The document is a Performance Work Statement outlining requirements for a new wash rack at Joint Base Anacostia Bolling. The government requires the contractor to dismantle the existing wash rack, build a new turn-key automated wash rack capable of handling vehicles up to coach buses, and provide maintenance services for one base year plus four option years. Key requirements include removing the old structure, installing all new equipment, conducting start-up tests, training personnel, and performing quarterly inspections and preventative maintenance. The contractor must also develop quality control and transition plans, and employees will be subject to security and drug testing requirements on base. The period of performance is one base year with four optional years and the solicitation number for this opportunity is FA706022R0014, issued by the Department of the Air Force.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wash Rack - FA706022R0014 - revised.pdf | ||
| JBAB 5512 Base Access Registration Form.xlsx | XLSX spreadsheet | |
| Wash Rack - FA706022R0014.pdf | ||
| Wash Rack - FA706022R0014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
11TH LOGISTICS READINESS SQUADRON WASH RACK
AT
JOINT BASE ANACOSTIA-BOLLING, DC
16 December 2021
Contents
SECTION I
1.0 DESCRIPTION OF SERVICES
1.1 General
1.2 Background
SECTION II
2.0 Task Descriptions
2.1 Task 1
2.2 Task 2
2.3 Task 3………………………………………………………………………………………5
SECTION III
3.0 SERVICE SUMMARY
SECTION IV
4.0 DELIVERABLES
SECTION V
5.0 GOVERNMENT FURNISHED PROPERTY OR SERVICES
5.1. Government Furnished Property or Services
SECTION VI
6.0 GENERAL INFORMATION
6.1 Scheduling Concerns
6.2 Kickoff Meeting
6.3 Transition-Out Plan
6.4 Quality Control
6.5 Emergency Operations/Mission Essential Personnel
6.5 Contractor Manpower Reporting Application (CMRA)
6.6 Subcontractor Input in CMRA
6.7 Security Instructions
6.9 Listing of Employees
6.10 Miscellaneous Paragraphs
SECTION VII
APPENDIX 1
1.0 DEFINITIONS, ABBREVIATIONS, AND ACRONYMS
2.0 ACRONYMS............................................................... Error! Bookmark not defined.
SECTION I
1.0 DESCRIPTION OF SERVICES
1.1 General. The 11th LRS Ground Transportation section is made up of Airmen who operate various types of government vehicles. As stated on the Logistics Readiness Force Development website, “Ground Transportation Airmen serve the Air Force mission by providing centralized, efficient, and economical organic ground transportation capabilities for movement of personnel and cargo.” In the NCR under AFDW, the 11th LRS supports DV transfers, the AF Band and
Honor Guard, and supports approximately 68 mission partners.
1.2 Scope. The Contractor shall ensure Contractor personnel take action to remove the existing wash rack, install the new wash rack and entry/exit roll-up doors as outlined below, and provide continued inspection and maintenance. The Contractor shall manage contractor personnel. The Contractor shall interface and perform technical and programmatic liaison support with the 11th LRS Ground Transportation section, conducting or interfacing with program or system requirements, operations, planning Research, Developmental, Testing, and
Evaluation (RDT&E), and system acquisition and sustainment.
1.3 Background. The 11th LRS directly supports the 11th Wing’s mission for readiness, partnerships, and heritage. An operational wash rack is essential for the proper care and servicing of government vehicles, impacting their lifespan and readiness. Additionally, a premier wash rack aligns with the Wing mission for partnerships by supporting all installation vehicles across multiple agencies and services. In regard to heritage, the high visibility missions, notably services at the Arlington National Cemetery, necessitate immaculate transportation vehicles. The previous wash rack is currently inoperable and has out dated equipment. The cost to update and procure a preventive maintenance contract with outdated equipment has similar costs to putting in a completely new system with a warranty and preventive maintenance contract. In short, it is more costly for the 11th Wing and US Air Force to maintain the old, subpar wash rack than to purchase a new and effective wash rack.
https://usaf.dps.mil/sites/10826/logr/siteassets/fd/prod/index.aspx#/ground-transportation
SECTION II
2.0 Task Descriptions
The Contractor shall provide all services, materials, supplies, equipment, and project supervision, as required in connection with this Performance Work Statement (PWS). For a fully functional and premier wash rack, Contractors must remove the existing structure, install the new wash rack, and return for regular inspection and maintenance. Please see the subsections below for details.
2.1 Task 1: Removal
Dismantle and dispose of the existing wash rack internal structure and equipment (external structure will remain intact)
Disposal of all debris from the old structure in accordance with environmental standards
2.2 Task 2: Installation
Arrange for forklift to receive and install all equipment unless provided by customer
Uncrate all equipment
Mechanical installation of all equipment o Hydraulic hose o Pneumatic control panel o Water heater o Soft pluming o Chemical delivery lines o Wash Control Center o Final control terminations in control center o Fresh water and recycled water storage o Water delivery pumps o Vehicle detection system o Guiderails o Spray/rinse arches o Undercarriage flush unit in compliance with environmental contamination standards o Air compressor o Wheel blaster o Traffic control system
Install a fully automated, drive through system that can wash up to 38 and 44 passenger busses at about 15 feet high.
o Automatic deactivation after set time limit
Connect electrical, plumbing, wiring, and HVAC for car wash tunnel and equipment room
Conduct at least three start-ups of all equipment to ensure proper functionality
User training for at least four employees.
o Provide copies of the operation and maintenance manuals
2.3 Task 3: Regular Inspection and Maintenance
Perform preventive maintenance services every quarter for 12 months with three option years
During regularly scheduled inspections and maintenance, technicians will lubricate, inspect, and adjust the equipment as necessary for proper functionality
11th LRS will hold preferential service during the entirety of the service contract
All damaged or defective equipment will be replaced
Provide warranty for damage to vehicles caused by automatic car wash
Cleaning and inspection of solids spin down separator, inlet recovery tank, spray nozzles, undercarriage nozzles, water recovery point and pumps, water delivery pumps
Salinity monitor calibration
SECTION III
3.0 SERVICE SUMMARY
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement and will be assessed on an
“Acceptable” or “Unacceptable” basis. These thresholds are critical to mission success.
The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, vehicles, transportation, incidental engineering, and other items necessary to remove, install, and maintain the Joint Base Anacostia-Bolling wash rack. From demolition to quarterly inspections and maintenance, work conducted by the Contractor will comply with all Federal, State, County, and municipal laws, statutes, ordinances, rules, and regulations. The period of performance for this requirement is for a base period of one year, with four optional years available.
Performance
Objective
PWS
Paragraph Performance Threshold
Method of
Surveillance Existing wash rack must be removed in its entirety with all debris disposed of in compliance with environmental standards
2.1 Contractor must meet performance
objective 100% of the time during the demolition phase
COR documentation and program review
Arrange for equipment necessary for installation, along with the uncrating upon arrival
2.2 Contractor must meet performance
objective 100% of the time during installation
COR documentation and program review
Conduct at least three start-ups and tests for proof of proper functionality
2.2 Contractor must meet performance
objective 100% of the time during and after installation
COR documentation and program review
Train at least four 11 LRS
Ground Transportation personnel and provide copies of operation and maintenance manuals
2.3 Contractor must meet performance
objective 100% of the time after installation
COR documentation and program review
AT/OPSEC Training N/A All Contractor employees, to include subcontractor employees, requiring access to DoD installations shall complete AT Level I Awareness
Training within 90 calendar days after contract start date
COR receives training completion certificates prior to the 90-day point
SECTION IV
4.0 DELIVERABLES
The Contractor shall provide deliverable(s) in a format mutually agreed upon by the Government and the Contractor.
The following enumerated deliverables are not expected to change. Due Date intervals are not expected to change but actual dates may need to be revised depending on actual contract start date.
DELIVERABLE PWS
PARA
DUE DATE DELIVERY
Demolition and disposal of existing wash rack
2.1 Determined at kickoff
meeting
By email to the COR
Installation of new, fully functional wash rack
2.2 Determined at kickoff
meeting
By email to the COR
Quarterly Status and technical Report
2.3 No Later than (NLT) one
(1) week prior to the end of the quarter as determined at kickoff meeting
By email to the COR
Quarterly meeting minutes/reports
2.3 No Later than (NLT) one
(1) business days after the meeting
By email to the COR
Kickoff Meeting
Agenda
6.2.1 NLT 3 days after contract
award
By email to the COR
Transition-In Plan 6.3.1 Submitted at Kickoff
Meeting
By email to the COR
Transition-Out Plan 6.4.1 NLT 90 days prior to contract expiration
By email to the COR
Quality Control Plan 6.5.2 Submitted at Kickoff
Meeting and annual revisions submitted 15 days after OY award.
By email to the COR
Employee List 6.10.1 Upon Request By email to COR
SECTION V
5.0 GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, MATERIAL,
INFORMATION, OR SERVICES
5.1 Government Furnished Property, Equipment, Material, Information, or Services. The
Government will not furnish property or services for this requirement.
5.2 Contractor Acquired Property. The contractor will not be required to acquire any property.
SECTION VI
6.0 GENERAL INFORMATION
6.1 Scheduling Concerns.
6.1.1 Duty Hours. The Contractor shall have access to Government facility five days per week, Monday through Friday, eight hours a day, except when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings, unless otherwise approved. Contractor personnel are expected to conform to customer agency normal operating hours; however the Contractor may be required access to Government facility outside of duty hours based on the customer agency’s needs. As a baseline, Contractor personnel shall work 8 hours per day, 40 hours per week. Compensatory time arrangements are permissible for temporary spikes in worktime; but overtime pay is prohibited without COR and
CO approval. Federal Holidays shall be observed in accordance with Office of Personnel
Management policy.
6.1.2 Core Duty Hours and Base Shutdown/Inclement Weather. Core duty hours are 0800 -
1600, Monday through Friday (excluding federal holidays). The Contractor shall follow guidance of the installation containing their place of performance to determine reporting schedules whether due to a base closure or inclement weather. The website for guidance regarding status of performance for work to be performed in the National Capital Region (NCR) is http://www.opm.gov/status/.
6.2 Kickoff Meeting/Orientation Meeting
6.2.1 The Contractor shall schedule and coordinate a Project kick-off Meeting no later than
(NLT) five (5) calendar days after contract award at the location approved by the Government.
The meeting will provide an introduction between the Contractor personnel and Government personnel who will be involved with the contract. The meeting will provide the opportunity to discuss technical, management, and logistic issues; travel authorization; communication process between Government and Contractor; and reporting procedures. At a minimum, the attendees shall include key Contractor personnel, key Government representatives, and the COR. The
Contractor shall provide a Kick-Off Meeting Agenda that will include, but not be limited to, the following.
• Introduction of personnel
• Overview of project tasks
• Review of organization (complexity)
• Schedule (shows major tasks, milestones, and deliverables; planned and actual start and completion dates for each)
• Communication Plan/lines of communication overview (between both Contractor and
Government)
• Travel notification and processes
• Security requirements (Building access, badges, Common Access Cards (CAC))
• Analytical Support Status Accreditation (ASSA) Documentation
• Invoice procedures http://www.opm.gov/status/
• Monthly meeting dates
• Reporting Requirements, e.g. Monthly Status Report (MSR)
• POCs
• Roles and Responsibilities
• Overview of incoming Transition Plan to include process, timeframes, and status
• Prioritization of Contractor activities
• Any initial deliverables
• Other logistic issues
• Quality Control Plan (QCP)
• Sensitivity and protection of information
• Additional issues of concern (Leave/back-up support)
6.2.2 The Contractor shall provide a draft copy of the agenda NLT 3 days after contract award for review and approval by the COR prior to finalizing. The Government will provide the
Contractor with the number of participants for the kick-off meeting and the Contractor shall provide sufficient copies of the presentation for all present.
6.2.3 The Kickoff Meeting location will be held at the Government’s facility or another designated location and the date and time will be mutually agreed upon by both parties.
6.3 Transition-In Plan
6.3.1 The Contractor shall provide a Transition-In Plan at the Kickoff Meeting, the plan shall facilitate the accomplishment of a seamless transition from the incumbent Contractor (if applicable) and incoming Contractor. The Contractor shall identify how it will coordinate with the incumbent Contractor and Government personnel to transfer knowledge regarding the following:
• Project management processes
• Points of contact
• Location of technical and project management documentation
• Status of ongoing technical initiatives
• Transition of key personnel
• Schedules and milestones
• Actions required of the Government
• Coordination of IT related programs, issues
6.3.2 The Contractor shall also establish and maintain effective communication with the incumbent Contractor and Government personnel for the period of the transition via weekly status meetings per the COR’s direction.
6.4 Transition-Out Plan
6.4.1 The Contractor shall provide a Transition-Out Plan NLT than 30 calendar days prior to expiration of the contract. The plan shall facilitate the accomplishment of a seamless transition from the incumbent to and incoming Contractor (if applicable). In addition, the Contractor will continue to accomplish all tasks as outlined in the contract during this period. The Contractor shall identify how it will coordinate with the incoming Contractor and Government personnel to transfer knowledge regarding the following:
• Project management processes
• Points of contact
• Location of technical and project management documentation
• Status of ongoing technical initiatives
• Transition of key personnel
• Schedules and milestones
• Actions required of the Government
• Coordination of IT related programs, issues
6.4.2 The Contractor shall also establish and maintain effective communication with the incoming Contractor and Government personnel for the period of the transition via weekly status meetings.
6.5 Quality Control.
6.5.1. Quality Assurance. The Government shall rely on the Contractors’ existing quality assurance system as the method to ensure that the requirements of the contract and performance thresholds are met; however, the Government reserves the right to monitor and evaluate the quality of services provided and compliance with the contract terms and conditions at any time.
6.5.2. Quality Control Plan (QCP). The Contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS, applicable laws and regulations, and best commercial practices. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services with special emphasis placed on those services listed in this PWS. The Contractor’s quality control program is the means by which it assures itself that the work complies with the requirement of the contract.
6.6 Emergency Operations/Mission Essential Personnel.
6.6.1. Continuation of Essential Contractor Services During Crisis. All services in this PWS
HAVE NOT been defined or designated as essential services for performance during crisis IAW
DFARs 252.237-7023, “Continuation of Essential Contractor Services.”
6.7 Contractor Manpower Reporting Application (CMRA)
6.7.1 The Contractor shall report ALL labor hours (including subcontractor labor hours) required for performance of services provided under this contract via the secure Contractor
Manpower Reporting Application (CMRA) data collection site. The Contractor is required to completely fill in all required data fields at: http://www.SAM.gov. Reporting inputs shall be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. The UIC for AFDW is FF16M0. While inputs may be reported anytime during the FY, all data shall be reported not later than 31 October of each calendar year. The Contractor may direct questions to the CMRA help desk.
6.7.2 Subcontractor Input in CMRA: Prime Contractors are responsible to ensure all subcontractor data is reported. Subcontractors will not be able to enter any data into CMRA, but will enter their information into a Bulk Loader spread sheet available from the AF CMRA helpdesk. Subcontractor shall fill in columns A-C then return it to the AF CMRA helpdesk after it's completed and a technician team will enter the information into CMRA.
6.8 Security Instructions
6.8.1 Physical Security. The Contractor shall safeguard all Government property, documents and controlled forms provided for Contractor use and adhere to the Government property requirements contained in this contract. At the end of each work day, all Government facilities, equipment, and materials shall be secured by a Government POC. Contractors are not allowed to secure Government facilities, equipment, and materials.
6.8.2 Access Control. The Contractor shall establish and implement methods of ensuring that no building access instruments issued by the Government are lost, misplaced or used by unauthorized persons. Access codes shall not be shared with any person(s) outside the organization. The Contractor shall control access to all Government provided lock combinations to preclude unauthorized entry. The Contractor is not authorized to record lock combinations without written approval by the Government COR. Records with written combinations to authorized secure storage containers, secure storage rooms, or certified vaults, shall be marked and safeguarded at the highest classification level as the classified material maintained inside the approved containers.
6.8.3 Pass and Identification Items. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-government owned vehicles.
6.8.4 Retrieving Identification Media. The Contractor shall retrieve all identification media, including vehicle passes, from employees who depart for any reason before the contract expires.
6.8.5 Traffic Laws. The Contractor and its employees shall comply with all base traffic regulations.
6.8.6 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned vehicle or privately-owned vehicle while on Joint Base Anacostia Bolling or any other military facility.
6.8.7 Communications Security (COMSEC). Contractors may require access to COMSEC information on Air Force installations. The Contractor shall not require a COMSEC account.
Access shall be controlled by the sponsoring agency. Access to COMSEC material by personnel is restricted to US citizens holding final US Government clearances. Such information is not releasable to personnel holding only reciprocal clearances. If it is determined the Contractor is required to access COMSEC information, the necessary training information and courses shall be provided by the COR. The DD Form 254 shall give further instructions on safeguarding and managing COMSEC material.
6.8.8 Contractor Identification. All Contractor personnel shall wear the Air Force issued
Common Access Card at all times when away from their immediate work area so as to distinguish themselves from Government employees. When conversing with Government personnel during business meetings, over the telephone or via electronic mail, Contractor personnel shall identify themselves as a contractor to avoid situations arising where sensitive topics might be better discussed solely between Government employees. Contractors shall identify themselves on any attendance sheet or any coordination documents they may review.
Electronic mail signature blocks shall identify their company affiliation. Where practicable, contractors occupying collocated space with their government program customer should identify their work space area with their name and company affiliation or as a minimum “Contractor” after name.
6.8.9 Drug, Tobacco, and Alcohol Use Policy. The consumption of alcoholic beverages or illegal drugs by contractor personnel, while on duty, is strictly forbidden. Contractor shall immediately remove any employee who is under the influence of alcohol or drugs.
6.9 Travel
6.9.1 Local Travel. Local travel to attend meetings or events may be required at no cost to the
Government. Travel within the National Capital Region commuting vicinity is considered a cost of doing business and shall not be separately reimbursed.
6.9.2 CONUS Travel: Prior to travel, the Contractor shall coordinate with, and receive approval from, the COR at least 10 business days prior to trip.
6.9.3 OCONUS Travel: (e.g., to EUCOM and/or PACOM Area of Responsibility) Prior to travel, the Contractor shall coordinate with, and receive approval from, the COR at least 20 business days prior to trip. Theater Business Clearances shall be obtained, as necessary, prior to travel.
6.9.4 Further guidance for Contractor travel can be found at
https://www.defensetravel.dod.mil/site/faqctr.cfm.
6.9.5 Trip Reports: Following each trip, the Contractor shall prepare and deliver Trip/After
Action Reports to the COR IAW AFH 33-337. The trip report shall be completed in accordance with AFDW guidance.
6.10 Employee Accountability & Turnover
6.10.1 Staffing of Contractor Personnel. Contractor shall provide a stable workforce, throughout the duration of the contract, by maintaining an 20% or less employee turnover rate. No positions shall remain vacant for more than 10 working days. The government shall not be billed for positions left vacant over 10 working days unless the vacancy is due to government delay and otherwise approved by the CO.
https://www.defensetravel.dod.mil/site/faqctr.cfm
6.10.2 List of Employees. The Contractor shall maintain a current listing of employees assigned under this contract and define who are key personnel. The list shall include the employee's name, and level of security clearance. The list shall be validated and signed by the company
Facility Security Officer (FSO) and provided to the Contracting Officer, Program Manager, and
Servicing Security Activity. An updated listing shall be provided upon request.
6.10.3 Contractor professionalism. The contractor shall:
Present a professional appearance and maintain professional demeanor and conduct at all times.
Conduct their work assignments IAW project schedules
Function effectively and efficiently during extended periods of high pressure and stress.
Function as an integral member of a team of highly trained professionals responsible for the safety and security of USAF personnel and resources.
6.11 Miscellaneous Paragraphs.
6.11.1 Freedom of Information Act (FOIA). All official Government records affected by this contract are subject to the provisions of the FOIA (5 U.S.C. 552/DoD 5400.7-R/AF Supplement).
Any request received by the Contractor for access/release of information from these records to the public (including Government/Contractor employees acting as private citizens), whether oral or in writing, shall be immediately brought to the attention of the CO for forwarding to FOIA
Manager to ensure proper processing and compliance with the Act.
6.11.2 For Official Use Only (FOUO). The Contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
6.11.3 Privacy Act. Work on this contract may require that personnel have access to information protected by the Privacy Act. Contractor personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations when handling such information.
6.11.4 Records. All records created and received by the Contractor in the performance of this contract shall be maintained and readily accessible. Records shall remain the property of the
Government.
6.11.5 Safety Concerns. The Contractor is solely responsible for compliance with OSHA standards for the protection of their employees. The Government is not responsible for ensuring that Contractors comply with “personal” safety requirements that do not present the potential to damage Government resources.
6.11.6 Project Policy. The Contractor shall comply with all industry standards. All work shall be done in accordance with all federal, local, and state laws and regulations.
6.11.7 Inherently Governmental Functions. The Contractor shall not perform inherently
Governmental functions as defined in the Federal Acquisition Regulation (FAR) Subpart 7.5 in relation to this PWS.
6.11.8 Ethics. The Contractor shall not employ any person who is an employee of the US
Government if employing that person would create a conflict of interest. Additionally, the
Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoDD
5500-7, Joint Ethics Regulation.
6.11.9 Professional Appearance of Work Space. The Contractor shall keep work space areas neat and orderly and avoid conditions leading to safety violations.
6.11.10 Non-Personal Services. The Government shall not supervise or task Contractor employees in any manner that generates actions of the nature of personal services, or that creates the perception of personal services. It is the responsibility of the Contractor to manage its employees directly and to guard against any actions that are of the nature of personal services, or give the perception of personal services to the Government or to Government personnel. If the
Contractor feels that any actions constitute, or are perceived to constitute personal services, it is the Contractor’s responsibility to notify the CO immediately. Non-personal Contractor services shall not be used to perform work of a policy/decision making or management nature.
SECTION VII
APPENDIX 1
1.0 DEFINITIONS, ABBREVIATIONS, AND ACRONYMS
Contracting Officer (CO). The duly appointed Government agent authorized to award or administer contracts. The contracting officer is the only person authorized to contractually obligate the Government.
Defective Service. A service output that does not meet the standard of performance specified in the contract for that service.
Government Furnished Property (GFP). Facilities, equipment, tools, supplies, parts, or any other items furnished for the concessionaire's use by the Government. A full list, if applicable, is in
Section V.
Performance Threshold. The minimum performance level of a performance objective required by the Government.