Performance Work Statement.docx

DOCX document 2 MB Posted

Attached to
Relocation and Calibration of Mobile Space Saver Racking System
Solicitation number
FA4600_Warehouse_Transition
Issued by

About this file

This is a Performance Work Statement for the relocation and calibration of a mobile space saver racking system from Building 301D to Building 504. The contractor shall provide all labor, tools, and equipment necessary to complete the project, which involves disassembling, transporting, and reassembling a high-density mobile storage system with a footprint of approximately 19' x 19' x 8.5'. The system consists of four rows of shelving integrated with Vidmar-style drawers mounted on a three-rail sliding track system. The scope includes: disassembly and inventory of all components in Building 301D; secure transportation of all components to Building 504; reinstallation with proper leveling of the 3-rail system to manufacturer specifications, reconstruction of shelving rows, and reinstallation of Vidmar drawers with verification of smooth mechanical operation; and site restoration including disposal of all packing materials and debris from both locations.

The Period of Performance is 5-10 business days during standard operating hours of 0800-1700, Monday through Friday, with a projected start date to be determined. This is a pre-solicitation opportunity under solicitation number FA4600_Warehouse_Transition issued by the Department of the Air Force Air Combat Command. Interested vendors are required to submit a capabilities statement via email to the Contracting Specialist SrA Janiya Brown (janiya.brown.1@us.af.mil) and SSgt Thearith.em@us.af.mil.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Project Title: Relocation and Calibration of Mobile Space Saver Racking System Locations: From Bldg 301D to Bldg 504

1.0 Vision Statement

The contractor shall provide all labor, tools, and equipment necessary to disassemble, transport, and reassemble one (1) high-density mobile storage system.

2.0 Scope of Work

The system footprint is approximately 19’ x 19’ x 8.5’, consisting of four (4) rows of shelving integrated with Vidmar-style drawers, mounted on a three-rail sliding track system.

· Disassembly (Bldg 301D): Contractor shall inventory all components, safely remove Vidmar drawers, and disassemble the shelving units and the three-rail track system.

· Transportation: Secure transport of all components from Bldg 301D to Bldg 504.

· Reassembly & Calibration (Bldg 504): * Install and level the 3-rail system to manufacturer specifications.

· Reconstruct the 4 rows of shelving.

· Reinstall Vidmar drawers and ensure smooth mechanical operation of the sliding mechanism.

· Site Restoration: Dispose of all packing materials and debris from both sites.

3.0 Period of Performance (PoP)

The project shall be completed within a 5-10 business day window.

· Standard Hours: 0800–1700, Monday through Friday.

· Projected Start Date: [TBD]

File details come from the government source that posted it. Updated .