contact the Government POC to schedule repair services. Service repair technicians will perform repair services using the most up-to-date maintenance techniques, instrument operation and modifications, and latest state-of-the-art applications for repair being performed on this equipment. The contractor shall provide the Government Point of Contact (POC) an informational summary of repairs or modifications resulting from this service. Contractor will provide a repair status report upon completion. (CDRL A001, DI-MGMT-80995A, Maintenance Service Report).

1.7 Acceptance: Upon completion of repair, the Contractor shall conduct a performance test to demonstrate the performance capability of the 100- ton Carrier Condenser to the Government Point of Contact (POC).

1.8 Warranty: One-year parts and labor warranty from Contractor. One-year parts and labor warranty from Carrier. Five-year compressor warranty from Carrier.

2.0 SERVICES SUMMARY (SS). None.

3.0 GOVERNMENT INVENTORY. None

4.0 GENERAL INFORMATION.

4.1 Government Representatives. The following individuals will serve as Government Representatives for (CMXG).

4.2 Shipping/Delivery/Period of Performance. The delivery address is the northwest corner of Bldg. 169 located at 450 First Street Robins AFB, GA 31088. Period of performance is date of contract award through 8 weeks.

FOB destination

4.3 Ship To Address.

Attention: Michael Decker Unit: CMXG

DODAAC: F3QCCL

Address: 450 First Street, building 169; Robins AFB, GA 31098

Primary Government Representative Alternate Government Representative Name: Michael Decker Name: Austin Walker Unit: CMXG/MXDE Unit: CMXG/MXDE Phone: (478) 327-3578 Phone: (478) 327-3838 Email: michael.decker.12@us.af.mil Email: austin.walker.2@us.af.mil

4.4 Contractor Program Manager. The Contractor shall provide a Program Manager who shall be the single point of contact between the Contractor and the Government. The name and phone number of the Contractor’s Program Manager shall be provided in writing to the Contracting Officer, Government Representatives, and COR no later than five (5) calendar days after contract award date.

4.5 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 169 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 7:00 am to 4:00pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours (schedule) for contractor personnel and will provide a 48-hour notice prior to changing any work hours.

4.6 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.7 Security Requirements.

4.7.1 Government Security Regulations. The Contractor shall ensure personnel, information, system, facility, and international security requirements are met in accordance with 32 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM), Air Force Instruction (AFI) 31-101, Integrated Defense.

4.7.2 Contractor Security Clearance. This requirement does not require a security clearance.

4.7.3 Communications Security (COMSEC). The Contractor shall use only secure communications methods and/or equipment to transmit or otherwise transfer classified and/or sensitive, but unclassified, information in accordance with 2 CFR Part 117, National Industrial Security Program Operating Manual (NISPOM).

4.7.4 Foreign Nationals must meet the requirements of AFMAN 16-1405, Air Force Personnel Security Program, prior to access.

4.7.5 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA. Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short-term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).

4.7.6 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.7.7 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.7.8 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations. Contractor risk management procedures shall comply with:

Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life

Cycle Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and

Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800- 53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.

4.8 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.

4.9 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.

Information may be obtained by calling the following phone number: Commercial 478-222- 1972.

4.10 Quality Management System (QMS): The Contractor shall ensure the quality of services through a quality and/or inspection system. Within 21 days of contract award, the Contractor shall submit a Quality Control Plan (QCP) to the Government Representatives addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor.

4.11 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.11.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

4.12 Environmental Management System (EMS). Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.

4.12.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement.

Contractors that do not have a Common Access Card must exercise Option 2.

4.12.2 Option 1 (Preferred Option): The Air Force version of EMS Awareness Training is available through the myLearning website: https://lms-jets.cce.af.mil/. EMS Awareness Training is located under the Air Force Civil Engineer Center (AFCEC) /Air Force Environmental Courses tab. This option is only available to contractors who have a CAC and requires self-enrollment.

4.12.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training Power Point Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil. Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.

http://www.biopreferred.gov/ mailto:78ceg.cev.FrontOfc@us.af.mil https://lms-jets.cce.af.mil/

4.13 ISO 50001 – Energy Management System. Due to the WR-ALC being ISO 500001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

4.13.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

4.13.2. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.

4.13.3. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.

4.14 Contractor Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.14.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil. The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A002, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).

4.14.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil mailto:402MXSG.MXDEA.EnergyAssurance@us.af.mil http://www.osha.gov/dcsp/vpp/index.html mailto:402mxw.se.wf@us.af.mil identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.15 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information

(CDRL A003, DI-SAFT-81563 NOT 2, Accident/Incident Report)

4.16 Essential Services During Crisis. The Functional Service Manager (FSM) has determined, by placing in writing their decision, that this requirement is not Mission Essential (M-E) in accordance with DFARS 237.76, Continuation of Essential Contractor Services.

4.17 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

4.18 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:

https://piee.eb.mil/

4.19 Non-Releasability to Foreign Owned Company. Neither assets nor STINFO will be knowingly sent to a foreign-owned, controlled, or influenced company. Procedures in AFI 16- 201 “Air Force Foreign Disclosure and Technology Transfer Program” will be followed, and the servicing Foreign Disclosure Office (FDO) will be consulted.

https://piee.eb.mil/

5.0 APPENDICES

5.1 Appendix A, References -

Name of Publication

Sections that Apply

Date of Publication Title of Publication

AFI 63-138 Entirety 11 May 17 Acquisition of Services

01560 Jan 2022 Environmental Requirements for Robins Air Force Base

File details come from the government source that posted it. Updated .