Performance Work Statement Catered Meals 14-29Jun2023 45th FAB XCTC Ft Chaffee AR.pdf
PDF 160 KB Posted
- Solicitation number
- W912L6-23-R-4195
- Issued by
-
Department of the Army National Guard
About this file
This is a combined synopsis and solicitation for catered meals services. The Oklahoma Army National Guard requires catered breakfast and dinner meals to be provided at Fort Chaffee, Arkansas from June 14 through 29, 2023. The performance work statement outlines requirements for menu items, meal quantities estimated between 16,049 breakfasts and 15,372 dinners, delivery and serving timelines, cleaning responsibilities, and quality control standards. Offerors must submit proposals by April 24, 2023 and the award will be a firm fixed price contract based on lowest price technically acceptable to the responsible offeror meeting the requirements. The North American Industry Classification code is 722320 for caterers with an $8 million size standard and is set aside for small businesses only.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Catered Meals
45th FAB XCTC at Fort Chaffee, AR
1.0 General: The Oklahoma Army National Guard (OKARNG) has a requirement for catered meals located at FT
Chaffee, Arkansas. These menus will be approved by OKARNG. Meal items included in the menus shall be prepared in accordance with Army TB Med 530, which can be found at https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=83563 .
1.1 Scope: The Contractor shall provide all equipment, tools, labor, personnel, supervision, incidentals necessary, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished to prepare / serve catered meals for approximately 1469 soldiers out of a dining facility as defined in this PWS. Members of the
OKARNG shall not be tasked to serve meals provided by the Contractor.
1.2 Background: The Oklahoma Army National Guard (OKARNG) has a requirement for catered meals located at
FT Chaffee, Arkansas
1.3 Period of Performance (PoP): 14 - 29 June 2023.
1.3.1 Place of Performance: Contractor is free to cook meals at a location of their preference. A location on FT
Chaffee, Arkansas near the dining facility BLDG 1549 should be able to be utilized if the vendor is cooking using mobile kitchen equipment. Coordination for this site will be done through the COR. Serving of meals and the loading of the insulated food containers and insulated drink containers will take place at the DFAC BLDG 1549 on
FT Chaffee, Arkansas.
1.4 General Information:
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements
Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the
Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Recognized Holidays: 1 Federal Holiday falls in between 14 – 29 June 2023 and the contactor is required to feed all meals withing this timeline.
1.4.4 Place and Performance of Services: The contractor shall provide services 24 hours a day for the entirety of the
PoP except when the Government installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at FT Chaffee, Arkansas, KS. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
https://armypubs.army.mil/ProductMaps/PubForm/Details.aspx?PUB_ID=83563
1.4.4.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The
Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the
Contractor from responsibility for total performance of this contract.
1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security
Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by
Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force
Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening
Database (TSDB) (Army Directive 2014-05/AR 190-13), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).
1.4.5.2 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct
COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to
COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit
Government personnel or advertise job openings.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Lock Combinations: The contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.7 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR Subpart 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.8 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The
CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.9 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.10 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does
NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
AEI Army Enterprise Infostructure
AR Army Regulation
AT/OPSEC Antiterrorism/Operational Security
BI Background Investigation
CM Contract Manager
CMRA Contractor Manpower Reporting Application
COR Contracting Officer Representative
DA Department of the Army
DD254 Department of Defense Contract Security Classification Specification
DFAC Dining Facility
DFARS Defense Federal Acquisition Regulation Supplement
DoD Department of Defense
FAR Federal Acquisition Regulation
GFP/M/E/S Government Furnished Property/Material/Equipment/Services
HQDA Headquarters, Department of the Army
HSPD Homeland Security Presidential Directive
IA Information Assurance
IFC Insulated Food Container(s)
IS Information System(s)
KO Contracting Officer
NGB National Guard Bureau
OCI Organizational Conflict of Interest
PII Personally Identifiable Information
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
SSN Social Security Number
TE Technical Exhibit
USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: Dining Facilities, BLDG 1549, Ft. Smith Bldv, Ft. Chaffee, AR 72905.
3.1.2 Dining facilities will be used for the sole purpose of assembling, heating, and maintaining the proper temperature of food served. The facility MAY NOT be used for cooking purposes.
3.2 Materials: None.
3.3 Equipment: None.
3.4 Services: None.
3.5 Utilities:
3.5.1 Potable and Non-potable Water: Refill may be available to the contractor through coordination with the COR.
3.5.2 Waste Disposal: The water treatment plant at FT Chaffee, Arkansas MAY be available to the contractor through coordination with the COR. Contractor will be responsible for discharge hoses of sufficient length to release wastewater into the water treatment plant site being utilized.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: The Contractor will have limited Government Furnished Equipment (GFE) available for use to increase the quality and / or efficiency of the services delivered to the OKARNG. The Contractor may use the GFE located on site for the sole purpose of assembling, heating and to maintain the proper temperature of food served. The GFE
MAY NOT be used for cooking food.
5.0 Requirements: The contractor shall:
5.1 Meal Requirements:
5.1.1 Provide all table and flatware, cups, napkins, as well as serving utensils, to accommodate all feeding locations to include the meals to be delivered in insulated food containers.
5.1.2 The following meal requirements are provided to assist the Contractor in developing the required menus, as mentioned in paragraph 1 above and 5.3 below.
5.1.2.1 Breakfast Meal Requirements: The breakfast meal shall, at a minimum, include the following classes of foods and servings per person:
Eggs (2ea) Scrambled or Omelet style
Choice of two meat products (8 oz. serving each)
-Pork
-Non-Pork
Fruit or vegetable (1cup)
Starch, bread, or potatoes (3/4cup)
Hot or cold cereal (½ cup)
Drinks shall include but not limited to coffee, juice, and milk
5.1.2.2 Dinner Meal Requirements: The dinner meal shall, at a minimum, include the following classes of foods and servings per person:
Entrée to include a 8 oz. serving of meat
Vegetables- 2ea (½ cup servings ea.)
Starch, bread, or potatoes- (3/4 cup serving)
Fruit or dessert -1ea
Drinks shall include coffee plus choice of two other drinks
-such as flavor aid, tea, juice, soda or punch
5.1.3 Contractor is required to provide a minimum of eight (8) breakfast menus and eight (8) dinner menus for use on a daily rotating basis.
5.1.3.1 In addition to these menus, Contractor shall allow for one dinner meal to be a hamburger/hot dog cookout style meal and one dinner to be a steak dinner style meal.
5.1.3.1.1 The dates of the serving of these two meals will be scheduled by the Contracting Officer Representative
(COR) with sufficient lead-time needed by the vendor.
5.1.3.2 Contractor will be notified of special diet request within the contractor’s required timeframe.
5.2 Delivery and Serving:
5.2.1 It is the responsibility of the Contractor to set up and serve the prepared meal at the designated Dining Facility
(DFAC) based on the spreadsheet provided in Technical Exhibit 3.
5.2.2 Contactor must be prepared to serve at each location, at the same time, based upon Technical Exhibit 3.
5.2.3 Government will provide an area to serve from.
5.2.4 Contractor must be prepared to begin serving no later than 0600 for breakfast meals and 1800 for dinner meals.
5.2.5 Contractor must maintain safe food temperature for at least 4 hours after preparation.
5.2.6 All personnel shall wear appropriate attire for food service and preparation. Shorts and sandals are prohibited.
5.2.7 Insulated Food Containers (IFC):
5.2.7.1 Vendor will provide enough IFCs to be transported to the feeding location for two days of meals so containers can be cleaned properly between meals.
5.2.7.2 IFCs broken down by company in accordance with the feeding scheduled provided to the vendor by the
COR. Meals counts will be given to the contractor 72 hours out.
5.2.7.3 Vendor consolidate meals into IFCs NLT 0400 for Breakfast and 1600 for Dinner for pickup by unit. Will load them into insulated food containers at the DFAC with Government assistance.
5.2.7.4 Vendor needs to organize the meal deliveries at the DFAC for all IFCs to facilitate for quick packaging of the insulated food containers and their delivery to the field. Vendor will clearly separate all breakfast and dinner meals to be delivered daily via IFCs. Vendor will supply enough plates, cups, flatware, napkins, and condiments to each breakout.
5.2.7.4.1 Insulated Food Containers Dimensions: The IFC can fit a full size pan (20 3/4" x 12 3/4") or two half size pans (12 3/4" x 10 3/8"). The following disposal food trays should be able to fit inside the IFC:
5.2.7.4.2 https://www.webstaurantstore.com/choice-full-size-foil-deep-steam-table-pan-case/612605070.html
5.2.7.4.3 https://www.webstaurantstore.com/choice-1-2-size-foil-deep-steam-table-pan-case/612613245.html
5.3 Cleaning and COR Release:
5.3.1 The Contractor is responsible to abide by the FT Chaffee, Arkansas Environmental Office, and the
Environmental Protection Guidelines for Contractors.
https://www.webstaurantstore.com/choice-1-2-size-foil-deep-steam-table-pan-case/612613245.html
5.3.2 Contractor shall be solely responsible for cleaning up all areas of the DFAC to include serving equipment and
GFE.
5.3.3 Facilities shall be subject to inspection for cleanliness prior to Contractor’s release.
5.3.4 Contractor shall not leave the DFAC site without a verbal or written release from the COR.
5.3.5 The COR’s release shall constitute confirmation that all facilities and GFE utilized by Contractor, if any, is in clean and satisfactory condition.
5.4 Disposition of Leftover Food:
5.4.1 Food prepared and delivered but not served (leftover food) is the property of the Government. Leftovers shall be disposed of in whole or in part as directed by the COR in one or more of the following ways:
5.4.1.1 Food shall be left onsite for Government use.
5.4.1.2 Food shall be donated to a qualifying charity in the locality as directed by FAR Part 52.226-6
5.4.1.3 Food, due to its quantity or quality, cannot be donated and shall be disposed of as waste.
5.5 Contractor Manpower Reporting Application (CMRA): N/A
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication
(Chapter/Page)
Date of
Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/
Defense Federal Acquisition Regulation
Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/ind ex.html or http://farsite.hill.af.mil/
DoDM 1000.13-M-V1
DoD Identification (ID) Cards
(Enclosure 2, paragraph 3.b)
01/23/2014 http://www.esd.whs.mil/Directives/issuances/dodm/
Federal Information Processing Standards
(FIPS) Publication 201-2
Personal Identity Verification (PIV) of
Federal Employees and Contractors
(paragraph 9)
August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-
2.pdf
DoDM 5200.2 Regulation 5200.02
Procedures for the DoD Personnel
Security Program (PSP)
04/03/2017 http://www.dtic.mil/whs/directives/corres/pub1.html
Army Directive 2014-05
Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared
Contractors
03/07/2014 http://www.apd.army.mil/ProductMaps/PubForm/Arm yDir.aspx
AR 190-13
The Army Physical Security Program
02/25/2011 http://www.apd.army.mil/ProductMaps/PubForm/AR.a spx
Homeland Security Presidential Directive
(HSPD)-12
08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.acquisition.gov/?q=browsefar http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html http://farsite.hill.af.mil/ http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf http://www.dtic.mil/whs/directives/corres/pub1.html http://www.apd.army.mil/ProductMaps/PubForm/ArmyDir.aspx http://www.apd.army.mil/ProductMaps/PubForm/ArmyDir.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx http://www.apd.army.mil/ProductMaps/PubForm/AR.aspx https://www.dhs.gov/homeland-security-presidential-directive-12 https://www.dhs.gov/homeland-security-presidential-directive-12
Policy for a Common Identification
Standard for Federal Employees and
Contractors
DoDD 5400.11
Department of Defense Privacy Program
10/29/2014 http://www.dtic.mil/whs/directives/corres/dir.html#
DoD 5400.11-R
Department of Defense Privacy Program
05/14/2007 http://www.dtic.mil/whs/directives/corres/pub1.html
DoDD 8140.01
Cyberspace Workforce Management
08/11/2015 OK http://www.dtic.mil/whs/directives/corres/dir.html
DoD 8570.01-M
Information Assurance Workforce
Improvement Program
12/19/2005
(Change 4:
11/10/2015)
OK http://www.dtic.mil/whs/directives/corres/pub1.html
AR 25-2
Information Assurance
10/24/2007 OK http://armypubs.army.mil/ProductMaps/PubForm/AR.
aspx
AR 530-1
Operations Security
09/26/2014 OK http://armypubs.army.mil/ProductMaps/PubForm/AR.
aspx
DoD 5220.22-M
National Industrial Security Program
Operating Manual
02/28/2006
(Change 2:
05/18/2016)
OK http://www.dtic.mil/whs/directives/corres/pub1.html
AR 381-12
Threat Awareness and Reporting
Program (TARP)
(Section II, ¶ 2-4.b)
06/01/2016 OK http://armypubs.army.mil/ProductMaps/PubForm/AR.
aspx
Army TB Med 530 09/15/2006 https://armypubs.army.mil/ProductMaps/PubForm/Det ails.aspx?PUB_ID=83563
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172-2
Application for Identification
Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I-9
Employment Eligibility Verification
11/14/16 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security
Agreement
Jan 2017 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving
Report
Aug 2000 http://dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://www.dtic.mil/whs/directives/corres/dir.html http://www.dtic.mil/whs/directives/corres/pub1.html http://www.dtic.mil/whs/directives/corres/dir.html http://www.dtic.mil/whs/directives/corres/pub1.html http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/corres/pub1.html http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/forminfo/forminfopage2479.html http://www.dtic.mil/whs/directives/forms/index.htm https://www.uscis.gov/sites/default/files/files/form/i-9.pdf http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm http://dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
Performance
Objective
Performance Standard Acceptable Quality
Levels (AQL)
Surveillance Method / By
Whom
Staff performance of hygienic practices
The contractor shall implement and ensure proper hygienic standards (QASP
Worksheet, Appendix A) through the entirety of the contract.
0% Failure Periodic inspection – COR will observe feeding and preparing operations.
Vendor quality assurance of food preparation, food temperatures and service portions.
Contractor will follow guidance in paragraph 3 of the
PWS no less than 98% of the time.
No more than 2% failure to meet standards defined in the PWS.
Periodic inspection – COR will observe feeding, storing, and preparing operations.
Required meals delivered in adequate quantities, set-up and served at the required time.
The contractor shall perform task within the established timeframes 95% of the time throughout the contract.
No more than 5% failure to meet the established timelines provided in the contract.
Periodic Inspection - COR will observe delivery and operations.
Facilities cleaned prior to daily departure.
Facility cleanliness in line with QASP-W (Appendix C)
95% of the time throughout the entirety of the contract. .
No more than 5% failure to meet cleanliness standards.
Periodic inspection – COR will inspect facilities prior to, or immediately after the vendor departs the facility.
TECHNICAL EXHIBIT 2
Deliverables Schedule
PWS Reference /
Deliverable Title
Frequency Number of
Copies
Medium/Format Submit To
1.4.1 Quality Control
Plan (QCP)
Provide NLT 10 days after contract award.
1 Electronic
Submission
COR
TECHNICAL EXHIBIT 3
Estimated Meal Numbers
This information is provided for estimation only. It is not a guarantee of exact quantities.
DFAC Meal schedule / times are: Breakfast 0600-0930 and Dinner 1800-2130.
DATE
BREAKFAST
DFAC
BREAKFAST
MEREMITE
DINNER
DFAC
DINNER
MEREMITE
14-Jun-
23 0 232 15-Jun-
23 244 472 16-Jun-
23 930 1383 17-Jun-
23 1252 1347 18-Jun-
23 1347 917 430
19-Jun-
23 917 430 212 1135
20-Jun-
23 212 1135 212 1135
21-Jun-
23 212 1135 212 1135
22-Jun-
23 212 1135 212 1135
23-Jun-
23 212 1135 212 1135
24-Jun-
23 212 1135 302 1045
25-Jun-
23 302 1045 302 1045
26-Jun-
23 1007 340 1089 27-Jun-
23 1089 1043 28-Jun-
23 1043 1043 29-Jun-
23 1013
REMARKS
340-1/138FA; 90-279OPFOR
340-2/138FA; 90-279OPFOR/28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA; 90-279OPFOR
28-205th SC; 85-HSC 271; 340-2/138 FA; 373-1/178 FA
340-2/138 FA
Total Breakfast Meals: 16,049
Total Dinner Meals: 15,372
File details come from the government source that posted it. Updated .